Professional Documents
Culture Documents
BP18181 Ab Mep SS PJW B1 0002
BP18181 Ab Mep SS PJW B1 0002
AS-BUILT
Approved with Approved with
By Date Approved Comments, Comments, Revise &
Resub. not Req'd Resub. Req'd. Resubmit
E
SJ Consultants Pte. Ltd.
LIN
(Architect)
Safdie Architects LLC.
E
SJ Consultants Pte. Ltd.
N
(Landscape)
LIN
IO
PWP Landscape Architecture
CT
Arup (Facade)
TY
Arup (Fire)
E
D1/A
D1/A T.2
OT
Nipek Pte. Ltd.
FE
122300
Endpoint APAC Pte. Ltd.
121600 D1/B
D1/B
SA
PR
Acviron Acoustic Consultants
D1/CL
D1/CL Pte Ltd
OUTLINE OF 1200X1200MM CAPPING BEAM (ABOVE) B1/D
B1/D
D1/C
D1/C
OUTLINE OF 400MM THK RC PARAPET WALL (ABOVE)
AY
AY
TUNNEL STAIR (ST29-TNL) TUNNEL STAIR (ST28-TNL)
SJ Consultants Pte. Ltd. (M&E)
B1/C
B1/C
ILW
ILW
D1/D
D1/D C1/A
C1/A C1/B
C1/B C1/CL
C1/CL C1/C
C1/C C1/D
C1/D B/CL
B/CL
B1/B
B1/B Please be advised that our examination of the drawings do not relieve
E1/1
E1/1 the Contractor of his/her responsibilities. Work shall conform to all
RA
RA
S/2
S/2 D1/E
D1/E
S/L02
S/L02 drawings and specifications. The Contractor is responsible for all
SUBMISSION UNDER PROJECT REFERENCE
E1/2
E1/2
NO. A1721-00003-2019 S/L04
S/L04
S/L03
S/L03 B1/A
B1/A correctness of dimensions and details in these drawings and for the full
S/L05
S/L05 coordination of all aspect of the work.
S/L06
S/L06
S/L07
S/L07 GENERAL NOTES:
S/L08
S/L08 B1/A.5
B1/A.5
- ALL DIMENSIONS ARE TO BE IN 'mm' UNLESS OTHERWISE STATED.
S/1
S/1 A1/A
A1/A A1/B
A1/B
N 37065.132
N 37068.430
E 12191.941
N 37071.733
E 12191.961
A
A B
B C
C D
D E
E F
F G
G H
H JJ K
K LL M
M
N 37235.789
E 12197.788
N
N P
P Q
Q R
R S TT
S N 37303.958
E 12200.209
N 37308.567
N 37313.161 - ALL DIMENSIONS ARE SUBJECT TO SITE VERIFICATION.
N 37061.849 E 12192.112 E 12200.472
E 12200.932 N 37317.731
E 12192.476
DEVELOPMENT BOUNDARY LINE DEVELOPMENT BOUNDARY LINE DEVELOPMENT BOUNDARY LINE E 12201.590 N 37322.268
- DO NOT SCALE ON DRAWINGS.
E 12202.443
2500 2000
2500 2000
FH
N 37336.765 - ANY DISCREPANCY MUST BE REPORTED BY MAIN CONTRACTOR IMMEDIATELY.
2000 3000
2000 3000
E 12203.490
2.0M WIDE PERIPHERAL GREEN PLANTING
FIRE VERGE 2.0M WIDE PERIPHERAL GREEN PLANTING VERGE - ALL DRAWINGS MUST BE USED IN CONJUNCTION WITH M&E AND STRUCTURAL
4500
4500
5000
5000
CAR EGRESS E 12204.729
HYDRANT HYDRANT HYDRANT EGRESS CAR INGRESS INGRESS HT SWITCHROOM 3.0M WIDE GREEN BUFFER LINE
SUMMIT
TANK TANK TANK RAMP UP FROM BASEMENT 2 TO 1ST STOREY (GRADIENT 1:8.3) RAMP UP TO 1ST STOREY (GRADIENT 1:12) RAMP DOWN TO B2 (GRADIENT 1:8.3) RAMP DOWN FROM 1ST STOREY TO B2 (GRADIENT 1:12) (AC) S/2
S/2 N 37335.602
DRAWINGS.
