Professional Documents
Culture Documents
CONSTRUCTION WORKS
LOCATION: TITLE:
Q C 1 0 - H - 1 2 5 00
SUBCONTRACTOR: Page 1 of 12
SWCC WATER TRANSMISSION SYSTEMS
Specification S05
Subject: Page 2 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
LIST OF CONTENTS
1 SCOPE .........................................................................................................................4
2 CODES AND STANDARDS.......................................................................................... 4
3 ENVIRONMENTAL CONDITIONS ................................................................................ 4
4 SYSTEM REQUIREMENTS ......................................................................................... 4
4.1 System Topology .......................................................................................................... 4
4.2 Redundancy .................................................................................................................5
4.3 Expandability ................................................................................................................6
4.4 Consistency ..................................................................................................................6
4.5 Availability ....................................................................................................................6
5 STANDARD HARDWARE ............................................................................................ 7
5.1 Display Wall ..................................................................................................................7
5.2 Server ...........................................................................................................................8
5.3 Working Place ..............................................................................................................8
5.4 Printer ...........................................................................................................................9
5.5 Network Access Storage (NAS) .................................................................................... 9
5.6 Training Working Place ............................................................................................... 10
5.7 SYSCON .................................................................................................................... 10
6 STANDARD SOFTWARE ........................................................................................... 10
6.1 Licenses ..................................................................................................................... 10
6.2 Operating system........................................................................................................ 11
6.3 System Monitor........................................................................................................... 11
6.4 Access Control ........................................................................................................... 11
6.5 Operation System Amendments ................................................................................. 11
7 CYBER SECURITY .................................................................................................... 12
8 TEST AND COMMISSIONING ................................................................................... 12
9 DOCUMENTATION .................................................................................................... 12
SWCC WATER TRANSMISSION SYSTEMS
Specification S05
Subject: Page 3 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
ABBREVIATION
CC Central Control
IP Internet Protocol
Specification S05
Subject: Page 4 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
1 SCOPE
The scope of the specification shall cover the functional requirements for the Central
Control Hardware and Standard Software.
The following standards, rules and regulations, all in the latest valid edition must be
observed specifically:
3 ENVIRONMENTAL CONDITIONS
All components of the CC shall properly work within the environmental conditions that
are summarised in the Specification S01 “Design and Construction of I&C System” and
in the General Specification G02 “Description of Project and Works”.
The above-mentioned conditions are valid for all components, except for server and work
place hardware for which the following is applicable.
4 SYSTEM REQUIREMENTS
4.1 System Topology
The control system shall meet the specified requirements on functionality, data
throughput, update time, consistency, availability, maintainability and safe guarding the
future.
SWCC WATER TRANSMISSION SYSTEMS
Specification S05
Subject: Page 5 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
An open system topology shall be provided that allows for an optimal upgrade in the
future.
The protocol, which has to be used inside the local area network including the
communication between the individual systems of the control system, shall be based on
Ethernet, routable IP-based protocols are preferred.
The control system components shall be time synchronized (as far as functionality is
supported).
4.2 Redundancy
Specification S05
Subject: Page 6 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
The failure of two individual components shall only have a tolerable limitation for the
operation. Tolerable means all actual process information shall be displayed at least at
one operator working place and all commands can be given and registered.
Operator working place, server, front end processor (if required), LAN in the CC shall be
set-up redundant. Therefore, two independent networks are necessary to which each
component shall be connected.
4.3 Expandability
It shall be possible to extent the system without the need for basic modifications as
follows:
4.4 Consistency
The central control system shall display the actual process and system status within 2 s
at all working places consistently under regular operating conditions. This requirement on
consistency with respect to the actual process and system status also applies for the
process history, acknowledgement status, substitute values, signal blocking and power
of command.
4.5 Availability
The availability of the system is defined by the characteristic of the provided hardware
and software components. The system availability explicitly includes the availability of the
hardware and standard software as well as the availability of the control and process
specific software.
Specification S05
Subject: Page 7 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
Registration of
Monitoring Access to Leak Visualisation of
Function all essential
& Control archive data Detection hydraulic profile
data
Outage of 1x
NEex1 NEex NEex NEex NEex
Server
Outage of 1x
Operator NEex NEex NEex NEex NEex
Working Place.
