You are on page 1of 41

Client : Kuwait Oil Company

Project : Facility Upgrade and Relocation of Under Ground Process


Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

4.7 Design of Concrete Column Bund Wall for


Main Crude Oil Tank TK - 1526 &
Test Tank Tk - 1527.

SR NO TABLE OF CONTENTS PAGE NO

1.0 Design Data

2.0 Design Philosophy

3.0 Design of Wall

4.0 Design of Column

5.0 Design of Footing

APPENDIX - I Typical GA & RC Details of Column Wall


Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

1.0 DESIGN DATA :

A Lc

Wc Tw

Ht3

Lw

Ww Tank side Out Side

H1

H Ht2 Ho2

Ht1 Ho1

Tf Tf

Wf Lf

Elevation Section A - A

1.1 Geometrical Data :


Length of footing ( Lf ) = 4.7 m
Width of footing ( Wf ) = 2.7 m
Thickness of footing ( Tf ) = 0.6 m
Width of column ( Wc ) = 0.4 m
Length of column ( Lc ) = 0.6 m
Length of Wall ( Lw ) = 3.6 m, ( Max wall Length has been Considered )
Width of wall ( Ww ) = 4.4 m Width of wall insufficient
Thickness of wall ( Tw ) = 0.3 m
Top of footing from tank side GL ( Ht1 ) = 1.6 m
Height of liquid from GL ( Ht2 ) = 2.7 m
Free board ( Ht3 ) = 0.3 m
Top of footing from out side GL ( Ho1 ) = 1.6 m
Height of wall from outside GL ( Ho2 ) = 3 m
Height of wall from top of footing ( H1 ) = 4.6 m
Top of wall from bottom of footing ( H ) = 5.2 m

1.2 Soil Data : ( As Per JI-180-000-ECV-SPE-001 )


Unit weight of soil,( g ) = 18 kN/m3
Bearing capacity of soil = 150 KN/m2
Coefficient of soil pressure at rest ( Ko ) = 0.5
Angle of internal friction, ( f ) = 32
Coefficient of active earth pre. ( Ka ) = ( 1-SINf ) / ( 1+SINf ) = 0.31
Coefficient of passive earth pre. ( Kp ) = ( 1+SINf ) / ( 1-SINf ) = 3.25
Factor of safety against sliding = 1.75
Factor of safety against overturning = 1.75

1.3 Material Data: ( As Per JI-180-000-ECV-SPE-001 )


Grade of Concrete ( Fcu ) = 30 N/mm2

88
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Yield Strength of reinforcement ( Fy ) = 414 N/mm2

89
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Clear Cover to Reinforcement ( c ) = 75 mm
Unit Weight of Concrete ( gc ) = 24 KN/m3
Density of retained liquid, ( gw ) = 8.77 KN/m3

2.0 DESIGN PHILOSOPHY :


Here, wall has been designed for two condition,

a ) Tank side empty and Other side earth + wind pressure, &
b ) Tank side with liquid & Submerged soil pressure & Other side with soil pressure only.

In both of the cases whatever pressure will comes over the wall will be transferred through the one way
load distribution pattern to column and then will ultimately go to ground. So in this case design formula as
per Clause 3.4.4.2 of BS : 8110 ( Part I ) has been used.

3.0 DESIGN OF WALL :

3.1 BM Calculation For Case ( a ) :

a)
Active earth pressure ( Pa ) = g*Ka* Ho1
= 8.8704 KN/m2
Moment at base of wall due to = 1/6 * Pa * Ho12
active earth Pressure ( Ma ) = 3.785 kNm

b)
Wind pressure, ( Qw ) = 0.76 KN/m2, For the top height of (Ho2) = 3.00m
Moment at base of wall due to = Qw * Ho2 * ( Ho1 + Ho2 /2 )
wind pressure ( Mw ) = 7.068 kNm

c) ( Passive pressure for moment


Passive earth pressure ( Pp ) = g*Kp*Ht1 calculation has been ignored so
= 0.00 KN/m2 as to be on conservative side )
Moment at base of wall due to = 1/6 * Pp * Ht12
passive earth Pressure ( Mp ) = 0.00 kNm

Total Moment at the base ( M1 ) = Ma + Mw - Mp


= 10.853 kNm

Converting to eq triangle of same ht which will prodcue the same moment at the base.
0.76
1/2 x Peq x 4.40 x 4.40/3 = 10.853 1

Peq = 3.363441 KN/m2 0.76

2
Dividing plate into 3 equal part, and designing for the same. 4.82

Effective Length of each plate ( Lweff ) = Lw + Wc 3


= 4 m 8.87
8.8704
Width of each plate ( We ) = Ww / 3
= 1.466667 m

Calculating moment and shear for each panel using coefficient of BS : 8110 (Part I ) : Table 3.5

90
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Moment coefficient for middle of interior span ( Mcoeffspan ) = 0.07

91
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Moment coefficient for interior supports ( Mcoeffsupport ) = 0.08
Shear coefficient at interior supports ( Scoeffsupport ) = 0.55

( Load factor for soil pressure is 1.4, as per BS:8110-Part I )


Moment at middle of interior span = 1.4 * Mcoeffspan * W * We * Lweff 2 kNm
Moment at interior supports = 1.4 * Mcoeffsupport * W * We * Lweff 2 kNm
Shear at interior supports = 1.4 * Scoeffsupport * W * We * Lw 2
kNm