FFL = 121.250
(MIN. CLEAR HEADROOM 2.20M HT.) FFL. +116.914 E 12206.158
TL = 120.950 BELOW BELOW BELOW (MIN. CLEAR HEADROOM 4.20M HT.) (MIN. CLEAR HEADROOM 2.20M HT.) 2.5M WIDE SETBACK LINE (MIN. CLEAR HEADROOM 4.20M HT.) FFL. +114.375
IL = 119.800
D = 1.15M
2.0M WIDE PHYSICAL BUFFER LINE N 37339.927
E 12207.774
1.1
1.1 S/A
S/A TD05
SHR
EVCS
MD11
S/L02
S/L02
FIRE E
N 37344.179
FIRE FIRE HYDRANT TES PIPE R
E 12209.574
VOID
SHTD05
R
SH
SHR
TD05
S/L03
S/L03
MD11
METERING
SHAFT
3.0M(W)X7.5M(L)
HYDRANT TANK BELOW KIOSK
GRADIE
LORRY LOT
MD17 MD23
N 37348.349
MD24
CORRIDOR
1
NGINE
(DUE TO ESCS)
D1/3
D1/3 B1/3
B1/3 E 12211.556
CLEAR SPACE
1500X1500MM
CLEAR SPACE
1200X1200MM
BELOW (AC)
MD04
RC G T
NO
FFL. +114.375
EVCS
SIN
STA ILES
AHU
OOM S/L04
S/L04 N 37352.430
TRA
*R D E-L
CHR
MD22
NT ≤ 1
1.2
1.2
IRC /ST
TD34
TD28
AN
S/B
S/B
O
2.0209m² E 12213.714
ACCES
OM IGH
A
AS RIP
A AS-BUILT
66.2
STORE
HT S
MALE PRAYER
TD
CA
ST(MV)
CT ING
OPEN TO SKY 4
FFL
ESC
EW S
S/L05
S/L05
DR
+11
BL
VOID
FR)
H O OV
-2
EL
675
NR
25
NTR
CON
.+
FT
FFL.
TO
ITH
ROOM REE C)
NE ISIO
ORM
MD
OOM
.+
3.0M(W)X7.5M(L)
ITH UR
m²
23
2 W LO
UE
OOM
MV
TD28
0 25-11-2022
1:1 G CO
HR/
HR
SUNKEN GARDEN G m²
DO N
N 37356.415
AS-BUILT
MP
RA STIN
(A X
1
CORRIDOR
LORRY LOT
(M
CHILLER 5
LL (D
5
GL = 121.125
S/BL
FF
S/BL
RA
.906
4.37
NT
SPK *ROO
V) (AC) A
OR
FFL. 28 P
L.
CO
114
08 M
248
:15
AN
D E- WITH
E 12216.046
CW
TD
+
TL = 119.150 m²
+11
ER R
17 mm
WA
SW
121LIGH ON
33
+11
11
= 5mm
016
CURTAIN
R= 250
T PR E DO
PLANTROOM
0
MD22
.199
4.4
IL = 118.050 OV OR
0
FFL.