Outage of 1x
NE3 NE NE NE NE
LAN component
Annual
99.9 % 99.9 % 99.9 % 99.9 % 99.9 %
availability4
5 STANDARD HARDWARE
The following parameters given for the hardware components are only on informational
basis. Generally state of the art hardware using latest available technology (e.g. high
energy efficiency) shall be provided.
The display wall system shall be designed such that burn in effect is avoided.
1
no effect except that the faulty component is not available
2
not available
3
no effect
4
on at least one working place
SWCC WATER TRANSMISSION SYSTEMS
Specification S05
Subject: Page 8 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
5.2 Server
The servers shall be rack mounted and meet at least following requirements, incl. long
term archive:
- HD: RAID1
- Backup/long term archive: Tape drive e.g. DDS or DAT format
- DVD: Multilayer, double sided
- NIC: ≥2
- Power supply: Redundant
1x Monitor
- Keyboard: Alphanumeric
- Pointer Device: 3-Key-Mouse
The working place shall be rack mounted and meet at least following requirements, incl.
short term archive:
- HD: RAID 1
- Backup/Archive Export: DVD, multilayer, double sided (Engineering
Working Place only)
- NIC: ≥2
- Power Supply: Redundant
2x Monitors
- Size: 24“
- Type: LCD
Periphery
- Keyboard: Alphanumeric
- Pointer Device: 3-Key-Mouse
SWCC WATER TRANSMISSION SYSTEMS
Specification S05
Subject: Page 9 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
Only keyboard, mouse and monitors shall be installed in the control room, extended via
KVM switches from the instrumentation room.
5.4 Printer
Page Printer
- Type: Raid 5
- Power Supply: Redundant
Following minimum requirements shall be considered:
Specification S05
Subject: Page 10 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
A dedicated working place for training shall be considered. The working place shall be
rack mounted and meet at least following requirements:
- HD: RAID 1
- NIC: ≥1
2x Monitors
- Size: 24“
- Type: LCD
Periphery
- Keyboard: Alphanumeric
- Pointer Device: 3-Key-Mouse
Only keyboard, mouse and monitors shall be installed in the control room, extended via
KVM switches from the instrumentation room.
5.7 SYSCON
For SYSCON PLC and Local Control Panel requirements refer to S04 “Distributed
Control System”.
6 STANDARD SOFTWARE
6.1 Licenses
For the whole standard software system unlimited and transferable licenses for all
system components shall to be provided. This includes also required development
licenses for maintenance and administration purposes.
These licenses shall be written out on behalf of the Employer and submitted with
installation of the system.
SWCC WATER TRANSMISSION SYSTEMS
Specification S05
Subject: Page 11 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
For all components of the control system, a consistent operating system shall be
provided.
The basic requirements on the operating system are described in the following:
- The operating system shall support a multi-user and multi-tasking environment and
shall support time-sharing with batch operation
- The windowing function shall support multi-monitoring with min. 3 monitors, i.e. the
assignment of a window to a mouse shall work properly over several monitors.
- CPU performance
- Paging
- Context changeover
- Overview over the capacity of every partition/storage media
- Network traffic
Deviations from the normal status, limit violations at overload of resources have to be
announced and recorded.
At standard operating system the user accounts shall be limited to the real requirements
like standard user and administrator. The applications as per specification S06 “SCADA
and Process Specific Software” shall be executed at standard user level.
Access to the administrator account shall be password protected, whereas the standard
user level shall allow an automatic logon to allow “SCADA and Process Specific
Software” start-up without operator intervention.
All amendments to the standard operating system that are required for a proper
performance of the pipeline control system out of the described applications are part of
the scope.
SWCC WATER TRANSMISSION SYSTEMS
Specification S05
Subject: Page 12 of 12
Central Control Hardware and Standard Software
Doc. - No.: Q C 1 0 - H - 1 2 5 Rev. 00
7 CYBER SECURITY
The appropriate tests of the central control hardware and the standard software are part
of the tests for the entire control system according to the specification S04 “Distributed
Control System”.
9 DOCUMENTATION
The documentation of the central control hardware and the standard software is part of
the documentation of the entire DCS system according to the specification S04
“Distributed Control System”.