Rebar Schedule Foundation Slab Schedule

Bar Bar Length Total Bar Core


Diameter (m) Quantity Length (m) Area Thickness Volume

0.37" 0.806 15 12.093 4 m² 200 0.86 m³


0.37" 0.897 54 48.425 35 m² 200 7.10 m³
0.37" 15.347 114.652 Grand total: 2
0.50" 1.247 13 16.215
0.50" 11.883 1 11.883
0.50" 47.962 83.933
0.50" 5.020 7 35.143
0.50" 5.040 9 45.364
0.50" 2.898 13 37.679
0.50" 1.592 28 44.574
0.50" 6.997 3 20.990
0.50" 3.739 9 33.653
0.50" 9.393 4 37.571
0.50" 9.401 1 9.401
0.50" 9.422 1 9.422
0.50" 9.427 1 9.427 Do not scale drawing,
0.50"
0.50"
9.431
32.380
1 9.431
148.569
work to dimension.
0.50" 7.919 44 348.414
0.50" 4.080 9 36.722
0.50" 4.668 13 60.687
0.50" 9.344 8 74.753
0.50" 2.560 13 33.285
0.50" 2.565 13 33.349
0.50" 33.590 375.093
0.50" 25.331 253.309
0.50" 21.972 5 109.858
0.50" 17.845 107.070
0.50" 36.000 5 180.000
0.50" 52.996 84.794
0.50" 24.798 13 322.379 Owner
Grand total:
426.553 2748.139
192

No. Description Date

Police HQ St.
Catherine
Chlor. Chamber
Project number Project Number
Date 07.02.2023
Drawn by J. Gilman
Checked by

2/7/2023 6:23:00 PM
S-1
Scale