Table 5.1 Design Moment And Shear For Case ( a )

Panel Span Moment Support Moment Design Moment Support Shear


1 1.748 kNm 1.997 kNm 1.997 kNm 3.090 kN
2 11.074 kNm 12.656 kNm 12.656 kNm 19.577 kN
3 20.400 kNm 23.314 kNm 23.314 kNm 36.063 kN

3.2 BM Calculation For Case ( b ) :

a)
Liquid pressure ( Pl ) = gw * H1
= 40.342 KN/m2
Moment at base of wall due to = Pl * H / 6
1
2

liquid pressure ( Ml ) = 142.273 kNm

b)
Active earth pressure ( Pa ) = Ka*(g-gw)*Ht1
= 4.549 KN/m2
Moment at base of wall due to = Ka*(g-gw)*Ht13 /6
active earth Pressure ( Ma ) = 1.941 kNm

c)
Passive earth pressure ( Pp ) = g*Kp*Ho1 ( Passive pressure for moment
= 0 KN/m 2 calculation has been ignored so
Moment at base of wall due to = 1/6 * Pp * Ho12 as to be on conservative side )
passive earth Pressure ( Mp ) = 0 kNm

d)
Wind pressure, ( Qw ) = 0.76 KN/m2, For the top height of (Ho2) = 3.00m
Moment at base of wall due to = Qw * Ht3 * ( H1 - Ht3 /2 )
wind pressure ( Mw ) = 1.0146 kNm

Moment at base ( M2 ) = Ml + Ma + Mw
- Mp 1 0.76
= 145.228 kNm 15.00

2
Converting to eq triangle of same ht, 30.01
which will prodcue the same moment at the base. 3

45.01

92
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
1/2 x Peq x 4.40 x 4.40/3 = 145.2281 4.55 40.34

Peq = 45.00871 KN/m2

93
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

Dividing plate into 3 equal part, and designing for the same.
Effective Length of each plate ( Lweff ) = 4 m
Width of each plate ( We ) = 1.466667 m

Calculating moment and shear for each panel using coefficient of BS : 8110 (Part I ) : Table 3.5
Moment coefficient for middle of interior span ( Mcoeffspan ) = 0.07
Moment coefficient for interior supports ( Mcoeffsupport ) = 0.08
Shear coefficient at interior supports ( Scoeffsupport ) = 0.55

( Load factor for soil pressure is 1.4, as per BS:8110-Part I )


Moment at middle of interior span = 1.4 * Mcoeffspan * W * We * Lweff 2 kNm
Moment at interior supports = 1.4 * Mcoeffsupport * W * We * Lweff 2 kNm
Shear at interior supports = 1.4 * Scoeffsupport * W * We * Lw 2
kNm

Table 5.2 Design Moment And Shear For Case ( b )

Panel Span Moment Support Moment Design Moment Support Shear


1 34.503 kNm 39.432 kNm 39.432 kNm 60.996 kNm
2 69.005 kNm 78.863 kNm 78.863 kNm 121.992 kNm
3 103.508 kNm 118.295 kNm 118.295 kNm 182.987 kNm

Table 5.3 Maximum Design Moment And Shear

Panel Tank Side Out Side Support Shear


1 39.432 kNm 34.503 kNm 60.996 kNm
2 78.863 kNm 69.005 kNm 121.992 kNm
3 118.295 kNm 103.508 kNm 182.987 kNm

3.3 Rebar Calculation :


( Sample calculation for panel 3 )

Design factored bending = 118.29 kNm


moment ( Mu )
Assumed main dia of wall ( dmain ) = 20 kNm
Effective thickness of wall ( Tweff ) = ( Tw * 1000 ) - (dmainl / 2) - c
= 215 mm

Now as per clause 3.4.4.4 of BS 8110 ( Part - I )


k = Mu / fcu bd2
= 118.29 x 106
30 x 1467 x 215 x 215
= 0.058 < 0.156

z = d* [ 0.5 + sqrt ( 0.25 - k/0.9 )]


= 215 x [ 0.5 + sqrt( 0.25 - 0.058 /0.9)]
= 200.07 mm &

z = 0.95 x d

94
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
= 204.25 mm

95
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

Take z = Minimum of above two values


= 200.07 mm

Required Ast1 = M / [0.95*fy*z]


= 1503.36 mm2/m

As per table 3.25 of BS : 8110 ( Part - I )


Min reinforcement for flexure ten Ast2 = 0.13 % of Area of concrete
= 0.130 x 1467 x 300 / 100
= 572.00 mm2/m

As per table 3.25 of BS : 8110 ( Part - I ) clause 3.9.4.19


Min reinforcement for crack control Ast3 = 0.25 % of Area of concrete
= 0.250 x 1467 x 300 / 100
= 1100 mm2 on both face
= 550 mm2 on each face

From the above required Astreq1 = 1503.36 mm2/m Max of Ast1, Ast2 & Ast3

Required 20 mm bar at a spacing of 306 mm c/c


Provide 20 mm bar at a spacing of 200 mm c/c
Area of steel provided Astprov1 = 2303 mm2
ptprovided = 0.52 %

Table 5.4 Steel Provided On The Tank Side Face

Panel Ast Required Rebar Dia Spacing Ast Provided


1 501 mm2 12 mm 200 mm 829 mm2 OK
2 1002 mm2 16 mm 150 mm 1965 mm2 OK
3 1503 mm2 20 mm 200 mm 2303 mm2 OK

