You are on page 1of 1

Surbana Jurong Campus

Referenced Drawing No.:


-
-

AS-BUILT
Approved with Approved with
By Date Approved Comments, Comments, Revise &
Resub. not Req'd Resub. Req'd. Resubmit

E
SJ Consultants Pte. Ltd.

LIN
(Architect)
Safdie Architects LLC.

E
SJ Consultants Pte. Ltd.

N
(Landscape)

LIN
IO
PWP Landscape Architecture

CT
Arup (Facade)

TY
Arup (Fire)

E
D1/A
D1/A T.2

OT
Nipek Pte. Ltd.

FE
122300
Endpoint APAC Pte. Ltd.
121600 D1/B
D1/B

SA
PR
Acviron Acoustic Consultants
D1/CL
D1/CL Pte Ltd
OUTLINE OF 1200X1200MM CAPPING BEAM (ABOVE) B1/D
B1/D
D1/C
D1/C
OUTLINE OF 400MM THK RC PARAPET WALL (ABOVE)

Aa KTP Consultants Pte. Ltd.

AY
AY
TUNNEL STAIR (ST29-TNL) TUNNEL STAIR (ST28-TNL)
SJ Consultants Pte. Ltd. (M&E)
B1/C
B1/C

ILW
ILW
D1/D
D1/D C1/A
C1/A C1/B
C1/B C1/CL
C1/CL C1/C
C1/C C1/D
C1/D B/CL
B/CL
B1/B
B1/B Please be advised that our examination of the drawings do not relieve
E1/1
E1/1 the Contractor of his/her responsibilities. Work shall conform to all

RA
RA
S/2
S/2 D1/E
D1/E
S/L02
S/L02 drawings and specifications. The Contractor is responsible for all
SUBMISSION UNDER PROJECT REFERENCE
E1/2
E1/2
NO. A1721-00003-2019 S/L04
S/L04
S/L03
S/L03 B1/A
B1/A correctness of dimensions and details in these drawings and for the full
S/L05
S/L05 coordination of all aspect of the work.
S/L06
S/L06
S/L07
S/L07 GENERAL NOTES:
S/L08
S/L08 B1/A.5
B1/A.5
- ALL DIMENSIONS ARE TO BE IN 'mm' UNLESS OTHERWISE STATED.
S/1
S/1 A1/A
A1/A A1/B
A1/B
N 37065.132
N 37068.430
E 12191.941
N 37071.733
E 12191.961
A
A B
B C
C D
D E
E F
F G
G H
H JJ K
K LL M
M
N 37235.789
E 12197.788
N
N P
P Q
Q R
R S TT
S N 37303.958
E 12200.209
N 37308.567
N 37313.161 - ALL DIMENSIONS ARE SUBJECT TO SITE VERIFICATION.
N 37061.849 E 12192.112 E 12200.472
E 12200.932 N 37317.731
E 12192.476
DEVELOPMENT BOUNDARY LINE DEVELOPMENT BOUNDARY LINE DEVELOPMENT BOUNDARY LINE E 12201.590 N 37322.268
- DO NOT SCALE ON DRAWINGS.
E 12202.443

2500 2000
2500 2000

FH
N 37336.765 - ANY DISCREPANCY MUST BE REPORTED BY MAIN CONTRACTOR IMMEDIATELY.

2000 3000

2000 3000
E 12203.490
2.0M WIDE PERIPHERAL GREEN PLANTING
FIRE VERGE 2.0M WIDE PERIPHERAL GREEN PLANTING VERGE - ALL DRAWINGS MUST BE USED IN CONJUNCTION WITH M&E AND STRUCTURAL