T=
69.1
.50
HT
22
(AC)
ISIO
4.32 9
75
No. Description Date
*ROOM WITH ONE DOOR
m²
300
N
S/L06
S/L06
CLEAR SPACE
1200X1200MM
UP
EIG
500
CLEAR SPACE
1200X1200MM
D = 1.1M
(NV)
AND E-LIGHT PROVISION
57
5
SW
OM
5 (MV)
OOM
DW
MALE ABLUTION
SD04
RO )
H
m²
AY
FFL
IT (AC
28
FULL
FFL. +114.375
VOID
TD
FFL. 114.275
ITC(AC) 375
TD
T
SH
S/C
S/C
44
SHAF
ATV) N 37360.296
CH
.+
TD MD22
COAT T
W
3.0
02
BIB TAP BIB TAP
HRO
28
SHOW
VO
P
MD06
23
TD
E 12218.547
ST
FLIP-U SEAT
OUT
LL
AHU
(M SE
C1/4
C1/4
MD
ID
)
B1
M(W
CLO
ER
0
115
L)X9 CE
R
UP 175m m
WA
MW
114
P
HEIG CS)
ST AND ) KER
00M
S/L07
MM( SPA
S/L07
R= 250m
WER
IPS 5MM(H
TRA
=22 m
FFL.
ER
T=
AR
RA (M
SECURITY
200
EP 1M
CLE
LA
SHO
-5
HT
RIS ESCS)
FULL TO ES
CLEAR SPACE
1200X1200MM
.36
R
7
CLEAR SPACE
OM
NSF
1200X1200MM
S/BK
S/BK
+11
WALL (DUE TO
1500
SD01
MD22
S W (H) B AT
CT FEMALE ABLUTION
AUTO
EL
MD22
FULL HEIGHT
MP IN.
IDE
LIN
SD04
3
.
DU
4.47
EC
SD01 DOO
41m
SLID
(AC) &
AUT
ITH RAIL BO
RO RMER
08
O SLI
ITH
U
HAIR UP
DIN
TD
ING
5
E
SD01 G DOOR
AH
EVC
D1/4 2.0
(DU
D1/4 FFL. +114.275
B1/4
B1/4
NO ING TTO
(AC AX 5
GR
S
ST(M2V)
UP CLE
W IPS CS)
S
EVC
²
R
FFL. (AC)OM
12
FFL
ES
MAK C)
EO
CURTAIN
FRES UE TO
(DUE TO
B
SIN
E
CLEA
MW N 37364.066
150 R SPAC
AS TR T WALL
EEN
MD11
EVCS
E2/B
E2/B G
VO
TD01 0X150
E1(32A)
E
(A
G T WITH
TO AR
SSIN
IGH
(D
TD
8 P 14.37
0MM
MD06
FULL HE
SD01
RC ES/S
HA
E2
FEM
)
+11
35
.+
FEMALE
TE
DRE OM
TD38
E 12221.212
ILE
B1(
F BU
)
L
IR M CS)
ID
C1(36A)
2.0M WIDE PERIPHERAL GREEN PLANTING VERGE
IDE
02
A L ALE
TD34
4.32 BU
1S HEA
4.5M WIDE SETBACK LINE
TD
MD23
S/
ST TI
34A
RO C)
EG TORE OOM
SHR
1
-2
AKE-
ES
TO 5 PRAYER ROOM R S/L08
S/L08
63
DR
FFE
(32
M
TS D
RC SING
(A
FAD
S/D
S/D ILET KE IDO E PH
EL
)
TOR
RE Y
9.3
SMO
(MV CS
R B02/A
B02/A
UP
V
TO ES
S/BJ
S/BJ
1.0
28
AD )
COR (AC) .375
TD
YS
1200X1200MM
RL
ILDI
NO S
38A
MPH LOBBY
R
(AC) (DUE
51
ER
SS (G 4.20
5
CLEAR SPACE
ALL
COR CT
RIDO
4.37
M(W
SERV OM
)
GAS
HT W (AC
IC
0m
B)
LOADING/ INE
MD
D1(
HEIG FRE (MV) 75 14
M
+.815159m²
23
AL
AND E-LIGHT PROVISION
FULL
. +1 ION
²
GL = 118.225
TD02
14.3
)
NG
SER TELCO
RESS RO
R
N 37367.718
C)
A2
FFL.
