IEEE Guide for Specifications

for High-Voltage Gas-Insulated


Substations Rated 52 kV and Above

IEEE Power and Energy Society

Sponsored by the
Substations Committee

IEEE IEEE Std C37.123™-2016


3 Park Avenue (Revision of IEEE Std C37.123-1996)
New York, NY 10016-5997
USA
IEEE Std C37.123™-2016
(Revision of IEEE Std C37.123-1996)

,(((*XLGHIRU6SHFL¿FDWLRQV
IRU+LJK9ROWDJH*DV,QVXODWHG
6XEVWDWLRQV5DWHGN9DQG$ERYH

Sponsor

6XEVWDWLRQV&RPPLWWHH
of the
,(((3RZHUDQG(QHUJ\6RFLHW\

Approved 3 March 2016

,(((6$6WDQGDUGV%RDUG
$EVWUDFW7KHGHYHORSPHQWRIVSHFL¿FDWLRQVIRUWKHWHFKQLFDOUHTXLUHPHQWVIRUWKHGHVLJQIDEUL-
FDWLRQWHVWLQJLQVWDOODWLRQDQGLQVHUYLFHSHUIRUPDQFHRIDKLJKYROWDJHJDVLQVXODWHGVXEVWDWLRQ
*,6 DUHFRYHUHGLQWKLVJXLGH

.H\ZRUGV JDVLQVXODWHG PHWDOHQFORVHG VZLWFKJHDU JDVLQVXODWHG VXEVWDWLRQ *,6 HTXLSPHQW


*,6VSHFL¿FDWLRQ,(((&Œ6)6VXOIXUKH[DÀXRULGH

7KH,QVWLWXWHRI(OHFWULFDODQG(OHFWURQLFV(QJLQHHUV,QF
3DUN$YHQXH1HZ<RUN1<86$

&RS\ULJKW‹E\7KH,QVWLWXWHRI(OHFWULFDODQG(OHFWURQLFV(QJLQHHUV,QF
$OOULJKWVUHVHUYHG3XEOLVKHG0D\3ULQWHGLQWKH8QLWHG6WDWHVRI$PHULFD

1DWLRQDO(OHFWULFDO&RGHDQG1(&DUHERWKUHJLVWHUHGWUDGHPDUNVRIWKH1DWLRQDO)LUH3URWHFWLRQ$VVRFLDWLRQ,QF

3') ,6%1 67'


3ULQW ,6%1 67'3'

IEEE prohibits discrimination, harassment, and bullying.


For more information, visit http://www.ieee.org/web/aboutus/whatis/policies/p9-26.html.
No part of this publication may be reproduced in any form, in an electronic retrieval system or otherwise, without the prior written permission
of the publisher.
,(((LVDUHJLVWHUHGWUDGHPDUNLQWKH863DWHQW 7UDGHPDUN2I¿FHRZQHGE\7KH,QVWLWXWHRI(OHFWULFDODQG(OHFWURQLFV(QJLQHHUV
Incorporated.
,PSRUWDQW1RWLFHVDQG'LVFODLPHUV&RQFHUQLQJ,(((6WDQGDUGV'RFXPHQWV

IEEE documents are made available for use subject to important notices and legal disclaimers. These notices
and disclaimers, or a reference to this page, appear in all standards and may be found under the heading “Im-
portant Notice” or “Important Notices and Disclaimers Concerning IEEE Standards Documents.”

1RWLFHDQG'LVFODLPHURI/LDELOLW\&RQFHUQLQJWKH
8VHRI,(((6WDQGDUGV'RFXPHQWV
IEEE Standards documents (standards, recommended practices, and guides), both full-use and trial-use, are
developed within IEEE Societies and the Standards Coordinating Committees of the IEEE Standards Asso-
ciation (“IEEE-SA”) Standards Board. IEEE (“the Institute”) develops its standards through a consensus de-
velopment process, approved by the American National Standards Institute (“ANSI”), which brings together
YROXQWHHUVUHSUHVHQWLQJYDULHGYLHZSRLQWVDQGLQWHUHVWVWRDFKLHYHWKH¿QDOSURGXFW9ROXQWHHUVDUHQRWQHFHV-
sarily members of the Institute and participate without compensation from IEEE. While IEEE administers the
process and establishes rules to promote fairness in the consensus development process, IEEE does not inde-
pendently evaluate, test, or verify the accuracy of any of the information or the soundness of any judgments
contained in its standards.

IEEE does not warrant or represent the accuracy or content of the material contained in its standards, and
expressly disclaims all warranties (express, implied and statutory) not included in this or any other document
UHODWLQJWRWKHVWDQGDUGLQFOXGLQJEXWQRWOLPLWHGWRWKHZDUUDQWLHVRIPHUFKDQWDELOLW\¿WQHVVIRUDSDUWLFXODU
purpose; non-infringement; and quality, accuracy, effectiveness, currency, or completeness of material. In
addition, IEEE disclaims any and all conditions relating to: results; and workmanlike effort. IEEE standards
documents are supplied “AS IS” and “WITH ALL FAULTS.”

Use of an IEEE standard is wholly voluntary. The existence of an IEEE standard does not imply that there
are no other ways to produce, test, measure, purchase, market, or provide other goods and services related to
the scope of the IEEE standard. Furthermore, the viewpoint expressed at the time a standard is approved and
issued is subject to change brought about through developments in the state of the art and comments received
from users of the standard.

In publishing and making its standards available, IEEE is not suggesting or rendering professional or other
services for, or on behalf of, any person or entity nor is IEEE undertaking to perform any duty owed by any
other person or entity to another. Any person utilizing any IEEE Standards document, should rely upon his or
her own independent judgment in the exercise of reasonable care in any given circumstances or, as appropri-
ate, seek the advice of a competent professional in determining the appropriateness of a given IEEE standard.

,112(9(176+$//,(((%(/,$%/()25$1<',5(&7,1',5(&7,1&,'(17$/63(&,$/
(;(03/$5<25&216(48(17,$/'$0$*(6 ,1&/8',1*%87127/,0,7('72352&85(-
0(172)68%67,787(*22'6256(59,&(6/2662)86('$7$25352),7625%86,1(66
,17(55837,21 +2:(9(5&$86('$1'21$1<7+(25<2)/,$%,/,7<:+(7+(5,1&21-
75$&7675,&7/,$%,/,7<257257 ,1&/8',1*1(*/,*(1&(2527+(5:,6( $5,6,1*,1
$1<:$<2872)7+(38%/,&$7,2186(2)255(/,$1&(8321$1<67$1'$5'(9(1
,)$'9,6('2)7+(3266,%,/,7<2)68&+'$0$*($1'5(*$5'/(662):+(7+(568&+
'$0$*(:$6)25(6(($%/(

7UDQVODWLRQV

The IEEE consensus development process involves the review of documents in English only. In the event that
an IEEE standard is translated, only the English version published by IEEE should be considered the approved
IEEE standard.
2I¿FLDOVWDWHPHQWV

A statement, written or oral, that is not processed in accordance with the IEEE-SA Standards Board Operations
0DQXDOVKDOOQRWEHFRQVLGHUHGRULQIHUUHGWREHWKHRI¿FLDOSRVLWLRQRI,(((RUDQ\RILWVFRPPLWWHHVDQGVKDOO
not be considered to be, or be relied upon as, a formal position of IEEE. At lectures, symposia, seminars, or
educational courses, an individual presenting information on IEEE standards shall make it clear that his or her
views should be considered the personal views of that individual rather than the formal position of IEEE.

&RPPHQWVRQVWDQGDUGV

Comments for revision of IEEE Standards documents are welcome from any interested party, regardless of
PHPEHUVKLSDI¿OLDWLRQZLWK,(((+RZHYHU,(((GRHVQRWSURYLGHFRQVXOWLQJLQIRUPDWLRQRUDGYLFHSHUWDLQ-
ing to IEEE Standards documents. Suggestions for changes in documents should be in the form of a proposed
change of text, together with appropriate supporting comments. Since IEEE standards represent a consensus
of concerned interests, it is important that any responses to comments and questions also receive the concur-
rence of a balance of interests. For this reason, IEEE and the members of its societies and Standards Coordi-
nating Committees are not able to provide an instant response to comments or questions except in those cases
where the matter has previously been addressed. For the same reason, IEEE does not respond to interpretation
requests. Any person who would like to participate in revisions to an IEEE standard is welcome to join the
relevant IEEE working group.

Comments on standards should be submitted to the following address:

Secretary, IEEE-SA Standards Board


445 Hoes Lane
3LVFDWDZD\1-86$

/DZVDQGUHJXODWLRQV

Users of IEEE Standards documents should consult all applicable laws and regulations. Compliance with the
provisions of any IEEE Standards document does not imply compliance to any applicable regulatory require-
ments. Implementers of the standard are responsible for observing or referring to the applicable regulatory
requirements. IEEE does not, by the publication of its standards, intend to urge action that is not in compliance
with applicable laws, and these documents may not be construed as doing so.

&RS\ULJKWV

IEEE draft and approved standards are copyrighted by IEEE under US and international copyright laws. They
are made available by IEEE and are adopted for a wide variety of both public and private uses. These include
both use, by reference, in laws and regulations, and use in private self-regulation, standardization, and the pro-
motion of engineering practices and methods. By making these documents available for use and adoption by
public authorities and private users, IEEE does not waive any rights in copyright to the documents.

3KRWRFRSLHV

Subject to payment of the appropriate fee, IEEE will grant users a limited, non-exclusive license to photocopy
portions of any individual standard for company or organizational internal use or individual, non-commercial
use only. To arrange for payment of licensing fees, please contact Copyright Clearance Center, Customer Ser-
YLFH5RVHZRRG'ULYH'DQYHUV0$86$3HUPLVVLRQWRSKRWRFRS\SRUWLRQVRI
any individual standard for educational classroom use can also be obtained through the Copyright Clearance
Center.
8SGDWLQJRI,(((6WDQGDUGVGRFXPHQWV

Users of IEEE Standards documents should be aware that these documents may be superseded at any time by
the issuance of new editions or may be amended from time to time through the issuance of amendments, corri-
JHQGDRUHUUDWD$QRI¿FLDO,(((GRFXPHQWDWDQ\SRLQWLQWLPHFRQVLVWVRIWKHFXUUHQWHGLWLRQRIWKHGRFXPHQW
together with any amendments, corrigenda, or errata then in effect.

(YHU\,(((VWDQGDUGLVVXEMHFWHGWRUHYLHZDWOHDVWHYHU\\HDUV:KHQDGRFXPHQWLVPRUHWKDQ\HDUVROG
and has not undergone a revision process, it is reasonable to conclude that its contents, although still of some
YDOXHGRQRWZKROO\UHÀHFWWKHSUHVHQWVWDWHRIWKHDUW8VHUVDUHFDXWLRQHGWRFKHFNWRGHWHUPLQHWKDWWKH\KDYH
the latest edition of any IEEE standard.

In order to determine whether a given document is the current edition and whether it has been amended through
the issuance of amendments, corrigenda, or errata, visit the IEEE Xplore® Website at http://ieeexplore.ieee.
org/Xplore/home.jsp or contact IEEE at the address listed previously. For more information about the IEEE-
SA or IEEE’s standards development process, visit the IEEE-SA Website at http://standards.ieee.org.

(UUDWD

(UUDWDLIDQ\IRUDOO,(((VWDQGDUGVFDQEHDFFHVVHGRQWKH,(((6$:HEVLWHDWWKHIROORZLQJ85/http://
VWDQGDUGVLHHHRUJ¿QGVWGVHUUDWDLQGH[KWPO8VHUVDUHHQFRXUDJHGWRFKHFNWKLV85/IRUHUUDWDSHULRGLFDOO\

3DWHQWV

Attention is called to the possibility that implementation of this standard may require use of subject matter
covered by patent rights. By publication of this standard, no position is taken by the IEEE with respect to the
existence or validity of any patent rights in connection therewith. If a patent holder or patent applicant has
¿OHGDVWDWHPHQWRIDVVXUDQFHYLDDQ$FFHSWHG/HWWHURI$VVXUDQFHWKHQWKHVWDWHPHQWLVOLVWHGRQWKH,(((
SA Website at http://standards.ieee.org/about/sasb/patcom/patents.html. Letters of Assurance may indicate
whether the Submitter is willing or unwilling to grant licenses under patent rights without compensation or
under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrim-
ination to applicants desiring to obtain such licenses.

(VVHQWLDO3DWHQW&ODLPVPD\H[LVWIRUZKLFKD/HWWHURI$VVXUDQFHKDVQRWEHHQUHFHLYHG7KH,(((LVQRWUH-
VSRQVLEOHIRULGHQWLI\LQJ(VVHQWLDO3DWHQW&ODLPVIRUZKLFKDOLFHQVHPD\EHUHTXLUHGIRUFRQGXFWLQJLQTXLULHV
LQWRWKHOHJDOYDOLGLW\RUVFRSHRI3DWHQWV&ODLPVRUGHWHUPLQLQJZKHWKHUDQ\OLFHQVLQJWHUPVRUFRQGLWLRQV
provided in connection with submission of a Letter of Assurance, if any, or in any licensing agreements are
reasonable or non-discriminatory. Users of this standard are expressly advised that determination of the valid-
ity of any patent rights, and the risk of infringement of such rights, is entirely their own responsibility. Further
information may be obtained from the IEEE Standards Association
3DUWLFLSDQWV

$WWKHWLPHWKLV,(((JXLGHZDVFRPSOHWHGWKH*XLGHWR6SHFL¿FDWLRQVIRU*DV,QVXODWHG(OHFWULF3RZHU
6XEVWDWLRQ(TXLSPHQW:RUNLQJ*URXSKDGWKHIROORZLQJPHPEHUVKLS

George Becker, Chair


Devki Sharma, Vice Chair
Patrick Fitzgerald, Secretary

Arun Arora Charles Hand William Munn


-RKQ%RJJHVV Ki Cheong Ho Dan Nix
3KLOLS%ROLQ $OODQ-DFREV 3UDYDNDU6DPDQWD
-RKQ%UXQNH 5LFKDUG-RQHV Steven Scharf
5DYL'KDUD Hermann Koch Lynn Sowerbrower
Markus Etter Tony Lim 5\DQ6WRQH
Arnaud Ficheux Hua Liu -HDQ0DUF7RUUHV
Noboro Fujimoto -RUJH0DUTXH]6DQFKH] Brian Withers
'DYLG*LHJHO -DPHV0DVVXUD Xi Zhu
3HWHU*URVVPDQQ 9HQNDWHVK0LQLVDQGUDP
Brent Haag Dave Mitchell

The following members of the individual balloting committee voted on this guide. Balloters may have voted
for approval, disapproval, or abstention.

William Ackerman 'DYLG*LOPHU Dennis Neitzel


Ficheux Arnaud -DODO*RKDUL Michael Newman
Arun Arora (GZLQ*RRGZLQ /RUUDLQH3DGGHQ
5R\$\HUV -DPHV*UDKDP &KDUOHV5RJHUV
*HRUJH%HFNHU 5DQGDOO*URYHV 7KRPDV5R]HN
Wallace Binder Steven Hensley Bartien Sayogo
-RKQ%UXQNH Lee Herron Steven Scharf
Eldridge Byron 5LFKDUG-DFNVRQ Hamid Sharifnia
Thomas Callsen $OODQ-DFREV Devki Sharma
Arvind Chaudhary Laszlo Kadar Hyeong Sim
Bill Chiu Hermann Koch -DPHV6WDJH
5REHUW&KULVWPDQ -LP.XOFKLVN\ 5\DQ6WRQH
5DQG\&OHOODQG Saumen Kundu K. Stump
*OHQQ'DYLV &KXQJ<LX/DP Michael Swearingen
*DU\'RQQHU Hua Liu David Tepen
5DQGDOO'RWVRQ Albert Livshitz 5RJHU9HUGROLQ
'RXJODV-(GZDUGV -RUJH0DUTXH]6DQFKH] -RKQ9HUJLV
Markus Etter Daleep Mohla -DQH9HUQHU
5DEL])RGD *HRUJHV0RQWLOOHW Kenneth White
'RDD*DODO Thomas Mulcahy -DPHV:LOVRQ
)UDQN*HUOHYH 5\DQ0XVJURYH Xi Zhu

6
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
:KHQWKH,(((6$6WDQGDUGV%RDUGDSSURYHGWKLVJXLGHRQ0DUFKLWKDGWKHIROORZLQJPHPEHUVKLS

Jean-Philippe Faure, Chair


Ted Burse, Vice Chair
John D. Kulick, Past Chair
Konstantinos Karachalios, Secretary

Chuck Adams 0LFKDHO-DQH]LF <LQJOL:HQ


Masayuki Ariyoshi -RVHSK/.RHS¿QJHU Howard Wolfman
Stephen Dukes Hung Ling Don Wright
-LDQELQ)DQ Kevin Lu <X<XDQ
5RQDOG:+RWFKNLVV *DU\5RELQVRQ Daidi Zhong
-7UDYLV*ULI¿WK $QQHWWH'5HLOO\
*DU\+RIIPDQ Mehmet Ulema

0HPEHU(PHULWXV


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
,QWURGXFWLRQ

7KLVLQWURGXFWLRQLVQRWSDUWRI,(((6WG&±,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG
6XEVWDWLRQV5DWHGN9DQG$ERYH

7KLV JXLGH LV D UHYLVLRQ RI ,((( 6WG &± ,W UHÀHFWV FKDQJHV QHHGHG WR FRRUGLQDWH ZLWK WKH
,(((6WG&Œ,WDOVRUHÀHFWVWKHSUHVHQWJDVLQVXODWHGVXEVWDWLRQ *,6 PDQXIDFWXULQJWHFKQRORJ\
7KLVJXLGHDSSOLHVWRDOOLQGRRUDQGRXWGRRUDFKLJKYROWDJHJDVLQVXODWHGVXEVWDWLRQVUDWHGDERYHN9DQGLV
LVVXHGDVDJXLGHIRUXVHLQFRPSLOLQJWHFKQLFDOVSHFL¿FDWLRQVIRUWKHSXUFKDVHRIDFKLJKYROWDJHJDVLQVXODWHG
switchgear.

7KLVJXLGHLVQRWDWXWRULDO7KLVJXLGHLVLQWHQGHGWRDVVLVWWKHXVHULQGHYHORSLQJDQGSUHSDULQJVSHFL¿FDWLRQV
for gas-insulated substations and equipment. The user of this guide should evaluate how, and to what extent,
HDFKFODXVHDSSOLHVWRWKHGHYHORSPHQWRIWKH*,6VSHFL¿FDWLRQ$SSOLFDWLRQRIWKLVJXLGHVKDOOEHGRQHZLWK
VXI¿FLHQWWHFKQLFDONQRZOHGJHDQGXQGHUVWDQGLQJ8VHUVRIWKLVJXLGHDUHH[SHFWHGWRKDYHEHFRPHIDPLOLDU
ZLWK,(((6WG&,(((6WDQGDUGIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHG$ERYHN9DQG
DUHHQFRXUDJHGWRUHYLHZ,(((6WG&,(((*XLGHIRU*DV,QVXODWHG6XEVWDWLRQV5DWHG$ERYHN9

7KHVWUXFWXUHRIWKLVJXLGHLVVLPLODUWRWKDWRIDW\SLFDOXWLOLW\*,6VSHFL¿FDWLRQ)URPWKHYHU\EHJLQQLQJLW
ZDVREYLRXVWRWKHZRUNLQJJURXSWKDWZKLOHPRVWRIWKH*,6SURMHFWVDUHH[HFXWHGDVDWXUQNH\SURMHFWWKLV
JXLGHZRXOGKDYHWREHOLPLWHGLQVFRSHWRD³SURFXUHPHQWVSHFL¿FDWLRQ´DQGSURYLGHJXLGDQFHIRUWKHGHVLJQ
IDEULFDWLRQ WHVWLQJ LQVWDOODWLRQ DQG LQVHUYLFH SHUIRUPDQFH UHTXLUHPHQWV RI WKH HTXLSPHQW RQO\ *HQHUDO
FRPPHUFLDOWHUPVDQGFRQGLWLRQVWKDWIRUPSDUWRIDVSHFL¿FDWLRQIRUDSURMHFWDUHQRWGLVFXVVHGLQWKLVJXLGH
7KHLPSHUDWLYHPRGHRIWKHODQJXDJHXVHGIRUH[DPSOHFODXVHVLVLOOXVWUDWLYHRIWKDWXVHGLQVSHFL¿FDWLRQV,W
does not imply that this document is anything other than advisory in its scope. This guide contains clauses that
PD\EHXVHGGLUHFWO\LQDSXUFKDVHU¶VVSHFL¿FDWLRQ$OWHUQDWHO\XVHUVPD\PRGLI\H[DPSOHFODXVHVWRIRUPWKH
EDVLVRIWKHLURZQVSHFL¿FDWLRQ7KLVJXLGHGRHVQRWFRQWDLQDOORIWKHFODXVHVWKDWDSXUFKDVHUPD\UHTXLUHIRU
WKHSXUFKDVHRID*,6IRUHDFKDQGHYHU\FRQFHLYDEOHDSSOLFDWLRQRUSK\VLFDOLQVWDOODWLRQ)RUH[DPSOHWKLV
guide makes no reference to commercial conditions that might be included in a purchaser’s complete speci-
¿FDWLRQ7KHJXLGHDOVRGRHVQRWFRQWDLQH[DPSOHFODXVHVWKDWZRXOGSURYLGHDOOQHFHVVDU\UHTXLUHPHQWVIRU
every system application or physical installation. Users of the guide are cautioned to thoroughly review each
LQGLYLGXDODSSOLFDWLRQZKHQSUHSDULQJD*,6VSHFL¿FDWLRQ8OWLPDWHO\WKHXVHUVSHFL¿FDWLRQZLOOKDYHWREH
LQÀXHQFHGE\WKHXVHU¶VRZQV\VWHPUHTXLUHPHQWVDQGRSHUDWLQJDQGPDLQWHQDQFHSUDFWLFHV

7KLVJXLGHZDVSUHSDUHGE\WKH+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQ:RUNLQJ*URXS.RIWKH,(((6XE-
stations Committee.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
&RQWHQWV

 2YHUYLHZ ................................................................................................................................................... 
 6FRSH .................................................................................................................................................. 
 3XUSRVH ............................................................................................................................................... 
 $SSOLFDWLRQ ......................................................................................................................................... 
 6SHFL¿FDWLRQIRUPDW ........................................................................................................................... 

2. Normative references ................................................................................................................................ 

 'H¿QLWLRQV ................................................................................................................................................. 

4. Service conditions ..................................................................................................................................... 

5. Scope of supply ......................................................................................................................................... 


 *HQHUDO ............................................................................................................................................... 
5.2 Equipment and services furnished by the user .................................................................................... 
 (TXLSPHQWDQGVHUYLFHVIXUQLVKHGE\WKHVXSSOLHU .............................................................................. 

6. Information required with proposal ........................................................................................................... 

 *,6GHVLJQ ................................................................................................................................................. 
 *,6OD\RXWDQGHTXLSPHQWUDWLQJV....................................................................................................... 
 *,6JHQHUDOUHTXLUHPHQWV ................................................................................................................... 

 *,6FRPSRQHQWVGHWDLOHGUHTXLUHPHQWV ..................................................................................................... 24
 *,6EXVDQGHQFORVXUHV ....................................................................................................................... 24
 &LUFXLWEUHDNHUV .................................................................................................................................. 25
 'LVFRQQHFWDQGJURXQGLQJVZLWFKHV ................................................................................................... 
 *DVV\VWHP.......................................................................................................................................... 
 6)6-to-air bushings ............................................................................................................................. 
 &DEOHFRQQHFWLRQV............................................................................................................................... 
 7UDQVIRUPHUFRQQHFWLRQV .................................................................................................................... 
 &XUUHQWWUDQVIRUPHUV........................................................................................................................... 
 9ROWDJHWUDQVIRUPHUV........................................................................................................................... 
 0HWDOHQFORVHGVXUJHDUUHVWHUV ......................................................................................................... 
 &DSDFLWLYHYROWDJHFRXSOHUV .............................................................................................................. 
 /RFDOFRQWURORUPDUVKDOOLQJFDELQHWV ............................................................................................... 
 1DPHSODWHV ....................................................................................................................................... 
 'RFXPHQWDWLRQ ................................................................................................................................. 

 7HVWV .......................................................................................................................................................... 
 'HVLJQWHVWV W\SHWHVWV ...................................................................................................................... 
 5RXWLQHSURGXFWLRQWHVWV ..................................................................................................................... 42
 )DFWRU\DFFHSWDQFHWHVWV ..................................................................................................................... 42
 )LHOGWHVWV............................................................................................................................................ 42

 4XDOLW\DQGVKRSLQVSHFWLRQV ................................................................................................................... 

 3DFNLQJVKLSSLQJDQGVWRUDJH ................................................................................................................ 

$QQH[$ QRUPDWLYH *,6VSHFL¿FUHTXLUHPHQWV ............................................................................................ 45

$QQH[% QRUPDWLYH 7\SLFDOSURSRVDOGDWDIRU*,6HTXLSPHQWDQGVHUYLFHVWREHSURYLGHGE\WKHVXSSOLHU


with bid........................................................................................................................................................... 


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
,(((*XLGHIRU6SHFL¿FDWLRQV
IRU+LJK9ROWDJH*DV,QVXODWHG
6XEVWDWLRQV5DWHGN9DQG$ERYH

IMPORTANT NOTICE: IEEE Standards documents are not intended to ensure safety, security, health, or
environmental protection, or ensure against interference with or from other devices or networks. Imple-
menters of IEEE Standards documents are responsible for determining and complying with all appropriate
safety, security, environmental, health, and interference protection practices and all applicable laws and
regulations.

This IEEE document is made available for use subject to important notices and legal disclaimers. These
notices and disclaimers appear in all publications containing this document and may be found under the
heading “Important Notice” or “Important Notices and Disclaimers Concerning IEEE Documents.” They
can also be obtained on request from IEEE or viewed at http://standards.ieee.org/IPR/disclaimers.html.

 2YHUYLHZ
1.1 Scope
7KLVJXLGHLVIRUWKHGHYHORSPHQWRIVSHFL¿FDWLRQVIRUWKHWHFKQLFDOUHTXLUHPHQWVIRUWKHGHVLJQIDEULFDWLRQ
WHVWLQJLQVWDOODWLRQDQGLQVHUYLFHSHUIRUPDQFHRIDKLJKYROWDJHJDVLQVXODWHGVXEVWDWLRQ *,6 

 3XUSRVH
7KLVGRFXPHQWLVLVVXHGDVDJXLGHIRUXVHLQFRPSLOLQJSURFXUHPHQWVSHFL¿FDWLRQVIRUWKHGHVLJQIDEULFD-
tion, testing, installation and in-service performance of high-voltage gas-insulated substation equipment. This
JXLGHDSSOLHVVSHFL¿FDOO\WRDOOW\SHVRIKLJKYROWDJHJDVLQVXODWHGVXEVWDWLRQHTXLSPHQWUDWHGDERYHN9DF
7KHLPSHUDWLYHPRGHRIWKHODQJXDJHLVLOOXVWUDWLYHRIWKDWXVHGLQGHVLJQDQGSURFXUHPHQWVSHFL¿FDWLRQV,W
GRHVQRWLPSO\WKDWWKLVGRFXPHQWLVDQ\WKLQJRWKHUWKDQDGYLVRU\LQLWVVFRSH6SHFL¿FDOO\WKLVUHYLVLRQZLOO
DOLJQWKHWH[WZLWK,(((6WG&ŒDQG,(((6WG&Œ

7KLVJXLGHLVQRWLQWHQGHGWRGHYHORSDFRPSOHWHVSHFL¿FDWLRQIRUDWXUQNH\SURMHFW*HQHUDOWHUPVDQGFRQ-
GLWLRQVIRUPLQJWKHFRPPHUFLDOSDUWRIDVSHFL¿FDWLRQIRUDSDUWLFXODUSURMHFWDUHRXWVLGHWKHVFRSHRIWKLV
document.


Information on references can be found in Clause 2.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

 $SSOLFDWLRQ
This guide should be considered as a general purpose resource and does not include all details needed for a
VSHFL¿FSURMHFW

This guide includes several clauses that use the word “shall”. These clauses are included as typical sample
FODXVHVWKDWPD\GLUHFWO\EHXVHGE\WKHXVHUVLQWKHLUVSHFL¿FDWLRQ VHHClause 5, , Clause 6, &ODXVH, ,
, &ODXVH, , , , , , , , , , , , , , , &ODXVH, , , , ,
&ODXVH, &ODXVH, and A.2). The other clauses with the word “should” may be used to form the basis of a
XVHU¶VRZQZRUGHGFODXVHIRUWKDWXVHU¶VVSHFL¿FDWLRQ

This guide includes Annex ALQWHQGHGIRUWKHXVHUWRVSHFLI\SURMHFWVSHFL¿FWHFKQLFDODQGRWKHUUHTXLUHPHQWV


and Annex BLQWHQGHGIRUWKH*,6PDQXIDFWXUHUWRSURYLGHSURSRVDOGDWD

In this guide, the words “user” and “purchaser” are used interchangeably. In many cases, however, the pur-
FKDVHUPD\QRWEHWKHVDPHDVWKHHQGXVHU,QVXFKFDVHVWKHVSHFL¿FDWLRQVKRXOGGLIIHUHQWLDWHEHWZHHQWKH
two.

 6SHFL¿FDWLRQIRUPDW
$*,6VSHFL¿FDWLRQVHWFRQVLVWVRIVHYHUDOGRFXPHQWVWKDWLQFOXGHLQDGGLWLRQWRJHQHUDOFRPPHUFLDOWHUPV
DQGFRQGLWLRQVDJHQHUDOVSHFL¿FDWLRQIRUWKHSURMHFWDVXSSOHPHQWDU\VSHFL¿FDWLRQOLVWLQJHTXLSPHQWUDWLQJV
and deliverables, schedule, etc., and a list of technical data and other information that should be provided by
WKHPDQXIDFWXUHURU*,6VXSSOLHUZLWKWKHELGIRUHYDOXDWLRQSXUSRVHV$W\SLFDO*,6VSHFL¿FDWLRQVWUXFWXUH
usually consists of the following clauses, not necessarily in the same sequence or with the same title:

a) 3URMHFWVFRSHDQGGHVFULSWLRQ
b) 5HIHUHQFHV
c) 'H¿QLWLRQV
d) Service conditions (environment, location)
e) Division of responsibilities
f) Engineering studies
g) (OHFWULFDOFKDUDFWHULVWLFVRI*,6GHVLJQ
h) 'HWDLOHGUHTXLUHPHQWVRI*,6FRPSRQHQWV
i) Control and monitoring
j) Accessories and appurtenances
k) Supervision of installation
l) Tests
m) Drawings and instruction manuals
n) Technical training
o) Shipping and receiving
p) *,6VSHFL¿FUHTXLUHPHQWVFRPSRQHQWUDWLQJVTXDQWLWLHVVSHFLDOUHTXLUHPHQWV Annex A)
q) Schedule (Annex A)
r) Information to be furnished by manufacturer or supplier with bid for bid evaluation (Annex B)


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7KHVSHFL¿FDWLRQJHQHUDOO\VKRXOGLQFOXGHDVWDWHPHQWWKDWUHTXLUHVWKHVXSSOLHUWRVXSSO\WKH*,6LQDF-
FRUGDQFHZLWKWKH3XUFKDVHU¶VVSHFL¿FDWLRQDQGWKHUHIHUHQFHGVWDQGDUGV7KHVSHFL¿FDWLRQVKRXOGDOVRVWDWH
ZKLFKVWDQGDUGVVKRXOGEHDSSOLFDEOHLQWKHHYHQWRIFRQÀLFWEHWZHHQVWDQGDUGVDQGLQGLFDWHZKLFKWDNHVSUH-
FHGHQFHLQWKHHYHQWRIFRQÀLFWEHWZHHQWKHSXUFKDVHU¶VVSHFL¿FDWLRQDQGWKHUHIHUHQFHGVWDQGDUGV7KHVSHF-
L¿FDWLRQVKRXOGLGHQWLI\WKHVWDQGDUGVLQFOXGLQJSXUFKDVHU¶VRZQLQKRXVHVWDQGDUGVSUDFWLFHVDQGGUDZLQJV
WKDWPXVWEHFRPSOLHGZLWKE\WKHVXSSOLHUGXULQJWKHSURYLVLRQRIWKH*,6

 1RUPDWLYHUHIHUHQFHV
The following referenced documents are indispensable for the application of this document (i.e., they must
be understood and used, so each referenced document is cited in text and its relationship to this document is
explained). For dated references, only the edition cited applies. For undated references, the latest edition of the
referenced document (including any amendments or corrigenda) applies.

$670%6WDQGDUG3UDFWLFHIRU2SHUDWLQJ6DOW6SUD\ )RJ $SSDUDWXV2

$670'6SHFL¿FDWLRQIRU6XOIXU+H[DÀXRULGH

,(&6SHFL¿FDWLRQRIWHFKQLFDOJUDGHVXOIXUKH[DÀXRULGH 6) IRUXVHLQHOHFWULFDOHTXLSPHQW(GLWLRQ


2.

,(&*XLGHOLQHVIRUWKHFKHFNLQJDQGWUHDWPHQWRIVXOIXUKH[DÀXRULGH 6)6) taken from electrical equip-


PHQWDQGVSHFL¿FDWLRQIRULWVUHXVH²(GLWLRQ

,(&+LJK9ROWDJH6ZLWFKJHDUDQG&RQWUROJHDU3DUW$OWHUQDWLQJ&XUUHQWGLVFRQQHFWRUVDQG
earthing switches.

,(&&DEOH&RQQHFWLRQVIRU*DVLQVXODWHG0HWDO(QFORVHG6ZLWFKJHDUIRU5DWHG9ROWDJHVDERYH
N9

,(&'LUHFW&RQQHFWLRQV%HWZHHQ3RZHU7UDQVIRUPHUVDQG*DV,QVXODWHG0HWDO(QFORVHG6ZLWFK-
JHDUIRU5DWHG9ROWDJHVRIN9DQG$ERYH

,(((6WGŒ,(((*XLGHIRUWKH'HVLJQDQG,QVWDOODWLRQRI&DEOH6\VWHPVLQ6XEVWDWLRQV4,5

,(((6WGŒ,(((*XLGHIRU&DEOH&RQQHFWLRQVIRU*DV,QVXODWHG6XEVWDWLRQV

,(((6WG&Œ,(((*XLGHIRU6XOSKXU+H[DÀRXULGH 6)6 *DV+DQGOLQJIRU+LJK9ROWDJH RYHU


9DF (TXLSPHQW

,(((6WG&Œ,(((6WDQGDUG5DWLQJ6WUXFWXUHIRU$&+LJK9ROWDJH&LUFXLW%UHDNHUV

,(((6WG&Œ,(((6WDQGDUGIRU$&+LJK9ROWDJH&LUFXLW%UHDNHUV5DWHGRQD6\PPHWULFDO&XUUHQW
%DVLV3UHIHUUHG5DWLQJVDQG5HODWHG5HTXLUHG&DSDELOLWLHVIRU9ROWDJHV$ERYH9

2
$670SXEOLFDWLRQVDUHDYDLODEOHIURPWKH$PHULFDQ6RFLHW\IRU7HVWLQJDQG0DWHULDOV%DUU+DUERU'ULYH:HVW&RQVKRKRFNHQ3$
86$ http://www.astm.org/).

,(&SXEOLFDWLRQVDUHDYDLODEOHIURPWKH6DOHV'HSDUWPHQWRIWKH,QWHUQDWLRQDO(OHFWURWHFKQLFDO&RPPLVVLRQ&DVH3RVWDOHUXHGH
9DUHPEp&+*HQqYH6ZLW]HUODQG6XLVVH http://www.iec.ch/). IEC publications are also available in the United States from
WKH6DOHV'HSDUWPHQW$PHULFDQ1DWLRQDO6WDQGDUGV,QVWLWXWH:HVWUG6WUHHWWK)ORRU1HZ<RUN1<86$ http://www.
ansi.org/).
4
,(((SXEOLFDWLRQVDUHDYDLODEOHIURPWKH,QVWLWXWHRI(OHFWULFDODQG(OHFWURQLFV(QJLQHHUV,QF+RHV/DQH3LVFDWDZD\1-
USA (http://standards.ieee.org/).
5
The IEEE standards or products referred to in this clause are trademarks of the Institute of Electrical and Electronics Engineers, Inc.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

,(((6WG&Œ,(((6WDQGDUG7HVW3URFHGXUHIRU$&+LJK9ROWDJH&LUFXLW%UHDNHUV5DWHGRQD6\P-
metrical Current Basis.

,(((6WG&Œ,((($SSOLFDWLRQ*XLGHIRU$&+LJK9ROWDJH&LUFXLW%UHDNHUV5DWHGRQD6\PPHWULFDO
Current Basis.

,(((6WG&Œ,(((*XLGHIRUWKH$SSOLFDWLRQRI7UDQVLHQW5HFRYHU\9ROWDJHIRU$&+LJK9ROWDJH
Circuit Breakers.

,(((6WG&Œ,(((*XLGHIRUWKH$SSOLFDWLRQRI&DSDFLWDQFH&XUUHQW6ZLWFKLQJIRU$&+LJK9ROWDJH
&LUFXLW%UHDNHUV$ERYH9

,(((6WG&Œ,(((*XLGHIRUWKH$SSOLFDWLRQRI6KXQW5HDFWRU6ZLWFKLQJ

,(((6WG&Œ,(((6WDQGDUGIRU%XVKLQJVIRU+LJK9ROWDJH>RYHU9 DF @&LUFXLW%UHDNHUVDQG
*DV,QVXODWHG6ZLWFKJHDU

,(((6WG&Œ,(((6WDQGDUGIRU5HTXLUHPHQWVIRU(OHFWULFDO&RQWUROIRU$&+LJK9ROWDJH !9 
Circuit Breakers.

,(((6WG&Œ,(((6WDQGDUGRI&RPPRQ5HTXLUHPHQWVIRU+LJK9ROWDJH3RZHU6ZLWFKJHDU5DWHG
$ERYH9

,(((6WG&Œ,(((6WDQGDUGIRU*DV,QVXODWHG6XEVWDWLRQVUDWHGDERYHN9

,(((6WG&Œ,(((*XLGHIRU*DV,QVXODWHG6XEVWDWLRQV5DWHG$ERYHN9

,(((6WG&Œ,(((6WDQGDUG5HTXLUHPHQWVIRU,QVWUXPHQW7UDQVIRUPHUV

,(((6WG&Œ,(((6WDQGDUGIRU0HWDO2[LGH6XUJH$UUHVWRUVIRU$&3RZHU&LUFXLWV

,624XDOLW\0DQDJHPHQW6\VWHPV²)XQGDPHQWDOVDQG9RFDEXODU\²7KLUG(GLWLRQ6

1(0$&&(OHFWULF3RZHU&RQQHFWLRQIRU6XEVWDWLRQV

1)3$1DWLRQDO(OHFWULFDO&RGHŠ 1(&Š 

 'H¿QLWLRQV
)RU WKH SXUSRVHV RI WKLV GRFXPHQW WKH IROORZLQJ WHUPV DQG GH¿QLWLRQV DSSO\ ,((( 6WG &
,(((6WG&DQGIEEE Standards Dictionary OnlineVKRXOGEHFRQVXOWHGIRUWHUPVQRWGH¿QHGLQWKLV
clause.

6
,62SXEOLFDWLRQVDUHDYDLODEOHIURPWKH,62&HQWUDO6HFUHWDULDWFKGHOD9RLH&UHXVH&DVHSRVWDOH&+*HQHYD
Switzerland (http://www.iso.ch/). ISO publications are also available in the United States from the Sales Department, American National
6WDQGDUGV,QVWLWXWH:HVWUG6WUHHWWK)ORRU1HZ<RUN1<86$ http://www.ansi.org/).

1(0$SXEOLFDWLRQVDUHDYDLODEOHIURP*OREDO(QJLQHHULQJ'RFXPHQWV,QYHUQHVV:D\(DVW(QJOHZRRG&286$ http://
global.ihs.com/).

1DWLRQDO(OHFWULFDO&RGHDQG1(&DUHERWKUHJLVWHUHGWUDGHPDUNVRIWKH1DWLRQDO)LUH3URWHFWLRQ$VVRFLDWLRQ,QF

IEEE Standards Dictionary Online subscription is available at: http://ieeexplore.ieee.org/xpls/dictionary.jsp.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

 6HUYLFHFRQGLWLRQV
8VXDO DQG XQXVXDO VHUYLFH FRQGLWLRQV DUH GHVFULEHG LQ &ODXVH  RI ,((( 6WG & DQG &ODXVH  RI
,(((6WG&7KHXVHUVVKRXOGUHYLHZWKHVHFODXVHVIRUWKHXQXVXDOVHUYLFHFRQGLWLRQVWRGHWHUPLQHLI
any apply to their system. If any of the actual service conditions differ from these normal (usual) service con-
GLWLRQVWKHVHVKRXOGEHVSHFL¿HGLQAnnex A.

 6FRSHRIVXSSO\
 *HQHUDO
7KHXVHUVSHFL¿FDWLRQVKRXOGFOHDUO\LQGLFDWHZKDWLVWREHVXSSOLHGE\WKH*,6PDQXIDFWXUHU,WVKRXOGDOVR
clearly indicate what is not to be supplied by the manufacturer, and the services that will be furnished by the
user at the project site. The following is a typical scope of the equipment and services to be furnished by the
user and the supplier. Annex A should be used to provide a detailed listing of the scope of supply. The user
VKRXOGLQGLFDWHWKHDSSOLFDWLRQRIWKHHTXLSPHQW LHW\SHRIVXEVWDWLRQIRUZKLFKWKH*,6ZLOOEHXVHG 

3URMHFWWHDPVEHQH¿WIURPFOHDUGH¿QLWLRQRISURMHFWVFRSH7KLVSDUWRIWKHVSHFL¿FDWLRQGH¿QHVWKHGHOLYHU-
ables and the constraints for the project, and facilitates communication and cooperation toward the project
goals. The deliverables are engineering studies and services, documentation, equipment supply, installation
services, and testing services. The major constraints are as follows:

a) Substation one-line diagram (including any applicable future provisions).


b) 3K\VLFDOFRQVWUDLQWVIRUWKH*,6DUHDVDQGKHLJKWVDYDLODEOHIRUWKH*,6DQGGH¿QLWLRQRIDUHDVH[-
cluded from use along with any construction access restrictions. These will include the locations of
physical barriers like retaining walls and unmovable conduit or cable trough.
c) Direction of connected lines/cables.
d) $Q\¿[HGORFDWLRQVIRUSULPDU\YROWDJHWHUPLQDWLRQVLQFOXGLQJSKDVLQJ
e) Schedule for the project including time when the jobsite will be ready to receive equipment and any
sequencing or outage planning restrictions that would change the normal progression of the work.
f) 6FRSHERXQGDULHVIRUWKHHQJLQHHULQJVXSSO\LQVWDOODWLRQYHUL¿FDWLRQDQGWHVWLQJRIWKH*,6$SLFWR-
rial example of scope division for equipment supply is shown in )LJXUH.

,QDGGLWLRQWRWKH*,6HTXLSPHQWVSHFL¿FDWLRQVDQGUDWLQJVVLWHGHVFULSWLRQ*,6LQWHUIDFHV HJWUDQVPLVVLRQ
lines, transformers, cables), control and monitoring requirements, etc., the user and potential suppliers should
discuss the following as part of the project pre-bid process.

The user and supplier should agree on the engineering studies to be performed and the calculations to be pro-
vided as part of the project. The studies and calculations may include but are not limited to the following:

² ,QVXODWLRQFRRUGLQDWLRQWUDQVLHQWUHFRYHU\YROWDJHV 759 WHPSRUDU\RYHUYROWDJHV 729 DQGYHU\


IDVWWUDQVLHQWV 9)7
² )HUURUHVRQDQFH LQWHUDFWLRQV EHWZHHQ WKH *,6 EXV RU LQWHUFRQQHFWHG FDEOHV DQG ZRXQG YROWDJH
transformers
² *URXQGLQJ²WRXFKVWHSDQGWUDQVIHUSRWHQWLDOV
² Calculated bus resistance
² Calculated trip and close coil burdens and dc circuit loads


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

)LJXUH²6FRSHGLYLVLRQIRUHTXLSPHQWVXSSO\

² 5HTXLUHGDFVWDWLRQVHUYLFHORDGV HJKHDWHUVFDELQHWOLJKWLQJFRQYHQLHQFHUHFHSWDFOHVFRPSUHV-
sors, or hydraulic operators)
² Overall installation lighting provisions
² Accessibility to devices, operating mechanisms, viewports, and gauges/instrumentation

The user and supplier should agree on the level of training to be provided to operations, maintenance, and
GLVSDWFKSHUVRQQHO7KHWUDLQLQJVKRXOGFRQVLVWRIFODVVURRPZRUNGHVFULELQJWKHQDWXUHRI*,6HTXLSPHQW
SF6 gas handling, features of the various devices (e.g., circuit breakers, disconnects, grounding and fast-acting
grounding switches, and instrument transformers), interlocking or control permissive schemes, methods to
determine device position, alarm descriptions and required actions, routine maintenance inspection require-
ments and checks, maintenance procedures for breaker-timing and travel checks, integration of one-line and
gas zone diagrams, etc. Also included in the training session before the equipment is placed in service should
be hands-on activities such as operating the devices, using viewports, bore scopes or other equipment to check
device positions, sampling SF6 gas, etc.

The user and supplier should agree on the project administrative procedures and practices including the
following:

² 5HTXLUHGPHHWLQJDWWHQGDQFHDQGVWDWXVRUVFKHGXOHXSGDWHV
² The quantity and format of the documentation, what design platforms should be used (e.g., AutoCAD,
0LFURVWDWLRQ KRZZLOOGUDZLQJFRQWUROEHDGPLQLVWHUHG HJWKHUHYLHZSURFHVVPRGL¿FDWLRQVLV-
sues for construction, and as-built drawings).
 Special security protocols or access requirements.
2) Acceptable material delivery times and any construction noise level limitations (residential
areas).


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

  Daily progress reports and photographs including records of safety training and incidents.
4) The user and supplier should agree on the responsible party to provide and administer.
i) Environmental (wetland) permits and reports (SF6 gas usage).
ii) Crane or material handling and construction (electrician) licenses.
iii) %XLOGLQJ¿UHSURWHFWLRQRUFRQVWUXFWLRQSHUPLWV
iv) Interfaces and the division of responsibility with other interconnected parties, e.g., a sepa-
UDWHSDUW\RZQVDWUDQVPLVVLRQOLQHRUFDEOHWREHFRQQHFWHGWRWKHXVHU¶V*,6
v) Interfaces in a user’s facility between equipment provided by different suppliers.
vi) The extent of support to be provided by the supplier’s on-site representative and that repre-
sentative’s level of communication skills.

The user and supplier should also discuss and agree on the procedures for gas handling and test equipment.
Who will supply the gas cart or processing equipment? Should a gas cart be included in the scope of supply?
:KDWLVWKHODUJHVW*,6]RQHWREHSURFHVVHG"+RZZLOOWKHJDVEHWHVWHGWRYHULI\SXULW\":KDWPDLQWHQDQFH
records will be provided before the equipment is placed in service to provide a historical basis for future con-
dition monitoring? The supplier generally conducts the high-voltage conditioning tests using a series resonant
set. The parties should agree whether a generator is needed or station service power has adequate capacity.
Where will test bushings be provided?

The user and supplier should also agree on any special tools, spare parts, routine maintenance products (lubri-
cants), or similar materials. In the case of special tools, two new sets with a detailed inventory and labeled for
the user should be included in the scope of supply. The supplier should provide the user with the ordering in-
IRUPDWLRQDQGFRQWDFWLQIRUPDWLRQIRUVSHFLDOLWHPVVXFKDVRULQJVDQGVHDODQWVWKDWKDYHDGH¿QHGVKHOIOLIH

 (TXLSPHQWDQGVHUYLFHVIXUQLVKHGE\WKHXVHU
8QOHVVRWKHUZLVHVSHFL¿HGRUDJUHHGXSRQWKHXVHUVKRXOGUHFHLYHLQVWDOODQG¿HOGWHVWWKHDSSDUDWXVVSHFL-
¿HGKHUHLQ,QVWDOODWLRQDQG¿HOGWHVWLQJRIWKH*,6VKRXOGEHFRPSOHWHGXQGHUWKHVXSHUYLVLRQRIWKHVXSSOLHU
WRKHOSHQVXUHFRUUHFWLQVWDOODWLRQ8QOHVVRWKHUZLVHVSHFL¿HGWKHIROORZLQJHTXLSPHQWDQGVHUYLFHVDUHRIWHQ
furnished by the user:

a) Concrete foundations
b) 3RZHUWUDQVIRUPHUVRUUHDFWRUVLQFOXGLQJEXVKLQJV
c) 6XUJHDUUHVWHUVRXWVLGHWKH*,6
d) The station ground grid, below ground, and jumpers of adequate length to structures
e) Ac and dc auxiliary power to furnished equipment
f) Hoist or crane
g) Supervisory control and data acquisition (SCADA) equipment
h) Conduit or troughs and wiring to supplier-furnished equipment
i) *DVKDQGOLQJHTXLSPHQW
j) Batteries and battery chargers
k) 3URWHFWLYHUHOD\LQJV\VWHPV
l) Transmission-line dead-end terminations
m) Control and power cable trenches


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

n) (UHFWLRQODERUZLWKWKHVXSHUYLVLRQDQGDVVLVWDQFHRIWKH*,6VXSSOLHU
o) Control house and related equipment or building in case of indoor installation, including crane, if
applicable
p) -REVLWHXQORDGLQJDQGVWRUDJH
q) )LHOGZHOGLQJLIUHTXLUHGZLWKWKHVXSHUYLVLRQDQGDVVLVWDQFHRIWKH*,6VXSSOLHU
r) 7HVWHTXLSPHQWFRRUGLQDWHGZLWKWKH*,6VXSSOLHU
s) Tertiary bus, tertiary reactors, and other related equipment
t) High-voltage power cables and terminations
u) Anchor bolts and/or embedded steel, if part of foundation pouring
v) ,QVWUXPHQWWUDQVIRUPHUVDQGFDSDFLWRUYROWDJHWUDQVIRUPHUVQRWLQFOXGHGLQWKH*,6
w) Substation fence, lighting, and direct stroke lightning protection

 (TXLSPHQWDQGVHUYLFHVIXUQLVKHGE\WKHVXSSOLHU
7KHVXSSOLHUVKDOOGHVLJQPDQXIDFWXUHWHVWGHOLYHUDQGJXDUDQWHHWKHIROORZLQJ*,6FRPSRQHQWVDQGVHU-
YLFHVDVUHFRPPHQGHGE\WKLVJXLGH7KHFRPSOHWH*,6EDVHGRQWKHRQHOLQHGLDJUDPSURYLGHGE\WKHXVHU
and including direct connections to power transformers and line exits with associated circuit breakers, discon-
nect and grounding switches (maintenance or high-speed), instrument voltage, current transformers, and surge
arresters.

a) $OO PHWDOHQFORVHG JDVLQVXODWHG EXVHV IRU LQWHUFRQQHFWLQJ YDULRXV DVVHPEOLHV LQFOXGLQJ ÀH[LEOH
joints to help ensure service continuity during thermal cycling and vibration.
b) All high-voltage SF6WRDLU EXVKLQJV ZLWK SURSHU WHUPLQDO SDG VKRXOG EH VSHFL¿HG DFFRUGLQJ WR
,(((6WG&
c) All cable connections, including SF6 enclosures, terminator support structures, and mounting insula-
WRUVVKRXOGEHDVVSHFL¿HGLQ,(&DQG,(((6WG
d) $OOSRZHUWUDQVIRUPHUDQGVKXQWUHDFWRUEXVKLQJVXOIXUKH[DÀXRULGH 6)6) enclosures, complete with
YLEUDWLRQGDPSHUVDQGRUDOLJQPHQWEHOORZVLIUHTXLUHGLQDFFRUGDQFHZLWK,(&
e) All coordination with power transformer, shunt reactor, cable, and cable termination suppliers to assure
SURSHUHOHFWULFDODQGPHFKDQLFDOLQWHUIDFHLQDFFRUGDQFHZLWK,(&DQG,(&
f) All necessary supports, platforms, stairways, and walkways, for operation and maintenance functions
including fasteners to foundation. Final design of platforms and walkway systems is to be by mutual
agreement between the user and the supplier.
g) All operating mechanisms installed in suitable cabinets.
h) All local control or marshalling cabinets.
i) All wiring of devices and terminations internal to the switchgear and all shielded control cables (and
DVVRFLDWHGUDFHZD\V DERYHIRXQGDWLRQEHWZHHQWKHHTXLSPHQWDQGWKH*,6ORFDOFRQWURORUPDUVKDO-
ling cabinets.
j) *URXQGEXVHVDQGJURXQGFRQQHFWLRQSDGVIRUFRQQHFWLRQWRWKHJURXQGJULG
k) *DVGHQVLW\PRQLWRUVSUHVVXUHUHOLHIGHYLFHVDQGJDV¿OOLQJFRQQHFWLRQV
l) All necessary gaskets, O-rings sealants, and desiccant.
m) ,QLWLDO¿OOLQJRI6)6 gas.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

n) $Q\RWKHUSDUWVRUHTXLSPHQWWKDWLVQRWVSHFL¿FDOO\QRWHGKHUHLQEXWWKDWLVQHFHVVDU\IRUWURXEOHIUHH
RSHUDWLRQLQVWDOODWLRQDQGPDLQWHQDQFHRIWKH*,6
o) Technical services for site assembly and testing by a competent service engineer. Indicate days includ-
ed in the base bid and give a per diem rate for additional time.
p) Any special tools, lifting devices, and gas manifolds necessary for erection that should be retained by
the user for maintenance purposes.
q) ([WHUQDOVXUIDFHSUHSDUDWLRQDQGFRDWLQJLIVSHFL¿HG&RORUPD\DIIHFWWKHUDWLQJDQGWKHXVHUVKDOO
EHLQIRUPHGLQWKHSURSRVDORIWKHQHZUDWLQJ6XI¿FLHQWDPRXQWRIWRXFKXSSDLQWLVWREHSURYLGHG
r) Nameplates for each main component and operating device.
s) 8VHUPD\UHTXLUHDVFDOHPRGHORIWKH*,6IRUXVHDVDGHVLJQDQGWUDLQLQJDLG
t) Documents to be provided as required by .

 ,QIRUPDWLRQUHTXLUHGZLWKSURSRVDO
7KHSURSRVDOIRUDQHZRUDQDGGLWLRQWRDQH[LVWLQJ*,6VKDOOLQFOXGHJHQHUDODUUDQJHPHQWGUDZLQJVDQGRQH
line diagrams, gas schematic diagrams, gas zone drawing, typical control diagrams, weights and dimensions,
anchor requirements, appropriate technical data, the bill of material, and a description of system components.
A suggested listing of data required with the proposal is shown in Annex B.

The proposal should also include the following documentation:

a) Type test report, if required by the user.


b) ,QVXODWLRQFRRUGLQDWLRQWUDQVLHQWUHFRYHU\YROWDJH 759 YHU\IDVWWUDQVLHQWV 9)7 DQGHOHFWUR-
magnetic transients program studies prices, if required by the user.
c) 6HLVPLFTXDOL¿FDWLRQSODQDQGSULFHLIUHTXLUHGE\WKHXVHU
d) *URXQGLQJDQGERQGLQJVWXG\SULFHLIUHTXLUHGE\WKHXVHU
e) Drawings showing full details of locations where future expansion is to take place.
f) 'RFXPHQWDWLRQRQLQVWDOODWLRQSURFHGXUHDQGVHTXHQFHRSHUDWLRQDQGPDLQWHQDQFHRIWKH*,6
g) Data on allowable misalignment at the installation or required accuracy of foundations and anchors.
h) List of recommended spare parts, including price and delivery for normal and catastrophic failure
conditions.
i) /LVWDQGSULFHRIVSHFLDOWRROV¿[WXUHVDQGOLIWLQJGHYLFHVUHTXLUHGIRULQVWDOODWLRQRSHUDWLRQDQG
maintenance.
j) Availability and price of high-voltage test equipment, if required by the user.
k) /LVWRISUHYLRXVO\VXSSOLHG*,6IDFLOLWLHVDQGWKHLUSHUIRUPDQFHWRGDWH
l) Estimated time required to install and to test the equipment.
m) User should indicate any limits on manpower available for installation that could have an effect on the
supplier’s time estimate. In the absence of any limitations, the supplier time estimate should indicate
PDQSRZHUORDGLQJDVVXPHGSOXVDQ\VSHFL¿FWDVNVWKDWPD\UHTXLUHKLJKHUPDQSRZHUORDGLQJWKDQ
the majority of the installation.
n) Field service engineer price.
o) Training for personnel of the user, including price, duration, and material covered.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

p) Filled-out data sheets provided in Annex A of this guide. Separate data sheets should be provided for
each alternative proposal.
q) /LVWLQJRIH[FHSWLRQVWRDQGGHYLDWLRQVIURPWKLVJXLGHDQGVSHFL¿FXVHUUHTXLUHPHQWV$OOH[FHSWLRQV
should be clearly and separately itemized. It should not be necessary for the user to examine the stan-
dard literature and documents of the supplier to determine the existence and extent of any exceptions
or deviations from this guide.
r) Weight and dimensions of largest removable component (for use by the user in designing permanent
KRLVWRUFUDQH 5HFRPPHQGHGFUDQHFDSDFLW\DQGKHLJKWWRKRRN/RDGGDWD NJ IRUWKHDVVHPEO\IRU
the foundation design. Turning radius needed to be able to rotate the largest removable component
for assembly/dis-assembly. (This is needed for designing the dimensions of the switchgear hall for an
indoor installation.)
s) Maximum weight of SF6 gas in largest compartment. If suppliers gas barrier design requires that ad-
jacent compartments have the SF6 gas pressure reduced during maintenance, supplier should explain
this and give the maximum amount of gas to be handled as a result.
t) Static and dynamic foundation loading for the circuit breaker.
u) A table of normal operating pressure, minimum operating pressure and alarm level pressure for each
gas zone or type of equipment.
v) Total amount of SF6LQWKH*,6
w) Location of the switch view ports and mechanism boxes.
x) 2XWOLQHGUDZLQJVZLWKGLPHQVLRQVRIDOOPDMRUFRPSRQHQWV'UDZLQJVKDOOLQFOXGHDOO*,6YLHZSRUW
locations.
y) Data of corrosion protection (paint) system.
z) 9ROWDJHDQGFXUUHQWWUDQVIRUPHUPDJQHWL]DWLRQDQGH[FLWDWLRQFXUYHV
aa) Local control or marshalling cabinet supplier name.
ab) Identify drawing labeling format for local control or marshalling cabinets, ANSI, and/or IEC.

 *,6GHVLJQ
 *,6OD\RXWDQGHTXLSPHQWUDWLQJV
The station layout and equipment rating shall be based on the one-line diagram furnished by the user. Depend-
ing on the station rating and the user’s preference, single- or three-phase enclosures may be furnished. The
XVHUVKDOODOVRSURYLGHWKH*,6HOHFWULFDOUDWLQJVDQGDQ\VSHFLDOUHTXLUHPHQWVVHLVPLFUHTXLUHPHQWVRUSUR-
tective measures in particularly harsh operating environments. The one-line diagrams should show interfaces
with transmission lines, power cables, power transformer(s), locations for future extension, and interface with
H[LVWLQJ*,6LIDQ\

The one-line diagram should include as a minimum the following components and information as applicable:

² Feeder (transmission line, power transformer), ratings


² *,6EXVUDWLQJ
² 3RZHUWUDQVIRUPHUVUDWLQJ
² Circuit breakers, rating
² Disconnect switches, rating


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

² *URXQGLQJVZLWFKHV PDLQWHQDQFHRUKLJKVSHHG
² 9ROWDJHWUDQVIRUPHUVUDWLQJ
² &XUUHQWWUDQVIRUPHUVUDWLRDFFXUDF\WKHUPDOUDWLQJIDFWRUDWVSHFL¿HGDPELHQWWHPSHUDWXUH
² Surge arresters, rating
² 3UHIHUUHGSKDVLQJ
² Interfaces with transmission line, power cables, etc.
² 'HYLFHLGHQWL¿FDWLRQQXPEHUV
² *DVFRPSDUWPHQWLGHQWL¿FDWLRQQXPEHUV

7KHSURMHFWVSHFL¿FUHTXLUHPHQWVVKRXOGEHVSHFL¿HGE\WKHXVHUXVLQJAnnex A as a guide.

The user may wish to add the preferred location of gas barriers on the one-line diagram.

 *,6HTXLSPHQWUDWLQJ

,(((6WG&VSHFL¿HVWKHHOHFWULFDOUDWLQJVWKDWDOOFRPSRQHQWVZLWKLQD*,6DUHH[SHFWHGWRPHHW7KH
XVHUVVKRXOGUHYLHZWKHUHFRPPHQGHGUDWLQJVLQ,(((6WG&VHOHFWDQGVSHFLI\WKHDSSURSULDWHUDWLQJV
as per Annex A as applicable to their particular project.

 *,6JHQHUDOUHTXLUHPHQWV
 (OHFWULFDOLQWHUORFNVFKHPHV

Electrical interlocks or another suitable means of interlocking between circuit breakers, disconnect switches,
and grounding switches shall be provided. The interlocking system shall prevent a disconnect switch operation
(close or open) under load, prevent grounding switches from being closed into an energized bus, and prevent a
disconnect switch from being closed into a grounded bus. Disconnect switches used for bus transfer switching
may require a means to override interlocks. Electrical interlock schemes should be fail-safe to prevent loss of
interlock function upon loss of control voltage.

 0LWLJDWLQJRYHUYROWDJHV

3URSHUJURXQGLQJIRUPLWLJDWLQJVZLWFKLQJRYHUYROWDJHVDQGYHU\IDVWWUDQVLHQWRYHUYROWDJHV 9)72V GXULQJ


disconnect operation shall be included.

 3URSHUKHDWHURSHUDWLRQ

+HDWHUV DQGWKHUPRVWDWVLIVSHFL¿HG VKRXOGEHIXUQLVKHGDVUHTXLUHGLQFRQWUROFDELQHWVDQGHTXLSPHQW


KRXVLQJVWRDYRLGFRQGHQVDWLRQ,QGLFDWLQJOLJKWVPD\EHVSHFL¿HGWRVKRZSURSHUKHDWHURSHUDWLRQ

 6WDQGDUGPDQXIDFWXUH

As much as possible, parts should be of standard manufacture with interchangeable parts and assemblies. All
FLUFXLWEUHDNHUVGLVFRQQHFWVZLWFKHVDQGRWKHUFRPSRQHQWVRI*,6KDYLQJLGHQWLFDOUDWLQJVKDOOKDYHLGHQWLFDO
and interchangeable parts and operating mechanisms.

 3UHVVXUHUHOLHIGHYLFHV

3UHVVXUHUHOLHIGHYLFHVVKDOOEHSURYLGHGZKHQSUHVVXUHULVHGXHWRLQWHUQDOIDXOWVH[FHHGVSUHVVXUHUDWLQJRI
enclosure. The pressure relief devices shall be provided with a shield and be vented to provide a safe envi-
URQPHQWIRU¿HOGSHUVRQQHODQGIRUHTXLSPHQWGXULQJRSHUDWLRQ7KHEXUVWLQJSUHVVXUHRIWKHUHOLHIGHYLFH


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

should be effectively coordinated with the rated gas pressure and the pressure rise due to arcing as described
LQ,(((6WG&

 ([SDQVLRQ

Expansion and installation alignment should be considered in the design of the conductor and the enclosure.
If required, expansion joints should be provided with compensators for the enclosure and sliding plug-in con-
tacts for the conductor.

 &RQQHFWLRQV

Connections between adjacent conductor sections should be made by means of plug-in type or bolted type
FRQWDFWV6KLHOGVVKRXOGEHSODFHGWRFRQWUROHOHFWULF¿HOGGLVWULEXWLRQ)LHOGZHOGLQJRIWKHFRQGXFWRULVQRW
DFFHSWDEOHH[FHSWZKHQUHTXLUHGIRUVSHFLDOFDVHVRIH[WHQVLRQUHSDLURUUHWUR¿W

 :HDWKHUSURRIHQFORVXUHV

Components outside the SF6 environment shall be installed in weatherproof enclosures for outdoor installa-
tion, when required.

 %ROWHGJDVNHWHGÀDQJHFRQQHFWLRQV

6KLSSLQJVHFWLRQVVKRXOGEHMRLQHGLQWKH¿HOGXVLQJEROWHGJDVNHWHGÀDQJHFRQQHFWLRQVRIWKHHQFORVXUH
)ODQJHGFRQQHFWLRQVVKDOOKDYHDJDVVHDOEHWZHHQWKHÀDQJHVXUIDFHV$VHFRQGVHDOULQJVHDODQWVRURWKHU
suitable means are required to protect the gas seal from the external environment. Connections, including
bolts, washers, and nuts, should be adequately protected from corrosion and should be easily accessible with
the proper tools.

 )LHOGZHOGHGFRQQHFWLRQV

:KHUHQHFHVVDU\DQGDJUHHGWRE\WKHXVHU¿HOGZHOGHGFRQQHFWLRQVPD\EHXVHGEHWZHHQPDMRU¿[HGFRP-
SRQHQWV WR SHUPLW OHQJWK DQG DQJXODU DGMXVWPHQWV WR FRPSHQVDWH IRU FRQVWUXFWLRQ WROHUDQFHV:KHUH ¿HOG
welding is used to join the enclosures, provision should be made and described to preclude the entry of foreign
materials into the gas space.

 'HVLJQRIVXSSRUWLQJVWUXFWXUHV

Where required, structures to support the equipment, platforms, and walkways for operation and maintenance
access to operating and monitoring devices should be designed to permit access without use of special devices
or portable ladders. The structures shall be either aluminum or hot-dipped galvanized steel. All structures,
stairs, platforms, and walkways shall conform to the relevant occupational health and safety regulations and
designed in accordance with the latest industry standards and guidelines. The platforms and walkways shall
be provided with a non-skid coating on surfaces that can be walked on. Handrails shall be provided where
necessary.

 *,6JURXQGLQJDQGERQGLQJ

$VSHU,(((6WG&WKHJURXQGLQJGHVLJQVKDOOEHEDVHGRQWKHPD[LPXPV\VWHPIDXOWOHYHOVSHFL¿HGE\
WKHXVHU6XI¿FLHQWERQGLQJRIWKH*,6VKDOOEHSURYLGHGWROLPLWWKHFLUFXODWLQJFXUUHQWVWRJURXQGJULGWRWKH
OHYHOVSHFL¿HGE\WKHXVHU*,6JURXQGSDGWHUPLQDOVVKDOOEHORFDWHGWRSHUPLWSURSHUFRQQHFWLRQWRWKHVWDWLRQ
ground grid and to minimize external bus enclosure voltage gradient to a safe limit. All support structures and
control cabinets are to be grounded.

 +DUGZDUH

All nuts and studs shall be securely locked in place to prevent loosening during operation.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

5HPRYDEOHEROWVRUQXWVVKDOOEHDGHTXDWHO\SURWHFWHGIURPFRUURVLRQDQGVKDOOEHHDVLO\DFFHVVLEOH

All moving parts shall be made free from objectionable friction due to corrosion or galling of pins, shafts,
bushings, etc., by the use of materials in the proper corrosion-resistant and non-galling combinations, properly
protected.

Corrosion-resistant cotter pins, fasteners, washers, and locking devices shall be used throughout. All clevices
and hangers shall be designed to allow rotating pins to move without excessive wear of cotter pins and other
fasteners.

 *DVNHWV

1HZJDVNHWVVHDODQWDQGGHVLFFDQWVKDOOEHLQVWDOOHGIRUSHUPDQHQWVHDOLQJRIDOO¿HOGDVVHPEOHGMRLQWVDQG
all access covers removed during assembly. No gaskets are to be reused for any permanent seal broken or
GLVWXUEHGLQWKH¿HOG,ISUHVVXUHUHOLHIGHYLFHVDUHUXSWXUHGLVNVRURWKHUVHOIGHVWUXFWLYHGHYLFHVWKHQDWOHDVW
WKUHHVSDUHGLVFVDQGDVVRFLDWHGJDVNHWVDUHWREHSURYLGHGDQGDYDLODEOHGXULQJ¿OOLQJDQGWHVWLQJRIWKHHTXLS-
PHQW5XSWXUHGLVNVDQGJDVNHWVDUHDOVRWREHLQFOXGHGDVSDUWRIQRUPDOVSDUHSDUWVVWRFN

 &RQGXLWVDQG¿WWLQJV

$OOFRQGXLWDQGFRQGXLW¿WWLQJVVKDOOEHRIDGHTXDWHVL]HWRSUHYHQWMDPPLQJRIZLUHVDQGVKDOOEHRIDGHTXDWH
mounting strength.

 5DFHZD\V

All raceways and wiring furnished by the supplier are to be designed in accordance with the NEC, with respect
WRUDFHZD\FDEOH¿OOV5DFHZD\VDQGFRQGXLWVVKDOOEHLQVWDOOHGVRDVQRWWRSUHVHQWDVDIHW\KD]DUGWRSHUVRQ-
nel servicing the equipment.

 &RQWUROZLUHSURWHFWLRQ

All control wires shall be protected from rough and sharp edges, and be routed so as to minimize the effects of
electromagnetic coupled transients.

 6KLHOGLQJ

Instrument transformer secondary wiring and all external and interconnecting control wiring shall be ade-
quately shielded from voltages induced by switching surges, and to minimize the possibility of insulation
IDLOXUHLQWURGXFLQJOLQHSRWHQWLDORQWKLVZLULQJDVSHU,(((6WG&7KHZLULQJVKDOOEHLQVWDOOHGLQ
accordance with IEEE Std 525.

 7\SHRIZLULQJ

7KHFRQWURODQGLQVWUXPHQWWUDQVIRUPHUVHFRQGDU\ZLULQJVKDOOEHRLOZDWHUDQGÀDPHUHVLVWDQW3RODULW\
SKDVHDQGWDSLGHQWL¿FDWLRQVKDOOEHSURYLGHG+LJKWHPSHUDWXUHLQVXODWHGZLUHUDWHGIRUƒ&PLQLPXP
shall be used for connections to heaters.

 :LUHVL]H

Wire sizes for control wiring and instrument transformer secondary leads shall be coordinated with the in-
herent current requirements and voltage drop limitations. No splices shall be allowed in current transformer
secondary leads, voltage transformer secondary leads, or any control wire circuits.

 7HUPLQDOEORFNV

All component wiring shall be terminated on terminal blocks.

22
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

The metallic parts of terminals for control and instrument transformer wiring shall be corrosion resistant.

All terminals of control wires and instrument transformer circuits shall be labeled/numbered with sleeve type
WDJVDWERWKHQGVRIWKHZLUHV7KLVLGHQWL¿FDWLRQVKDOOEHWKHVDPHDVWKDWVKRZQRQWKHEUHDNHUHOHPHQWDU\DQG
ZLULQJGUDZLQJV3K\VLFDODUUDQJHPHQWRIDOOZLULQJWHUPLQDOVVKDOOEHLGHQWLFDORQDOOVLPLODUFLUFXLWEUHDNHUV

Shorting type terminal blocks shall be used for current transformer lead connections.

 ,QVXODWLRQZLWKVWDQG

$OOWHUPLQDOVDQGFRQWUROFLUFXLWZLULQJVKDOOEHFDSDEOHRIZLWKVWDQGLQJ9DF+]IRURQHPLQXWHRU
9DF+]IRURQHVHFRQGLQDFFRUGDQFHZLWK,(((6WG&

 6XUIDFHSUHSDUDWLRQ

$OOVXUIDFHVRIRXWGRRUFLUFXLWEUHDNHUIUDPHVWDQNVRSHUDWLQJPHFKDQLVPVDQGRWKHU*,6SDUWVH[SRVHGWR
possible corrosion shall be weatherproofed and designed to prevent accumulation of moisture. Those surfaces
WKDWUHTXLUHSDLQWLQJVKDOOEHVKRWEODVWHGVDQGEODVWHGRUFKHPLFDOO\FOHDQHGDQGJLYHQDVXLWDEOH¿QLVK$
VDOWVSUD\WHVWPHHWLQJ$670%UHTXLUHPHQWVPD\EHVSHFL¿HG

The user should specify number of coats and paint thickness.

 6WDELOLW\RISDUWV

No part shall unduly change its characteristics due to aging, temperature variations, moisture, corrosion, or
wear; loosen excessively with operation; require delicate or frequent adjustments; or require frequent periodic
lubrication.

 *,6HQFORVXUHVEXLOGLQJHTXLSPHQWFOHDUDQFHVDQGDFFHVV

*,6XVHUVW\SLFDOO\GH¿QHLQWKH*,6DUUDQJHPHQWVSHFL¿FDWLRQWKHVLWHSDUDPHWHUVDQGOLPLWDWLRQVLQFOXGLQJ
indoor or outdoor installations, wetland and property boundaries, subsurface utilities, site access/roadways,
VWDWLRQVVHUYLFHDQGFRPPXQLFDWLRQIDFLOLWLHVDQGVXFK$VSDUWRIWKLVVSHFL¿FDWLRQSURFHVVLWLVLPSRUWDQWWR
include clear and safe maintenance and equipment access. Engineering and Operations, Maintenance, and test
SHUVRQQHOVKRXOGPHHWWRLGHQWLI\DQGGRFXPHQWWKHLUQHHGVWREHGHVFULEHGLQWKHVSHFL¿FDWLRQ

² 6SDFHUHTXLUHGIRUIXWXUHHTXLSPHQWH[SDQVLRQVRU*,6HTXLSPHQWED\V
² &RUULGRUVVKRXOGEHSURYLGHGWKHOHQJWKRIWKH*,6HQFORVXUHEXLOGLQJRUVSDFHRQDQHTXLSPHQWSDG
for gas processing equipment. These spaces should be clear of any columns, stairways, ladders, etc.,
WKDWZRXOGLPSHGHPRYHPHQWRIDJDVFDUW$W\SLFDO³FOHDU´ZLQGRZLVP IW ZLGHDSSUR[L-
PDWHO\DQGPWRP IWWRIW KLJK0DLQWHQDQFHDFFHVVFRUULGRUVPD\DOVREHQHHGHGEH-
tween adjacent bays.

127(²*,6E\GHVLJQLVLQWHQGHGWRUHGXFHHTXLSPHQWIRRWSULQWV([FHVVLYHO\ODUJHPDLQWHQDQFHDLVOHVZLOODGGWRWKH
FRVWSDUWLFXODUO\LID*,6HQFORVXUHRUEXLOGLQJLVLQYROYHGLQWKHSURMHFW

² A source of auxiliary power sources to operate gas carts, welders, high potential test sets, etc. should be
provided at convenient and appropriate locations.
² What space is required for circuit breaker maintenance access, e.g., interrupter assembly removal?
Manufacturers should provide a drawing, detailing how access is provided in the proposed design.


1RWHVLQWH[WWDEOHVDQG¿JXUHVDUHJLYHQIRULQIRUPDWLRQRQO\DQGGRQRWFRQWDLQUHTXLUHPHQWVQHHGHGWRLPSOHPHQWWKHVWDQGDUG


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

² In accordance with Owner’s and Occupational Safety and Health Administration (OSHA) criteria,
access should be provided to all circuit breaker, ground and disconnect viewports, operating mecha-
QLVPVGFLVRODWLRQVZLWFKHVDQGVLPLODURSHUDWLQJLQGLFDWRUV/DGGHUV¿[HGRUPRELOHSODWIRUPVDQG
stairways should be provided to minimize users’ employee’s exposure to injuries such as trips or falls.
² 3URYLVLRQVVKRXOGEHPDGHWRKDQJHTXLSPHQWVWDWXVWDJV HJ'R1RW2SHUDWH 
² Where gas-to-air bushings are adjacent to each other but are on two different circuits, they need to be
VSDFHGVXI¿FLHQWO\IDUDSDUWWKDWRQHFLUFXLWFDQEHHQHUJL]HGIURPWKHV\VWHPZKLOHWKHRWKHUFLUFXLW
FDQEHVDIHO\WHVWHGDWIXOO¿HOGKLJKYROWDJHWHVWFRQGLWLRQV
² Equipment control cabinets.
• *,6HTXLSPHQWFRQWUROFDELQHWVLQFOXGLQJEUHDNHUVVKRXOGEHDPLQLPXPRIFP LQ DERYH
ÀRRURUJURXQGOHYHOWRIDFLOLWDWHZLULQJDQGPLQLPL]HZDWHULQ¿OWUDWLRQDQGURGHQWSUREOHPV
• Equipment control cable entries should be sealed.
• $PLQLPXPRIP IW FOHDUDQFHVKRXOGEHSURYLGHGLQIURQWRIFRQWUROSDQHODFFHVVGRRUVRU
removable plates where wiring termination or similar work is required. Compliance with OSHA
electrical safety clearance criteria should be required for power supply panels.
² If an enclosure/building is incorporated in the design, consider the following:
• $QRYHUKHDGEULGJHFUDQHIRUPDWHULDOKDQGOLQJ7KHUHTXLUHGOLIWZHLJKWVKRXOGEHVSHFL¿HGEDVHG
on the single heaviest component as reviewed with the manufacturer. After discussions with the
VXSSOLHUDQGFRQVLGHUDWLRQIRUIXWXUHH[SDQVLRQFOHDUDQFHEHWZHHQWKHFUDQHKRRNDQGKLJKHVW*,6
FRPSRQHQWVKRXOGEHVSHFL¿HGZLWKFRQVLGHUDWLRQIRUWKHODUJHVWGLPHQVLRQHGSLHFHWKDWZLOOQHHG
WRSDVVRYHUWKHIXOO\DVVHPEOHG*,6
• The user should specify auxiliary equipment needed including but not limited to emergency and
LOOXPLQDWLRQOLJKWLQJKHDWLQJDQGYHQWLODWLRQDFDQGGFSRZHUSDQHOVEDWWHULHV*,6SURWHFWLRQDQG
FRQWUROHTXLSPHQWORFDWLRQVHWF$PLQLPXPRIP IW RIZRUNLQJVSDFHVKRXOGEHSURYLGHGLQ
front of equipment access points or doors.
• 5ROOLQJGRRUVIRUHTXLSPHQWGHOLYHULHVVKRXOGEHSURYLGHGZLWKQRLQWHUIHUHQFHVRUREVWUXFWLRQVWR
HTXLSPHQWRIIORDGVZLWKLQIHHWRIWKHRSHQLQJ
• 3HUVRQQHODFFHVVGRRUV
• SF6 gas accumulation detection equipment in low spaces.
• 6HFXULW\V\VWHPV¿UHDQGVPRNHGHWHFWLRQVKRXOGEHVSHFL¿HG
• (QHUJ\HI¿FLHQF\LQWKHEXLOGLQJGHVLJQVKRXOGEHVSHFL¿HGHJXVHRIWUDQVOXFHQWSDQHOVPD\
help minimize daytime lighting requirements, wall insulation thickness will reduce heating/venti-
lation costs.

,IWKHEXLOGLQJLVQRWLQWKH*,6VXSSOLHU¶VVFRSHRIVXSSO\XVHUVKRXOGUHTXHVWLQSXWIURPWKH*,6VXSSOLHUIRU
the building design and space requirements.

 *,6FRPSRQHQWVGHWDLOHGUHTXLUHPHQWV
 *,6EXVDQGHQFORVXUHV
7KH*,6HQFORVXUHVKDOOFRPSO\ZLWKWKHUHTXLUHPHQWVVSHFL¿HGLQ,(((6WG&

7KH*,6HQFORVXUHVKRXOGEHGLYLGHGLQWRVHYHUDOFRPSDUWPHQWVVHSDUDWHGE\JDVWLJKWEDUULHULQVXODWRUV(DFK
FRPSDUWPHQWVKRXOGEHSURYLGHGZLWKYDOYHVWRDOORZLVRODWLRQHYDFXDWLRQDQGUH¿OORIJDVZLWKRXWHYDFXD-

24
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

tion of any other section. Location of gas barrier insulators shall be clearly discernible outside the enclosure by
a band of distinct color normally used for safety purposes.

7KHFRPSRQHQWVRIWKH*,6VKDOOEHFRQQHFWHGE\DVLQJOHWKUHHSKDVHEXVGXFWV7KHHQFORVXUHVVKDOOEHFRQ-
nected by use of bolted and gasketed joints. The bus conductor shall be connected with plug-in contacts with
VLOYHUSODWHGFRQWDFWVXUIDFH7KHJDVLQVXODWHGEXV *,% VKDOOEHFDSDEOHRIZLWKVWDQGLQJWKHPHFKDQLFDO
DQGWKHUPDOVWUHVVHVGXHWRWKHVSHFL¿HGVKRUWFLUFXLWFXUUHQWVDVZHOODVWKHUPDOH[SDQVLRQDQGFRQWUDFWLRQ
created by temperature cycling.

For small gas compartments where pressure rise may burst the enclosure, automatic pressure relief devices
shall be incorporated into the basic design of each gas compartment as a safety precaution against the bursting
RIDQHQFORVXUH3UHVVXUHUHOLHIVKDOOEHE\PHDQVRIDEXUVWLQJGLVFV\VWHPZLWKDSUHGHWHUPLQHGRSHQLQJSUHV-
VXUH'HÀHFWLRQGHYLFHVVKDOOEHLQVWDOOHGWRKHOSHQVXUHWKDWSHUVRQQHOZLOOQRWEHHQGDQJHUHG

 &LUFXLWEUHDNHUV
 *HQHUDO

7KH*,6FLUFXLWEUHDNHUVKDOOEH6)6JDVLQVXODWHGDQGPHHWDOORIWKHUDWLQJVDVGH¿QHGLQ,(((6WG&
DQGDVOLVWHGLQ,(((6WG&DQGDVVSHFL¿HGE\WKHXVHU$SSOLFDWLRQVKDOOEHPDGHLQDFFRUGDQFHZLWK
WKHSURYLVLRQVRI,(((6WG&,(((6WG&,(((6WG&DQG,(((6WG&DVDSSOLFD-
EOH,(((6WG&SURYLGHVJXLGDQFHIRUFRPSLOLQJVSHFL¿FDWLRQRIWKHFLUFXLWEUHDNHUDQGVKRXOGEHXVHG
WRGHVFULEHVSHFL¿FXVHUUHTXLUHPHQWVLQAnnex A.

 $XWRUHFORVLQJ

If auto-reclosing is required, the circuit breakers shall be capable of tripping and reclosing according to the
XVHUVSHFL¿HGGXW\F\FOHZLWKRXWGHUDWLQJ

7KHFDSDFLW\RIHQHUJ\VWRUDJHIDFLOLWLHVWKDWDUHDQLQWHJUDOSDUWRIWKHFLUFXLWEUHDNHUVKDOOKDYHVXI¿FLHQW
VWRUHGHQHUJ\FDSDELOLWLHVIRUWKHVSHFL¿HGGXW\F\FOHRSHUDWLRQZLWKRXWUHSOHQLVKPHQWRIWKHHQHUJ\V\VWHP

 7ULSSLQJGHYLFHV

A shunt trip coil, when used, shall be capable of tripping the circuit breaker when any voltage throughout the
FRQWUROYROWDJHUDQJHVSHFL¿HGLQ,(((6WG&LVDSSOLHGHYHQLIWKHSOXQJHURIWKHVKXQWWULSFRLOLV
raised so that it is in contact with the trigger.

:KHQGXDOWULSFRLOVDUHVSHFL¿HGWKHFLUFXLWEUHDNHUVKDOORSHQZLWKLQVSHFL¿HGSDUDPHWHUVZKHQHLWKHURU
both trip coils are energized. The user may specify separate electrical and/or magnetic circuit for dual trip
coils. The user may specify minimum and maximum levels of tripping current to assure certain electrome-
chanical relays will actuate. Their design and installation shall help ensure that a failure of one trip coil shall
not affect the operation of the other trip coil. The interrupting speed of the breaker shall be independent of
whether one trip coil is energized or both are energized either simultaneously or sequentially.

For independent pole-operated circuit breakers, each trip coil circuit shall have its own pole disagreement cir-
cuit which automatically trips all poles if one (or more) pole is in the closed position and the remaining poles
are open. Control circuitry shall be designed to prevent trip coil burnout if pole disagreement circuits fail to
trip a faulty breaker pole.

:KHQVSHFL¿HGDQHPHUJHQF\WULSGHYLFHVKRXOGEHIXUQLVKHGZLWKDVDIHW\V\VWHPWRSUHYHQWLQDGYHUWHQW
operation. The user may specify that the emergency trip device should either mechanically trip the circuit
breaker, electrically trip the circuit breaker, or a combination of the two.

25
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

Users should be aware that these emergency trip devices may not have appropriate interlocks to prevent oper-
ation under some conditions, such as loss of gas pressure, etc.

 2SHUDWLQJPHFKDQLVP

Each circuit breaker shall be self-contained with its own operating mechanism(s), control circuits, and auxil-
iary equipment.

The design of the operating mechanism shall be tested together with the circuit breaker interrupter(s) design
to help ensure positive opening of the circuit breaker and circuit interruption, whether the tripping impulse
is received in the fully closed or any partially closed position. Closing the circuit breaker into a standing trip
signal or opening the circuit breaker into a standing close signal shall not cause damage to the circuit breaker.
If the release or tripping circuit is completed through an auxiliary switch, electrical release or tripping will not
take place until such auxiliary switch is closed. The operating mechanism and appurtenances shall conform to
,(((6WG&7KHPHFKDQLVPVKDOOEHVXLWDEOHIRURQHRIWKHFRQWUROYROWDJHVOLVWHGLQ,(((6WG&

On outdoor circuit breakers, the housing containing the operating mechanism shall have an insect screen over
openings or vents, be weatherproof, rainproof, dust-tight, and gasketed. The user should specify the required
LQJUHVVSURWHFWLRQDVSHU1(0$,3UDWLQJ

There shall be a means to prevent condensation and to maintain a satisfactory operating temperature within the
housing.

7KHRSHUDWLQJPHFKDQLVPVKDOOFRPSO\ZLWKWKHIXQFWLRQDOUHTXLUHPHQWVVSHFL¿HGLQ,(((6WG&

:KHQVSHFL¿HGE\WKHXVHUWKHFLUFXLWEUHDNHUVKDOOEHFDSDEOHRILQGHSHQGHQWSROHRSHUDWLRQ7KHFLUFXLW
breaker controls shall be wired to permit either three-pole or single-pole tripping and reclosing.

Operating mechanisms shall be complete with all control equipment. The only external requirements for oper-
ation shall be the electrical supply.

 $X[LOLDU\VZLWFKHV

(DFKEUHDNHUVKDOOKDYHWKHVSHFL¿HGQXPEHURIDX[LOLDU\VZLWFKHVDOOZLUHGWRWHUPLQDOEORFNVORFDWHGLQWKH
FLUFXLWEUHDNHUED\¶VORFDOFRQWUROFDELQHW /&& PDUVKDOOLQJFDELQHWIRUXVHE\WKHXVHU8QOHVVVSHFL¿HGRWK-
HUZLVHE\WKHXVHUDX[LOLDU\FRQWDFWVVKDOOEHUDWHG$FRQWLQXRXVDQG$LQGXFWLYHLQWHUUXSWLQJDW9
dc. The installation of auxiliary relays to achieve the number of auxiliary contacts (contact multiplying) may
QRWEHDFFHSWDEOHIRUXVHUGH¿QHGFULWLFDOFLUFXLWV

 2SHUDWLRQFRXQWHUV

Each circuit breaker should be equipped with a non-resetting operation counter. If the poles are operated in-
dependently, with individual operating mechanisms, each pole should be equipped with an operation counter.
The counter should preferably operate during the opening operation of the circuit breaker. Although operation
counters actuated by the mechanical movement of the circuit breaker mechanism are preferable, the user may
elect to request electrically actuated operation counters located in the LCC.

 &ORVLQJUHVLVWRUV

Closing resistors, synchronized switching, or other means for overvoltage mitigation shall be supplied when
VSHFL¿HGE\WKHXVHU6\VWHPVWXGLHVVKDOOEHXVHGLQRUGHUWRGHWHUPLQHWKHQHHGDQGWKHDSSURSULDWHVROXWLRQ

26
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

 ,QVXODWLQJSDUWV

All parts of the insulation structures and materials including that between phases to ground and across the open
contacts shall be of an inherently stable nature such that, when subjected to dielectric stresses corresponding to
the circuit breaker’s rating, no tracking or other deterioration occurs over the design life of the circuit breaker.

 3RVLWLRQLQGLFDWRU

$UHOLDEOHHDVLO\UHDGDEOHPHFKDQLFDOSRVLWLRQLQGLFDWRUWKDWPHHWVWKHUHTXLUHPHQWVRI,(((6WG&VKDOO
be furnished to indicate the open and closed positions of the circuit breaker. The word “open” in contrasting
letters shall be displayed on a green background and the word “closed” in contrasting letters shall be dis-
played on a red background. On spring-charged mechanisms, the mechanism indicator shall display the word
“charged” in black letters on a yellow background and the word “discharged” in black letters, on a white back-
ground. If more than one mechanism is utilized, each shall be equipped with the above operation indicators.

 7LPLQJDQGWUDYHOGHYLFH

For circuit breaker designs adaptable to the application of a timing and travel device, provisions shall be made
for such a device and, when requested, mounting facilities shall be furnished in an easily accessible testing
area.

For circuit breaker designs not adaptable to the application of a timing and travel device, instructions for tim-
ing of the circuit breaker shall be furnished, and when requested, any required devices on the circuit breaker
for such timing shall also be furnished.

 'LVFRQQHFWDQGJURXQGLQJVZLWFKHV
 8VHUVSHFL¿FDWLRQV

The user’s one-line diagram should show the locations where disconnect switches, maintenance ground
switches, and/or high-speed grounding switches will be required. The user should specify any anticipated
duty condition for the ground switches, including the interrupting and/or closing duty for ground switches,
HVSHFLDOO\ZKHQFRQQHFWHGWRSDUDOOHOWUDQVPLVVLRQOLQHVRUVLPLODUO\FRXSOHGV\VWHPV5HIHUWR&ODXVHRI
,(((6WG&IRUUDWLQJVUHTXLUHPHQWV7KLVGXW\FDQQRWQRUPDOO\EHSHUIRUPHGZLWKDVWDQGDUGJURXQG
VZLWFKDQGPD\UHTXLUHDVSHFLDOGHVLJQ7KHIROORZLQJRSHUDWLRQPRGHVVKRXOGEHVSHFL¿HGIRUKLJKVSHHG
grounding switches for special grounding applications:

² High speed for cable grounding


² Fault initiating
² Current-interrupting capability and recovery voltage for use with parallel transmission lines

The user should specify the expected disconnect switch operating capability in situations where a disconnect
switch can be operated with out-of-phase conditions, such as synchronizing generators or an inductive poten-
tial transformer on the load side of the switch.

 5DWLQJ

&ODXVHRI,(((6WG&DSSOLHV8QOHVVVSHFL¿HGRWKHUZLVHWKHDPSDFLW\RIWKHGLVFRQQHFWVZLWFKVKDOO
be the same as that of the associated circuit breakers. Ampacity of the disconnects for line/transformer/power
FDEOHLQWHUIDFHVVKDOOEHDVVSHFL¿HGLQAnnex A and shown on the one-line diagram.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

 *HQHUDO

All disconnects, and grounding switches including high-speed ground switches shall comply with the require-
PHQWVVSHFL¿HGLQRI,(((6WG&

Disconnect and grounding switches shall be interlocked in accordance with the requirements of .

All main contacts shall either be silver plated or shall have silver inserts.

For motor-operated disconnect and grounding switches, the control should be electrically and/or mechanically
uncoupled from the drive shaft when the switch is operated manually to prevent coincident power operation
of the switch and the drive mechanism(s).The switch mechanisms shall be arranged for padlocking in both the
fully open and closed position.

 2SHUDWLQJPHFKDQLVPV

Disconnect switches and grounding switches, including high-speed grounding switches should be three-pole,
group-operated, or single-pole operated, no-load break, with one operating mechanism per three-pole or one
RSHUDWLQJPHFKDQLVPSHUVLQJOHSROHSRVLWLRQDVVSHFL¿HGLQWKHAnnex A. The user should specify manual or
motor operation. Operating mechanisms are to be provided with position indication that may be color-coded,
RUWKHSRVLWLRQPD\EHVSHOOHGRXWRUWKHLQGLFDWRUVPD\XVHFRORUFRGHGZRUGRUV\PEROLQDVSHFL¿FEDFN-
ground color (e.g., white color word or symbol in green background color for open position and white color
word or symbol in red background color for closed position).

Disconnect and grounding switches shall have facilities for emergency manual operation using the supplied
handles or hand cranks.

Each disconnect and ground switch should open or close only due to manual- or motor-driven operation. The
switch blade should not move due to gravity or seismic event or other causes, even if a part fails, or is removed.
Once initiated electrically, the motor mechanism should complete an open or close operation even though the
electrical signal is removed before the operation is completed. Once initiated manually, the mechanism should
complete an open or close operation before the manual operation handle can be removed.

(DFKGLVFRQQHFWVZLWFKDQGJURXQGLQJVZLWFKVKRXOGEHIXUQLVKHGZLWKWKHVSHFL¿HGQXPEHURIHOHFWULFDOO\
independent auxiliary switches. The auxiliary switch contacts shall indicate that the main contacts are in the
proper position of the switch blades and should be provided so that the contacts can be adjusted to be fully
engaged and in proper alignment when in the closed position. User should specify the number of “a” and “b”
contacts.

Each manual-operating mechanism and each motor-operating mechanism should be housed in a weatherproof
enclosure. Each enclosure should have a hinged door and a handle with a latch that can be padlocked by the
XVHU(DFKHQFORVXUHVKRXOGEHUDLQSURRIDQGJDVNHWHG*DVNHWVVKRXOGEHSHUPDQHQWDQGPDLQWHQDQFHIUHH

 9LVXDOYHUL¿FDWLRQ

9LVXDOYHUL¿FDWLRQVKRXOGEHSURYLGHGIRUHDFKSROHRIHDFKGLVFRQQHFWVZLWFKDQGJURXQGLQJVZLWFKWRSHUPLW
visual inspection of each switch position.

9LHZSRUWVVKDOOEHSURYLGHGWRYLHZHDFKSROHRIWKHVZLWFKVXFKWKDWWKHFRUUHFWSRVLWLRQFDQEHGHWHUPLQHG
with a visible gap. External mechanically connected semaphores shall also be provided showing either open or
FORVHSRVLWLRQ9LHZSRUWVVKDOOEHDUUDQJHGVRWKDWDSRUWDEOHOLJKWVRXUFHFDQEHLQMHFWHGWRDOORZIRUYLHZLQJ
of the contact position. External position indicators should also be provided. Inspection viewports should have
removable covers to prevent damage of the actual port due to the elements or from abrasive action while clean-
LQJWKHSRUWIRUYLHZLQJ9LHZSRUWVVKRXOGEHSURSHUO\VHDOHGDQGUDLVHGQRWUHFHVVHG


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

9LHZSRUW¿WWLQJVVKDOODOVREHHTXLSSHGVRWKDWDWHPSRUDU\RUSHUPDQHQWFRQQHFWLRQRIDX[LOLDU\HTXLSPHQW
such as a camera is possible.

 $FFHVV

Access via platforms, walkways or other agreed means should be provided to each disconnect-switch and
grounding-switch housing, operating mechanism and viewport(s) for operations and maintenance personnel.
7KHVXSSOLHUVKRXOGSURYLGH'DUUDQJHPHQWGUDZLQJVWRVKRZWKHORFDWLRQRIHTXLSPHQWDQGDFFHVVWRLW

 /RZYROWDJHWHVWSURYLVLRQ

$ORZYROWDJHWHVWSURYLVLRQVKRXOGEHVXSSOLHGZLWKDJURXQGLQJVZLWFKWRSHUPLWWHVWYROWDJHVRIXSWRN9
RSWLRQDON9 DQGXSWR$WREHDSSOLHGWRWKHFRQGXFWRUZLWKRXWUHPRYLQJ6)6 gas from the enclosure
and without disassembling the enclosure except for ground shunt leads.

 *DVV\VWHP
8.4.1 SF6JDV

7KH*,6VKDOOEHIXUQLVKHGLIVRVSHFL¿HGZLWKVXI¿FLHQWQHZ6)6 gas to pressurize the complete system in a


sequential approach, one zone or compartment at a time, to the rated nominal density. An additional quantity
RIJDVVKRXOGEHIXUQLVKHGDVVSHFL¿HG

The SF6JDVVKRXOGFRQIRUPWR$670'RUWHFKQLFDOJUDGHJDVSHU,(&5HF\FOHG6)6 gas that


FRQIRUPVWRVSHFL¿FDWLRQVPXWXDOO\DJUHHGXSRQE\WKHXVHUDQGWKHHTXLSPHQWVXSSOLHUVXFKDV,(&
may also be used.

The supplier should provide guidelines or recommended practices for the reuse or recycling of SF6 gas re-
moved from the equipment.

 *DVVFKHPDWLFGLDJUDP

A gas schematic diagram should be submitted for approval. It should include the necessary valves, connec-
tions, density monitors, gas monitor system and controls, and location of gas partitions.

If calibration of SF6 gas density monitors without de-energizing the equipment is required, provisions shall be
shown on the diagram.

 ([WHUQDO¿[WXUHVDQGFRQQHFWLRQV

3URYLVLRQVKDOOEHPDGHIRUFRQQHFWLQJWKHJDVGHQVLW\PRQLWRUSUHVVXUHJDXJHJDVVHUYLFHFDUWDQGJDVTXDO-
ity (moisture, purity, decomposition) test equipment to each gas compartment. The location should be easily
DFFHVVLEOHE\WKHXVHU7KHH[WHUQDO¿[WXUHVDQGFRQQHFWLRQVVKRXOGEHPDGHRIFRUURVLRQUHVLVWDQWPDWHULDO
and should be capped where required.

 *DVPRQLWRULQJ]RQHV

An SF6 gas system proposed on a “gas schematic diagram” should be submitted with the proposal. The number
RIJDV]RQHVVKRXOGEHRSWLPL]HGEDVHGRQWKHXVHUFRQ¿JXUDWLRQDQGVHUYLFHFRQWLQXLW\UHTXLUHPHQWV7KH*,6
gas enclosures should be divided into several gas zones separated by gas-tight barrier insulators (partitions).
(DFK]RQHVKRXOGEHSURYLGHGZLWKQHFHVVDU\YDOYHVWRDOORZHYDFXDWLRQDQGUH¿OORIJDVZLWKRXWHYDFXDWLRQ
of any other compartment. Each gas compartment shall be independent from all other gas compartments. To
reduce the probability of leaks, gas piping is not preferred. For single-phase bus construction, single-phase gas
SUHVVXUHDQGGHQVLW\PRQLWRULQJVKRXOGEHVSHFL¿HG


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
,(((6WG&
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

)RUWKHSXUSRVHRIJDVPRQLWRULQJDQGPDLQWHQDQFHWKH*,6VKRXOGDVDPLQLPXPEHGLYLGHGLQWRWKHIROORZ
LQJLQGLYLGXDOPRQLWRUHGJDV]RQHV

² (DFKSRZHUFLUFXLWEUHDNHU
² (DFKYROWDJHWUDQVIRUPHU
² (DFKJDVLQVXODWHGVXUJHDUUHVWHU
² $GGLWLRQDO]RQHVDVPXWXDOO\DJUHHGXSRQE\WKHXVHUDQGWKHVXSSOLHU

7KHXVHUVKRXOGFRQVLGHUFUHDWLQJDOLPLWDWLRQWRWKHPD[LPXPYROXPH RUZHLJKW RI6)LQDFRPSDUWPHQW


EDVHGRQDYDLODEOHJDVVHUYLFHFDUWRURQVLWHJDVVWRUDJHFDSDELOLWLHV7KLVPD\EHWKHIXOO6)JDVTXDQWLW\RI
DQ\RQHFRPSDUWPHQWSOXVWKHTXDQWLW\RIWKHDGMDFHQWFRPSDUWPHQWV,QRUGHUWRPLQLPL]HJDVKDQGOLQJ
WLPHDQGYROXPHDVHSDUDWHJDV]RQHPD\EHUHTXLUHGIRUWKHIROORZLQJGHYLFHV

² &DEOHWHUPLQDWLRQV
² 7UDQVIRUPHUWHUPLQDWLRQV
² 6)WRDLUEXVKLQJV
² 5HPRYDEOHOLQNV

 *DVGHQVLW\PRQLWRUV

(DFKJDVFRPSDUWPHQW]RQHVKDOOEHIXUQLVKHGZLWKDFRQWLQXRXV6)JDVPRQLWRULQJV\VWHPFRQVLVWLQJRID
JDVGHQVLW\PRQLWRU7KHJDVGHQVLW\PRQLWRUVKDOOEHWHPSHUDWXUHFRPSHQVDWHGDQGSURYLGHWZRHOHFWULFDOO\
LQGHSHQGHQWFRQWDFWVZKLFKRSHUDWHWZRVWDJHVRIDODUPV7KHGHQVLW\PRQLWRUGLVSOD\PD\GLVSOD\FRORUVIRU
HDFKDODUPVWDJH LH\HOORZDQGUHG 7KHDODUPVWDJHVVKDOOEHDVIROORZV

D /RZ6)JDVaODUP5H¿OOGHQVLW\²DWDJDVGHQVLW\QRUPDOO\WREHORZWKHQRPLQDO¿OO
GHQVLW\
E /RZ /RZ JDV DODUP 0LQLPXP JDV GHQVLW\ PLQLPXP IXQFWLRQDO SUHVVXUHGHQVLW\ ²UHTXLUHG WR
DFKLHYHHTXLSPHQWUDWLQJV

,QVSHFLDOFDVHVDVGHWHUPLQHGE\WKHXVHUDWKLUGVWDJHZLWKDVHWRIFRQWDFWVPD\EHQHFHVVDU\LQFHUWDLQDUHDV

,IWKHJDVGHQVLW\PRQLWRULVHTXLSSHGZLWKDQ6)SUHVVXUHVFDOHLWVKDOOLQGLFDWHLQSVLJUHDGLQJV7KLVVFDOH
PD\EHWHPSHUDWXUHFRPSHQVDWHGDQGLQGLFDWHDEVROXWHRUUHODWLYHYDOXHVDVDJUHHGXSRQE\XVHUDQGVXSSOLHU

8VHUFRXOGDOVRH[SORUHWKHSRVVLELOLW\RIDQRQOLQHJDVPRQLWRULQJV\VWHPZKLFKIDFLOLWDWHVHDUO\GHWHFWLRQRI
JDVOHDNV

6XSSOLHUVKDOOLQGLFDWHLIVXQVKLHOGVDQGRULQVXODWHGFRYHUVDUHQHFHVVDU\WREHLQVWDOOHGRYHUWKHJDVGHQVLW\
PRQLWRUV

 /HDNDJHUDWH

7KHOHDNDJHUDWHVKDOOEHDVSHU,(((6WG&

 6)WRDLUEXVKLQJV
%XVKLQJVVKDOOFRQIRUPWRWKHUHTXLUHPHQWVRI,(((6WG&


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

SF6WRDLUEXVKLQJVIRUFRQQHFWLRQVEHWZHHQWKH*,6DQGRYHUKHDGOLQHVRUFRQYHQWLRQDODLULQVXODWHGHTXLS-
PHQWVKDOOEHIXUQLVKHGZKHUHVSHFL¿HG%XVKLQJORFDWLRQDQGRULHQWDWLRQVKDOOEHGHWHUPLQHGZLWKUHVSHFWWR
the design connection interface.

At a minimum, coordination between the supplier and user should be performed to determine the following:

a) Insulator material (composite, porcelain)


b) Bushing color
c) 5DWHGV\VWHPYROWDJH
d) BIL rating
e) 7HUPLQDOSDGVSHFL¿FDWLRQV
f) 3K\VLFDOFKDUDFWHULVWLFV

The creepage distance over the external surface of outdoor bushings shall conform to the requirements of
,(((6WG&IRUWKHXVHUVSHFL¿HGVHUYLFHFRQGLWLRQVEXWVKDOOQRWEHOHVVWKDQPPN9RIPD[LPXP
line-line voltage.

The bushings shall be provided with proper terminal pads. Mechanical forces on bushing terminals shall be
FDSDEOHRIZLWKVWDQGLQJDFDQWLOHYHUIRUFHDSSOLHGWRWKHWHUPLQDORIDWOHDVW1)RUFRURQDSURWHFWLRQDW
high voltages, external shields should be placed at the terminal location of the bushing.

(DFKEXVKLQJVKDOOEHORFDWHGZLWKLQLWVRZQLQGHSHQGHQWJDV]RQHXQOHVVVSHFL¿HGRWKHUZLVH7KHJDVSUHV-
VXUHLQWKHEXVKLQJ]RQHVKRXOGEHWKHVDPHDVWKHUHPDLQLQJSRUWLRQVRIWKH*,6

 &DEOHFRQQHFWLRQV
If required, SF6 enclosures for cable terminations should be provided for connecting high voltage power cable
WRWKH*,6DVVKRZQRQWKHRQHOLQHGLDJUDP

SF6WRFDEOHLQWHUIDFHV RUFDEOHHQGXQLWV DW*,6WHUPLQDOVPD\EHSRVLWLRQHGKRUL]RQWDOO\RUYHUWLFDOO\DQG


DUHGH¿QHGRQWKHVWDWLRQOD\RXWDQGVHFWLRQV$OOFDEOHHQGXQLWVVKDOOEHVXLWDEOHIRUFRQQHFWLQJWRWKHVSHF-
L¿HGVL]HDQGW\SHRIVROLGGLHOHFWULFRUSLSHW\SH LHÀXLG¿OOHGRUJDV¿OOHG FDEOHZLWKPD[LPXPFRQWLQ-
XRXVYROWDJHFXUUHQWLPSXOVHZLWKVWDQGDQGVKRUWFLUFXLWUDWLQJVWRPDWFKWKHFRUUHVSRQGLQJ*,6WHUPLQDO

7KHGHVLJQRIWKH*,6FDEOHHQGXQLWVDQGVFRSHRIUHVSRQVLELOLWLHVVKDOOIXOO\FRPSO\ZLWKWKHODWHVW,(((RU
IEC standards. The high-voltage power cable will be supplied by others. The size and type of the cable being
VXSSOLHGLVDVVSHFL¿HGLQWKHAnnex A.

$Q\FDEOHHQGXQLWWKDWLVGH¿QHGDVIXWXUHDQGZLOOQRWKDYHKLJKYROWDJHFDEOHVWHUPLQDWLRQSUHVHQWDWWKH
time of energization, shall be provided with a dead-end or dummy-type plug to maintain proper insulation in
DEVHQFHRIWKH¿QDOFDEOHWHUPLQDWLRQ

The SF6 cable end unit and connection support structure should be equipped with provisions for isolating the
FDEOHVKHDWKRUSLSHWRSHUPLWFDWKRGLFSURWHFWLRQRIWKHFDEOHV\VWHP VHH,(&DQG,(((6WG 

To help ensure the effectiveness of the corrosion-protection in handling power frequency fault current within
WKH*,6WKHXVHUDQGWKHVXSSOLHUVKRXOGFRRUGLQDWHSODFHPHQWUDWLQJVDQGWHVWLQJRIFRUURVLRQSURWHFWLRQ
installation.

The cable end module should be designed and constructed so that high-voltage ac/dc testing of the installed
SRZHUFDEOHDQGWKHKLJKYROWDJHDFWHVWLQJRIWKHLQVWDOOHG*,6FDQEHSHUIRUPHGRQVLWH5HPRYDEOHEROWHG


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

links, disconnect switches, or similar connections may be required. The design of the link and connections
should help ensure that when removed, the resulting gap can withstand the impulse and power frequency test
YROWDJHVDSSOLFDEOHWRWKH*,6DQGWKHFDEOHKLJKYROWDJHDFGFWHVWYROWDJH,IQHFHVVDU\LWPD\EHUHTXLUHG
to connect a test bushing. The test bushing should be equipped with a removable link to permit separate cable
DQG*,6KLJKYROWDJHWHVWV,QFDVHSOXJLQWHUPLQDWLRQVDUHXVHGSRZHUFDEOHVDUHWREHXQSOXJJHGIURP*,6
IRUKLJKYROWDJHWHVWLQJRI*,6FDEOHEHFDXVHWKHGLVFRQQHFWLQJOLQNRSWLRQPD\QRWEHSRVVLEOH7KHDFWXDO
testing method needs to be mutually agreed.

 7UDQVIRUPHUFRQQHFWLRQV
,IUHTXLUHGWKH*,6PD\EHFRQQHFWHGWRWKHWUDQVIRUPHURUUHDFWRUZLWKJDVLQVXODWHGEXV&RQVLGHUDWLRQZLOO
need to be given to routing, support and thermal expansion/contraction of the gas insulated bus. Additional-
ly, the transformer or reactor connection side should have a removable cover and removable bus link(s) or
disconnect switch to permit disconnecting the transformer from the bus for testing of the bus or transformer
VHSDUDWHO\6SHFL¿FWHFKQLFDOUHTXLUHPHQWVVXFKDVYLEUDWLRQWUDQVPLVVLRQÀDQJHGHVLJQDQGORFDWLRQRIWKH
LQVXODWHGMXQFWLRQPD\EHUHIHUUHGWRLQ,(&7KHUHVSRQVLELOLW\IRUWKHFRRUGLQDWLRQRIWKHJDVLQ-
VXODWHGFRQQHFWLRQWRWKHWUDQVIRUPHUDQGWKHIDFWRU\WHVWLQJRIWKH*,6DQGWKHWUDQVIRUPHUVKRXOGEHDJUHHG
XSRQEHWZHHQWKHXVHUWKH*,6PDQXIDFWXUHUDQGWKHWUDQVIRUPHUPDQXIDFWXUHU

Enclosure adapters may be required to connect the SF6 bus directly to the SF6-to-oil transformer bushing, bolt-
LQJGLUHFWO\WRDÀDQJHRQWKHEXVKLQJDQGWRWDOO\HQFORVLQJWKHLQVXODWRUDQGOLYHSDUWVLQWKH6)6 environment.
The adaptor should have a removable cover and removable bus link to permit disconnecting the transformer
from the bus, testing of the bus or transformer separately, and removal of the transformer if required.

The bus enclosure may be insulated from the transformer tank to minimize circulating currents through the
WUDQVIRUPHUWDQN7KHEXVFRQQHFWLQJWKHWUDQVIRUPHUWRWKH*,6PD\DOVRFRQWDLQDEHOORZVDVVHPEO\DQG
ÀH[LEOHFRQGXFWRUFRQQHFWLRQWRPLQLPL]HYLEUDWLRQWUDQVIHUIURPWKHWUDQVIRUPHU$OWHUQDWLYHO\DÀH[LEOH
element may be provided on the transformer side of the SF6-to-oil bushing. To permit alignment of the bus and
WKHEXVKLQJWKHXVHUVKRXOGDVVLJQUHVSRQVLELOLW\WRWKH*,6VXSSOLHUWRFRRUGLQDWHWKHGHVLJQVRIWKHLQWHUIDFH

:KHUHVSHFL¿HGWUDQVIRUPHUVVKDOOEHFRQQHFWHGWRWKH*,6RXWJRLQJ*,%XVLQJFRPSOHWHO\HQFORVHGDGDSW-
HUVWRWUDQVLWLRQIURPWKH*,66)6 gas to the transformer’s insulating medium. The design of the transformer
EXVKLQJKRXVLQJVKDOOIXOO\FRPSO\ZLWK,(&7KHDGDSWRUVKDOOKDYHDUHPRYDEOHEXVOLQNWRSHU-
mit electrical disconnection of the transformer from the bus, testing of the bus or transformer separately, and
removal of the transformer if required.

7KH*,%HQFORVXUHVKDOOEHLQVXODWHGIURPWKHWUDQVIRUPHUWDQNWRPLQLPL]HFLUFXODWLQJFXUUHQWVWKURXJKWKH
WUDQVIRUPHUWDQN7KHDGDSWRUXQLWVKDOODOVRFRQWDLQDEHOORZDVVHPEO\DQGÀH[LEOHFRQGXFWRUFRQQHFWLRQVWR
minimize vibration transfer from the transformer.

 &XUUHQWWUDQVIRUPHUV
(DFKFXUUHQWWUDQVIRUPHUVKDOOPHHWWKHDSSOLFDEOHUHTXLUHPHQWVLQ,(((6WG&8VHUVVKRXOGVSHFLI\
current transformer arrangements, designations, turns-ratio(s), and accuracy class. Each current transformer
should be provided so that the enclosure current does not affect the accuracy or the ratio of the device or the
FRQGXFWRUFXUUHQWEHLQJPHDVXUHG3URYLVLRQVKDOOEHPDGHWRSUHYHQWDUFLQJDFURVVWKHHQFORVXUHLQVXODWLRQ

Current transformer secondaries shall be terminated to shorting terminal blocks. Each current transformer
should be constructed in such a way that the following parameters can be tested from the LCC from externally
connected equipment supplied by user without the removal of SF6JDVDQGZLWKRXWGLVDVVHPEOLQJDQ\*,6
components, except for ground shunt leads:

a) 5DWLRWHVWV


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

b) Insulation tests
c) Saturation tests (accuracy and secondary excitation characteristics)
d) 3RODULW\WHVWV
e) 5HVLVWDQFHPHDVXUHPHQWVRQVHFRQGDU\ZLQGLQJDQGVHFRQGDU\OHDGV

The number and position of the current transformers, relative to the circuit breakers and switches, shall be as
shown in the single line diagram provided with the Annex A.

CT rating and diagram plates shall be provided. The information to be supplied on each plate shall be as speci-
¿HGLQWKH,(((6WG&7KHUPDOUDWLQJVIDFWRUVKDOOEHDVVSHFL¿HGLQWKHAnnex A.

 9ROWDJHWUDQVIRUPHUV
(DFKYROWDJHWUDQVIRUPHUVKDOOPHHWWKHDSSOLFDEOHUHTXLUHPHQWVLQ,(((6WG&7KHQXPEHUDQGSRVL-
tion of the voltage transformers shall be as shown in the one-line diagram provided in Annex A. The ratings of
WKHYROWDJHWUDQVIRUPHUVVKRXOGEHVSHFL¿HGLQWKHRQHOLQHGLDJUDPLQAnnex A.

9ROWDJHWUDQVIRUPHUVVKRXOGEHFRQQHFWHGWRWKHUHPDLQGHURIWKH*,6E\HLWKHUSOXJLQFRQVWUXFWLRQDGLV-
connect-link, or a disconnect switch, and be attached to the gas-insulated system in such a manner that they
can be easily disconnected while the system is being dielectrically tested. Alternately, a voltage transformer
designed to withstand the ac withstand testing may be provided so that disconnection is not necessary. The
PHWDOKRXVLQJRIWKHWUDQVIRUPHUVKRXOGEHFRQQHFWHGWRWKHPHWDOHQFORVXUHRIWKH*,6ZLWKDÀDQJHGEROWHG
DQGJDVNHWHGMRLQWVRWKDWWKHWUDQVIRUPHUKRXVLQJLVJURXQGHGWRWKH*,6HQFORVXUH

3ULPDU\DQGVHFRQGDU\WHUPLQDOVVKRXOGKDYHSHUPDQHQWPDUNLQJVIRULGHQWL¿FDWLRQRISRODULW\LQDFFRUGDQFH
ZLWK,(((6WG&

9ROWDJHWUDQVIRUPHUVHFRQGDULHVVKDOOEHWHUPLQDWHGWRWHUPLQDOEORFNVORFDWHGLQWKH/&&V

9ROWDJHWUDQVIRUPHUUDWLQJDQGQDPHSODWHGLDJUDPVVKDOOEHSURYLGHG7KHLQIRUPDWLRQWREHVXSSOLHGRQHDFK
QDPHSODWHVKDOOEHDVVSHFL¿HGLQWKHUHOHYDQW,(((VSHFL¿FDWLRQ(DFKWDSUDWLRVKDOOEHVKRZQRQWKHQDPH-
SODWHDORQJZLWKDGLDJUDPLQGLFDWLQJWKH97SRODULWLHV7KHUPDOUDWLQJVDQGEXUGHQVVKDOOEHFRRUGLQDWHG
with the protection system.

Each voltage transformer should be dry-type, encapsulated, or SF6 insulated, and should have the following
LQIRUPDWLRQVSHFL¿HG

a) Number of secondary windings


b) Number of taps in each secondary winding
c) 5DWHGSULPDU\YROWDJHDQGUDWLR
d) Frequency (in Hz)
e) $FFXUDF\FODVVDQGEXUGHQUDWLQJSHU,(((6WG&±
f) Thermal rating of each secondary winding
g) Thermal rating of primary winding

 &RYHUVDQGVKLHOGV

,IWKH97PXVWEHUHPRYHGIRU¿HOGZLWKVWDQGWHVWLQJFRYHUVDQGDQ\QHFHVVDU\FRQGXFWRUVKLHOGVVKRXOGEH
SURYLGHGWRHQDEOHWKH*,6WREHFRPSOHWHO\SUHVVXUL]HGDQGWHVWHGDWWKHDFZLWKVWDQGYROWDJH


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

 3ULPDU\DQGVHFRQGDU\WHUPLQDOV

3ULPDU\DQGVHFRQGDU\WHUPLQDOVVKRXOGKDYHSHUPDQHQWPDUNLQJVIRULGHQWL¿FDWLRQRISRODULW\LQDFFRUGDQFH
ZLWK,(((6WG&

 )HUURUHVRQDQFHPLWLJDWLRQ

Each voltage transformer should be fabricated to mitigate the possibility of ferroresonance during operation.
If damping equipment connected to a secondary winding is necessary to mitigate ferroresonant effects, it is
preferred that such damping equipment be mounted in the voltage transformer secondary wiring junction box
on the voltage transformer.

 0HWDOHQFORVHGVXUJHDUUHVWHUV
6SHFL¿FDWLRQVVKRXOGGH¿QHWKHDSSURSULDWHPD[LPXPFRQWLQXRXVRSHUDWLQJYROWDJH 0&29 UDWLQJVIRUWKH
VXUJHDUUHVWHUV,(((6WG&PD\EHXVHGDVDUHIHUHQFH$UUHVWHUVVKRXOGEHRIHLWKHUWKH³SOXJLQ´FRQ-
struction or the disconnect-link type and be attached to the gas-insulated system in such a manner that they can
be readily disconnected from the system while the system is being dielectrically tested. The metal housing of
WKHDUUHVWHUVKRXOGEHFRQQHFWHGWRWKHPHWDOHQFORVXUHRIWKH*,6ZLWKDÀDQJHGEROWHGMRLQW

7KHJURXQGFRQQHFWLRQVKRXOGEHVL]HGIRUWKHIDXOWOHYHORIWKH*,6,WVKRXOGEHLQVXODWHGIURPWKH*,6HQFOR-
sure and grounded externally to permit periodic maintenance and monitoring of the leakage current.

If the arresters are not equipped with removable links, special covers and any necessary corona shields should
be supplied so that the system can be pressurized and dielectrically tested after removal of the arrester.

Access to the arrester ground connection, when it is provided with means for leakage current monitoring,
should not be obstructed.

The surge arresters shall be of the SF6 gas insulated metal oxide and gapless type. The metal housing of the
DUUHVWHUVKDOOEHFRQQHFWHGWRWKHPHWDOHQFORVXUHRIWKH*,6ZLWKDÀDQJHGEROWHGDQGJDVNHWHGMRLQWVRWKDW
WKHDUUHVWHUKRXVLQJLVJURXQGHGWKURXJKWKH*,6HQFORVXUH

The surge arresters shall be capable of draining the dynamic currents repeatedly caused by impulse waves
JHQHUDWHGE\VZLWFKLQJ:KHQVSHFL¿HGE\WKHXVHURQHRSHUDWLQJFRXQWHUVKDOOEHSURYLGHGIRUHDFKSROHRI
the arresters and shall be located at a position convenient for inspection. The operating counter shall record the
number of discharges of the arrester.

The design data of the surge or lightning arresters shall be rated according to the system’s insulation coordina-
tion study.

 &DSDFLWLYHYROWDJHFRXSOHUV
Suitable capacitive voltage couplers can be furnished to provide for specialized measurements, such as ultra
high-frequency partial discharge and diagnostic monitoring. There are typically three different mounting con-
¿JXUDWLRQVIRUWKHVHFRXSOHUVLQWHUQDOORFDWHGH[WHUQDOO\RQLQVXODWRUVRUDWZLQGRZV

7KHORFDWLRQDQGIUHTXHQF\RIFRXSOHUVLVEDVHGRQWKHSK\VLFDOFRQ¿JXUDWLRQRIWKHEXVVLQFHLQVXODWRUVHO-
bows, and tees will attenuate the partial discharge signal.

Capacitive voltage couplers designed for partial discharge measurements do not normally have to be discon-
nected from the equipment during high potential testing.

$YROWDJHWHVWLQVWUXPHQWPD\EHVSHFL¿HGIRULQGLFDWLQJWKHSUHVHQFHRIYROWDJHRQWKHFRQGXFWRUV\VWHP


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7KLVLVDFFRPSOLVKHGE\PHDVXULQJFDSDFLWLYHFKDUJHRQDJURXQGHOHFWURGH,IWKLVIHDWXUHLVGHVLUHGVSHFL¿-
FDWLRQVKRXOGLQFOXGHWKHIROORZLQJSKUDVH³3URYLVLRQVIRUWKHDWWDFKPHQWRIDYROWDJHLQVWUXPHQW´

 /RFDOFRQWURORUPDUVKDOOLQJFDELQHWV
 *HQHUDOJXLGHOLQHV

*,6HTXLSPHQWE\GHVLJQZLWKLWVFRPSDFWDSSURDFKGRHVQRWDOORZWKHXVHUPDQ\RSWLRQVLQWHUPVRIWKHFRP-
ponents (switches, terminal blocks, and indicating lights) selected for use within the equipment. The exception
is the LCC or marshalling box (MB), which is the generally accepted point of interface between the utility and
*,6HTXLSPHQW7KHXVHUKDVWKHRSWLRQWRLQVWDOOFRQWURORUPRQLWRULQJHTXLSPHQWZLWKLQWKHFDELQHWRUVLPSO\
use the enclosure as a wiring marshalling point. As an example, many users design their switchyard facilities
with the equipment control panels in close proximity to the protective relay panels. In that case, disconnect and
ground switch controls may not be necessary in the LCC and the cabinet would be used primarily for wiring
terminations with possibly a push button control for circuit breaker maintenance purposes. Indicating lights
may also be provided on a mimic board within the LCC to assist operations personnel. In the event the LCC
is located some distance from the control house or protective relay installation, operating switches could be
installed to minimize the travel distance of the operators.

The LCC also provides the user an opportunity to require switches, terminal blocks, heaters, lighting, conve-
nience receptacles to be installed that are in compliance with the user’s standards. It is important to most users
to provide a consistent representation of the substation or switchyard controls to the operators whether the
LQGLYLGXDOVDUHORFDWHGLQD*,6RUDFRQYHQWLRQDODLULQVXODWHGVXEVWDWLRQ $,6 IDFLOLW\

As a guideline, the dispatch, operations, and maintenance groups should discuss and agree upon the LCC or
MB design. Some items to consider are as follows:

a) Where is the primary control point (at a remote dispatch location, in a control house or at the LCC)?
b) If the control will be remote and standard controls are provided locally in the control house, are redun-
dant controls needed in the LCC?
c) How will the breaker be operated for standard de-energized maintenance tests (e.g., travel and timing
tests)? Most manufacturers provide a push button operator at the breaker.
d) Will the LCC or MB be a central point for gas or equipment malfunction alarms? One option is to
LQVWDOOD3/&WKDWFDQFROOHFWDOOWKHDODUPSRLQWVIRUWUDQVPLWWDOWRDFHQWUDOSURFHVVRULQWKHFRQWURO
house where remote alarms signals can be sent and an HMI located. The historical approach is to in-
VWDOOVWDQGDUGXVHUVSHFL¿HGDQQXQFLDWRUVZLWKLQWKH/&&
e) :LOOWKHFDELQHWVEHLQVWDOOHGLQGRRUVZKHUHVWDQGDUG1(0$FDELQHWVFDQEHXVHGRURXWGRRUVLQ
FRUURVLYHDWPRVSKHUHV UH¿QHULHVIRVVLOSRZHUSODQWV ZKHUHD1(0$;PD\EHEHWWHUVXLWHG"
f) +RZPDQ\/&&0%VDUHQHHGHG"*HQHUDOO\RQHFDELQHWSHUFLUFXLWEUHDNHULVVDWLVIDFWRU\ZLWKEXV
and exit runs included in the breaker LCC/MB.

127(²Each LCC/MB should be provided with a gas zone diagram designating the equipment and bus within its zone
and the interfaces to adjacent zones.

a) Where will the LCC’s/MB’s be manufactured? It is generally not necessary to manufacture the cabi-
QHWVDWWKHSRLQWRIWKH*,6HTXLSPHQWPDQXIDFWXUH7KLVLVSDUWLFXODUO\WUXHIRU*,6DVVHPEOHGRYHU-
VHDV/&&VDQG0%VZKLOHVWLOOWKHUHVSRQVLELOLW\RIWKH*,6PDQXIDFWXUHUFRXOGEHSURGXFHGDWORFDO
SDQHOVKRSVZLWKH[SHULHQFHIDEULFDWLQJFDELQHWVWRWKHXVHU¶VVSHFL¿FDWLRQV
b) +RZZLOOWKHFRQWUROZLULQJEHUXQIURPWKH*,6HTXLSPHQWDQGWKHFRQWUROKRXVH"/&&V0%VFDQEH
SURYLGHGZLWKWRSVLGHRUERWWRPHQWU\7KHUHVKRXOGEHVXI¿FLHQWVSDFHDQGVSDUHFDSDFLW\ZLWKLQD


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

GHVLJQVRWKHZLULQJFDQEHJURXSHGDQGURXWHGWRWKH*,6RUWRWKHFRQWUROKRXVH,QDGGLWLRQWKHXVHU
VKRXOGVSHFLI\LIDVHSDUDWLRQRISURWHFWLRQFLUFXLWVLVUHTXLUHGE\DJRYHUQLQJERG\VXFKDV1(5&RU
LWVUHJLRQDODI¿OLDWHV

 /&&0%GHYLFHVFKHFNOLVW

LCC or MB cabinets may include any of the following equipment based upon the user requirements:

a) One control switch and remote selector switch for each three-phase circuit breaker.
b) One open-close control switch and one remote selector switch for each motor-operated disconnect and
grounding switch.
c) Dedicated indicating lights, typically multi-pole light-emitting diode (LED) are used for circuit indi-
FDWLRQ5HG/('VDUHXVHGWRPRQLWRUHDFKWULSFRLOFLUFXLWRUPHFKDQLFDOVHPDSKRUHGHYLFHDQGJUHHQ
/('VDUHXVHGIRUHDFKFORVHFRLOFLUFXLWRQWKHFLUFXLWEUHDNHUV3ROHGLVDJUHHPHQWLQGLFDWLQJOLJKWV
are also used. Each disconnect and grounding switch can be provided with an open close (red/green)
contact position indication.
d) Arranging the lights and switches on a mimic diagram will assist the operator to quickly determine the
equipment status.
e) 7KHPLPLFGLDJUDPVKRXOGLQFOXGHDRQHOLQHGLDJUDPLGHQWLI\LQJWKHSULPDU\HTXLSPHQWDQG*,6
external connections, gas zones may also be shown or provided on a separate nameplate. Mimic pan-
els to be durable and maintain the information without fading, cracking, or otherwise deforming the
LQIRUPDWLRQIRUWKHOLIHRIWKH*,67KHPLPLFGLDJUDPVKDOOPDWFKWKHSK\VLFDOHTXLSPHQWOD\RXWLH
if the switch is physically on the right, the mimic shall also show that switch on the right.
f) $3/&RUDQQXQFLDWRUSDQHOZLWKWRJJOHVZLWFKHVWRFRQVROLGDWHDODUPDQGHTXLSPHQWPDOIXQFWLRQ
indications with remote communications or retransmit contacts.
g) Terminal blocks and terminations for each gas density monitor, interlock circuits, remote interfaces
(protective relays), alarms and instrument transformers.
h) Dependent on the user’s preference, each tap of a multi-ratio current transformer and all secondary
winding taps for voltage transformers could be brought back to the LCC/MB. Alternatively, one pair
RIOHDGVFRXOGEHUHWXUQHGWRWKH/&&0%DQGFKDQJHVPDGHDWWKH*,6HTXLSPHQWLIQHHGHGLQWKH
future. Short-circuiting type terminal blocks shall be supplied for the instrument current transformers.
i) $PLQLPXPRIRUXVHUVSHFL¿HGVSDUHWHUPLQDOEORFNVVKRXOGEHSURYLGHG
j) 5HTXLUHGFLUFXLWSURWHFWLRQGHYLFHVLQFOXGLQJORZYROWDJHFLUFXLWEUHDNHUVDQGIXVHV
k) Knife switches for a visible point of disconnect on dc circuits.
l) &RQYHQLHQFHSRZHUUHFHSWDFOH *),UDWHG DQGFDELQHWOLJKWLQJ
m) Cabinet heaters.

 /&&0%FDELQHWVSHFL¿FDWLRQV

$OO*,6FRQYHQWLRQDOFRQWUROED\FRQWUROOHUIXQFWLRQVVKDOOEHGHVLJQHGIRUDVDIHDQGUHOLDEOHRSHUDWLRQ7KH
following are the generally accepted functions required on each LCC.

127(²7KHXVHU¶VRSHUDWLRQVDQGPDLQWHQDQFHUHTXLUHPHQWVVKRXOGGH¿QHWKHDFWXDOIXQFWLRQVLQFRUSRUDWHGLQWKH¿QDO
design.

a) /RFDO*,6ED\LQWHUIDFHFRQWUROSHUPLVVLYHLQWHUORFNLQJDQGVXSHUYLVLRQZLULQJDQGGHYLFHV
b) Acquisition of digital and/or analog control and alarm signals for the respective bay.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

c) Alarm indication, communications, and transmittal for the respective bay.


d) Display or transmittal of measured and processed analog values for the respective bay including de-
vice position status.
e) Each LCC shall contain the local control and indication devices for the associated SF6 circuit breakers,
disconnect-grounding switches, etc. The LCC shall also be a marshalling or junction point for all pro-
WHFWLRQFRQWURODODUPLQGLFDWLRQDQGSRZHUVXSSO\FLUFXLWVIURPWKHDVVRFLDWHG*,6FLUFXLWEUHDNHUV
disconnect-grounding switches, fast-acting ground switches, gas monitoring, alarm, and protection
systems.
f) Other application or design considerations are as follows:
  The LCC/MBs shall be provided with lifting lugs designed to support the entire assembled
weight of the unit.
2) The LCC/MBs shall be designed to meet the user’s grounding requirements.
  The doors shall be provided with padlock provisions to accept the user’s standard access doors
lock-system and shall be easily removable from their hinges; and shall include a frame or pocket
on the inside face, for the storage of folded drawings.
4) As approved by the user, LCC/MBs shall be provided with a window that allows a complete view
of the annunciator and mimic diagram when the LCC door is closed.
5) For outdoor LCC/MBs, a sloped roof and drip shield shall be provided to eliminate the possibility
of water entering the LCC when the door is open. If the LCCs are located outdoors in a vandalism
prone area, consider solid front cabinet doors. Otherwise it may be advantageous to have a clear
plastic window in the door so operators can determine the equipment status quickly from the
mimic board without opening the door.
6) 7KH/&&0%VKDOOEHDGHTXDWHO\YHQWHGZLWKVFUHHQHGRSHQLQJVDQGSURYLGHGZLWKGXVW¿OWHUV
(if required).
  The LCC/MBs shall be installed in accordance with the user’s requirements and mounted adja-
FHQWWRWKH*,6 SUHIHUUHG RUGLUHFWO\QH[WWR*,6LQDQDFFHVVDLVOH7KHORFDWLRQYDULHVZLWK*,6
UDWLQJPDQXIDFWXUHUDQGOD\RXW7\SLFDOO\IRU/&&0%VORFDWHGLQDQDFFHVVDLVOHD“P “
IW DFFHVVDLVOHLVUHFRPPHQGHGWREHVSHFL¿HGIURPWKH/&&WRFORVHVWEXLOGLQJFROXPQIRUDQ
LQGRRU*,6WRDOORZDPSOHVSDFHIRUSHUVRQQHODFFHVVDQGPRYHPHQWRIDJDVFDUW
  ,IWKH/&&ZLOOEHORFDWHGLQDÀRRGSODLQRUFRDVWDOUHJLRQLWPD\EHDGYLVDEOHGHSHQGHQWRQ
the practicality, to install the panels on stands or an elevated platform. Coastal areas subject to
KXUULFDQHVRUW\SKRRQVPD\EHSDUWLFXODUO\YXOQHUDEOHWRZDWHULQ¿OWUDWLRQ8VHUVPD\ZDQWWRLQ-
vestigate if cable bottom entry into the LCC is appropriate and evaluate the effectiveness of water
VHDOVEDVHGRQWKHH[SHFWHGK\GUDXOLFSUHVVXUHVDQGSRWHQWLDOÀRZV

 &RQYHQWLRQDOED\FRQWUROV

$OOFRQQHFWLRQVEHWZHHQWKH/&&0%VDQGWKHUHVSHFWLYH*,6ED\VVKDOOEHHLWKHUE\SUHIDEULFDWHGPXOWLFRUH
FDEOHVRU¿EHURSWLFVZKHUHSRVVLEOHRUVSHFL¿HG9ROWDJHWUDQVIRUPHUV 97V DQGFXUUHQWWUDQVIRUPHUV &7V 
VKDOOEHKDUGZLUHG,QWHUQDOZLULQJVKDOOXVHFRSSHUFRQGXFWRUV$:* PP2) minimum. For CTs and
97VWKHZLUHVL]HVKDOOEH$:* PP2). All cables shall be shielded and adequate for their application.

7KHSDQHOVVKDOODOVREHGXVWDQGYHUPLQSURRIDQGFDUU\D1(0$UDWLQJDVDPLQLPXP6SHFLDODWWHQWLRQ
VKDOOEHGUDZQWRWKHVXUJHSURWHFWLRQDQGWKHHOHFWURPDJQHWLFFRPSDWLELOLW\RIWKHGHVLJQ3UHYHQWLYHPHD-
sures should be taken to avoid any disturbance caused by Electro-Magnetic Interference (EMI).


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

 %D\FRQWUROOHUXQLWV %&8V

%DVHGRQ*,6PDQXIDFWXUHU¶VW\SLFDOGHVLJQIRUUDWLQJFODVVVSHFL¿HGED\FRQWUROOHUXQLWVVKDOOEHEDVHG
on microprocessor technology and real-time operation system. The substation control system shall have one
%&8SHU*,6ED\7KH%&8V\VWHPSHUIRUPVDOOED\UHODWHGIXQFWLRQVVXFKDVFRPPDQGVHTXHQFHVED\
VZLWFKFRQWUROVDQGLQWHUORFNLQJGDWDDFTXLVLWLRQVLJQDOSURFHVVLQJDQGFRPPDQGRXWSXWVIRUGLIIHUHQW*,6
IXQFWLRQVRIWKHFRUUHVSRQGLQJED\V3URWHFWLRQPD\DOVREHHQDEOHGIURPWKHED\FRQWUROOHUXQLWLIVSHFL¿HG

The BCUs shall be mounted clearly visible in the local control cabinet at a convenient height above ground to
be operated.

 /&&0%FDEOLQJ

The LCCs shall be completely fabricated, wired, assembled and tested at a panel shop mutually agreed be-
WZHHQWKHXVHUDQGPDQXIDFWXUHU$OOZLULQJVKDOOEHDUUDQJHGDFFRUGLQJWRWKHDSSURYHG*,6VFKHPDWLFV$OO
wiring shall be complete and connected to the “internal” side of the terminal blocks.

All control cable connections between the LCC and circuit breakers, disconnect-grounding switches, etc.,
VKDOOEHPDGHZLWKHLWKHUVKLHOGHGFRQWUROFDEOHVZLWK¿HOGLQVWDOOHGDQGWHUPLQDWHGULQJWRQJXHRURWKHUXVHU
approved terminals; or prefabricated cables with heavy duty multi-point plug-in connections on either one end
*,6VLGH RUERWKHQGV *,6DQG/&& $OOLQVWUXPHQWWUDQVIRUPHUFRQQHFWLRQVVKDOOEHKDUGZLUHGWRWHUPL-
nal blocks via ring lug-type connections.

 1DPHSODWHV
1DPHSODWHVRIWKH*,6DQGWKH*,6FRPSRQHQWVVKDOOEHVXSSOLHGDVVSHFL¿HGLQ,(((6WG&

A gas schematic one-line diagram illustrating all circuit breakers, disconnect switches, grounding switches,
high-voltage terminals, and potential transformers, as well as the gas compartments with their appropriate
LGHQWL¿FDWLRQQXPEHUVVKRXOGEHIXUQLVKHG6LQFHLWLVJHQHUDOO\FRQVLGHUHGGLI¿FXOWWRYLVXDOL]HWKHJDVLQ-
sulated substation, it is frequently advantageous to permanently post the gas schematic one-line diagram in
RQHRUPRUHDSSURSULDWHSODFHVLQWKHYLFLQLW\RIWKH*,6$OVRVKRZQVKDOOEHWKH*,6QRPHQFODWXUHDOHJHQG
manufacturer’s type, serial number, and year of manufacture.

*,6QDPHSODWHVVKDOOVKRZWKHIROORZLQJLQDFFRUGDQFHZLWK,(((6WG&

a) Maximum ambient temperature


b) System frequency
c) Maximum continuous voltage
d) 0D[LPXPFRQWLQXRXVFXUUHQWDWƒ& ƒ) DQGVSHFL¿HGPD[LPXPDPELHQWWHPSHUDWXUHV
e) Basic impulse level
f) 3RZHUIUHTXHQF\RQHPLQXWHYROWDJH
g) Short-circuit current, symmetrical
h) Short-time current, symmetrical
i) Momentary current, peak
j) Total weight of gas at rated density
k) 5DWHGJDVSUHVVXUHDWƒ& ƒ)
l) 0D[LPXPRSHUDWLRQSUHVVXUHDWƒ& ƒ)


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

m) 0LQLPXPLQVXODWLRQJDVSUHVVXUHDWƒ& ƒ)
n) Opening pressure of the bursting disc
o) 5HFRPPHQGHGPRLVWXUHOLPLWVRILQVXODWLRQJDV 3309
p) Auxiliary voltages
q) Contract/Order numbers
r) Date of manufacture
s) Total weight of the equipment

(TXLSPHQWQDPHSODWHVFRQWDLQLQJUDWLQJLQIRUPDWLRQDQGVHULDOQXPEHUVIRUDOO+9PRGXOHV FLUFXLWEUHDNHUV
disconnect-grounding switches, etc.) shall be provided.

 'RFXPHQWDWLRQ
The supplier contractor shall prepare and submit to the user approval drawings, details, and calculations that
VKRZWKH*,6GHVLJQLQRUGHUIRUWKHXVHUWRYHULI\WKHHTXLSPHQWFRQIRUPVWRWKHVSHFL¿FDWLRQVDJUHHGXSRQ
The project schedule shall allow the user a minimum of two (2) weeks to review and approve each design sub-
mittal. The design documents to be sent for review are as follows:

a) 3URMHFWVSHFL¿FSDUDPHWHUV
b) One-line diagram
c) *DVVFKHPDWLFGLDJUDP LGHQWLI\LQJJDV]RQHV
d) *HQHUDODUUDQJHPHQWOD\RXWDQGVHFWLRQV
e) Foundation loading plan and details
f) Seismic evaluation
g) *URXQGLQJSODQDQGGHWDLOV
h) Cable termination, SF6-to-air bushings, or other interface details
i) 5DWLQJSODWHQDPHSODWHGUDZLQJV
j) Type test reports
k) 5RXWLQHSURGXFWLRQWHVWUHSRUWV
l) Factory acceptance test plan
m) Commissioning plan
n) 2SHUDWLRQDQGPDLQWHQDQFHJXLGHOLQHVIRUWKH*,6
o) Training program

 7HVWV
 'HVLJQWHVWV W\SHWHVWV
$OO GHVLJQ WHVWV RQ WKH *,6 DQG *,6 FRPSRQHQWV VKDOO KDYH EHHQ SUHYLRXVO\ FRQGXFWHG DV VSHFL¿HG LQ
,(((6WG&7\SHWHVWVVKDOOYHULI\WKDWDOOFRPSRQHQWVRIWKH*,6SHUIRUPVDWLVIDFWRULO\ERWKHOHFWUL-
FDOO\DQGPHFKDQLFDOO\DWWKHUDWLQJVDVVLJQHG5HSRUWVRIWKHW\SHWHVWLQJVKDOOEHVXEPLWWHGZLWKWKHSURSRVDO


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

,(((6WG&LVVSHFLI\LQJDOOQHFHVVDU\W\SHWHVWVUHODWHGWR*,6WHFKQRORJ\7KLVVWDQGDUGGRHVQRWFRY-
HUDOOW\SHWHVWVUHODWHGWRVSHFL¿FFRPSRQHQWVLQFOXGHGLQVSHFL¿F*,6SURMHFWOLNHFLUFXLWEUHDNHULQVWUXPHQW
WUDQVIRUPHUVEXVKLQJVHWF$GGLWLRQDOW\SHWHVWVDUHVSHFL¿HGLQWKHVHFRUUHVSRQGLQJFRPSRQHQWVWDQGDUGV

7KHIROORZLQJOLVWJLYHVWKHW\SHWHVWVWKDWVKDOOKDYHEHHQSHUIRUPHGRQ*,6HTXLSPHQWRUFRPSRQHQWV7KLV
OLVWLVQRWH[KDXVWLYHDQGKDVWREHFRPSOHWHGZLWKVSHFL¿FFRPSRQHQWUHTXLUHPHQWVRQWKHSURMHFW

Basic tests are as follows:

² Dielectric tests (power frequency withstand voltage, switching impulse voltage when applicable,
lightning impulse voltage, partial discharge)
² Measurement of resistance test
² Temperature rise test
² Short-time withstand current and peak withstand current tests

6SHFL¿F*,6WHVWVDUHDVIROORZV

² 3URRIWHVWIRUHQFORVXUHV IRUHQFORVXUHVWKDWFDQQRWEHFDOFXODWHG
² 3UHVVXUHWHVWRQSDUWLWLRQV
² ,QWHUQDODUFWHVWRUYHUL¿FDWLRQ ZKHQUHTXLUHG
² Thermal performance of insulators
² Tightness test for partitions
² Corrosion test on earthing connections
² *DVWLJKWQHVVWHVWDWORZDQGKLJKWHPSHUDWXUHV

6SHFL¿FFLUFXLWEUHDNHUWHVWVDUHDVIROORZV

² Mechanical endurance test


² Low and high temperature test (depending on application)
² Terminal fault tests
² Short line fault tests (depending on application)
² Out of phase tests
² Capacitive tests (line, cable, capacitor bank, depending on application)
² Shunt reactor test (depending on application)

6SHFL¿FWHVWVIRUGLVFRQQHFWLQJVZLWFKDQGJURXQGLQJVZLWFKDUHDVIROORZV

² Mechanical endurance test


² Low and high temperature test (depending on application)
² Bus transfer current switching (depending on application)
² Induced current switching
² Bus charging current switching (depending on voltage level)


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

6SHFL¿FWHVWVRQYROWDJHWUDQVIRUPHUVDUHDVIROORZV

² Short-circuit withstand capability test


² Switching impulse voltage withstand test when applicable
² Lightning impulse voltage withstand test
² 9HUL¿FDWLRQRIWHUPLQDOPDUNLQJV
² 3RZHUIUHTXHQF\ZLWKVWDQGWHVWRQSULPDU\ZLQGLQJV
² 3DUWLDOGLVFKDUJHPHDVXUHPHQW
² 3RZHUIUHTXHQF\ZLWKVWDQGWHVWRQVHFRQGDU\ZLQGLQJV
² Determination of errors (part of routine test)

6SHFL¿FWHVWVRQFXUUHQWWUDQVIRUPHUVDUHDVIROORZV

² Temperature rise test


² Short-circuit withstand capability test
² Switching impulse voltage withstand test when applicable
² 3RZHUIUHTXHQF\ZLWKVWDQGWHVWRQSULPDU\ZLQGLQJV
² Determination of errors (part of routine test)

6SHFL¿FWHVWVRQVXUJHDUUHVWHUVDUHDVIROORZV

² Dielectric test
² 5HVLGXDOYROWDJHWHVW
² Long duration current impulse withstand test
² Operating duty test
² Cooling curve test

6SHFL¿FWHVWVRQ6)6/air bushings (when applicable) are as follows:

² Dielectric tests
² $UWL¿FLDOSROOXWLRQWHVW ZKHQUHTXLUHG
² 5DGLRLQWHUIHUHQFHYROWDJHWHVW
² Temperature rise test
² 9HUL¿FDWLRQRIWKHUPDOVKRUWWLPHFXUUHQWZLWKVWDQG
² Cantilever load withstand test
² Tightness test
² Internal pressure test
² 9HUL¿FDWLRQRIGLPHQVLRQV


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

 5RXWLQHSURGXFWLRQWHVWV
3URGXFWLRQWHVWVVKDOOEHPDGHHLWKHULQWKHFRXUVHRIWKH*,6DVVHPEO\DQGRURQWKHFRPSOHWHVKLSSLQJXQLW
assembly.

