Professional Documents
Culture Documents
+06
6.27
7.15
S15-T1
EP: 0+05
0+020
L=5.2m
C8 HDPE
H=1.6m SN8 Φ 0+000
=400mm
L=52.4
9m
4m
S16-T1
m L=27.2
L=4.5m 0+
00
PI: 0+ 0
0+080 002.3
0+23 8
9
8 Φ=400m
C9
EP: H=1.6m
0+23
8.60
HDPE SN
0+11
6
0+
02
0+095 0
1m
EP: 0+094.7
4
.6
54
L=
m
m
00
=4
Φ
8
SN
PE
HD
EP:
0+04
0+10
0
1.70
0+
0+04 04
2 0
0+04
0
m
1.70
C10
EP: PI
L=4
0+0 H=1.6m :0
35.7 0+0 +0
3 60 55
m
0+08
0
.25
4
00m
N=7811100
9.2
0+0
36
L=1
Φ=4
0+02
mm
0
SN8
400
S1-T1
E
HDP
Φ=
L=4.0m
8
SN
PE
m
HD
.73
0+0
=35
75
EP:
mL
TORRENTERA B 0+0
33.2E
0+0 7 P: 0
00m
20 +07 406
5.2 0
0+00
Φ=4
0+060
33
SN8
PE
0+00
0
HD
DESARENADOR 2 S2-T1
TORRENTERA B
L=4.9m
m
.27
=33
EP: 0
+020.2
2
L
0+02
mm
0
00++002200
400
0
00
0+
Φ=
m
0+0
20.22
00
8
SN
S3-T1
m L=
PE
0+0
40
L=4.0m EP: 0+
016.87
HD
400m
0+017
8 Φ=
3m
L=16.1
E SN
EP: 0
+018
.7
HDP
9
00mm
0+01
9
=4
20 0+0
0 00
0+
N8 Φ
9m
S4-T1 0+000
18.7
S
L=4.9m S5-T1
HDPE
m L=
L=4.0m
CANAL DE DRENAJE B1 0+02
400m
0
0+000
8 Φ=
DESARENADOR 1 S6-T1
TORRENTERA B L=6.8m
E SN
EP
BOCA DE TORMENTA 40
:0
HDP
55
+0
33
.60
0 0+00 m
04 0 46
0+ .
0+220
16
0+200
0+
3 S7-T1 L=
03
7.7 SALIDA TORRENTERA B2 m
0+240
4
04 L=6.3m
0+244
m
+ 50
0+180
:0
=4
0+160
EP
9.645
Φ
200.8
6
04
8 R2
0+21
0+ SD
PI
PC:: 0+
0+140
0+0
00
:0
PE
+0
EP: 0+243.59
PT
CANAL DE DRENAJE B HD
15
19
PC: 0+175.54
0+155.57
PC: 0+156.45
.1
4
PT: 0+176.
0+
0+120
02
0
BAJANTE CON TUBO
0+100
0+080
0+060
PT:
HDP SDR26 DE 450 mm
L=17.01m
0+040
DESARENADOR
7.47
PC: 0+116.68
CANAL DE DRENAJE B
0+055.60
PT: 0+11
PC: 0+056.21
0+020
PT:
0+000
276
0+
9.8
00
010.
0
0+02
PC:: 0+
PT
N=7811000
PROG=0+000.00
PERFIL TRAMO SALIDA TORRENTERA B2
ELEV =4059.37
4060 4060
4054 4054
PROG=0+000.00
4054 4054
ELEV =4051.40
ELEVACION (msnm)
ELEVACION (msnm)
-51.2
PROG=0+035.73
-0.98%
ELEVACION (msnm)
ELEV =4051.20
ELEVACION (msnm)
4054 4054
4%
S-2 4052 4052
PROG=0+000.00
4052 4052
ELEVACION (msnm)
ELEV =4052.10
HDPE SN8 Φ=400mm L=41.70m
PROG=0+000.00
ELEVACION (msnm)
ELEV =4051.80
PROG=0+020.22
-0.56%
ELEV =4051.70
PROG=0+000.00
ELEV =4051.85
PROG=0+033.27
4054 4054
ELEV =4051.16
PROG=0+018.79
S-3 4054 4054
ELEV =4051.55
HDPE SN8 Φ=400mm L=35.73m
4052 4052 4052 -1.98% 4052
-1.92%
PROG=0+000.00
4052 4052
ELEV =4052.05
4050 4050 S-4 S-5
-1.60%
PROG=0+016.87
4050 4050 HDPE SN8 Φ=400mm L=20.22m
ELEV =4051.70
0+035.73
PROG=0+015.14
PROG=0+016.34
0+000
0+020
S-7
ELEV =4051.61
ELEV =4051.61
0+041.70
0+020
0+040
PROGRESIVA
PROGRESIVA 4052 -2.07% 4052 HDPE SN8 Φ=400mm L=18.79m
4052 4052
PROG=0+033.60
4050 4050
ELEV =4050.70
4050 4050 0.00%
S-6
0+033.27
1.60
0.86
0.95
ALTURA CORTE
0+020.22
0+000
0+020
0+000
0+020
0.41
0.81
0.77
4050 4050
1.20
0+018.79
0+000
PROGRESIVA
4051.25
4052.85
4051.14
4052.00
4051.05
4052.00
4052.56
4053.76
4052.36
4052.78
4052.17
4052.94
4052.15
4052.96
0.97
1.00
4050 4050
ALTURA CORTE
3.28
1.44
1.45
ALTURA CORTE 4050 4050
0+016.87
0+000 0+020 0+035.73
0+000
0+033.60
3.89
1.45
0+000 0+020 0+040
0+041.70
ALTURA CORTE
0+000
0+020
PROGRESIVA PROGRESIVA
4054.71
4052.40
4052.02
4052.99
4051.76
4052.76
4051.95
4055.23
4051.55
4051.55
4053.00
4053.00
4051.85
4055.74
4051.55
4053.00
4.84
1.45
0+000 0+020 0+033.27 0+000 0+020.22
0+020 ALTURA CORTE
0.91
1.44
ALTURA CORTE
0+000 0+018.79
4051.90
4056.74
4051.55
4053.00
4059.87
4051.27
4052.18
4050.55
4051.99
0+000 0+016.87
0+000 0+020 0+033.60
SEPTIEMBRE
2/11
-2023