HR
TER
BO
. +1 L
MD04
(A
1.69
SUPP TEM
COUN
FFL F
)
11
TD35
E 12224.036
IT R(AC) ²
46m
4.82
X
TD22
RA M
IL = 112.975
VICE
28
FFE
-UP
4
STO
TD
TD25
²
(4
ABO
DR
SCC
R
MAKE
+11 DOOR
TD05
SYS(MV)
SAN
TO
E
TD12
D = 1.1M 2.80 ST7V)
DIE H
²
TD05
EVCS
TD27
78m 06m
FFL.OM4W9IT.0HH3TO1PN4REmOV²ISION RL
P
AIN
9 SHR
0)
TED
6m² 5
UNLOADING AREA 0.90 9.03 AFT
CLEAR SPACE
4.82
3.60 (M
NT T.)
TD22
1500X1500MM
)
1
INE
B2(
MPH VESTIBULE
45m DR- H
FFL. +114.375
VE
T=25
)
G
SAN
34B
TD01
EGRESS
R= 0mm
AT
EVC
²
=1:2
ELEC
FFL.
C2(36B
17
S/BH
S/BH *RO E-LIG
1:1
S
UP = 5mm
EVCS
S/1
S/1
MA LADD
23R
D
PL
AN
RW
TD02
(MV
1500
CA
CLE L)X900M
5)
00
TD08
S/E
S/E RAMP UP TO 1ST STOREY (GRADIENT 1:12)
FFL
MM(
TD42
N 37371.245
DP
INT
AH OOM
AR
AN (MV)
38B
TD01
CLEA 500MM
SPA M(W)
TD13
(MV) 25
TD14
150
T
CE
MD05 MD05 MD04 MD05 MD04
RE
0X1
14.8
R SP
D2(
E 12227.015
EN ER
U
MD
STO M
. + .5684m
C3(36C)
(AC)
M
ACE
MD45
MD45
SHR
LL
22
0M E
1
TD35
50 AC
RAMP 1:12
WA
AN
X1 SP
K
HEIG SCS)
FFL. +114.175 .+
00
S)
TAN
CO
15 AR
JA
TD23
PA CCE 00(W
SL
10
CLE
FRANGIBLE
RO(MOV)
WITH
FFL
ESC
11
(MVN
SS SS )x
A 15
MAL
HT
CE
TER
38
FFL. 114.275
EN IB 21
)
TD
m²
4
FULL TO E
5
FFL
5
GE LE 00
CONTRASTING
MPH E
RC SIN
E2/C
E2/C )
WA
RR(AC) 75
ET 4.37
11
BOLLARDS 131
R LIF (L)
4.3
E TO
TD01 MD
LIF T
TD01
4000MM(W)X5000MM(H) UREC)
NO
1HR COLOUR
(MV OIL
T (P (HL)
.+
0.5
+1193m²
E
ST G T
R
RATE FIRE RA RAMP 1:25
B1 T
A1/CL
A1/CL
IDO
L)
1
(DU
02
ET
/ SH
A
(DU
D1/5
D1/5 R
/
TD
FE (A .725
EV
75
15
TR
STO(MV) B1/5
00 CLEA
LA
ROLLER SHUTTER
B1/5
11
S/BG
CS
AIR ILE
) D SE TED
S/BG
MM
FFL. 31.14
WITH CONTRASTING COLOUR
TD35
- CORRIDOR TER
(L) R SP
²
CLE
X1 AC
RVIC CEIL
15
DR-2
54
ALL
20
4.3
12
0M E
00 AR SP
WA +1
E )
D1 ES A ING/ BAND ON TOP AND BOTTOM
AN
R SPAC M(W
R
M(
TD29
CA S/S
TD13
RAMP 1:12
W)
TD13
X1
CLEA L)X750M
FIR GRA
20 AC
FRE SMOKE
BOV FIRE FFL. +114.275 4.37
. N 37374.642
W
DW
0M E
(MV) ELEC L
MD2
FF
M
MM(
FFL. +114.175
E
AD
SE TR
TD08
TD03
HT
11
1200
PA CC 500
(AC B
SF
2
FFL
EL
SL
SS ES (W
12
A 1
+ E 12230.142
UP 175m m
FFL. +114.375
00 CLEA
HEIG
EN SIB )x2
S/F
S/F FFL.
