You are on page 1of 7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 SHOP DRAWING

REVISION TYPE R E VIS IO N N O .

LEGEND
∅100 FT PIPE OPENING = 150 ∅
∅100 WC PIPE OPENING = 150 ∅ Letter Ref. S u b m i ss i o n R e f .
T h i s D r a w in g h a s b e e n c h e c k e d fo r c o m p l ia n c e w i t h t h e
∅100 VS PIPE OPENING = 150 ∅ design intent the following comments apply
- N o C o m m e n t . Y o u m a y p r o c e e d w i t h c o n st r u c t i o n
∅100 SWS PIPE OPENING = 150 ∅ subject to full compliance with the
contract/sub-
contract/sub-contract re quirements .S ubmit the
DN DN ∅150 SWS PIPE OPENING = 200 ∅
r e q u i si t e n u m b e r o f c o p i e s o f h i s c l e a r e d d r a w i n g .
- A m e n d t h i s d r a w in g in a c c o r d a n c e w i t h t h e c o m m e n t s
∅50 WB PIPE OPENING = 75 ∅
m a r k e d h e r e o n a n d / o r c o n t a i n e d i n t h e c o ve r i n g l e t t e r
∅75 SH - FW PIPE OPENING = 100 ∅ you may proceed with construction.re- construction.re-submit the
amended drawing.
DN
∅50 FW PIPE OPENING = 75 ∅ -the drawing requires revision and re- re-submission in
a c c o r d a n c e w it h t h e c o m m e n t s m a r k e d h e r e o n a n d / o r
A ∅50 VENT PIPE OPENING = 75 ∅ c o n t a i n e d i n t h e c o ve r i n g l e t t e r . T h e d r a w i n g i d n o t
UP
UP
∅40 URINAL PIPE OPENING = 75 ∅ cleared for construction.
Checking does not relieve the contractor of the
responsibility for ensuring full compliance with all
r e q u i r e m e n t s o f t h e t e c h n i c a l s p e c i f ic a t i o n , c o n t r a c t
DN
working drawing and other contract documents.
T h e c o n t r a c t o r i s r e s p o n s ib l e fo r a ll d im e n s io n w h ic h s h a l l
B B1 b e c o n fo r m e d a n d c o r r e l a t e d a t t h e j o b s i t e . F a b r i c a t io n
DN
proess,techniques of construction,andthe co- co-ordination
his work with that of all other trades.

UP
UP C1
C2 Signature Date
C
OWNER
SH M&E ENGINEERING PTE LTD
D1 1 BUROH CRESCENT, #07-01,
DN SINGAPORE 627545

TEL: 6661 6800


FAX: 6266 6996

D
M&E CONSULTANTS
PDC CONSULTANTS PTE LTD
23 NEW INDUSTRIAL ROAD , #06-03
SOLSTICE BUSINESS CENTER ,
SINGAPORE 538209
DN
DN
TEL: 6293 1111
FAX: 6293 9921

DN

E ARCHITECT
AC CONSORTIUM PTE LTD
105 CECIL STREET, #12-02,
DN THE OCTAGON,
SINGAPORE 069534

TEL: 6293 1111


F FAX: 6293 9921

1ST STOREY PENETRATION PLAN MAIN CONTRACTOR


1 ERNST ENGINEERING PTE LTD
1 : 300
1 BUROH CRESCENT, #08-01,
10 11 12 13 14 10 11 12 13 14 SINGAPORE 627545

TEL: 6661 6800


234 613 333481279450 234 613 333481279450 234 613 333481279450 234 613 333481279450 234 613 333481279450 234 613 333481279450
FAX: 6266 6996
815 155 193

815 155 194

815 155 193

815 155 193

815 155 194

815 155 193


B1 B1 SUB-CONTRACTOR
815 159 189

815 159 189

815 159 189

815 159 189

815 159 189

815 159 189


295

295

295

295

295

295
335 13

335 13

335 13

335 13

335 13

335 13
FT FT FT FT FT FT
FT WB FT WB FT WB FT WB FT WB FT WB
WC FW WC FW WC FW WC FW WC FW WC FW
WC WC WC WC WC WC

FW FW FW FW FW FW FW FW FW FW FW FW
731

731

731

731

731

731
WB WB WB WB WB WB
554 206
533 439 519 79 533 439 519 79 533 439 519 79 533 439 519 79 533 439 519 79 533 439 519 79
141 131 141 131 141 131 141 131 141 131 141 131
189

189
182 FT 182 FT
446 250 349 205 446 630 349 205 BLOCK 28 SIN MING DRIVE
#01-159, SINGAPORE 575702
730 334

730 334
WB WB WB WB TEL: 6454 0995 FAX: 6552 2630
891

891
FT FT EMAIL: TLSP@TLSP.COM.SG

C1 C1 PROJECT TITLE
670 400 270 PROPOSED ERECTION OF A SINGLE USER PART SINGLE/
PART 5 STOREY FACTORY WITH OPEN YARD, INDUSTRIAL
C2 C2 CANTEEN AT 1ST STOREY AND A BLOCK OF 12 STOREY
618

214 618

SECONDARY WORKERS DORMITORY (300 PAX) ON LOT


Ø150 DI CWPG (OPENING) Ø150 DI CWPT (OPENING@ DOR-4STY LEVEL)
04889A MK 06 AT JALAN PAPAN (JURONG EAST
PLANNING
Ø150 DI CWPG (OPENING)
AREA)
1221 959 131 79 1221 959 131 79 1221 959 131 79 1221 959 131 79 1221 959 131 79 1221 959 131 79

WB WB WB WB WB WB
DRAWING TITLE
731

731

731

731

731

731
FW FW FW FW FW FW
FW FW FW FW FW FW SANITARY SYSTEM
189 815

193 815

189 815

193 815

189 815

193 815

189 815

193 815

189 815

193 815

189 815

193 815
WC WC WC WC WC WC
1ST STOREY, DORM 2ND,3RD & 4TH
301 13 335

301 13 335

301 13 335

301 13 335

301 13 335

301 13 335
FW FW FW FW
159

159

159

159

159

159
WC WC WC FW WC WC WC FW
155

155

155

155

155

155
FT WB FT WB FT WB FT WB
FT FT FT WB
FT FT FT FT WB
FT STOREY PENETRATION PLAN
D1 D1
176 580 279450 176 580 279450 261 533 580 279450 314 232 479279450 314 232 479279450 314 232 479279450
Checked By BENJAMIN
261 137 533 261 137 533 132 181 300 101 300 101 300 101

Drawn By LIN
Drawing NO. TLEC-JP-PS-S-001PE

DORMITORY 2ND PENETRATION PLAN DORMITORY 3RD & 4TH PENETRATION PLAN Scale As indicated
2 3 Date
1 : 100 1 : 100 23/05/2023
SHOP DRAWING
REVISION TYPE R E VIS IO N N O .