Table 5.5 Steel Provided On The Other Side Face

Panel Ast Required Rebar Dia Spacing Ast Provided


1 438 mm2 12 mm 200 mm 829 mm2 OK
2 877 mm2 16 mm 150 mm 1965 mm2 OK
3 1315 mm2 20 mm 200 mm 2303 mm2 OK

3.4 Distribution Steel :

Provide Min Reinforcement As Dist. Steel, As per table 3.25 of BS : 8110 ( Part - I )
Distribution steel, Adist = 0.13 % of Area of concrete
= 0.13 x 1000 x 300 / 100
= 390 mm2/m

Dia of distribution rebar = 12 mm


Provide 12 mm bar at a spacing of 200 mm c/c
Area of steel provided Astprov1 = 565 mm2

96
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
3.5 Check For Shear :
( Sample calculation for panel 3 )

Shear V at face of the column = 183 kN

Shear stress at face of support, ( v ) = 0.580 N/mm²


Maximum allowed Max( 0.8Öfck , 5 ) = 4.382 N/mm2 or 5 N/mm2
O.K. (Clause 3.7.7.2)

100 Ast / bd = 0.73


From BS 8110, Part 1 Table 3.8, ( vc ) = 0.61 N/mm² For fcu = 25 N/mm2
Revise value of ( vc ) = vc * ( fcu /25 )1/3 For fcu = 30 N/mm2
= 0.648 N/mm²
Since vc > v Hence Section Is SAFE In Shear

Table 5.6 Shear Check At Face Of Column For Each Panel

Shear Permissible Shear


Panel Stress ( 100 Ast / bd Stress Revised
v N/mm2 ) ( vc N/mm2 ) Shear
Stress ( vc )
1 0.193 0.26 0.430 N/mm2 0.457 v < vc, Ok
2 0.387 0.62 0.540 N/mm2 0.573 v < vc, Ok
3 0.580 0.73 0.610 N/mm2 0.648 v < vc, Ok

3.6 Calculation Of Crack Width

Maximum allowable crack width = 0.3 mm (Per BS 8110-2 : 1985 clause 3.2.4)

1 ) Crack width for drying shrinkage / thermal movement :

fcu = Characteristic strength of reinforced concrete


= 30 N/mm2
fy = Characteristic strength of reinforcing steel as per table 3.1 of BS 8110
= 414 N/mm2 ( As per design philosophy 0.9fy )

Thermal strain er = 0.8*Dt*a*R ( Refer equation 14 of clause 3.8.4.2 of BS 8110-2)

R = 0.6 ( Per Table 3.3 of BS 8110-2)


a = Coefficient of thermal expansion of mature concrete
= 0.000012 Table 7.3 of BS 8110 ( Part 2 )
DT = Fall in temperatue between hydration peak and ambient
= 20 ( per Table 3.2 of BS 8110-2)

Thermal strain er = 0.0001152

Design surface crack width, W1 = 3*acr*er/(1+2*((acr-cmin)/(h-x)))

Where,
acr = Dist from point considered to the surface of the nearest long bar
= Sqrt( S/22+ (c+f/2)2 ) - (f/2)

97
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
= 131.21 mm

f = Size of each reinforcing bar


= 20
acr
D = Depth of wall = B
= 300

S = Spacing of reinforcement
= 200

As = Area of steel
= 2303 mm2

W1 = 0.03 mm < 0.30 mm OK

2 ) Crack width in flexure :

Crack width, ( W2 ) = 3*acr*em/(1+2*(acr - cmin)/(h-x))

Where,
acr = 131.21 mm

em = average strain at the level where the cracking is being considered


= e1 -e2
= 0.001
e2 = bt*(h-x)*(a'-x)/3*Es*As*(d-x) for crack width of 0.3mm
= 0.0003
e1 = fs/Es*((h-x)/(d-x))
= 0.001

Moment in section, M = 84.50 kNm ( Unfactored moment)


Stress in steel, fs = M/(As*(d-S'/2))
= 190.91582 N/mm2 OK

h = Overall depth of member = D


= 300 mm
bt = Width of section at the centroid of tensile steel
= 1466.67 mm
Es = Modulus of elasticity of reinforcement
= 200000.00 N/mm2
a = Distance from the compression face to the point at which the
crack width is being calculated
= effective depth ( d )
= 215 mm
d = Effective depth
= D - cmin - f/2
= 215 mm
cmin = Minimum cover to tensile steel
= 75.00 mm

k = Mu / fcu bd2
= 0.085 < 0.156
z = d* [ 0.5 + sqrt ( 0.25 - k/0.9 )] & 0.95 x d

98
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
= 192.21 mm & 204.25 mm
z = 192.21 mm

