DETAIL ENGINEERING DESIGN FOR Doc.

No: P16142-PSPSB-ME-DS-003

KVDT T-501 DIESEL TANK Revision: 0

CONVERSION TO ULG95 Date: 03.11.16

MECIP (M) SDN BHD T-501 TANK DATASHEET Page 1 of 3

CLIENT:

PS PIPELINE SDN BHD

PROJECT TITLE:
DETAIL ENGINEERING DESIGN FOR KVDT T-501 DIESEL TANK
CONVERSION TO ULG 95

DOCUMENT TITLE:
T-501 TANK DATASHEET

MECIP PROJECT NUMBER:


P16142

CONTRACT NUMBER:
PS/16/505

Approved for
0 03.11.16 KY SH ZIZ
Construction
A 20.10.16 Issued for Comment KY SV ZIZ
PREPARED CHECKED APPROVED APPROVED
REV. DATE DESCRIPTION BY BY BY BY
MECIP PSPSB
TANK PROCESS DATA SHEET

1 Number of Tanks : One (1) Specific Gravity: 0.75 ~ 0.79 @ 15oC


2 Vapour Pressure : RVP in kPa max 70
3 Flash Point : < 37.78 oC
4
5 Shell ID : 34.25 m Nom Capacity : 15,706 m3 @ 17.0 m
6 H : 17.0 m Net Capacity : 9,766 m3 @ LSL of 3.40 m (Option 1 )
7 Net Capacity : 11,148 m3 @ LSL of 1.90 m (Option 2 )
8 Roof Type : Fixed Cone Roof c/w Internal Floating Roof
9
10 Design Code : DEP 34.51.01.31 ( 1Foot Method)
11 Design Condition : Pressure : 20 mbarg Vacuum : 6.0 mabarg
o
12 : Temperature - 54 C
13
14 Material of construction: Shell / Bottom / Roof - carbon steel
15
16 Corrosion Allowance : Shell - 1.0 mm and 3.0 mm for upto 2m bottom course
17 : Roof & Internals - 1.0 mm : Bottom - 3.0 mm
18
19 Painting : Refer to DEP painting coating system
20
21 Heating / Cooling Coil : No Mixer : No Insulation : No
22
23 Max. Flow Rate (In) : 2,000 m3 / hr Normal Flow Rate (Out) : 1,840 m3 / hr
24 Required Normal Pressure Relief : 178,770 SCFH Air

25 Required Normal Vacuum Relief : 124,325 SCFH Air


26 Emergency Pressure Reilef (Fire) : 742,000 SCFH Air
27 Environmental Data : Malaysian climate

Option 2 is to extend 24" suction header to T-501

0 KY SH BAT 03.11.16 AFC


A KY SH BAT 20.10.16 Issue for Comment
Rev. Drawn Checked Approved Date Description
Contract : PS / 16 / 505

Title : KVDT T-501 DIESEL TANK CONVERSION


TO ULG 95 ( T-501)

MECIP (M) SDN BHD Drg No. Rev. 0


Sheet 2 of 3
TANK PROCESS DATA SHEET
Description Mark Nos Size Remarks
1 Liquid In A 1 400 Inlet Difusser to be provided
2 Liquid Out B 1 600 Vortex Breaker to be provided
3 Product Drain C 1 250 Riser to be provided
4 Water Drain D 1 100 Riser to be provided
5 Shell Manway M1 / 2 2 600
6 Roof Manway M3 / 4 2 500
7 Free Vent V1 / 2 2 200
8 Peripheral Vent FR1~12 12 500 TBC - Size & qty pending vendor design
9 Gauge Hatch H 1 200
10 Level Gauge Pole L1 1 6" 150# Stilling well to be provided incl temp sensor
11 Level Switch High-High L2 1 4" 150#
12 Level Switch Low-Low L3 1 2" 150#
13 Foam pourer nozzle F1 ~ F2 2 10" 150# Install on top tank shell
14 Spare Nozzle J/K 2 10" 150# Blind off
15 Internal Floating Roof IFR Note 2
16 V
17 M3 V L1 Note 1 mm Vol (m3)
H L2 FR1~12
18 M4 LSL 3,400 3,132 Option 1
19 LSL 1,900 1,751 Option 2
20 LSH 14,000 12,898
21 LSHH 14,400 13,267
F1~2 IF
22 Notes
23 M1 1 Set points allow 10 minutes operator
D
24 M2 response time from LSH to LSHH
25 J/K Option 1 & 2 - refer to process design
C
26 2 IFR is tubular pontoon type with
A DF V B
27 adjustable leg, automatic bleeder
28 valve, MH and standard accessories

0 KY SH BAT 03.11.16 AFC


A KY SH BAT 20.10.16 Issue for Comment
Rev. Drawn Checked Approved Date Description
Contract : PS / 16 / 505

Title : KVDT T-501 DIESEL TANK CONVERSION


TO ULG 95 ( T-501)

MECIP (M) SDN BHD Drg No. Rev. 0


Sheet 3 of 3