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Letter Ref. S u b m i ss i o n R e f .
T h i s D r a w in g h a s b e e n c h e c k e d fo r c o m p l ia n c e w i t h t h e
design intent the following comments apply
- N o C o m m e n t . Y o u m a y p r o c e e d w i t h c o n st r u c t i o n
subject to full compliance with the
contract/sub-
contract/sub-contract re quirements .S ubmit the
r e q u i si t e n u m b e r o f c o p i e s o f h i s c l e a r e d d r a w i n g .
820 875
- A m e n d t h i s d r a w in g in a c c o r d a n c e w i t h t h e c o m m e n t s
A m a r k e d h e r e o n a n d / o r c o n t a i n e d i n t h e c o ve r i n g l e t t e r

420

306 411
you may proceed with construction.re- construction.re-submit the
234 613 333481279450 234 613 333 481279450 234 613 333481279450
amended drawing.
-the drawing requires revision and re- re-submission in
3

815 155 193

815 155 194

815 155 193


B1 a c c o r d a n c e w it h t h e c o m m e n t s m a r k e d h e r e o n a n d / o r

815 159 189

815 159 189

815 159 189


295

295

295
335 13

335 13

335 13
TLEC-JP-PS-S-002PE FT FT FT
WC
FT WB
WC
FT WB
WC
FT WB c o n t a i n e d i n t h e c o ve r i n g l e t t e r . T h e d r a w i n g i d n o t
FW FW FW
WC WC WC cleared for construction.
Checking does not relieve the contractor of the
B FW FW FW FW FW FW

731

731

731
responsibility for ensuring full compliance with all
WB WB WB
206 r e q u i r e m e n t s o f t h e t e c h n i c a l s p e c i f ic a t i o n , c o n t r a c t
533 439 519 79 533 439 519 79 533 439 519 79 working drawing and other contract documents.
141 131 141 131 141 131 T h e c o n t r a c t o r i s r e s p o n s ib l e fo r a ll d im e n s io n w h ic h s h a l l

189
182 FT
446 630 349 205 b e c o n fo r m e d a n d c o r r e l a t e d a t t h e j o b s i t e . F a b r i c a t io n
605 proess,techniques of construction,andthe co- co-ordination

730 334
WB WB
his work with that of all other trades.
C

891
FT
Ø150 DI CWPG (OPENING)

560 2725
Ø150 DI CWPT (OPENING) C1 Signature Date
400 270

C2 OWNER

214 618
SH M&E ENGINEERING PTE LTD
1 BUROH CRESCENT, #07-01,
Ø150 DI CWPT (OPENING) SINGAPORE 627545
Ø150 DI CWPG (OPENING)
D TEL: 6661 6800
1221 959 131 79 1221 959 131 79 1221 959 131 79 FAX: 6266 6996
WB WB WB
M&E CONSULTANTS

731

731

731
FW FW FW FW FW FW

189 815

193 815

189 815

193 815

189 815

193 815
WC WC WC PDC CONSULTANTS PTE LTD

301 13 335

301 13 335

301 13 335
FW FW

159

159

159
WC WC WC FW

155

155

155
FT WB
FT
FT WB
FT FT WB
FT
23 NEW INDUSTRIAL ROAD , #06-03
D1 SOLSTICE BUSINESS CENTER ,
314 232 479279450 314 232 479279450 314 232 479279450 SINGAPORE 538209
300 101 300 101 300 101
TEL: 6293 1111
E FAX: 6293 9921

ARCHITECT
DORMITORY 5TH PENETRATION PLAN
AC CONSORTIUM PTE LTD
2 105 CECIL STREET, #12-02,
1 : 100
THE OCTAGON,
F SINGAPORE 069534

TEL: 6293 1111


2ND STOREY PENETRATION PLAN FAX: 6293 9921
1 10 11 12 13 14
1 : 300
MAIN CONTRACTOR
ERNST ENGINEERING PTE LTD
81 2663 3 1 BUROH CRESCENT, #08-01,
234 613 333481279450 234 613 333 481279450 234 613 333481279450 SINGAPORE 627545

A TEL: 6661 6800

815 155 193

815 155 194

815 155 193


B1

815 159 189

815 159 189

815 159 189


295

295

295
335 13

335 13

335 13
186 545

WC
FT FT FT FAX: 6266 6996
845

FT WB FT WB FT WB
WC FW WC FW WC FW

SUB-CONTRACTOR
127

WC WC WC
FT
2135

FW FW FW FW FW FW
163 265 2285

731

731

731
829

WB UR 200 228
LEGEND WB WB WB
206
493 260

533 439 519 79 533 439 519 79 533 439 519 79


FT
WB UR 141 141 141
∅100 FT PIPE OPENING = 150 ∅
250 290

131 131 131

189
UT 182 FT
200

265 446 630 349 205


200
UR ∅100 WC PIPE OPENING = 150 ∅

730 334
WB WB
WB
200 561 347 605

MALE TOILET

891
FW BLOCK 28 SIN MING DRIVE
FT
WC 222 ∅100 VS PIPE OPENING = 150 ∅ #01-159, SINGAPORE 575702
169 TEL: 6454 0995 FAX: 6552 2630
∅100 SWS PIPE OPENING = 150 ∅ C1 EMAIL: TLSP@TLSP.COM.SG

