You are on page 1of 2

Production SAP PP

CK11N: Create Cost Estimate with Quantity Structure

Transaction

Description
The transaction CK11N is used to create a standard cost estimate for a material with a quantity
structure. Enter the material and plant for the cost estimate. Then enter the costing variant, which
controls the type/cost components to be included in the estimate and the quantity structure (i.e.,
BOM's and Routings). Enter the costing version and the costing lot size (if left blank, the material
master will determine the costing lot size) and click ENTER. The standard cost estimate will be
calculated which can be analyzed by cost component or by cost element.

Menu Path
Image Gallery
[play]

The gallery of images below provides high resolution images of the screens and features of the
transaction.

Sharesap.com®. Copyright©. Tous droits réservés. Par Mickael QUESNOT


Production SAP PP

SAP CK11N Create Cost Estimate with Quantity Structure 1

Prev

Next

Related Transaction
In the list below, you will find the SAP transactions that relate to the current document or that have
similar functionalities.

CK13N Display Cost Estimate with Quantity Structure transaction

Other Languages
The document is translated in other languages. You can quickly navigate to the language of your
choice by clicking on the document in the list below.

Category
The SAP Transaction is categorized according to the SAP Module it belongs to, the business domain
and the business sector.

Action: Create

Product: SAP ERP

SAP Module: Controlling (CO)

Sharesap.com®. Copyright©. Tous droits réservés. Par Mickael QUESNOT

You might also like