S' = Depth of stress block


= 45.589754 mm
x = depth of neutral axis
= (d-z)/0.45
= 50.655282 mm

W2 = 3*acr*em/(1+2*(acr - cmin)/(h-x))
= 0.32 mm > 0.30 mm NOT OK

99
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

100
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

6.0 DESIGN OF COLUMN :


Lw A Lc

Tw

Tank Side Ht3

Lc Tank side Out Side

Lf H1

Out Side H Ht2 Ho2

Wc

x A Ht1 Ho1

z Wf Tf

Lf

Plan Section A - A

Here,
Length of footing ( Lf ) = 4.70 m
Width of footing ( Wf ) = 2.70 m
Width of column ( Wc ) = 0.40 m
Length of column ( Lc ) = 0.60 m
Width of wall ( Ww ) = 4.40 m
Length of Wall ( Lw ) = 3.60 m, ( Max wall Length has been Considered )
Top of footing from tank side GL ( Ht1 ) = 1.60 m
Height of liquid from GL ( Ht2 ) = 2.70 m
Free board ( Ht3 ) = 0.30 m
Top of footing from out side GL ( Ho1 ) = 1.60 m
Height of wall from outside GL ( Ho2 ) = 3.00 m
Thickness of footing ( Tf ) = 0.60 m
Height of wall from top of footing ( H1 ) = 4.60 m
Top of wall from bottom of footing ( H ) = 5.20 m
Thickness of wall ( Tw ) = 0.30 m

6.1 BM Calculation :
Case ( a ) :

> Here, column is subjected to uniaxial bending moment due to earth


and wind pressure & compressive load due to self wt as well as weight of wall.

> It is assumed that column is monolithically constructured to both side with


same span, height and thick wall, So it is subjected to uniaxial moment only.

Wt of column ( Wc ) = gc x Lc x Wc x H1
= 26.496 kN

Wt of wall ( Ww ) = gc x Lw x Ww x Tw Kp = 0
= 114.048 kN

96
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

Axial Force in column ( W ) = Wc + Ww

97
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
= 140.544 kN ... ( 1 )
( Weight of platform
Eccentricity of Wall ( ewall ) = 0.15 m has been neglected )

Active
a)
Calculation of Moment & Shear due to wind and active earth pressure about the base of column.
Wind pressure ( Qw ) = 0.76 KN/m2, For the top ht of ( Ho2 ) = 3m

Wind & Active earth pressure ( Pia ) = ( g*Ka*Ho1 + Qw ) x ( Lw + Wc )


= 38.5216 kN/m2
Shear at base of column due to wind & = ( 1/2*g*Ka*Ho12 + Qw * Ho2 ) ( Lw+Wc )
active earth pressure ( Via ) = 37.505 kN
Moment at base of column due to wind = ( 1/6*g*Ka*Ho13 + Qw * Ho2 * (Ho2 / 2 + Ho1)) *( Lw+Wc)
& active earth pressure ( Mia ) = 43.411 kNm

b)
Moment due to wall eccentricity ( Mwa ) = Ww ewall
= 17.1072 kNm
Passive
c)
Calculation of Moment & Shear due to 2/3 height of passive earth pressure about the base of column.
( Passive pressure has been ignored so as to be on conservative side )

Passive earth pressure ( Pip ) = g*Kp*(2/3*Ht1 - Tf/3) * ( Lw + Wc )


= 0.000 kN/m2
Shear at base of column due to = 1/2*g*Kp*(2/3*Ht1 - Tf/3)2 * ( Lw + Wc )
passive earth pressure ( Vip ) = 0.000 kN
Moment at base of column due to = 1/6*g*Kp*(2/3*Ht1 - Tf/3)3 * ( Lw + Wc )
passive earth pressure ( Mip ) = 0.000 kNm

Shear at the base of column ( V ) = Via - Vip


= 37.505 kN ... ( 2 )

Moment at the base of column ( M ) = Mia + Mwa - Mip


= 60.518 kNm ... ( 3 )

Case ( b ) :

> Here, column is subjected to uniaxial bending moment due to submerged earth
and liquid pressure & compressive load due to self wt as well as weight of wall.

> It is assumed that column is monolithically constructured to both side with


same span, height and thick wall, So it is subjected to uniaxial moment only.

Axial Force in column ( W ) = Wc + Ww Kp = 0

= 140.544 kN ... ( 4 )
Active

98
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
a)
Calculation of Moment & Shear due to wind, liquid and submerged active earth pre about the base of column.

99
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Wind pressure, ( Qw ) = 0.76 kN/m2, For the top ht of ( Ho2 ) = 3m

Pressure due to wind, liquid & = (gw*(H1 - Ht3)+ Ka*(g-gw)*Ht1 + Qw) x (Lw + Wc)
submerged active earth pressure ( Pia ) = 172.08 kN/m2
Shear due to wind, liquid & submerged = (gw*( H1 - Ht3)2/2 + Ka*(g-gw)*Ht12/2 + Qw*Ht3)x(Lw + Wc)
active earth pressure ( Via ) = 339.78 kN
Moment due to wind, liquid & = ( Ka*(g-gw)*Ht13/6 + Qw*Ht3*(Ht3/2+Ht2+Ht1) +
submerged active earth pressure ( Mia ) gw*(H1 - Ht3)3/6) x (Lw + Wc)
= 476.67 kNm

Passive
b)
Calculation of Moment & Shear due passive earth pressure abou the base of column.