MM R
R= 250m
22 m
WI IPS
RAM
(L) SP
1200X1200MM
GE LE 10
4
CONTR P 1:12
X9 AC
OR(AC) .375
²
DW
MD33
00 E
R LIF 0(L
TD22 WITH CLEAR SPACE
R
ASTING
MM
E E DIE
)
58m
3 4 5 RE
T=
+
LIF T )
(W
TH
SAN
.
COLOU
N
)
T (HL
=
E1
114 1
FULL
FALL
29
TD03 R
STO M
(P )
ING
C1/5
C1/5
FF
TD05
ST(MV) 14.475
31.1
TD
+1
L)
2.60
ME
MD06 MD06
OS
/
RAMP 1:60 SHR SHR
.375
L.
15
00 CLEA
HN S 74m
L
MM
WATER TAP
2
)
(L) R SP
+1
M
IFT (AC)
WIT RIP
ING
X1 AC
11.9
7 ²
ROO
6
MD08 TD05
ROO
20 E
FULL PROTECTED DW
0M
RR
0M E
M(
FF 8 P
20 AC
790
W
STE TILES
)
X1
00 SP HEIG
SINGPOST
SAN
LO
WASH
RESERVED FOR
m²
AHU EEP 5
TD29
75
DN 175m m
12 AR
ELE
HT DW
CLE
INTERNAL )
S/BF
S/BF
R= 250m
19 m
TD49
C HW (MV
.375
AD
WA
+ AX
L. 14.3OOR
SINGPOST
TD35
)
OO
LL
BB
LL P
MA OF (A76 PAX114.375
(MV
C
P
R
CHW
T=
08
(DU AREA
RAMP 1:30
INE T ≤ 1
RA URF AND
EK )
TD
114 ²
WA
22
IT R MPH SMOKE
=
. +1 ONEmD²ISION
CORRIDOR
OUTLINE OF COMPACTOR
E TO
ST
HEIG SCS)
(cater for 2 days refuse output Rotary
Y
MP AC RA
ESC OO (MV)
SJ MAIL
ST2 7
CLEAR SPACE
M
RIP 75M
RESTING ROOM/
S
ST AND (H) K
11 MV CONTROL
TD25
Drum System will be provided )
+
HT
6.01(AC) M FFLOOM4-LW2IGIT.7HH4T 6PR4OV
TD34
(AC)
US (AC 114.3m²
S)
1500X1500MM
FREE LOBBY .
1:1 E AT IL A
EP
FULL TO E
B1
(MV 2
FFL 2.4390m
2.3
S
34
38 4.3 PANEL FFL. +114.375
SP 0MM
ISOLATION*ROOM
ROOM
TD02
S W 1M(H RB A
FFL
2W
TD
32
2
6.0 91m
E
HO
(MV)
AC
TEL
AR 20
MD
SORTING
H
NA FICC)
94
.+ ) TEL
CS
CLE 00X1
-5
AC
FAD
75 ²
E
EV
E2/D
FAD
E2/D
WITH ONE DOOR
ITH ) RA T B
114
M
00 12
-2 *R
12
DE
(DU
1.0M(W)X2.5M(L)
+ 02
2m
12 AR
DR .4
00
GL = 118.225
CLE
3m 75 100MM(W)X100MM(H) AN
FL. 9.30
2
X1
A
TD02
NO ILIN OTT
TD02
DE AND H SID
FFL. +114.275
TD
20 AC
TD
FL
PROJECT TITLE
²
28 TD24 TD05
ROOM
0M E
FG
PAN NANT'S
AC R
TD02
²
SP
MULTI-PURPOSE HALL
ARE
35
E
KERB
CO
SIN G
TL = 117.433 2.08
D
M
TE
RA ST
SHR
TD29
AF
TD29
LPS
ELV
F
NT
CE 15
MP ING
E ELV 4
RA
NURSING
GE E
1:1 CO
CT BOTT ES
RIS 3M
S/G
G T WIT M
S/G
TD05
2 W LO
T
A
WIT S
IL = 116.333 (AC) DR-1
S/BE
S/BE
D
ITH UR
FG
PAN NANT'S
² ST15
AB
CLE 00X1
TO
ARE
ST
IP
S(MT6V)
ILE H
15
TRY
AR 50
H
TD03
OR
LE OM A
D = 1.1M /
ROOM FFL. +114.375
IT
SP 0MM
0mm
FFL. +114.375
IRC ES/STR
TD06
S/
L) FF
HR/
SS
MD06
HRR/
AC
475
TD03
B02/B
MD22
T=25 5mm
T (P (HL)
B02/B
E
T=
S)
FULL HEIGHT WALL (DUE TO ESCS)
TE
(MV)
02
0M E
E
E
WA ND
PA CCE 00(W
MD11
50 AC
LIF T SO 25
DR-2
114.
TD
m
ME
M
T=25
O
17 R= 0mm
R LIF ) SPK SPK
SP
250m
SS SS )x
ESC
A 16
R= 19R
TRY
OUR
+
PROPOSED ERECTION OF 7-STOREY SINGLE-USER
GE LE 00(L
R= 0mm 175m
RG
T= 5mm
15 AR
EN IBLE 15
OM
RN
DN =
NG COL H
FFL.
SATD
DR-2
DN
X1
EN IB 19
CONTR
CLE
:
17
DOW
.375
100MM(W)X75MM(H)
GE
EDGE KERB
T=250mm UP = 5mm
00
P 50
SS SS )x
RAM
14
R= 22R
FR
TE
.+ ) R
EVC
ASE
ING
NO FIXED SEATINGS
R
R LIF (L)
PA CCE 00(W
WA
=
100
50S
E TO
22R
≤5M
P 1:12 COLOU
AST
LIF T (H
R=175mm
EVC
UP
S
CLE
TD
G
VE
A 19
PL
RAM
RIDO
T (P L)
ING
AN ER
ST
PL
12 AR
RC ING TIL
UP =23R
SERV
NHA
WITH R
00
FF
50
X1 SPAC
CON
L)
NH 3.0M(W)X7.5M(L) 3.0M(W)X7.5M(L) 3.0M(W)X7.5M(L) RE S
BIN CENTRE
TD
PR
(DU
FUTU RACK
20
D1
/
)
NT
0M E
1
35
(W
IRE
S/BD
S/BD BUSINESS PARK (WHITE) DEVELOPMENT COMPRISING
114
MM M W
LIFT FIRE
ES
L.
NG
00 E
E2 LOB )
LIF (A
LP
S
(L) SP
Y
LL
MD37
EVC
MM R
C
00 EA
15 CL
S
12 CL
STA
TIN
00
FIR BY
DW
FRO
LO FUEL
+
(A
WA
(MV)
MM
D1/6
D1/6
T C
LO
COR
SAN
8.6
TD
TL = 117.005
(L) R SP
(MV BBY
B1/6
B1/6
OR
EA
X1 AC
TD04
05
LIFT (MV)
NOS
MD
20 E
(
W)
TD
0M
IT (AC
FFL. 114.340
75
AC
M(
FIR
MS
HT
IT ROOM
M(
18
51
E
67
0M
EV
FFL. +114.250 (AC)
20 E
W)
2000 2500
IL = 115.905 )
RO )
X1 AC E
AN
T
AC 1600
TM
FFL.
1 BASEMENT AND 1 BASEMENT MEZZANINE ANCILLARY USE
)
(L) SP
1.0
E
LIF
MM R
LIF
HEIG
OOM
COR (AC)
UA x1
TD38
00 EA
8m
OM
E
T
OFF
15 CL N 150
MEE OM
/
TIO 550
S/H
PWD
D = 1.1M
S/H (AC)
FALL
TIO 0X
PWD RAMP 1:12
9
CLEA 1500M
≤5
H
N
UA
(F
FFL
LIN
12
NTR PL
FL
BR
MAKE-UP COUNTER
74
R SP M
LIF
00 CLEA
²
MD15
AC 900 RAMP 1:12
MM R
02
IT T
IRE
ACE
TILE SE WIT
T
FULL
EV x1
(L) SP
TD
SHO.
≤5
SHO. SHO.
6 T))
23
FFL. +114.375
X9 AC
76.5552m²
m²
RIP
T / 1900
859 PAX PLA
1
00 E
FIRLEE LLIFIFT
WITH CONTRASTING COLOUR
R RE
MM
LIF
RO )
LIF
S/BC
O 3M
S/BC
(W
.89
+11
RIDO
1 2 3
IDO 825
)
E2/E
S
E2/E
PWD
E
EVC
ER
NT N
EVC
AHU (MV) 4.375R CK
FIR SERV
T
FFL. +114.375
FFL. 114.350 BAND ON TOP AND BOTTOM
MD2
4500 5
)
S
S/ST
PWD
RE S
15
EE
FUTU RACK
4.37
(F IR
0M E
3
(AC
RR(AC) 4. CE
AD
E
50 AC
AND HANDRAIL AT BOTH SIDES
AFF
15 AR
FFL. +114.375
m²
X1 SP
5
00
CLE
MD04
CA
00
BA
X1 SP
CO +11
50 AC
CLE
A2 LOB )
CORRIDOR
R
MD
AF FIR MD50
E LIF
L
0M E
FFL.
COR (AC) 14.375
4.37
EVAC E LIF FIR TION LIF
LIF A
SP AKO
FEMALE TOILET AND
R
42
C1/6
C1/6
M
T/
DA
UA
NOS STAIR
FFLO.O5M6W.7IGIT7HH8T 6PmROV
3M UA 400
ET
ER
FIR BY
LIF EVAC1500x2
T C
M
x240 LIFT
E
R (L) TO
1
0M E
CS
RIS
TD
GE 9M
L.
0
FL5
20 AC
²
AL
ACE
EV
03
FL2
E
FIT X1
TD14
EN 1. 00 AR SP
. + 970m IN
CS
(
CT
B02/C
B02/C
PWD
FG
DR
S
SS )X CLEA 1200M
F
EV
12
ING
(F(FIR
13 FF
CLE
D
PA 9M(W SO
RIDO
DU FT)
0X
5
FFL 459.3
-2
(AC)
+1
120
IREELIF
PW
YL
-L E LI
R
1. *R
0M E
DE
U DE
PL
LIFT)T
20 AC
RC
(FIR
RO
M
05
(MV)
D
AH
X1 SP
AN
LL
12 AR
PASS
WI
CLE
S/J
S/J
)/
A UT
AN
00
ACCE ENGER
WA
T (PL
HEIG SCS)
LAB
NH R LIF T (HL)
MDF
SS LIF
PANTRY
RIP
CO
R
DA
CO
W (W)x2 LIFT )/ ENGE E LIF )
HT
LOCKERS
FF
PASS SSIBL 100(L
HR
DO
PL1 100(L (HL)
≤5
FULL TO E
DOW
ACCE 00(W)x2
EV
PL4
1200 )
BA
CS
(A C
/S
RR(AC)
m²
1.0
0 M
RR(AC) 4.3
CL X120 17 06
L.
