Professional Documents
Culture Documents
'X'
SECTIONAL ELEVATION
DETAIL 'X'
DETAIL 'X'
DETAIL 'Z'
'Z'
EARTH RIVER
SIDE SIDE
'Z'
SECTION AT B-B
(ABUTMENT SHAFT)
EARTH RIVER
SIDE SIDE
DETAIL 'Y'
EARTH
SIDE
DETAIL AT 'P'
(DETAILS OF BRACKET)
DETAILS OF PEDESTAL
REINF. IN PEDESTAL
4 125 C/C
5 125 C/C
7 3 NOS.
8 4 NOS.
10
BRIDGEDECK
STRINGER
STRINGER
TRUSS PLANE
L0 L1 L2
FB1
G1
ARRANGEMENT OF BEARINGS
Y Y
X X
NOTES:-
MISCELLANEOUS DRAWING
Consultancy Services for carrying out Feasibility Study, Preparation BRIDGE
of Detailed Project Report (DPR) and providing pre-construction
services in respect of 2 Laning of Kohima Bypass connecting NH-39
(New NH-02) ,NH-150 (New NH-02), NH-61 (New NH-29) and NH-39 S-601 HIGHWAY ENGINEERING CONSULTANT
(New NH-02) on Engineering, Procurement and Construction (EPC) Original Size: A2 01 OF 01 IN ASSOCIATION WITH
mode in the state of Nagaland Path -
Plotting Scale:
DETAIL DRAWING OF RETAINING WALL
Consultancy Services for carrying out Feasibility Study, Preparation BRIDGE
of Detailed Project Report (DPR) and providing pre-construction
services in respect of 2 Laning of Kohima Bypass connecting NH-39
(New NH-02) ,NH-150 (New NH-02), NH-61 (New NH-29) and NH-39 S-701 HIGHWAY ENGINEERING CONSULTANT
(New NH-02) on Engineering, Procurement and Construction (EPC) Original Size: A2 01 OF 01 IN ASSOCIATION WITH
mode in the state of Nagaland Path -
Plotting Scale: