UAP Document 401 provides the format for the Owner-Architect Agreement. However, since the
adoption of the 2010 Standards of Practice (SPP) Documents by the PRBoA and the 2014 Architects
Guidelines on Methods of Compensation and Schedule of Fees, the document has not yet been amended
or updated. Here is a sample format for the contract which incorporated the 2010 SPP and 2014 Architects
Guidelines. This sample contract can be used for the basic or full detailed architectural and engineering
design (DAED) services. You may amend some provisions to suit your project requirements.
THIS AGREEMENT, made and entered into this 12 day of July, Two Thousand and
Twenty Three by Mr. Benjie of legal age, Filipino and with postal address 1860, the party of the
First Part, hereinafter called the OWNER and between Ar. JOhnjohn, a duly registered and
licensed architect under the laws of the Republic of the Philippines with PRC Registration No
0000000, of legal age, Filipino and with postal address at 1096, the party of the Second Part,
hereinafter called the ARCHITECT.
WITNESSETH,
That whereas the OWNER intends to build a Two-Storey Residential House building at Block 6 Lot
6 Montavilla Phase 2, Barangay Burgos, Rodriguez, Rizal hereinafter called the PROJECT.
NOW,THEREFORE,
The OWNER and the ARCHITECT, for and in consideration of the foregoing premises and of
the other covenants hereinafter named, agree as follows:
Page 1 of 4
ARCHITECT - OWNER AGREEMENT
Note: The 1979 Standards of Professional Practice (SPP) are also referred to as the United Architects of the Philippines (UAP) Documents.
Owner-Architect Agreement
UAP Document – 401-A
4.6 Specifications
Page 2 of 4
ARCHITECT - OWNER AGREEMENT
Note: The 1979 Standards of Professional Practice (SPP) are also referred to as the United Architects of the Philippines (UAP) Documents.
Owner-Architect Agreement
UAP Document – 401-A
The owner agrees to pay the Architect in accordance with the Architect’s National
Code (UAP Doc. 202) a basic fee of percent ( %) of the total
estimated project construction cost. However, the fee shall be adjusted up or
down based on the final construction cost.
Any payment due the Architect beyond 30 days from receipt of billing shall bear
2% interest per month.
Page 3 of 4
ARCHITECT - OWNER AGREEMENT
Note: The 1979 Standards of Professional Practice (SPP) are also referred to as the United Architects of the Philippines (UAP) Documents.
Owner-Architect Agreement
UAP Document – 401-A
All technical description of property, duly certified lot and vicinity plans, contour
maps, etc., at a convenient scale and other relevant data will be furnished by the
Client/Owner so that the design of the project can start immediately.
Any changes and/or revisions requested by the Owner after the approval of final
design shall be subjected to compensation agreed by both parties but not less
than man-hour time charge plus materials used times a factor of 2.5.
Contract documents shall remain the property of the Architect in accordance with
R.A. 9266 and R.A. 8293 whether the design is executed or not. Additional
copies when required will be for account of the Owner.
Conforme
Architect Owner-Client
Date
Page 4 of 4