4500
4500

FIRE FIRE N 37331.212

5000

5000
CAR EGRESS E 12204.729
HYDRANT HYDRANT HYDRANT EGRESS CAR INGRESS INGRESS HT SWITCHROOM 3.0M WIDE GREEN BUFFER LINE
SUMMIT
TANK TANK TANK RAMP UP FROM BASEMENT 2 TO 1ST STOREY (GRADIENT 1:8.3) RAMP UP TO 1ST STOREY (GRADIENT 1:12) RAMP DOWN TO B2 (GRADIENT 1:8.3) RAMP DOWN FROM 1ST STOREY TO B2 (GRADIENT 1:12) (AC) S/2
S/2 N 37335.602
DRAWINGS.
FFL = 121.250
(MIN. CLEAR HEADROOM 2.20M HT.) FFL. +116.914 E 12206.158
TL = 120.950 BELOW BELOW BELOW (MIN. CLEAR HEADROOM 4.20M HT.) (MIN. CLEAR HEADROOM 2.20M HT.) 2.5M WIDE SETBACK LINE (MIN. CLEAR HEADROOM 4.20M HT.) FFL. +114.375
IL = 119.800
D = 1.15M
2.0M WIDE PHYSICAL BUFFER LINE N 37339.927
E 12207.774
1.1
1.1 S/A
S/A TD05
SHR
EVCS
MD11

S/L02
S/L02
FIRE E

N 37344.179
FIRE FIRE HYDRANT TES PIPE R
E 12209.574
VOID

SHTD05
R
SH

SHR
TD05
S/L03
S/L03

MD11
METERING
SHAFT

3.0M(W)X7.5M(L)
HYDRANT TANK BELOW KIOSK
GRADIE

LORRY LOT
MD17 MD23

N 37348.349

FRESH AIR MAKE-UP


TANK

MD24
CORRIDOR

1
NGINE

(DUE TO ESCS)
D1/3
D1/3 B1/3
B1/3 E 12211.556

CLEAR SPACE
1500X1500MM

CLEAR SPACE
1200X1200MM
BELOW (AC)

MD04
RC G T
NO

FFL. +114.375

EVCS
SIN
STA ILES
AHU

OOM S/L04
S/L04 N 37352.430

TRA
*R D E-L

CHR

MD22
NT ≤ 1

1.2
1.2
IRC /ST

TD34
TD28
AN

S/B
S/B
O

2.0209m² E 12213.714
ACCES

OM IGH

WIT (AC) .375


SHA
MD (AC 14.37

A
AS RIP

MPH OOM 27-12-2022


FFL

A AS-BUILT
66.2

STORE
HT S

NSF (AC) .375


S)
PAN TROL
PLA HU
28
WIT T PR

MALE PRAYER
TD

CA

ST(MV)
CT ING
OPEN TO SKY 4

FFL
ESC
EW S

S/L05
S/L05
DR

+11

BL
VOID
FR)

H O OV

-2

EL
675

NR

25
NTR

CON
.+

FT

FFL.

TO
ITH

ROOM REE C)
NE ISIO

ORM
MD

OOM

.+
3.0M(W)X7.5M(L)
ITH UR

23

2 W LO

UE
OOM

MV
TD28
0 25-11-2022
1:1 G CO
HR/
HR
SUNKEN GARDEN G m²
DO N

N 37356.415
AS-BUILT
MP
RA STIN
(A X
1

CORRIDOR
LORRY LOT
(M
CHILLER 5

LL (D
5
GL = 121.125
S/BL

FF
S/BL
RA

.906
4.37
NT
SPK *ROO
V) (AC) A
OR

FFL. 28 P

L.
CO

114
08 M
248
:15

AN
D E- WITH
E 12216.046

CW
TD

+
TL = 119.150 m²
+11

ER R
17 mm

WA
SW

121LIGH ON

33
+11

11
= 5mm
016
CURTAIN

(MAINTENANCE ACCESS ONLY)

R= 250
T PR E DO
PLANTROOM

0
MD22
.199

4.4
IL = 118.050 OV OR

0
FFL.

T=
69.1

.50

HT
22

(AC)
ISIO

4.32 9

75
No. Description Date
*ROOM WITH ONE DOOR

300
N

S/L06
S/L06

CLEAR SPACE
1200X1200MM
UP

EIG

500
CLEAR SPACE
1200X1200MM
D = 1.1M
(NV)
AND E-LIGHT PROVISION

57
5
SW

OM
5 (MV)

OOM
DW
MALE ABLUTION

SD04
RO )