Passive earth pressure ( Pip ) = g*Kp*(2/3*Ho1 - Tf/3) * ( Lw + Wc )


= 202.99 kN/m2
Shear due to passive earth = 1/2*g*Kp*(2/3*Ho1 - Tf/3)2 * ( Lw + Wc )
pressure ( Vip ) = 87.96 kN
Moment due to passive = 1/6*g*Kp*(2/3*Ho1 - Tf/3)3 * ( Lw + Wc )
earth pressure ( Mip ) = 25.41 kNm

c)
Moment due to wall eccentricity ( Mwp ) = Ww ewall
= 17.1072 kNm

Shear at the base of column ( V ) = Via - Vip


= 251.82 kN ... ( 5 )
Moment at the base of column ( M ) = Mia - Mip - Mwp
= 434.15 kNm ... ( 6 )

( Load factor for soil pressure is 1.4, as per BS:8110-Part I )


Maximum Axial Force, Moment & Shear From Case I & II :

Fy = 1.4*Max of ( 1 ) & ( 4 )
= 196.76 kNm
Fx = 1.4*Max of ( 2 ) & ( 5 )
= 352.55 kNm
Mz = 1.4*Max of ( 3 ) & ( 6 )
= 607.82 kNm

Table 6.1 Ultimate Load For Column Design.

FY Fx Fz Mx Mz
MAX 197 353 0 0 608

6.2 Rebar Caculation :

dtendia = 25 mm
dstirr = 8 mm

100
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Assumed pt% = 2 %

101
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
b = Width of column ( Wc ) Effective width b' = b - c - dstirrups - dtendia/2
= 0.40 m = 0.305 m
h = Length of column ( Lc ) Effective length h' = h - c - dstirrups - dtendia/2
= 0.60 m = 0.505 m

Here, As per BS 8110 : Cl 3.8.1, h / b = 1.50 if h/b < 4, Design it as a column

a)
Axial Force & Moment From Case I & II :
N = Maximum Design Axial load ( Wu ) = 196.76 kN ... ( 7 )
Mz = Maximum Design Moment ( Mu ) = 607.82 kNm ... ( 8 )
Mx = Maximum Design Moment ( Mu ) = 0 kNm ... ( 9 )

b)
Moment due to mnimum eccentricity :

Minimum Eccentricity ( emin ) as per BS : 8110 Cl 3.8.2.4


In X direction ( ex ) = 20 mm
In Z direction ( ez ) = 20 mm

Moment due to minimum eccentricity ( Me = Wu x emin )


In X direction (Mez = ex Wu) = 3.935 kNm ... ( 10 )
In Z direction (Mex = ez Wu) = 3.935 kNm ... ( 11 )

c)
Moment due to slenderness :

Restrain factor ( b ), in X direction = 2.2 Un braced


in Z direction = 0.75 Braced

Clear height between end restrain ( Lo )


in X direction ( Lox ) = H1 = 4.60 m < 60 x Minimum Dim
in Y direction ( Loz ) = H1 = 4.60 m < 60 x Minimum Dim

Effective length ( Le ) = b x Lo
in X direction ( Lex = b x Lox) = 10.12 Un braced < 10 Short Column
in Z direction ( Ley = b x Loz) = 3.45 Braced < 15 Short Column

Moment due slenderness ( Madd )


In X direction (Mzadd ) = Wu x (1/2000)(lex/h)2 x K x h ... ( 12 )
= 0.000 kNm
In Z direction (Mxadd ) = Wu x (1/2000)(lez/b)2 x K x b ... ( 13 )
= 0.000 kNm

Maximum design moment for column as per BS : 8110


M M + Madd Here, Mi = 0.4M1 + 0.6M2 > 0.4M2
For braced column For unbraced
Mi + Madd e N M1 = 0 ;
maximum of column maximum of min
emin N M2 = M ;

102
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

103
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Design Moment :

In X direction ( Mz ) = Maximum 607.82 For Un braced condition


Of 3.94

= 607.82 kNm ... ( 14 )

In Z direction ( Mx ) = Maximum 0.00 For Braced condition


Of 0.00
3.94

= 3.94 kNm ... ( 15 )

Here, Mx << Mz

d/h = 0.85 = 0.85


N / bh = 0.82 N/mm2
Mz / bh2 = 4.22 N/mm2

Refering corresponding chart for


Fcu = 30 N/mm2
Fy = 460 N/mm2
d/h = 0.85 from chart No 28 to 50, for
N / bh = 0.82 N/mm2
Mz / bh2 = 4.22 N/mm2
We have,

100 Asc / bh = 2.50 %


Asc = 6000 mm2

Provide T25 of 12 No bars, &


Provide stirrups T8 of 150 mm c/c ( Stirrups calculation formula not added )

6.3 Loading Data For Stability Check :

Resisting Moment & Axial Force Calculation :


Case ( a )

Wt of column ( Wc ) = gc x Lc x Wc x H1
= 26.496 kN
Wt of wall ( Ww ) = gc x Lw x Ww x Tw
= 114.048 kN
Soil Cushion ( Ws1 ) = g x Ht1xWf x Lh
272.16 kN
Soil Cushion ( Ws2 ) = g x Ho1 x [(Wf - Wc)*(Lc - Tw) + Wf*Lt]
66.53 kN
Eccentricity of Ws2 in x = [(Wf - Wc)*(Lc - Tw)*(Lt+(Lc-Tw)/2) + Wf*Lt*Lt/2]
direction ( es2 ) [(Wf - Wc)*(Lc - Tw) + Wf*Lt]

104
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
= 0.434 m
Weight of Footing ( Wfo ) = gc*Wf*Lf*Tf

105
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
182.74 kN

Fy = Wc + Ww + Ws1 + Ws2 + Wfo


= 661.97 kN ... ( 16 )

Resisting Moment ( Mrz )


Moment @ heel Mrz = Wc*(Lc/2+Lh) + Ww*(Lh+Tw/2) + Ws1*(Lh/2) +
Ws2*( Lf-es2 ) + Wfo*Lf/2
= 1706.48 kNm ... ( 17 )
Resisting Moment ( Mrx )
Mrx = ( Wc + Ww + Ws1 + Ws2 + Wfo ) * Wf/2
= 893.66 kNm ... ( 18 )
Case ( b )
Weight of liquid ( Wl ) = gw x Ht2 x (Wf*Lh)
= 223.77 kN

Fy = Wc + Ww + Ws1 + Ws2 + Wfo + Wl


= 885.73 kN ... ( 19 )

Resisting Moment ( Mrz )


Moment @ toe Mrz = Wc*(Lc/2+Lt) + Ww*(Lt+Lc-Tw/2) + Ws1*(Lh/2+Lc+Lt) +
Ws2*es2 + Wfo*Lf/2 + Wl*(Lh/2+Lc+Lt)
= 2064.88 kNm ... ( 20 )
Resisting Moment ( Mrx )
Mrx = ( Wc + Ww + Ws1 + Ws2 + Wfo + Wl ) * Wf/2
= 1195.74 kNm ... ( 21 )

Wc

Wl Ww

Here,
Ws1 Ws2 Lt = 0.6

Y Lh = 3.50
Heel Wfo Toe

X Lh Lc Lt

Lf

Axial Force From Case I & II :


Fy = Max of ( 16 ) & ( 19 )
= 885.73 kN

Resisting moment From Case I & II :


Mzr = Max of ( 17 ) & ( 20 )
= 2064.88 kNm

106
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

Resisting moment From Case I & II :

107
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Mxr = Max of ( 18 ) & ( 21 )
= 1195.74 kNm

Over turning Moment ( Mz ) & Shear ( Fx ) Calculation :


Case ( a ) :

Active
a)
Calculation of Moment & Shear due to wind and active earth pressure about the base of footing.
Wind pressure ( Qw ) = 0.76 kN/m2, For the top ht of ( Ho2 ) = 3m

Pressure due to wind & earth ( Pia ) = ( g*Ka*(Ho1+Tf )+ Qw ) x ( Lw + Wc )


= 51.827 kN/m2
Shear at base of footing due to wind = ( 1/2*g*Ka*(Ho1+Tf )2 + Qw * Ho2 ) ( Lw+Wc )
& active earth pressure ( Via ) = 62.786 kN
Moment at base of footing due to Wind = ( 1/6*g*Ka*(Ho1+Tf)3 +
& active earth pressure ( Mia ) Qw * Ho2 * (Ho2 / 2 + Ho1 + Tf )) *( Lw+Wc)
= 73.099 kNm

Passive
b)
Calculation of Moment & Shear due to 2/3 height of passive earth pressure about the base of footing.

Passive earth pressure ( Pip ) = g*Kp*2/3*(Ht1 + Tf) * ( Lw + Wc )


= 0.000 kN/m2
Shear due to earth pressure ( Vip ) = 2/9*g*Kp*(Ht1 + Tf)2 * ( Lw + Wc )
= 0.000 kN
Moment due to earth pressure ( Mip ) = 4/81*g*Kp*(Ht1 + Tf)3 *( Lw + Wc )
= 0.000 kNm

Shear at the base of footing ( Vs ) = Via - Vip


= 62.786 kN ... ( 22 )

Moment at the base of footing ( Mo ) = Mia + Msa - Mip - Msp


= 73.099 kNm ... ( 23 )
Case ( b ) :

Active
a)
Calculation of Moment & Shear due to wind, liquid and active earth pressure about the base of footing.
Wind pressure, ( Qw ) = 0.76 kN/m2, For the top ht of ( Ho2 ) = 3m

Pressure due to wind, liquid & = (gw*(H - Ht3)+ Ka*(g-gw)*(Ht1+Tf )+ Qw) x (Lw + Wc)
submerged earth ( Pia ) = 196.91 kN/m2
Shear due to wind, liquid & submerged = (gw*( H - Ht3) /2 + Ka*(g-gw)*(Ht1+Tf)2/2 + Qw*Ht3)x(Lw+Wc)
2

active ( Via ) = 449.57 kN


Moment due to wind, liquid & = (Ka*(g-gw)*(Ht1+Tf)3/6 + Qw*Ht3*(H - Ht3/2) +
submerged earth ( Mia ) gw*(H - Ht3)3/6*) x (Lw + Wc)
= 712.64 kNm

108
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

109
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Passive
b)
Calculation of Moment & Shear due to 2/3 height of passive earth pressure about the base of footing.

Pressure due to earth ( Pip ) = g*Kp*2/3*(Ho1 + Tf) * ( Lw + Wc )


= 343.52 kN/m2
Shear due to earth pressure ( Vip ) = 2/9*g*Kp*(Ho1 + Tf)2 * ( Lw + Wc )
= 251.91 kN
Moment due to earth pressure ( Mip ) = 4/81*g*Kp*(Ho1 + Tf)3 * ( Lw + Wc )
= 123.16 kNm

Shear at the base of footing ( Vs ) = Via - Vip


= 197.65 kN ... ( 24 )
Moment at the base of footing ( Mo ) = Mia - Mip
= 589.48 kNm ... ( 25 )

Maximum Moment & Shear From Case I & II :


Mz = Max of ( 23 ) & ( 25 )
= 589.48 kNm
Fx = Max of ( 22 ) & ( 24 )
= 197.65 kNm

