Professional Documents
Culture Documents
10.0
QC PROCESS FLOW CHART 10.1 Process Description for Gas Piping (Reticulation) JKKP (DOSH) and Client Specifications Requirements (PTI )
Material Receiving/ Incoming Material Piping Pipe Fittings Structural for Pipe supports Welding Consumables
REFER TO SOP
Fabrication/Installation according to Standard Operating Procedure (SOP) Inspection and Test Plan (ITP)
PASS/OK
FAIL
Commissioning Application for PTO from DOSH Final Quality Check (FQC)
Rectify