You are on page 1of 1

Engineer/ Contractor/

Nadzorni organ: Izvođač:

Modernization and Reconstruction of the Hungarian-Serbian railway line in the territory of the Republic of Serbia, section Novi Sad – Subotica
Modernizacija i rekonstrukcija mađarsko-srpske železničke pruge na teritoriji Republike Srbije, deonica Novi Sad – Subotica

No./Br.
REQUEST FOR INSPECTION AND APPROVAL (RIA)
(ZAHTEV ZA INSPEKCIJU I ODOBRENJE) NSSU-S1-D2-STR-ST6-RIA-314

Following works are ready for inspection at: time: date:


8:00 9/15/2023
Sledeći radovi su spremni za inspekciju u: vreme: datum:

Laboratory testing (LAB)/ Geodetski radovi (SUR)/ Visual inspection (WKS)/


Laboratorijsko ispitivanje (LAB) x Surveying works (SUR) Vizuelna inspekcija (WKS)

Location / Lokacija:

Pruga Novi Sad-Subotica , Stanica Vrbas Nova 113+610 km

Type of works /
Vrsta radova:
Provera zbijenosti podtla peronskog zida 2 (113+630-113+680)

The works comply with design drawings /


Radovi su u skladu sa crtežima projekta:
Projekat:2/9.7.7.

Prepared by / Pripremio: Signature / Potpis:


Jovana Pekić

Signed for Contractor / Overava za Izvođača: Signature / Potpis:


Dušan Janković

RESPONSIBLE ENGINEER FOR STRUCTURES

The above works are / Gore navedeni radovi su:

Approved / Approved with corrections /


Returned for corrections /
A B C Vraćeni na ispravku
Odobreni Odobreni uz korekcije
Comments / Komentari:

Signed for Engineer / Overava za Nadzor: Position / Pozicija: Date / Datum:

Nadzorni organ za infrastrukturne objekte u


službenim mestima

You might also like