Table 6.2 Load for Stability & Bearing Pressure Check

FY FX FZ MX MZ
MAX 886 198 0 0 589

110
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for
WetMain
Crude
Crude
Oil Oil
Tank-21-TK-001
Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

111
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

7.0 DESIGN OF FOUNDATION:


y

x Wc Wf H1 z

Lc Water Table

Tf

Lf

Lf

7.1 Geometrical Data :


Width of footing ( Wf ) = 2.7 m
Length of footing ( Lf ) = 4.7 m
Depth of Footing ( Tf ) = 0.6 m
Width of column ( Wc ) = 0.4 m
Length of column ( Lc ) = 0.6 m
Height of column ( H1 ) = 4.6 m
Projection of column above ground = 3.00 m

7.2 Soil Data :


Unit weight of soil,( gs ) = 18 KN/m3
Net allowable bearing pressure = 150 KN/m2
Angle of internal friction, ( f ) = 32 O

Factor of safety against overturning = 1.75


Factor of safety against sliding = 1.75
Coefficient of active earth pre. ( Ka ) = ( 1-SINf ) / ( 1+SINf ) = 0.31
Coefficient of passive earth pre. ( Kp ) = ( 1+SINf ) / ( 1-SINf ) = 3.25
Depth of Water table from Ground = 10 m

7.3 Material Data :


Grade of Concrete ( Fcu ) = 30 N/mm2
Yield strength of rebar ( Fy ) = 414 N/mm2
Unit Weight of Concrete ( gc ) = 24 KN/m3
Dia of Reinforcement in direction of Lf = 16 mm
Dia of Reinforcement in direction of Wf = 16 mm
Clear Cover to Reinforcement ( c ) = 75 mm
Factor for the moment calculation ( f ) = 1.4

7.4 Load Data For Stability Check :


(a) Load for Stability
JOINT FY FX FZ MX MZ
MAX 886 198 0 0 589
(b) Ultimate load combination for concrete design.
JOINT FY FX FZ MX MZ
MAX 1240 277 0 0 825
(c) Load combination for bearing pressure check:.
JOINT FY FX FZ MX MZ
MAX 1 886 198 0 0 589

18
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

19
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

Uplift Force Due to Water Table ( Bf ) = 0 kN


Total Weight ( Fy ) = Fy + Bf
= 886 kN

7.5 Check For Stability :

Check For Sliding :


In X direction:
Sliding force in X direction ( Fx ) = 198 KN
FY = 886 kN
Resisting frictional force ( Rx ) = Fy tan(2/3*f )
= 345.93 KN

F.O.S. against sliding in X direction = Rx / F x


= 1.75
O.K. as value greater than permissible value

In Z direction:
Net Sliding force in Z direction ( Fz ) = 0 KN
FY = 886 KN
Resisting frictional force ( Rz ) = Fy tan(2/3*f )
= 345.9272 KN
F.O.S. against sliding in Z direction = Rz / Fz
= NA
O.K. as value greater than permissible value

Check For Overturning :


In X direction:
Forces acting at bottom of footing about Z
FY = 886 KN
( Mzo ) = Mz
= 589 KNm
Restoring Moment ( Mr ) = BF*Lf/2 + Mzr From Case I & II
2064.883 KN-m

1.4 Factor of safity against overturning = Mr / Mzo


= 3.50

2.35 p O.K. , As value is greater than 1.75


BF

In Z direction:
Forces acting at bottom of footing about X
FY = 885.7346 KN
Total overturning moment ( Mxo ) = Mx
= 0 kNm

20
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Restoring Moment ( Mr ) = BF*Lf/2 + Mxr From Case I & II
= 1195.742 kNm

Factor of safity against overturning = Mr / Mxo


1.4 = N.A.

O.K. , As value is greater than 1.75


p

1.35

BF
7.5 Check For Bearing Pressure:

Gross vertical load ( PY ) = 886 KN


Moment about Z
Mxo = 0 kNm
Mxr = 1196 kNm
Net Moment Mx = Mxo - Mxr = 1195.7 kNm
Moment about X
Mzo = 589 kNm
Mzr = 2065 kNm
Net Moment Mz = Mzo - Mzr = 1475.4 kNm

x = ( Mzo - Mzr ) / PY z = ( Mxo - Mxr ) / PY


= 1.67 m = 1.35 m

ex = Lf/2 - x = 0.684 M e<L/6, No Tension in footing.


ez = Wf/2 - z = 0.00 M e<B/6, No Tension in Footing.

Gross pressure under footing ( p ) = ∑ P Y ( 1± 6 e x ± 6 e Z )


Lf W f Lf Wf
p1 = 130.77 kN/m2 p3 = 130.77 kN/m2
p2 = 8.83 kN/m2 p4 = 8.83 kN/m2

Here, Contact Area = 100.000% p4 p3


+Mx
Maximum Gross Pressure Mx
= 2P/ 3Wf(0.5Lf - ex)
= 130.77 KN/m2 p2 Mz p1
< 189.60 KN/m2
Sign Convention
O.K. Less than allowable bearing pressure 4.7

4.7
7.6 Check For Moment And Shear

Pressure intensities at the base of footing:


p1u = 130.77 kN/m2 p3ut = 130.77 kN/m2
p2u = 8.83 kN/m 2
p4u = 8.83 kN/m2

21
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

Downward pressure intensities due to selfweight of footing & earth cushion:


p1d = 36.00 kN/m2 p3d = 36.00 kN/m2
p2d = 36.00 kN/m2 p4d = 36.00 kN/m2

(a) Check for Moment and One way Shear in X direction

1 2 3

36.00 1 2 36.00

P2 P1
8.83 d d
77.58 104.41 ( d = D - 75 - 8 = 517 mm )
90.99 130.77

Factored Pressure Distribution At Salient points Critical Sections For Moment & Shear

Moment at the Critical section 1: = 161.8788 KNm/m Width of Footing.


Shear at critical section 1: = 139.7583 KN

22
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Shear at critical section 2: = 114.7934 KN
Shear at critical section 3: = 103.9843 KN

Tensile Reinforcement:
K = Mu / fcubd2 Factore Moment
= 0.028263 < 0.156
Z = d[0.5+Ö(0.25-k/0.9)]
= 500.22 mm &
= 0.95*d
= 491.15 mm
Hence z = 491.15 mm

Ast = M/0.95fyz
= 838.0151 mm2/m
Amin = 0.13% of Area of concrete
= 780 mm2/m
Reqd. Spacing of 16 mm dia bar = 240 mm
Provided Spacing of 16 mm dia bar = 200 mm
Ast,provided = 1005.31 mm2/m

Design Concrete shear stress uc = 0.389 N/mm2

Section 1 Ultimate shear stress v1 = 0.100121 N/mm2


Maximum allowed 0.8Öfcu = 4.38178 N/mm2 O.K. (Clause 3.7.7.2)

Section 2 Ultimate shear stress v2 = 0.082236 N/mm2


Maximum allowed 1.5uc = 0.583631 N/mm2 O.K. (Clause 3.7.7.4)

Section 3 Ultimate shear stress v3 = 0.074493 N/mm2


Maximum allowed uc = 0.389087 N/mm2 O.K.

(b) Check for Moment and One way Shear in Z direction

1 2 3
36.00 36.00

1 d
P3 P1 d
130.77
130.77 130.77 130.77
130.77 ( d= D-75-16-8 = 501 mm )
Factored Pressure Distribution At Salient points Critical Sections For Moment & Shear

Moment at the Critical section 1: = 62.67 KNm/m Width of Footing.


Shear at critical section 1: = 108.984 KN
Shear at critical section 2: = 61.505 KN
Shear at critical section 3: = 37.765 KN

23
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

24
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool
Tensile Reinforcement:
K = Mu / fcubd2 Factore Moment
= 0.011651 < 0.156
Z = d[0.5+Ö(0.25-k/0.9)]
= 494.43 mm &
= 0.95*d
= 475.95 mm
Hence z = 475.95 mm
Ast = M/0.95fyz
= 334.77 mm2/m
Amin = 0.13% of Area of concrete
= 780 mm2/m
Reqd. Spacing of 16 mm dia bar = 258 mm
Provided Spacing of 16 mm dia bar = 200 mm
Ast,provided = 1005.31 mm2/m

Design Concrete shear stress uc = 0.370 N/mm2

Section 1 Ultimate shear stress v1 = 0.046 N/mm2


Maximum allowed 0.8Öfcu = 4.38 N/mm2 O.K. (Clause 3.7.7.2)

Section 2 Ultimate shear stress v2 = 0.03 N/mm2


Maximum allowed 1.5uc = 0.555003 N/mm2 O.K. (Clause 3.7.7.4)

Section 3 Ultimate shear stress v3 = 0.016038 N/mm2


Maximum allowed uc = 0.37 N/mm2 Hence O.K.

(c) Check for Punching Shear

UO 1.5d
U1

1.5d

Average of effective depth in two directions ( d ) = 509 mm


Uo = 2 (Wc+Lc) = 2000 mm
U1 = U0 +12d = 8108 mm

Maximum ultimate Vertical load on column FY = 1240 KN


Ultimate shear stress for Uo = 1.218 N/mm2
Maximum allowed 0.8Öfcu = 4.382 N/mm2 O.K.
Ultimate shear stress for U1 = = 0.300 N/mm 2

Maximum allowed uc = = 0.370 N/mm2 O.K.

25
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No : 0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By : Mr. Girish Kurnool

26
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process
Job No : JI-180 Doc No : JI-180-000-ECV-CAL-050
Subject : Design of Column Bund Wall Rev No :0
for Main Crude Oil Tank TK - 1526 & Prep. By : Dipak
Test Tank Tk - 1527 Checkd. By :Mr. Girish Kurnool

Appendix - I
EL 100.50 A EL 100.50
400 3600 400 600

300

3000

4400 2700 300

1600
1600

600 600 3.5 0.6

A 2700 4700

GA Details Of Wall & Column Section A-A


** All Dimensions Are In MM ** All Dimensions Are In MM
B
T 12 @ 200 mm c/c
Tt

To

x Sectional Plan Of Wall


z B ( RC Detail Only )
Panel Tankside Face ( Tt ) Otherside Face ( To )
Top - 1 T 12 @ 200 mm c/c T 12 @ 200 mm c/c
Mid - 2 T 16 @ 150 mm c/c T 16 @ 150 mm c/c
Bottom -3 T 20 @ 200 mm c/c T 20 @ 200 mm c/c

T 8 @ 150 mm c/c

T 25 @ 12 Nos

T 16 @ 200 mm c/c
T 16 @ 200 mm c/c

Section B-B

24
( RC Detail Only )