H

AY

FFL

IT (AC

28

FULL
FFL. +114.375
VOID

TD
FFL. 114.275
ITC(AC) 375

TD

T
SH

S/C
S/C
44

SHAF
ATV) N 37360.296

CH
.+

TD MD22

COAT T

W
3.0
02
BIB TAP BIB TAP
HRO

28

SHOW
VO
P
MD06
23

TD
E 12218.547
ST

FLIP-U SEAT
OUT

LL
AHU
(M SE
C1/4
C1/4
MD

BIB TAP BIB TAP

ID

)
B1

M(W
CLO

ER

0
115

L)X9 CE
R

UP 175m m

WA
MW
114

P
HEIG CS)
ST AND ) KER

00M
S/L07

MM( SPA
S/L07
R= 250m

WER
IPS 5MM(H

TRA
=22 m
FFL.

ER
T=

AR
RA (M
SECURITY

200
EP 1M

FOR MAINTENANCE ACCESS ONLY

CLE
LA

SHO
-5

HT
RIS ESCS)

FULL TO ES
CLEAR SPACE
1200X1200MM
.36

R
7

CLEAR SPACE
OM

NSF

1200X1200MM
S/BK
S/BK
+11

WALL (DUE TO

1500
SD01

MD22
S W (H) B AT

CT FEMALE ABLUTION

AUTO
EL
MD22
FULL HEIGHT

MP IN.
IDE
LIN

SD04
3
.

DU
4.47

EC

SD01 DOO
41m

SLID
(AC) &
AUT
ITH RAIL BO

RO RMER

08
O SLI

ITH
U
HAIR UP
DIN

TD

ING
5

E
SD01 G DOOR
AH

EVC
D1/4 2.0

(DU
D1/4 FFL. +114.275
B1/4
B1/4
NO ING TTO

(AC AX 5

GR
S
ST(M2V)

UP CLE
W IPS CS)

S
EVC
²

R
FFL. (AC)OM
12
FFL

ES
MAK C)
EO

CURTAIN

FRES UE TO
(DUE TO
B
SIN

E
CLEA

MW N 37364.066
150 R SPAC

AS TR T WALL
EEN
MD11

EVCS
E2/B
E2/B G
VO

TD01 0X150

E1(32A)
E
(A
G T WITH

TO AR
SSIN
IGH

(D
TD

8 P 14.37

0MM
MD06
FULL HE

SD01
RC ES/S

HA

E2
FEM
)

+11
35

.+

FEMALE

TE
DRE OM

TD38
E 12221.212
ILE

B1(
F BU

)
L

IR M CS)
ID

C1(36A)
2.0M WIDE PERIPHERAL GREEN PLANTING VERGE

IDE

02
A L ALE

TD34
4.32 BU

1S HEA
4.5M WIDE SETBACK LINE

TD

MD23
S/

ST TI

34A
RO C)

EG TORE OOM

SHR
1

-2

AKE-
ES
TO 5 PRAYER ROOM R S/L08
S/L08
63

DR
FFE

(32
M

TS D
RC SING
(A
FAD
S/D
S/D ILET KE IDO E PH

EL
)
TOR

RE Y
9.3

SMO
(MV CS
R B02/A
B02/A

UP
V
TO ES
S/BJ
S/BJ
1.0

28
AD )
COR (AC) .375

TD
YS
1200X1200MM

RL
ILDI

NO S

38A
MPH LOBBY

R
(AC) (DUE
51

ER

SS (G 4.20
5
CLEAR SPACE
ALL

COR CT
RIDO
4.37
M(W

SERV OM
)
GAS
HT W (AC
IC
0m

B)
LOADING/ INE
MD

*ROOM WITH ONE DOOR

D1(
HEIG FRE (MV) 75 14

M
+.815159m²
23

AL
AND E-LIGHT PROVISION
FULL
. +1 ION
²

GL = 118.225

TD02
14.3
)
NG

SER TELCO
RESS RO

R
N 37367.718

C)

A2
FFL.
HR

TER
BO

. +1 L
MD04

OOM EQP (AC) BU


TL = 118.075
TD24

(A
1.69
SUPP TEM

COUN
FFL F

)
11

VEHICULAR GANTRY WITH EPS


5

TD35
E 12224.036
IT R(AC) ²
46m
4.82
X

TD22

RA M
IL = 112.975

VICE
28

FFE

-UP
4
STO
TD

TD25
²

(4
ABO

DR

SCC
R

MAKE
+11 DOOR
TD05

SYS(MV)
SAN

TO
E

TD12
D = 1.1M 2.80 ST7V)