M
PE
EA
UN
M
(AC)
28
SW . + 747m
TD
PK
R SP 0MM
ROO )
TD
4.5
1
RE SE M FF
AC
NHA
GL = 121.900
R SP M
TD
E
M(
ACE
E
VOID LP
03
CLEA 1500M
ID
TED
03
TENANT'S PANTRY WET AREA
ID
FFL. +114.375
9.4HR
C) E
(DU
) S
12
W)
CLE 00X1
MPH 5
BO
TL = 121.700
DE
0X
P
TD30
OR
OR 5
(AC)
FGD
FT
4.37R OM DEVELOPER
11
ST EN L.
)
FF 63
AR 200M
RC
1200
150
W (AC
EL
M(W
GF
MM( 13
HA
00M
CLE L)X900M
CH
SP
TE
E
L)X9 CE TD
AC M
CLEA0X1200M
37
V
AR
BO
13
120
TD AR
1200
L
+11 NE DOOION
F.
CE
ING T + OR RO
HR) .37
E CLE
L .4
TD
TD
ROM
AT Y
NT
D1 L ST16 RE
R SP M
PANTRY OBB
*ROOM WITH ONE DOOR
X
1500 )
)
MD
D = 2.764M
AR 1 114.
27
SIN
MM( M(W
ST PS
SCS
TD02
FFL. WITHTOPROVIS
ACE
FAD
CLE L)X1200M
G T CASE
32 200M TD
AND E-LIGHT PROVISION
IFT TL
OO
AR
CLEAR SPACE L)X1 CE
TEL
DR
7
(MV)
E2/F
E2/F (MV) 1500 CLEAR
SOF
1500MM(L)X900MM(W)
CE
TE
ME
CO AY A
T=250mm
S/K
S/K 75
E
1H
M
L
U ) ST ILE
32
R=175mm
FFL. +114.475 W
AIN
AC
37 BBY B1-6
M
EA
R SP 0MM
E TO
28
RA R F
75
PL
O
S/S ITH
FIT
2.0
B OM
FLIP-UP
RE (AC 14.3
TD
K A2
C)
UP =22R
VE RE
H
EA T=250mm
4.13 R
FF
CL X150 Y
1500
(A
FFL. +114.375 14.3 *RO E-LIG
OC
96 E
E
F FL SHOWER SEAT CIT
TE IRE
M)
1500
OP
CL X150 ART ER IT BL
5
AC R=175mm
00
1500 CLEAR
M
TR
SP 0MM EA CE )
UN
G=
TO
R SP 0MM SM
2 MA
TD29
SERV
. +1
0M E m²
150 R SP
D D
SPA M(W
TU
MM(
TD03
TD01 SPA
(DU
TD01 AC
RE A
ELV
L
20 AC
AR
CLEA
L)X1 CE
AN SE RAT
AR 50 CLE L)X1200M TD
4 (B1
AC DN =19R CR
IPS
200M
O3
FFL. +114.375
X1 SP
0X1
CLE 00X1 E
LPS
M(W
1
MM(
. + (NV)
00
FFL
00 R
1500
3M
E2/1
14
1:2
IT T
E2/1 L
12 LEA
RV ED
55
(FU
15
500 E
5
ER
MD
D
ALL
C
CONTRASTING COLOUR
FF
. + 874m²
45
12 AGE
CLE
MM
IC C
VE
CE
AC
PASS
1200
SPA M(W) AR
3M O M
TD01
RIS
MM( SPA
)/
D1/7
SO
AFF
D1/7
ES EIL
L)X9 CE
ACCE ENGE
CLE L)X900M
FL
T (PL L)
B1/7
B1/7
00M
11
FGD
HR/
L
TW
M(W
0
MD M MM(
E
12 SS R LIF
25
R LIF T (H
1200 )
120 R SPAC
TO G FR
RO
0MM
CLEAR SPACE
1200X1200MM
CL 00X1 AB IN
AF
DR-2
TD46
EL
42