WC
FT
∅150 SWS PIPE OPENING = 200 ∅
400 270
PROJECT TITLE
191

222
C2 PROPOSED ERECTION OF A SINGLE USER PART SINGLE/
702

∅50 WB PIPE OPENING = 75 ∅


214 618

169 207
PART 5 STOREY FACTORY WITH OPEN YARD, INDUSTRIAL
880 160 ∅75 SH - FW PIPE OPENING = 100 ∅ CANTEEN AT 1ST STOREY AND A BLOCK OF 12 STOREY
1109

141 44 Ø150 DI CWPT (OPENING)


UTILITY ∅50 FW PIPE OPENING = 75 ∅ SECONDARY WORKERS DORMITORY (300 PAX) ON LOT
MV Ø150 DI CWPG (OPENING) 04889A MK 06 AT JALAN PAPAN (JURONG EAST
∅50 VENT PIPE OPENING = 75 ∅
Ø150 DI CWPG (OPENING) 1221 959 131 79 1221 959 131 79 1221 959 131 79 PLANNING
∅40 URINAL PIPE OPENING = 75 ∅
1209

238 384 244 562 201 2511 49 34632


WB WB WB
AREA)

DRAWING TITLE
731

731

731
176

FW FW
WB FW FW FW FW
178

189 815

193 815

189 815

193 815

189 815

193 815
FT WC WC WC
301 13 335

301 13 335

301 13 335
FW FW
159

159

159
FT
SANITARY SYSTEM
WC WC WC FW

155

155

155
FT WB
ACCESSIBLE

FT WB FT WB FT WB
WB WC FEMALE TOILET FT FT FT
D1 2ND STOREY, DORM 5TH & 6TH
1847
TOILET

314 232 479279450 314 232 479279450 314 232 479279450


FW 300 101 300 101 300 101
STOREY PENETRATION PLAN
462
138

WC WC
B Checked By BENJAMIN
368 562 2711
Drawn By LIN
Drawing NO. TLEC-JP-PS-S-002PE
2ND STOREY PENETRATION PLAN -BLOW UP DETAIL-A DORMITORY 6TH PENETRATION PLAN
3 4 Scale As indicated
1 : 65 1 : 100
Date 23/05/2023
SHOP DRAWING
REVISION TYPE R E VIS IO N N O .
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Letter Ref. S u b m i ss i o n R e f .
T h i s D r a w in g h a s b e e n c h e c k e d fo r c o m p l ia n c e w i t h t h e
design intent the following comments apply
- N o C o m m e n t . Y o u m a y p r o c e e d w i t h c o n st r u c t i o n
subject to full compliance with the
∅150 SWS PIPE OPENING ∅200 SWS PIPE OPENING contract/sub-
contract/sub-contract re quirements .S ubmit the
r e q u i si t e n u m b e r o f c o p i e s o f h i s c l e a r e d d r a w i n g .
820 875 ∅150 VS PIPE OPENING - A m e n d t h i s d r a w in g in a c c o r d a n c e w i t h t h e c o m m e n t s
A m a r k e d h e r e o n a n d / o r c o n t a i n e d i n t h e c o ve r i n g l e t t e r

420

308 411
you may proceed with construction.re- construction.re-submit the
234 613 333481279450 234 613 333 481279450 234 613 333481279450
amended drawing.
-the drawing requires revision and re- re-submission in
2

815 155 193

815 155 194

815 155 193


B1 a c c o r d a n c e w it h t h e c o m m e n t s m a r k e d h e r e o n a n d / o r

815 159 189

815 159 189

815 159 189


295

295

295
335 13

335 13

335 13
TLEC-JP-PS-S-003PE FT FT FT
WC
FT WB
WC
FT WB
WC
FT WB c o n t a i n e d i n t h e c o ve r i n g l e t t e r . T h e d r a w i n g i d n o t
FW FW FW
WC WC WC cleared for construction.
Checking does not relieve the contractor of the
B FW FW FW FW FW FW

731

731

731
responsibility for ensuring full compliance with all
WB WB WB
206 r e q u i r e m e n t s o f t h e t e c h n i c a l s p e c i f ic a t i o n , c o n t r a c t
533 439 519 79 533 439 519 79 533 439 519 79 working drawing and other contract documents.
141 131 141 131 141 131 T h e c o n t r a c t o r i s r e s p o n s ib l e fo r a ll d im e n s io n w h ic h s h a l l

189
182 FT
446 630 349 205 b e c o n fo r m e d a n d c o r r e l a t e d a t t h e j o b s i t e . F a b r i c a t io n
605 proess,techniques of construction,andthe co- co-ordination

730 334
WB WB
his work with that of all other trades.
C

891
FT
Ø150 DI CWPG (OPENING)

560 2725
Ø150 DI CWPT (OPENING) C1 Signature Date
400 270

C2 OWNER

214 618
SH M&E ENGINEERING PTE LTD
1 BUROH CRESCENT, #07-01,
Ø150 DI CWPT (OPENING) SINGAPORE 627545
Ø150 DI CWPG (OPENING)
D TEL: 6661 6800
1221 959 131 79 1221 959 131 79 1221 959 131 79 FAX: 6266 6996
WB WB WB
M&E CONSULTANTS

731

731

731
FW FW FW FW FW FW

189 815

193 815

189 815

193 815

189 815

193 815
WC WC WC PDC CONSULTANTS PTE LTD

301 13 335

301 13 335

301 13 335
FW FW

159

159

159
WC WC WC FW

155

155

155
FT WB
FT
FT WB
FT FT WB
FT
23 NEW INDUSTRIAL ROAD , #06-03
D1 SOLSTICE BUSINESS CENTER ,
314 232 479279450 314 232 479279450 314 232 479279450 SINGAPORE 538209
300 101 300 101 300 101
TEL: 6293 1111
E FAX: 6293 9921

ARCHITECT
DORMITORY 7TH PENETRATION PLAN AC CONSORTIUM PTE LTD
3 105 CECIL STREET, #12-02,
1 : 100 THE OCTAGON,
F SINGAPORE 069534

TEL: 6293 1111


10 11 12 13 14 FAX: 6293 9921
3RD STOREY PENETRATION PLAN
1
1 : 300
MAIN CONTRACTOR
3 ERNST ENGINEERING PTE LTD
81 2663 1 BUROH CRESCENT, #08-01,
234 613 333481279450 234 613 333 481279450 234 613 333481279450 SINGAPORE 627545

TEL: 6661 6800

815 155 193

815 155 194

815 155 193


A B1

815 159 189

815 159 189

815 159 189


295

295

295
335 13

335 13

335 13
FT FT FT FAX: 6266 6996
186 545

FT WB FT WB FT WB
WC
845

WC FW WC FW WC FW

SUB-CONTRACTOR
WC WC WC
127

FT
2135

FW FW FW FW FW FW

731

731

731
163 265 2285
829

WB WB WB
WB UR 206
200 228 533 439 519 533 439 519 533 439 519
493 260

79 79 79
FT
141 141 141
UR
LEGEND 131 131 131

189
WB
250 290

182 FT
UT
200

446 630 349 205


265 200

730 334
UR WB WB
∅100 FT PIPE OPENING = 150 ∅

891
WB BLOCK 28 SIN MING DRIVE
200 521 387 605

MALE TOILET FT
FW #01-159, SINGAPORE 575702
WC 222
∅100 WC PIPE OPENING = 150 ∅ TEL: 6454 0995 FAX: 6552 2630
169 C1 EMAIL: TLSP@TLSP.COM.SG
∅100 VS PIPE OPENING = 150 ∅
WC
FT 400 270
PROJECT TITLE
191

222 ∅100 SWS PIPE OPENING = 150 ∅ C2 PROPOSED ERECTION OF A SINGLE USER PART SINGLE/
214 618
702

169 207
∅150 SWS PIPE OPENING = 200 ∅ PART 5 STOREY FACTORY WITH OPEN YARD, INDUSTRIAL
880 160 CANTEEN AT 1ST STOREY AND A BLOCK OF 12 STOREY
∅50 WB PIPE OPENING = 75 ∅ Ø150 DI CWPT (OPENING)
1109

141 44 SECONDARY WORKERS DORMITORY (300 PAX) ON LOT


UTILITY Ø150 DI CWPG (OPENING)
MV ∅75 SH - FW PIPE OPENING = 100 ∅ 04889A MK 06 AT JALAN PAPAN (JURONG EAST
Ø150 DI CWPG (OPENING) 1221 959 131 79 1221 959 131 79 1221 959 131 79 PLANNING
∅50 FW PIPE OPENING = 75 ∅
1209

238 384 244 562 201 2511 49 34632


WB WB
AREA)
∅50 VENT PIPE OPENING = 75 ∅ WB

DRAWING TITLE
731

731

731
FW FW FW FW FW
176

FW
WB ∅40 URINAL PIPE OPENING = 75 ∅
178

189 815

193 815

189 815

193 815

189 815

193 815
WC WC WC
FT
301 13 335

301 13 335

301 13 335
FW FW
159

159

159
SANITARY SYSTEM
WC WC WC FW

155

155

155
FT FT WB FT WB FT WB
FT WB FT FT
ACCESSIBLE

FT
FEMALE TOILET
WB WC D1 3RD STOREY, DORM 7TH & 8TH STOREY
1847
TOILET

314 232 479279450 314 232 479279450 314 232 479279450


FW 300 101 300 101 300 101
PENETRATION PLAN
121 478

462

B WC WC Checked By BENJAMIN
368 562 2711
Drawn By LIN

3RD STOREY PENETRATION PLAN -BLOW UP DETAIL-A DORMITORY 8TH PENETRATION PLAN Drawing NO. TLEC-JP-PS-S-003PE
2 4 Scale As indicated
1 : 65 1 : 100
Date 23/05/2023
SHOP DRAWING
REVISION TYPE R E VIS IO N N O .

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Letter Ref. S u b m i ss i o n R e f .
T h i s D r a w in g h a s b e e n c h e c k e d fo r c o m p l ia n c e w i t h t h e
design intent the following comments apply
- N o C o m m e n t . Y o u m a y p r o c e e d w i t h c o n st r u c t i o n
subject to full compliance with the
contract/sub-
contract/sub-contract re quirements .S ubmit the
820 r e q u i si t e n u m b e r o f c o p i e s o f h i s c l e a r e d d r a w i n g .
874
- A m e n d t h i s d r a w in g in a c c o r d a n c e w i t h t h e c o m m e n t s

305 413
A m a r k e d h e r e o n a n d / o r c o n t a i n e d i n t h e c o ve r i n g l e t t e r

420
you may proceed with construction.re- construction.re-submit the
234 613 333481279450 234 613 333 481279450 234 613 333481279450
amended drawing.
-the drawing requires revision and re- re-submission in
2

815 155 193

815 155 194

815 155 193


B1 a c c o r d a n c e w it h t h e c o m m e n t s m a r k e d h e r e o n a n d / o r

815 159 189

815 159 189

815 159 189


295

295

295
335 13

335 13

335 13
TLEC-JP-PS-S-004PE FT FT FT
WC
FT WB
WC
FT WB
WC
FT WB c o n t a i n e d i n t h e c o ve r i n g l e t t e r . T h e d r a w i n g i d n o t
FW FW FW
WC WC WC cleared for construction.
Checking does not relieve the contractor of the
B FW FW FW FW FW FW

731

731

731
responsibility for ensuring full compliance with all
WB WB WB
206 r e q u i r e m e n t s o f t h e t e c h n i c a l s p e c i f ic a t i o n , c o n t r a c t
533 439 519 79 533 439 519 79 533 439 519 79 working drawing and other contract documents.
141 131 141 131 141 131 T h e c o n t r a c t o r i s r e s p o n s ib l e fo r a ll d im e n s io n w h ic h s h a l l

189
182 FT
446 630 349 205 b e c o n fo r m e d a n d c o r r e l a t e d a t t h e j o b s i t e . F a b r i c a t io n
605 proess,techniques of construction,andthe co- co-ordination

730 334
WB WB
his work with that of all other trades.

330 158
C

891
FT
Ø150 DI CWPG (OPENING)

560 2725
Ø150 DI CWPT (OPENING) C1 Signature Date
400 270

C2 OWNER

214 618
SH M&E ENGINEERING PTE LTD
1 BUROH CRESCENT, #07-01,
Ø150 DI CWPT (OPENING) SINGAPORE 627545
Ø150 DI CWPG (OPENING)
D TEL: 6661 6800
1221 959 131 79 1221 959 131 79 1221 959 131 79 FAX: 6266 6996
WB WB WB
M&E CONSULTANTS

731

731

731
FW FW FW FW FW FW

189 815

193 815

189 815

193 815

189 815

193 815
WC WC WC PDC CONSULTANTS PTE LTD

301 13 335

301 13 335

301 13 335
FW FW

159

159

159
WC WC WC FW

155

155

155
FT WB
FT
FT WB
FT FT WB
FT
23 NEW INDUSTRIAL ROAD , #06-03
D1 SOLSTICE BUSINESS CENTER ,
314 232 479279450 314 232 479279450 314 232 479279450 SINGAPORE 538209
300 101 300 101 300 101
TEL: 6293 1111
E FAX: 6293 9921

ARCHITECT
AC CONSORTIUM PTE LTD
105 CECIL STREET, #12-02,
F DORMITORY 9TH PENETRATION PLAN THE OCTAGON,
SINGAPORE 069534
3
1 : 100
TEL: 6293 1111
FAX: 6293 9921

4TH STOREY PENETRATION PLAN 3


MAIN CONTRACTOR
1 10 11 12 13 14 ERNST ENGINEERING PTE LTD
1 : 300
81 2663 1 BUROH CRESCENT, #08-01,
234 613 333481279450 234 613 333 481279450 234 613 333481279450 SINGAPORE 627545

A TEL: 6661 6800

815 155 193

815 155 194

815 155 193


B1

815 159 189

815 159 189

815 159 189


295

295

295
335 13

335 13

335 13
186 545

WC
FT FT FT FAX: 6266 6996
845

FT WB FT WB FT WB
WC FW WC FW WC FW

SUB-CONTRACTOR
127

WC WC WC
FT
2135

FW FW FW FW FW FW
163 265 2285

731

731

731
829

WB UR 200 228 LEGEND WB WB WB


206
493 260

533 439 519 79 533 439 519 79 533 439 519 79


FT
WB UR 141 141 141
250 290

131 131 131

189
UT ∅100 FT PIPE OPENING = 150 ∅ 182 FT
200

265 446 630 349 205


200
UR ∅100 WC PIPE OPENING = 150 ∅

730 334
WB WB
WB
200 521 387 605

MALE TOILET
330 158

891
FW BLOCK 28 SIN MING DRIVE
FT
WC 222 ∅100 VS PIPE OPENING = 150 ∅ #01-159, SINGAPORE 575702
169 TEL: 6454 0995 FAX: 6552 2630
∅100 SWS PIPE OPENING = 150 ∅ C1 EMAIL: TLSP@TLSP.COM.SG

WC
FT
∅150 SWS PIPE OPENING = 200 ∅
400 270
PROJECT TITLE
191

222
C2 PROPOSED ERECTION OF A SINGLE USER PART SINGLE/
702

∅50 WB PIPE OPENING = 75 ∅


214 618

169 207
PART 5 STOREY FACTORY WITH OPEN YARD, INDUSTRIAL
880 204 ∅75 SH - FW PIPE OPENING = 100 ∅ CANTEEN AT 1ST STOREY AND A BLOCK OF 12 STOREY
1109

141 Ø150 DI CWPT (OPENING)


UTILITY ∅50 FW PIPE OPENING = 75 ∅ SECONDARY WORKERS DORMITORY (300 PAX) ON LOT
MV Ø150 DI CWPG (OPENING) 04889A MK 06 AT JALAN PAPAN (JURONG EAST
∅50 VENT PIPE OPENING = 75 ∅
Ø150 DI CWPG (OPENING) 1221 959 131 79 1221 959 131 79 1221 959 131 79 PLANNING
1209

238 384 244 562 201 2511 49 34632 ∅40 URINAL PIPE OPENING = 75 ∅ AREA)
WB WB WB

DRAWING TITLE
731

731

731
176

FW FW
WB FW FW FW FW
178

189 815

193 815

189 815

193 815

189 815

193 815
FT WC WC WC
301 13 335

301 13 335

301 13 335
FW FW
159

159

159
FT
SANITARY SYSTEM
WC WC WC FW

155

155

155
FT WB
ACCESSIBLE

FT WB FT WB FT WB
WB WC FEMALE TOILET FT FT FT
D1 4TH STOREY,DORM 9TH & 10TH STOREY
1847
TOILET

314 232 479279450 314 232 479279450 314 232 479279450


FW PENETRATION PLAN
478

300 101 300 101 300 101


462

WC WC
B Checked By BENJAMIN
121

368 562 2711


Drawn By LIN
Drawing NO. TLEC-JP-PS-S-004PE
4TH STOREY PENETRATION PLAN -BLOW UP DETAIL-A DORMITORY 10TH PENETRATION PLAN Scale As indicated
2 4
1 : 65 1 : 100 Date 23/05/2023
SHOP DRAWING
REVISION TYPE R E VIS IO N N O .

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Letter Ref. S u b m i ss i o n R e f .
T h i s D r a w in g h a s b e e n c h e c k e d fo r c o m p l ia n c e w i t h t h e
design intent the following comments apply
- N o C o m m e n t . Y o u m a y p r o c e e d w i t h c o n st r u c t i o n
subject to full compliance with the
contract/sub-
contract/sub-contract re quirements .S ubmit the
r e q u i si t e n u m b e r o f c o p i e s o f h i s c l e a r e d d r a w i n g .
- A m e n d t h i s d r a w in g in a c c o r d a n c e w i t h t h e c o m m e n t s
A m a r k e d h e r e o n a n d / o r c o n t a i n e d i n t h e c o ve r i n g l e t t e r
5 you may proceed with construction.re- construction.re-submit the
234 613 333481279450 234 613 333 481279450 234 613 333481279450
TLEC-JP-PS-S-005PE 4 amended drawing.
-the drawing requires revision and re- re-submission in
3 TLEC-JP-PS-S-005PE

815 155 193

815 155 194

815 155 193


B1 a c c o r d a n c e w it h t h e c o m m e n t s m a r k e d h e r e o n a n d / o r

815 159 189

815 159 189

815 159 189


295

295

295
335 13

335 13

335 13
TLEC-JP-PS-S-005PE FT FT FT
WC
FT WB
WC
FT WB
WC
FT WB c o n t a i n e d i n t h e c o ve r i n g l e t t e r . T h e d r a w i n g i d n o t
FW FW FW
WC WC WC cleared for construction.
Checking does not relieve the contractor of the
B FW FW FW FW FW FW

731

731

731
responsibility for ensuring full compliance with all
WB WB WB
DN 206 r e q u i r e m e n t s o f t h e t e c h n i c a l s p e c i f ic a t i o n , c o n t r a c t
533 439 519 79 533 439 519 79 533 439 519 79 working drawing and other contract documents.
141 131 141 131 141 131 T h e c o n t r a c t o r i s r e s p o n s ib l e fo r a ll d im e n s io n w h ic h s h a l l

189
182 FT
446 630 349 205 b e c o n fo r m e d a n d c o r r e l a t e d a t t h e j o b s i t e . F a b r i c a t io n
605 proess,techniques of construction,andthe co- co-ordination

730 334
WB WB
his work with that of all other trades.

330 158
C

891
FT
Ø150 DI CWPG (OPENING)

560 2725
Ø150 DI CWPT (OPENING) C1 Signature Date
400 185 85

C2 OWNER

214 618
SH M&E ENGINEERING PTE LTD
1 BUROH CRESCENT, #07-01,
Ø150 DI CWPT (OPENING) SINGAPORE 627545

D Ø150 DI CWPP (OPENING) TEL: 6661 6800


1221 959 131 79 1221 959 131 79 1221 959 131 79 FAX: 6266 6996
Ø150 DI CWPG (OPENING)
WB WB WB
M&E CONSULTANTS

731

731

731
FW FW FW FW FW FW

189 815

193 815

189 815

193 815

189 815

193 815
WC WC WC PDC CONSULTANTS PTE LTD

301 13 335

301 13 335

301 13 335
FW FW

159

159

159
WC WC WC FW

155

155

155
FT WB
FT
FT WB
FT FT WB
FT
23 NEW INDUSTRIAL ROAD , #06-03
D1 SOLSTICE BUSINESS CENTER ,
314 232 479279450 314 232 479279450 314 232 479279450 SINGAPORE 538209
300 101 300 101 300 101
TEL: 6293 1111
E FAX: 6293 9921

DORMITORY 11TH PENETRATION PLAN


2 ARCHITECT
1 : 100
AC CONSORTIUM PTE LTD
105 CECIL STREET, #12-02,
THE OCTAGON,
F SINGAPORE 069534

LEGEND TEL: 6293 1111


FAX: 6293 9921
5TH STOREY PENETRATION PLAN
1 ∅100 FT PIPE OPENING = 150 ∅
1 : 300 MAIN CONTRACTOR
∅100 WC PIPE OPENING = 150 ∅
ERNST ENGINEERING PTE LTD
81 2663
3 8 ∅100 VS PIPE OPENING = 150 ∅ 1 BUROH CRESCENT, #08-01,
∅100 SWS PIPE OPENING = 150 ∅ SINGAPORE 627545

A ∅150 SWS PIPE OPENING = 200 ∅ TEL: 6661 6800


186 545

WC FAX: 6266 6996


845

∅50 WB PIPE OPENING = 75 ∅


SUB-CONTRACTOR
127

FT
2135

163 265 2285 876 263 2228 648 2573 319 ∅75 SH - FW PIPE OPENING = 100 ∅
829

WB UR 200 228 A ∅50 FW PIPE OPENING = 75 ∅


304 411
493 260

238 600
262 625

WC
228 107 317 733

FT
∅50 VENT PIPE OPENING = 75 ∅
1092

WB UR seat
250 290

UT WB FT WB WC FW
200

265 ∅40 URINAL PIPE OPENING = 75 ∅


200
5
465 182
165

713

FT FT
663

UR WC 317
WB Toilet
178 586 345 605

MALE TOILET BLOCK 28 SIN MING DRIVE


236

278

FW 50 WC
387 NV WB FT #01-159, SINGAPORE 575702
275

FW
2667

WC WB
714

WC TEL: 6454 0995 FAX: 6552 2630


1078

169
273 399 278 398
1833

688 132 1659 246 503 EMAIL: TLSP@TLSP.COM.SG


186

WC FW
FT FW
PROJECT TITLE
258

WC
702 191

rwo
81

WC rwdp FW
387 FT Male ToiletUT
555

PROPOSED ERECTION OF A SINGLE USER PART SINGLE/


A
140380

169 208 FT
518

SH
WC

217 495 247


MV
2289

PART 5 STOREY FACTORY WITH OPEN YARD, INDUSTRIAL

174
Screed to fall
1021

156
579 725
Female Toilet CANTEEN AT 1ST STOREY AND A BLOCK OF 12 STOREY
788

1540 164 1436 165 420 526 223262 1311 344 260270 335 207
1522

141 55 149 MV
433 198

50
FT WC SECONDARY WORKERS DORMITORY (300 PAX) ON LOT
201

215
FT FW FT
Ø150 DI CWPP (OPENING) 542 320 431 FT 04889A MK 06 AT JALAN PAPAN (JURONG EAST
WB 497
PLANNING
1186

967
647

Accessible Toilet 425


580

Ø150 DI CWPG (OPENING)


122
216 369 AREA)
470 91

FT WC WB
DRAWING TITLE
208

243 294 518 268223 203301 511 135 3189 FT


MV
1372
416

575 FT
438
296 182

EXEC FEMALE
50

SANITARY SYSTEM
157

WB
313 258

FT UR UT TOILET WB
WC
198
ACCESSIBLE

FT 34677 5TH STOREY, DORM 11TH STOREY


1719

WB FT 252
1439

1418

UP PENETRATION PLAN
1089
TOILET
1000

EXEC MALE 50
WC TOILET W
B FT
Checked By
473 103
35

WB BENJAMIN
2843 132 415 2252 Drawn By LIN
Drawing NO. TLEC-JP-PS-S-005PE
5TH STOREY PENETRATION PLAN -BLOW UP DETAIL-A 5TH STOREY PENETRATION PLAN - BLOW UP DETAIL-B 5TH STOREY PENETRATION PLAN - BLOW UP DETAIL- C Scale
3 4 5 As indicated
1 : 65 1 : 65 1 : 65
Date 23/05/2023
SHOP DRAWING
REVISION TYPE R E VIS IO N N O .
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Letter Ref. S u b m i ss i o n R e f .
T h i s D r a w in g h a s b e e n c h e c k e d fo r c o m p l ia n c e w i t h t h e
design intent the following comments apply
- N o C o m m e n t . Y o u m a y p r o c e e d w i t h c o n st r u c t i o n
Ø150 VP OPENING Ø150 VP OPENING subject to full compliance with the
contract/sub-
contract/sub-contract re quirements .S ubmit the
r e q u i si t e n u m b e r o f c o p i e s o f h i s c l e a r e d d r a w i n g .
822 875
- A m e n d t h i s d r a w in g in a c c o r d a n c e w i t h t h e c o m m e n t s
A m a r k e d h e r e o n a n d / o r c o n t a i n e d i n t h e c o ve r i n g l e t t e r

620

716
2240 you may proceed with construction.re- construction.re-submit the

4137
234 613 333481279450 234 613 333 481279450 234 613 333481279450
amended drawing.
-the drawing requires revision and re- re-submission in

815 155 193

815 155 194

815 155 193


B1 a c c o r d a n c e w it h t h e c o m m e n t s m a r k e d h e r e o n a n d / o r

815 159 189

815 159 189

815 159 189


295

295

295
335 13

335 13

335 13
FT FT FT
WC
FT WB
WC
FT WB
WC
FT WB c o n t a i n e d i n t h e c o ve r i n g l e t t e r . T h e d r a w i n g i d n o t
FW FW FW
741 4503 WC WC WC cleared for construction.
3
Checking does not relieve the contractor of the
B FW FW FW

3582 498
TLEC-JP-PS-S-006PE FW FW FW

731

731

731
2234
UP responsibility for ensuring full compliance with all
WB WB WB
Ø40 CWPP OPENING 206 r e q u i r e m e n t s o f t h e t e c h n i c a l s p e c i f ic a t i o n , c o n t r a c t
UP
533 439 519 79 533 439 519 79 533 439 519 79 working drawing and other contract documents.
141 131 141 131 141 131 T h e c o n t r a c t o r i s r e s p o n s ib l e fo r a ll d im e n s io n w h ic h s h a l l

189
741 4 182 FT
446 630 349 205 b e c o n fo r m e d a n d c o r r e l a t e d a t t h e j o b s i t e . F a b r i c a t io n
Ø40 CWPP OPENING TLEC-JP-PS-S-006PE
proess,techniques of construction,andthe co- co-ordination

730 334
WB WB
his work with that of all other trades.

330 158
C

891
FT

C1 Signature Date
400 185 85

C2 OWNER

214 618
SH M&E ENGINEERING PTE LTD
1 BUROH CRESCENT, #07-01,
Ø150 DI CWPT (OPENING) SINGAPORE 627545

D Ø150 DI CWPP (OPENING) TEL: 6661 6800


1221 959 131 79 1221 959 131 79 1221 959 131 79 FAX: 6266 6996
Ø150 DI CWPG (OPENING)
WB WB WB
M&E CONSULTANTS

731

731

731
FW FW FW FW FW FW

189 815

193 815

189 815

193 815

189 815

193 815
WC WC WC PDC CONSULTANTS PTE LTD

301 13 335

301 13 335

301 13 335
FW FW

159

159

159
WC WC WC FW

155

155

155
FT WB
FT
FT WB
FT FT WB
FT
23 NEW INDUSTRIAL ROAD , #06-03
D1 SOLSTICE BUSINESS CENTER ,
314 232 479279450 314 232 479279450 314 232 479279450 SINGAPORE 538209
300 101 300 101 300 101
TEL: 6293 1111
E FAX: 6293 9921

ARCHITECT
AC CONSORTIUM PTE LTD
DORMITORY 12TH PENETRATION PLAN 105 CECIL STREET, #12-02,
F 2
1 : 100
LEGEND THE OCTAGON,
SINGAPORE 069534
∅100 FT PIPE OPENING = 150 ∅
TEL: 6293 1111
∅100 WC PIPE OPENING = 150 ∅ FAX: 6293 9921
ROOF PENETRATION PLAN
1
1 : 300
∅100 VS PIPE OPENING = 150 ∅ MAIN CONTRACTOR
∅100 SWS PIPE OPENING = 150 ∅
ERNST ENGINEERING PTE LTD
6 ∅150 SWS PIPE OPENING = 200 ∅ 1 BUROH CRESCENT, #08-01,
SINGAPORE 627545
∅50 WB PIPE OPENING = 75 ∅
TEL: 6661 6800
∅75 SH - FW PIPE OPENING = 100 ∅ FAX: 6266 6996
∅50 FW PIPE OPENING = 75 ∅
∅50 VENT PIPE OPENING = 75 ∅ SUB-CONTRACTOR
∅40 URINAL PIPE OPENING = 75 ∅
3879
3
Ø150 CWTG OPENING
292 269