DIE H
²

TD05
EVCS

TD27
78m 06m
FFL.OM4W9IT.0HH3TO1PN4REmOV²ISION RL

P
AIN

9 SHR

0)
TED

6m² 5
UNLOADING AREA 0.90 9.03 AFT
CLEAR SPACE

4.82
3.60 (M

NT T.)
TD22
1500X1500MM

)
1
INE

B2(
MPH VESTIBULE
45m DR- H

(TO MANUF. DETAIL)


+11
S

FFL. +114.375
VE

T=25

)
G

SAN

34B
TD01

EGRESS
R= 0mm

AT

EVC
²
=1:2

ELEC
FFL.

C2(36B
17

S/BH
S/BH *RO E-LIG

1:1

S
UP = 5mm
EVCS

S/1
S/1

MA LADD
23R
D
PL

AN
RW

TD02
(MV

1500

CA
CLE L)X900M

5)
00

TD08

S/E
S/E RAMP UP TO 1ST STOREY (GRADIENT 1:12)
FFL

MM(
TD42
N 37371.245
DP

INT
AH OOM

AR
AN (MV)

38B
TD01

CLEA 500MM
SPA M(W)
TD13

(MV) 25

TD14
150

T
CE
MD05 MD05 MD04 MD05 MD04

RE

0X1
14.8

R SP

D2(
E 12227.015

EN ER
U
MD

STO M
. + .5684m

(MIN. CLEAR HEADROOM 4.20M HT.)


TR

C3(36C)
(AC)
M

ACE

MD45

MD45
SHR

LL
22

0M E

1
TD35
50 AC
RAMP 1:12

WA

AN
X1 SP
K

HEIG SCS)
FFL. +114.175 .+
00

S)
TAN
CO

15 AR
JA
TD23

PA CCE 00(W

SL
10

CLE
FRANGIBLE
RO(MOV)
WITH
FFL

ESC
11

(MVN

SS SS )x
A 15
MAL

HT

CE
TER
38

FFL. 114.275

EN IB 21

)
TD


4

FULL TO E
5
FFL

5
GE LE 00
CONTRASTING
MPH E
RC SIN

E2/C
E2/C )
WA
RR(AC) 75

ET 4.37
11
BOLLARDS 131

R LIF (L)
4.3

E TO
TD01 MD

LIF T

TD01
4000MM(W)X5000MM(H) UREC)
NO

1HR COLOUR
(MV OIL

T (P (HL)
.+

0.5
+1193m²

E
ST G T

R
RATE FIRE RA RAMP 1:25
B1 T
A1/CL
A1/CL
IDO

L)
1

(DU
02

ET

/ SH
A

(DU
D1/5
D1/5 R
/
TD

FE (A .725
EV

75

15
TR

STO(MV) B1/5
00 CLEA

LA
ROLLER SHUTTER
B1/5
11

S/BG
CS

AIR ILE

) D SE TED
S/BG
MM

FFL. 31.14
WITH CONTRASTING COLOUR

TD35
- CORRIDOR TER
(L) R SP
²

CLE
X1 AC

RVIC CEIL
15

DR-2
54

ALL
20
4.3

12
0M E

00 AR SP

WA +1

E )
D1 ES A ING/ BAND ON TOP AND BOTTOM
AN

R SPAC M(W
R

M(

TD29
CA S/S

TD13

RAMP 1:12
W)

TD13
X1

CLEA L)X750M
FIR GRA

20 AC

FRE SMOKE
BOV FIRE FFL. +114.275 4.37
. N 37374.642

W
DW
0M E

(MV) ELEC L
MD2

FF
M

MM(

FFL. +114.175
E

AD
SE TR

TD08
TD03
HT
11

1200
PA CC 500
(AC B
SF

2
FFL

EL

SL
SS ES (W
12

A 1
+ E 12230.142
UP 175m m

FFL. +114.375
00 CLEA

(MV OBBY FFL.

HEIG
EN SIB )x2
S/F
S/F FFL.
MM R
R= 250m
22 m

WI IPS

RAM
(L) SP

1200X1200MM

GE LE 10

4
CONTR P 1:12
X9 AC
OR(AC) .375

²
DW

MD33
00 E

R LIF 0(L
TD22 WITH CLEAR SPACE
R

ASTING
MM
E E DIE

)
58m
3 4 5 RE
T=

+
LIF T )
(W
TH

SAN
.

COLOU

N
)

T (HL
=

E1

114 1

FULL

FALL
29

TD03 R

STO M
(P )
ING
C1/5
C1/5
FF

TD05
ST(MV) 14.475

31.1
TD
+1

L)
2.60
ME

MD06 MD06
OS

/
RAMP 1:60 SHR SHR
.375
L.

15
00 CLEA

HN S 74m
L

MM

WATER TAP
2

)
(L) R SP
+1

M
IFT (AC)

WIT RIP
ING
X1 AC

11.9
7 ²
ROO
6

MD08 TD05

ROO
20 E

WITH CONTRASTING COLOUR


M
NG

FULL PROTECTED DW
0M

P S / ST WITH CONTRASTING COLOUR

BAND ON TOP AND BOTTOM


14

RR

0M E
M(

FF 8 P
20 AC
790
W

STE TILES
)

X1
00 SP HEIG
SINGPOST

SAN
LO

WASH

RESERVED FOR

AHU EEP 5

TD29
75
DN 175m m

12 AR
ELE

HT DW
CLE
INTERNAL )
S/BF
S/BF
R= 250m
19 m

BAND ON TOP AND BOTTOM

TD49
C HW (MV
.375

AD
WA

+ AX
L. 14.3OOR

SINGPOST
TD35
)
OO

LL
BB

LL P
MA OF (A76 PAX114.375

(MV
C

P
R

DRIVERS' WC MAIL ROOM


MD

CHW
T=
08

(DU AREA

RAMP 1:30
INE T ≤ 1

RA URF AND
EK )
TD

114 ²

WA
22

IT R MPH SMOKE
=

. +1 ONEmD²ISION
CORRIDOR

OUTLINE OF COMPACTOR
E TO
ST

HEIG SCS)
(cater for 2 days refuse output Rotary
Y

MP AC RA
ESC OO (MV)
SJ MAIL
ST2 7
CLEAR SPACE
M
RIP 75M

RESTING ROOM/

S
ST AND (H) K

11 MV CONTROL

TD25
Drum System will be provided )
+

HT
6.01(AC) M FFLOOM4-LW2IGIT.7HH4T 6PR4OV
TD34
(AC)
US (AC 114.3m²
S)
1500X1500MM

FREE LOBBY .

1:1 E AT IL A
EP

FULL TO E
B1

(MV 2
FFL 2.4390m
2.3
S

34
38 4.3 PANEL FFL. +114.375
SP 0MM

ISOLATION*ROOM
ROOM

TD02
S W 1M(H RB A

FFL

2W
TD

32
2
6.0 91m
E

HO
(MV)
AC

TEL
AR 20

MD
SORTING

H
NA FICC)
94

.+ ) TEL
CS

CLE 00X1
-5
AC

FAD
75 ²

E
EV

E2/D

FAD
E2/D
WITH ONE DOOR
ITH ) RA T B

114
M

00 12

ITH TOP BOT


(AC)AND E-LIGHT PROVISION
N

-2 *R
12

DE

(DU
1.0M(W)X2.5M(L)

+ 02
2m

12 AR

DR .4
00

GL = 118.225
CLE

3m 75 100MM(W)X100MM(H) AN

FL. 9.30
2
X1

A
TD02
NO ILIN OTT

TD02

DE AND H SID
FFL. +114.275
TD
20 AC
TD

FL
PROJECT TITLE
²

28 TD24 TD05

ROOM
0M E

FG

PAN NANT'S
AC R
TD02
²
SP

MULTI-PURPOSE HALL

ARE
35
E

KERB
CO
SIN G

TL = 117.433 2.08
D
M

TE
RA ST

SHR

TD29
AF

TD29
LPS
ELV
F
NT
CE 15

MP ING

E ELV 4
RA

NURSING
GE E
1:1 CO

RECYCLE BIN SPACE


57m

CT BOTT ES
RIS 3M
S/G
G T WIT M

S/G

TD05
2 W LO

T
A

WIT S
IL = 116.333 (AC) DR-1
S/BE
S/BE
D
ITH UR

FG

PAN NANT'S
² ST15

AB
CLE 00X1

TO

(660L BULK BIN)