Ø150 CWTP OPENING


Ø150 CWPP OPENING BLOCK 28 SIN MING DRIVE
#01-159, SINGAPORE 575702
TEL: 6454 0995 FAX: 6552 2630
EMAIL: TLSP@TLSP.COM.SG

5113 PROJECT TITLE


3775 PROPOSED ERECTION OF A SINGLE USER PART SINGLE/
Ø75 PPR CWP OPENING PART 5 STOREY FACTORY WITH OPEN YARD, INDUSTRIAL
3088
CANTEEN AT 1ST STOREY AND A BLOCK OF 12 STOREY
5622

SECONDARY WORKERS DORMITORY (300 PAX) ON LOT


WB
04889A MK 06 AT JALAN PAPAN (JURONG EAST
100 174301 308 382
1610

3099
FT PLANNING
AREA)
WC
B
3217
DRAWING TITLE
SANITARY SYSTEM
C
ROOF , DORM 12TH STOREY
PENETRATION PLAN
Checked By BENJAMIN
Drawn By LIN
ROOF PENETRATION PLAN - BLOW UP DETAIL - A ROOF PENETRATION PLAN - BLOW UP DETAILS - B
3 4 Drawing NO. TLEC-JP-PS-S-006PE
1 : 65 1 : 65
Scale As indicated
Date 23/05/2023
1 2 3 4 5 6 7 8 9 10 11 12 13 14 SHOP DRAWING
LEGEND REVISION TYPE R E VIS IO N N O .

∅100 FT PIPE OPENING = 150 ∅


∅100 WC PIPE OPENING = 150 ∅
∅100 VS PIPE OPENING = 150 ∅ Letter Ref. S u b m i ss i o n R e f .
∅100 SWS PIPE OPENING = 150 ∅ T h i s D r a w in g h a s b e e n c h e c k e d fo r c o m p l ia n c e w i t h t h e
design intent the following comments apply
∅150 SWS PIPE OPENING = 200 ∅ - N o C o m m e n t . Y o u m a y p r o c e e d w i t h c o n st r u c t i o n
subject to full compliance with the
∅50 WB PIPE OPENING = 75 ∅ contract/sub-
contract/sub-contract re quirements .S ubmit the
r e q u i si t e n u m b e r o f c o p i e s o f h i s c l e a r e d d r a w i n g .
∅75 SH - FW PIPE OPENING = 100 ∅ - A m e n d t h i s d r a w in g in a c c o r d a n c e w i t h t h e c o m m e n t s
A ∅50 FW PIPE OPENING = 75 ∅ m a r k e d h e r e o n a n d / o r c o n t a i n e d i n t h e c o ve r i n g l e t t e r
you may proceed with construction.re- construction.re-submit the
∅50 VENT PIPE OPENING = 75 ∅ amended drawing.
-the drawing requires revision and re- re-submission in
∅40 URINAL PIPE OPENING = 75 ∅ a c c o r d a n c e w it h t h e c o m m e n t s m a r k e d h e r e o n a n d / o r
c o n t a i n e d i n t h e c o ve r i n g l e t t e r . T h e d r a w i n g i d n o t
3215
cleared for construction.
Checking does not relieve the contractor of the
B
103

B1 responsibility for ensuring full compliance with all


r e q u i r e m e n t s o f t h e t e c h n i c a l s p e c i f ic a t i o n , c o n t r a c t
working drawing and other contract documents.
T h e c o n t r a c t o r i s r e s p o n s ib l e fo r a ll d im e n s io n w h ic h s h a l l
b e c o n fo r m e d a n d c o r r e l a t e d a t t h e j o b s i t e . F a b r i c a t io n
C1 proess,techniques of construction,andthe co- co-ordination
C2 his work with that of all other trades.
C
Signature Date
D1
OWNER
SH M&E ENGINEERING PTE LTD
1 BUROH CRESCENT, #07-01,
SINGAPORE 627545

D TEL: 6661 6800


FAX: 6266 6996

M&E CONSULTANTS
PDC CONSULTANTS PTE LTD
23 NEW INDUSTRIAL ROAD , #06-03
SOLSTICE BUSINESS CENTER ,
SINGAPORE 538209

TEL: 6293 1111


E FAX: 6293 9921

ARCHITECT
AC CONSORTIUM PTE LTD
105 CECIL STREET, #12-02,
THE OCTAGON,
F SINGAPORE 069534

UPPER ROOF PENETRATION PLAN 10 11 12 13 14 TEL: 6293 1111


FAX: 6293 9921
1 1245 1246 1246
1 : 300
MAIN CONTRACTOR
B1
94

91

93
ERNST ENGINEERING PTE LTD
1 BUROH CRESCENT, #08-01,
2855

SINGAPORE 627545
380
TEL: 6661 6800
FAX: 6266 6996

SUB-CONTRACTOR
2444

1618
495

C1
239 755

Ø150 CWTP OPENING


Ø150 CWPP OPENING
C2 BLOCK 28 SIN MING DRIVE
247

Ø150 CWPG OPENING #01-159, SINGAPORE 575702


TEL: 6454 0995 FAX: 6552 2630
EMAIL: TLSP@TLSP.COM.SG

PROJECT TITLE
PROPOSED ERECTION OF A SINGLE USER PART SINGLE/
PART 5 STOREY FACTORY WITH OPEN YARD, INDUSTRIAL
CANTEEN AT 1ST STOREY AND A BLOCK OF 12 STOREY
SECONDARY WORKERS DORMITORY (300 PAX) ON LOT
395 2591 685 04889A MK 06 AT JALAN PAPAN (JURONG EAST
PLANNING
D1
100
96

AREA)

DRAWING TITLE
SANITARY SYSTEM
UPPER ROOF , DORM ROOF
PENETRATION PLAN
Checked By BENJAMIN
Drawn By LIN
Drawing NO. TLEC-JP-PS-S-007PE
DORMITORY ROOF PENETRATION PLAN Scale
2 As indicated
1 : 100
Date 23/05/2023

You might also like