FT LPS

ARE
ST

IP
S(MT6V)
ILE H

15

TRY
AR 50

H
TD03
OR

LE OM A
D = 1.1M /
ROOM FFL. +114.375
IT
SP 0MM

0mm
FFL. +114.375

IRC ES/STR

TD06
S/

L) FF
HR/
SS

MD06
HRR/
AC

475
TD03

B02/B

MD22
T=25 5mm
T (P (HL)

B02/B
E

T=

S)
FULL HEIGHT WALL (DUE TO ESCS)
TE
(MV)
02

0M E

E
E

WA ND

PA CCE 00(W
MD11
50 AC

LIF T SO 25

DR-2
114.
TD

m
ME
M

T=25
O

17 R= 0mm
R LIF ) SPK SPK
SP

250m

SS SS )x
ESC

A 16
R= 19R

TRY

OUR
+
PROPOSED ERECTION OF 7-STOREY SINGLE-USER
GE LE 00(L
R= 0mm 175m

RG
T= 5mm
15 AR

EN IBLE 15
OM

RN
DN =

NG COL H
FFL.

SATD

DR-2
DN
X1

EN IB 19

TRASTI 1:12 WIT


17 =19 m

CONTR
CLE
:

17

DOW

.375

100MM(W)X75MM(H)

GE
EDGE KERB
T=250mm UP = 5mm
00

P 50
SS SS )x

RAM
14
R= 22R
FR

TE

.+ ) R

EVC

ASE

ING
NO FIXED SEATINGS
R

R LIF (L)
PA CCE 00(W
WA

=
100

50S
E TO
22R
≤5M

P 1:12 COLOU
AST

LIF T (H
R=175mm

EVC
UP

S
CLE

TD
G

VE
A 19

PL

RAM
RIDO

T (P L)
ING
AN ER
ST

PL
12 AR

RC ING TIL
UP =23R
SERV

NHA

WITH R
00
FF

50
X1 SPAC

CON

L)
NH 3.0M(W)X7.5M(L) 3.0M(W)X7.5M(L) 3.0M(W)X7.5M(L) RE S

BIN CENTRE
TD

PR

(DU
FUTU RACK
20

D1

/
)
NT

0M E

1
35

(W

IRE
S/BD
S/BD BUSINESS PARK (WHITE) DEVELOPMENT COMPRISING

114
MM M W
LIFT FIRE
ES

L.

NG
00 E
E2 LOB )

MD11 MD07 MD07 MD07


DO
(FOR DEVELOPER / TENANTS USE ONLY) B1 F BBY G
X9 AC LORRY LOT LORRY LOT LORRY LOT
GL = 117.025 ELEC
ST

LIF (A

LP

S
(L) SP
Y

LL
MD37

EVC
MM R

C
00 EA

15 CL
S

12 CL

STA
TIN

00
FIR BY

DW

FRO
LO FUEL
+

(A

WA
(MV)

MM
D1/6
D1/6
T C

LO

COR
SAN
8.6

TD
TL = 117.005

(L) R SP
(MV BBY
B1/6
B1/6
OR

EA
X1 AC
TD04

05
LIFT (MV)

NOS
MD

20 E
(

W)
TD

0M
IT (AC

FFL. 114.340
75
AC

M(
FIR

MS

HT
IT ROOM

M(
18
51

E
67

0M

EV
FFL. +114.250 (AC)
20 E

W)
2000 2500
IL = 115.905 )
RO )

X1 AC E

AN
T

AC 1600
TM

FFL.
1 BASEMENT AND 1 BASEMENT MEZZANINE ANCILLARY USE
)

(L) SP
1.0
E

LIF
MM R
LIF

HEIG
OOM

COR (AC)

UA x1
TD38
00 EA
8m

OM

E
T

OFF
15 CL N 150

MEE OM
/

TIO 550
S/H
PWD
D = 1.1M
S/H (AC)
FALL
TIO 0X
PWD RAMP 1:12
9

CLEA 1500M

≤5
H

N
UA

(F
FFL
LIN

12
NTR PL

FL
BR

MAKE-UP COUNTER
74

R SP M

LIF
00 CLEA
²

MD15
AC 900 RAMP 1:12

MM R
02

IT T

IRE
ACE

TILE SE WIT

T
FULL
EV x1

(L) SP
TD

SHO.

≤5
SHO. SHO.
6 T))
23

FFL. +114.375

X9 AC
76.5552m²

RIP
T / 1900
859 PAX PLA

1
00 E
FIRLEE LLIFIFT
WITH CONTRASTING COLOUR
R RE

MM
LIF

RO )

LIF
S/BC

O 3M
S/BC

(W
.89

+11
RIDO
1 2 3
IDO 825

)
E2/E

S
E2/E

PWD
E

WITH 1 BASEMENT CARPARK ON LOT 01988C MK09 AT

EVC
ER

NT N

EVC
AHU (MV) 4.375R CK
FIR SERV

T
FFL. +114.375
FFL. 114.350 BAND ON TOP AND BOTTOM
MD2

4500 5

)
S
S/ST

PWD
RE S
15

EE
FUTU RACK

4.37
(F IR
0M E
3

(AC
RR(AC) 4. CE
AD

E
50 AC
AND HANDRAIL AT BOTH SIDES

AFF
15 AR

FFL. +114.375

X1 SP

5
00
CLE

MD04

CA
00

BA
X1 SP

+11ONE ²DOISOION +11 TA (AC) 14.82


FL 15 AR
18000 T/ T

CO +11
50 AC

CLE

A2 LOB )
CORRIDOR
R
MD
AF FIR MD50
E LIF

L
0M E

FFL.
COR (AC) 14.375

4.37
EVAC E LIF FIR TION LIF

LIF A
SP AKO
FEMALE TOILET AND

R
42

C1/6
C1/6
M

T/

DA
UA

NOS STAIR
FFLO.O5M6W.7IGIT7HH8T 6PmROV
3M UA 400

FFL. G CLEANTECH LOOP


T 1500 TION

ET
ER

FIR BY
LIF EVAC1500x2

T C
M
x240 LIFT

E
R (L) TO
1
0M E
CS

RIS

TD
GE 9M

L.
0
FL5
20 AC
²
AL
ACE
EV

03
FL2

E
FIT X1

TD14
EN 1. 00 AR SP

B1-55 SHOWER ROOM


R SP M

. + 970m IN

CS
(
CT
B02/C
B02/C
PWD
FG

DR
S
SS )X CLEA 1200M
F

EV
12

ING
(F(FIR
13 FF
CLE
D

PA 9M(W SO

RIDO
DU FT)
0X

5
FFL 459.3
-2

(AC)

+1
120
IREELIF

PW
YL
-L E LI
R
1. *R
0M E

DE
U DE
PL
LIFT)T
20 AC

RC
(FIR
RO
M

05
(MV)

D
AH
X1 SP

AN

HE (WESTERN WATER CATCHMENT DGP)


TD
GF )

LL
12 AR

PASS

WI
CLE

S/J
S/J
)/

A UT
AN
00

ACCE ENGER

WA
T (PL

HEIG SCS)
LAB
NH R LIF T (HL)

MDF
SS LIF

PANTRY
RIP
CO

1700 IBLE T (PL

R
DA

CO
W (W)x2 LIFT )/ ENGE E LIF )

HT
LOCKERS

FF
PASS SSIBL 100(L
HR

DO
PL1 100(L (HL)

≤5
FULL TO E
DOW
ACCE 00(W)x2
EV

PL4
1200 )

BA
CS

(A C
/S
RR(AC)


1.0

0 M

RR(AC) 4.3
CL X120 17 06

L.
M
PE
EA

UN

M
(AC)
28
SW . + 747m

TD
PK

R SP 0MM

ROO )
TD

4.5

1
RE SE M FF
AC

NHA
GL = 121.900

R SP M

TD
E
M(

ACE
E
VOID LP

03
CLEA 1500M
ID

TED

03
TENANT'S PANTRY WET AREA

ID
FFL. +114.375

FULL HEIGHT WALL (DUE TO ESCS)

9.4HR
C) E

(DU
) S
12
W)

ITC (AC 114 ²

CLE 00X1

MPH 5
BO
TL = 121.700
DE

0X
P

TD30
OR

OR 5
(AC)

FGD
FT
4.37R OM DEVELOPER

11
ST EN L.
)
FF 63

AR 200M
RC
1200

150
W (AC
EL

M(W

GF
MM( 13
HA
00M
CLE L)X900M

CH
SP
TE
E
L)X9 CE TD
AC M

CLEA0X1200M
37
V

AR
BO

SPA M(W) MM( SPA


S IL = 118.936
WI
NO STAIR
29

13
120
TD AR
1200
L
+11 NE DOOION
F.
CE

ING T + OR RO
HR) .37

E CLE
L .4

TD

TD
ROM
AT Y
NT
D1 L ST16 RE

R SP M
PANTRY OBB
*ROOM WITH ONE DOOR
X

1500 )

)
MD

D = 2.764M
AR 1 114.
27

SIN
MM( M(W

ST PS

SCS
TD02
FFL. WITHTOPROVIS

ACE

FAD
CLE L)X1200M

G T CASE
32 200M TD
AND E-LIGHT PROVISION
IFT TL
OO

AR
CLEAR SPACE L)X1 CE
TEL
DR

SPA M(W) MM( SPA

7
(MV)
E2/F
E2/F (MV) 1500 CLEAR

SOF
1500MM(L)X900MM(W)
CE
TE

ME
CO AY A

T=250mm

(A LO 180 PAX (AC)


1 LIF C)
MD

S/K
S/K 75

E
1H
M
L

U ) ST ILE
32

R=175mm
FFL. +114.475 W
AIN

AC

37 BBY B1-6
M

EA
R SP 0MM

E TO
28

RA R F
75
PL

O
S/S ITH

FIT
2.0
B OM
FLIP-UP

RE (AC 14.3
TD

K A2
C)
UP =22R
VE RE

H
EA T=250mm
4.13 R
FF
CL X150 Y
1500
(A
FFL. +114.375 14.3 *RO E-LIG
OC
96 E
E
F FL SHOWER SEAT CIT
TE IRE
M)
1500

OP
CL X150 ART ER IT BL

5
AC R=175mm
00

1500 CLEAR
M
TR
SP 0MM EA CE )
UN
G=

TO
R SP 0MM SM

2 MA

TD29
SERV

. +1
0M E m²

150 R SP
D D
SPA M(W

TU
MM(
TD03
TD01 SPA

(DU
TD01 AC
RE A

ELV
L
20 AC
AR

CLEA
L)X1 CE

AN SE RAT
AR 50 CLE L)X1200M TD

4 (B1
AC DN =19R CR
IPS
200M
O3
FFL. +114.375
X1 SP

0X1
CLE 00X1 E
LPS
M(W

1
MM(

. + (NV)
00

FFL
00 R
1500

3M
E2/1

14
1:2

IT T
E2/1 L
12 LEA
RV ED
55
(FU
15

500 E
5

ER
MD
D

ALL
C

CONTRASTING COLOUR
FF
. + 874m²
45

12 AGE
CLE

MM
IC C

VE
CE

AC
PASS
1200
SPA M(W) AR
3M O M

TD01

RIS
MM( SPA
)/

D1/7
SO

AFF
D1/7

RAMP 1:12 WITH


AR
0

ES EIL
L)X9 CE
ACCE ENGE
CLE L)X900M
FL

T (PL L)

B1/7
B1/7
00M

11

FGD
HR/
L

TW
M(W
0

MD M MM(

E
12 SS R LIF
25

R LIF T (H
1200 )

120 R SPAC
TO G FR

RO

0MM
CLEAR SPACE
1200X1200MM
CL 00X1 AB IN
AF

DR-2

TD46
EL
42

You might also like