7HVWUHSRUWVVKDOOEHVXSSOLHGZLWKLQWKHVSHFL¿HGSHULRGDIWHUWKHWHVWVKDYHEHHQ¿QLVKHG7KHIROORZLQJSUR-
duction tests shall be performed at the factory on every unit following its manufacture:

a) &LUFXLWEUHDNHUWHVWVSHU,(((6WG&
b) Switch timing and resistance tests
c) Mechanical operation tests
d) 3UHVVXUHWHVWVRQDOOLQGLYLGXDOHQFORVXUHVDQGEDUULHULQVXODWRUV SDUWLWLRQV
e) *DVOHDNWHVWVRIHQFORVXUHDQGEDUULHULQVXODWRUVLIDSSOLFDEOH
f) Low-voltage wiring tests
g) 3RZHUIUHTXHQF\ZLWKVWDQGYROWDJH
h) 3DUWLDOGLVFKDUJHWHVWRILQVXODWRUVDQGRUVKLSSLQJVHFWLRQV
i) Current transformer and voltage transformer tests
j) Functional tests on all control and indication circuits

 )DFWRU\DFFHSWDQFHWHVWV
In addition to the routine production tests described previously, the following inspection tests are required on
one representative bay. These tests shall be performed in the presence of a representative of the user.

127(²These tests may incur extra charges.

a) 9LVXDOFKHFNRIWKH*,6DQG/&&VLQFOXGLQJGLPHQVLRQDOFKHFN
b) 9HULI\WKHUDWLQJSODWHVRI*,6HTXLSPHQWDFFRUGLQJWRWKHVLQJOHOLQHGLDJUDP
c) Inspection tests at the LCC’s shall be a repetition of the routine factory tests, as described previously,
performed on one selected cabinet.
d) Current transformer polarity check.
e) 3RZHUIUHTXHQF\YROWDJHWHVWRIWKHPDLQFLUFXLW
f) 3DUWLDOGLVFKDUJHPHDVXUHPHQW7KLVWHVWPD\EHFDUULHGRXWLQFRQQHFWLRQZLWKWKHSRZHUIUHTXHQF\
voltage test.
g) Measuring of the resistance of the main circuit.
h) 9ROWDJHZLWKVWDQGWHVWRQDX[LOLDU\DQGFRQWUROFLUFXLWV
i) Mechanical operation and timing tests.
j) Leakage test with SF6JDVDWVKLSSLQJXQLW WHVWRQVL[VHOHFWHGVDPSOHVRIÀDQJHFRQQHFWLRQV 

 )LHOGWHVWV
7KHIROORZLQJ¿HOGWHVWVVKRXOGEHSHUIRUPHGDVDPLQLPXPUHTXLUHPHQW

42
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

a) SF6 gas leakage test.


b) SF6 gas quality tests (moisture, purity and density).
c) Circuit breaker, disconnect switch, and grounding switch operational tests from local control cabinet
and from individual mechanism.
d) Equipment interlocking tests.
e) (OHFWULFDOFRQWLQXLW\WHVWVRQ*,6JURXQGLQJDQGERQGLQJFRQQHFWLRQV
f) 5HVLVWDQFHPHDVXUHPHQWVRIWKHPDLQFXUUHQWFDUU\LQJFLUFXLWVDQGJURXQGVZLWFKHV
g) Current transformer testing.
h) /RZIUHTXHQF\DFYROWDJHZLWKVWDQGWHVWVRQKLJKYROWDJH*,6FLUFXLWVLQFOXGLQJYROWDJHWUDQVIRUP-
ers up to the saturation voltage of the transformers (test on voltage transformers up to their saturation
voltage is not necessary if it has been performed in the factory).
i) 'LHOHFWULFDQGFRQWLQXLW\WHVWVRQ¿HOGLQVWDOOHGZLULQJ
j) High voltage ac tests on power cables.

,IWKH*,6LVHTXLSSHGZLWKSDUWLDOGLVFKDUJHVHQVRUVWRDOORZDSDUWLDOGLVFKDUJHWHVWGXULQJWKH¿HOGWHVWVWKHQ
a partial discharge test shall be conducted during the low frequency ac voltage withstand test.

 4XDOLW\DQGVKRSLQVSHFWLRQV
7KHVXSSOLHUVKDOOIXO¿OOWKHUHTXLUHPHQWVRIWKH,627KHXVHUUHVHUYHVWKHULJKWWRVHQGDUHSUHVHQWDWLYH
to the factory to examine the manufacturing process, the quality of the equipment, verify if the components
DQGDSSOLHGPDWHULDODUHLQDFFRUGDQFHZLWKWKHVSHFL¿FDWLRQVDQGWKHDSSOLFDEOHVWDQGDUGVDQGWDNHSDUWLQWKH
IDFWRU\DFFHSWDQFHWHVWDFFRUGLQJWRWKHFRQWUDFW7KHVHIDFWRU\DQGVKRSLQVSHFWLRQVPD\LQFOXGHERWK*,6
and LCC suppliers.

 3DFNLQJVKLSSLQJDQGVWRUDJH
$OO*,6HTXLSPHQWVKDOOEHSURSHUO\SDFNHGDQGSURWHFWHGGXULQJVKLSPHQW(DFKVKLSSLQJXQLWDIWHUSDVVLQJ
DOOVSHFL¿HGSURGXFWLRQWHVWVVKDOOEHVHDOHGLQDFOHDQGU\FRQGLWLRQZLWKYDSRUEDUULHUVDQGVHFXUHO\FUDWHG
IRUVKLSPHQW$OOWHPSRUDU\*,6FRYHUVWREHUHPRYHGGXULQJLQVWDOODWLRQVKDOOEHFOHDUO\PDUNHG(DFKVKLS-
SLQJVHFWLRQVKDOOEHFDUHIXOO\VHDOHGDQG¿OOHGZLWKGU\JDVWRDVOLJKWO\SRVLWLYHSUHVVXUHWRSUHYHQWWKHHQ-
trance of moisture and contamination. The supplier shall notify the user whether the shipping sections contain
SF6, nitrogen or another type of dry gas.

7KHSDFNLQJDQGVKLSPHQWPHWKRGVIRUWKH*,6HTXLSPHQWVKDOOPHHWWKHVXSSOLHU¶VRULQWHUQDWLRQDOSDFNLQJ
standard for the shipment destination. Shipments should be made under freight terms making any damages
during shipment the responsibility of the manufacturer and the transportation company(ies), and NOT the pur-
chaser or his receiving contractor. An example would be “FOB job site” under the “US Uniform Commercial
Code.”

/LIW SRLQWV FHQWHU RI JUDYLW\ DQG DUHDV QRW WR EH FXW VKRXOG EH VWHQFLOHG RU DI¿[HG WR WKH RXWVLGH RI WKH
containers.

Shipment in standard containers using minimum packing material is encouraged. The supplier shall supply
instructions for storage of the equipment at site and for long-term storage. The instructions shall outline any
VSHFLDOSUHFDXWLRQVUHTXLUHGIRUDGHTXDWHVWRUDJHLQFOXGLQJLGHQWL¿FDWLRQRIFRPSRQHQWVUHTXLUHGWREHVWRUHG
LQGRRUVRULQKHDWHGHQYLURQPHQWV3URYLVLRQVVKRXOGEHPDGHIRUWHPSRUDU\KHDWDSSOLHGWRRSHUDWLQJPHFK-
anisms. In addition, measures should be taken for rodent control in all containers during long-term storage.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

Because special conditions that may be required for long-term storage are easier to apply in the factory, the
supplier should be informed of such requirement before shipment.

44
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

$QQH[$
(normative)

*,6VSHFL¿FUHTXLUHPHQWV
$ 5HTXLUHPHQWV
7KH*,6HTXLSPHQWVKRXOGEHVSHFL¿HGZLWKGHWDLOHGVHUYLFHFRQGLWLRQUHTXLUHPHQWVDQGUDWLQJV7DEOH$
LVDQH[DPSOHVHUYLFHFRQGLWLRQVDQGUDWLQJVWDEOHZLWKWKHVSHFL¿HGUDWLQJVWKDWPD\EHXVHGWRSURYLGHWRWKH
PDQXIDFWXUHUDVSDUWRIWKHRYHUDOO*,6VSHFL¿FDWLRQ

7DEOH$²([DPSOHVHUYLFHFRQGLWLRQVDQGUDWLQJVWDEOH
General
*,6ORFDWLRQDQGDGGUHVV
Desired in-service date
*,6RQHOLQHGLDJUDP
Site plan drawing (if available)
*,6ORFDWLRQ LQGRRURXWGRRU
Terminations 'HVFULSWLRQRIWKH*,6FRQQHFWLRQVWRWKHV\V-
tem; bus to SF6 gas-to-air bushings and ca-
ble sealing ends are outdoors
Dimensional restrictions

Service conditions
Maximum ambient temperature
Minimum ambient temperature
Site elevation above mean sea level
Site pollution class
Basic wind speed
Maximum ice coating
,(((6WG6HLVPLFTXDOL¿FDWLRQOHYHO Low/moderate/high
Special environment conditions and exposure

GIS electrical ratings


5DWHGPD[LPXPYROWDJH ;;;N9
5DWHGLQVXODWLRQOHYHO²EDVLFLPSXOVHOHYHO %,/  ;;;N9;;;N9PLQLPXPSHDNYDOXH
(to ground/across the isolating distance)
5DWHGVZLWFKLQJLPSXOVHOHYHO 6,/ ;;;N9LIDSSOLFDEOH
5DWHGSRZHUIUHTXHQF\SKDVHWR ;;;N9DFURRWPHDQVTXDUH UPV
ground withstand voltage
5DWHGIUHTXHQF\ +]or+]
5DWHGFRQWLQXRXVFXUUHQWPDLQEXVHV X,XXX A (amperes)
Table continues

45
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH$²([DPSOHVHUYLFHFRQGLWLRQVDQGUDWLQJVWDEOH(continued)
5DWHGFRQWLQXRXVFXUUHQWLQWHUFRQ- X,XXX A (amperes)
necting buses and feeder bays
Rated short-time symmetrical withstand current XX kiloamperes (kA) rms
5DWHGZLWKVWDQGFXUUHQW XXX kA peak
5DWHGGXUDWLRQRIVKRUWFLUFXLW V PLQLPXP
System grounding (effectively grounded/ungrounded)
6\VWHP;5 ;5 ;;

*,6SK\VLFDOVXUIDFHDQGDSSHDUDQFH
6SHFLDO*,6FRORU

Support structures (galvanized/aluminum)

Local control cabinets (LCC)


Indoor or outdoor installation
Operating voltage
+HDWHUV/LJKWV*),FRQYHQLHQFH
Welding receptacle/disconnect
Mimic panel/indicating
Lights/controls
Top/bottom or side cable entry
Terminal blocks or cable
Connectors

AC station service requirements


Nominal voltage ;;;;;;9DF
Number of phases/Number of wires
5DWHGIUHTXHQF\ +]+]

Circuit breakers
5DWHGPD[LPXPYROWDJH ;;;N9DF
5DWHGPD[LPXPLQWHUUXSWLQJWLPH ;F\FOHVRQD+]EDVLV
5DWHGFRQWLQXRXVFXUUHQWDOOEUHDNHUV X,XXX A
5DWHGVKRUWFLUFXLWFXUUHQW XX kA rms
5DWHGFORVLQJDQGODWFKLQJFXUUHQW XXX kA peak
5DWHGGXW\F\FOH
5DWHGFDSDFLWLYHVZLWFKLQJFXUUHQWV ,(((6WG&

Number of trip coils X


6SHFLDO759UHTXLUHPHQWV
First pole to clear factor RU
Timing for enforced triple pole operation

&RQWUROOHGVZLWFKLQJ3UHLQVHUWLRQUHVLVWRU LIUHTXLUHG
Table continues

46
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH$²([DPSOHVHUYLFHFRQGLWLRQVDQGUDWLQJVWDEOH(continued)

Disconnect switches
5DWHGFRQWLQXRXVFXUUHQWDOOGLVFRQQHFWVZLWFKHV X,XXX A
5DWHGVKRUWWLPHZLWKVWDQGFXUUHQW XX kA
5DWHGSHDNZLWKVWDQGFXUUHQW XXX kA
5DWHGGXUDWLRQRIVKRUWFLUFXLW V
Mechanical endurance RSHUDWLRQV

Grounding switches

5DWHGVKRUWWLPHZLWKVWDQGFXUUHQW XX kA
5DWHGSHDNZLWKVWDQGFXUUHQW XXX kA
5DWHGVKRUWFLUFXLWPDNLQJFXUUHQW KLJK
speed ground switch only)a XXX kA a
Number of fault closing operations (high-
speed ground switch only) Two minimum, before inspection/contact replacementa
Operating mechanism Motor and/or manual
5DWHGGXUDWLRQRIVKRUWFLUFXLW V
Mechanical endurance

Current transformers
5DWLRUDWHGSULPDU\FXUUHQW Single- or multi-ratio X,XXX A
5DWHGVHFRQGDU\FXUUHQW XA
7KHUPDOUDWLQJIDFWRUSHU,(((6WG& ;HWF

5HOD\DFFXUDF\FODVV ,(((6WG& &;;;;


Metering accuracy class

Voltage transformers
Application
5DWHGSULPDU\YROWDJHOLQHWRJURXQG ;;;N9DF
5DWHGVHFRQGDU\YROWDJHV ;;;9
5DWHGRXWSXW ;;;YROWDPSHUHV 9$  PLQLPXP HDFKZLQGLQJ
Accuracy class

Metal-enclosed surge arresters


Type 0HWDOR[LGHYDULVWRU 029 VWDWLRQFODVV
Application
Duty-cycle voltage rating ;;;N9
0D[LPXPFRQWLQXRXVRSHUDWLQJYROWDJH 0&29 UDWLQJ ;;;N9DF

SF6 gas-to-air bushings


Table continues


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH$²([DPSOHVHUYLFHFRQGLWLRQVDQGUDWLQJVWDEOH(continued)

5DWHGPD[LPXPV\VWHPYROWDJH ;;;N9DF
5DWHGLQVXODWLRQOHYHO²%,/ ;;;N9 PLQLPXP

5DWHGFRQWLQXRXVFXUUHQW X,XXX A
Minimum centerline phase-to-phase spacing XX feet (minimum), unless other-
wise noted on the drawings
Minimum external housing insulation creepage distance XXX inches (minimum)

SF6 gas-to-cable connection

5DWHGPD[LPXPV\VWHPYROWDJH ;;;N9DF PLQLPXP


5DWHGLQVXODWLRQOHYHO²%,/ ;;;N9DF PLQLPXP

5DWHGFRQWLQXRXVFXUUHQW X,XXX A
Cable type +3))+3*)/32);/3(
Connection type &RQYHQWLRQDO3OXJLQ

SF6 gas-to-transformer connection

5DWHGPD[LPXPV\VWHPYROWDJH ;;;N9DF PLQLPXP


5DWHGLQVXODWLRQOHYHO²%,/ ;;;N9 PLQLPXP

5DWHGFRQWLQXRXVFXUUHQW X,XXX A
Circulating current isolation method
a
The manufacturer should provide information with its proposal to help ensure the switch will perform in this service as
UHTXLUHG3URYLVLRQVIRUEORFNLQJDUHUHTXLUHGWRKHOSHQVXUHWKDWWKHVZLWFKEODGHZLOOQRWPRYHGXHWRJUDYLW\RUVHLVPLF
event or other causes, even if a part fails or is removed (see ).

$ 6XPPDUL]HGOLVWRI*,6HTXLSPHQW
7KH*,6VKDOOFRQVLVWRISRZHUFLUFXLWEUHDNHUVGLVFRQQHFWJURXQGLQJVZLWFKHVIDVWDFWLQJJURXQGVZLWFKHV
surge arresters, cable terminations, SF6 to air bushings, SF6 to oil connections, current transformers, voltage
transformers, LCCs, special tools, and SF6JDV IRULQLWLDO¿OOLQJ DVVKRZQLQWKHVLQJOHOLQHGLDJUDP Table
A.2).

7DEOH$²/LVWRI*,6HTXLSPHQW
Description Installation Spare
SF6 power circuit breakers 47< 47<
Disconnect switches 47< 47<
Disconnect grounding switches 47< 47<
High-speed ground switches 47< 47<
Table continues


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH$²/LVWRI*,6HTXLSPHQW(continued)
Description Installation Spare
Surge arresters 47< 47<
SF6 to air bushings 47< 47<
SF6 to oil connections/links 47< 47<
Current transformers 47< 47<
9ROWDJHWUDQVIRUPHUV 47< 47<
Cable terminations (sealing ends) 47< 47<
Dummy plugs 47< 47<
Test plugs 47< 47<
LCCs 47< N/A
SF6 reclaimer (gas cart) 47< N/A
*DVGHQVLW\PRQLWRUVIRU N/A 47<
circuit breakers
*DVGHQVLW\PRQLWRUVIRU N/A 47<
other components
Bay controller N/A 47<

$OO¿WWLQJVDFFHVVRULHVDSSDUDWXVWKDWDUHQRWPHQWLRQHGLQWKLVVSHFL¿FDWLRQEXWWKDWDUHXVXDORUQHFHVVDU\
IRUWKHVDWLVIDFWRU\LQVWDOODWLRQRSHUDWLRQRIWKH*,6VKDOOEHGHHPHGWREHLQFOXGHGLQWKLVVSHFL¿FDWLRQDQG
shall be provided by the supplier.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

$QQH[%
(normative)

7\SLFDOSURSRVDOGDWDIRU*,6HTXLSPHQWDQGVHUYLFHV
WREHSURYLGHGE\WKHVXSSOLHUZLWKELG
% 'UDZLQJV
The proposal data listed in 7DEOH% for drawings should be provided with the bid.

7DEOH%²'UDZLQJV
User requirements Supplier proposal
7LPHDIWHUQRWL¿FDWLRQRIDZDUG
when the following drawings and
data will submitted (in weeks)
*HQHUDODUUDQJHPHQWGUDZLQJV
Structural plan and details
)RXQGDWLRQORDGLQJVIRUDOO*,6
equipment and supporting structures
3K\VLFDOGHWDLOGUDZ-
ings (shipping unit)
Electrical schematic diagrams
Wiring diagrams
*DVVFKHPDWLFGLDJUDPV
*URXQGLQJDUUDQJHPHQW
and ground bus details
Erection drawings
Dimensional tolerances,
X
<
Z

% :HLJKWV
The proposal data listed in Table B.2 for weights should be provided with the bid.

7DEOH%²:HLJKWV
User requirements Supplier proposal
Circuit breaker 1-Phase or 3-Phase
'LVFRQQHFWVZLWFK3KDVHRU3KDVH
*URXQGLQJVZLWFK3KDVHRU3KDVH
High-speed grounding switch
3KDVHRU3KDVH
9ROWDJHWUDQVIRUPHU3KDVHRU3KDVH
SF6WRDLUEXVKLQJ3KDVH
6XUJHDUUHVWHU3KDVH
Table continues


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH%²:HLJKWV(continued)
User requirements Supplier proposal
Longest section of interconnect-
LQJEXV3KDVHRU3KDVH
Interconnecting bus el-
ERZ3KDVHRU3KDVH
Weight of the heaviest piece of
equipment to be handled during
construction (name item)
Estimated total weight of all structural steel
Estimated total weight of ac-
cess platforms and stairs
Total estimated weight of all items

% *HQHUDOWHFKQLFDOGDWD
The general technical data listed in 7DEOH% should be provided with the bid.

7DEOH%²*HQHUDOWHFKQLFDOGDWD
User requirements Supplier proposal
5DWHGVHUYLFHYROWDJH N9DFUPV
0D[LPXPYROWDJH N9DFUPV
0LQLPXPRSHUDWLQJYROWDJH N9DFUPV
5DWHGIUHTXHQF\ +]
5DWHGFRQWLQXRXVFXUUHQW2YHUDOO $UPV
5DWHGFRQWLQXRXVFXUUHQW%XV $UPV
5DWHGFRQWLQXRXVFXUUHQW/LQH7HUPLQDO $UPV
5DWHGVKRUWFLUFXLWFXUUHQW N$UPV
Short-time current and duration (kA, s)
3HDNZLWKVWDQGFXUUHQW FORVHDQGODWFK  N$UPV
Withstand voltages:
3RZHUIUHTXHQF\SKDVHWRJURXQG N9DFUPV
5DWHGIXOOZDYHLPSXOVHOHYHO N9%,/
6ZLWFKLQJLPSXOVH N96,/ LIUHTXLUHG
Maximum acceptable moisture level:
&LUFXLWEUHDNHU SSP9 a

&RPSDUWPHQWVZKHUHDUFLQJLVH[SHFWHG SSP9 a
Compartments where arcing is
QRWH[SHFWHG SSP9 a

SSP9 3DUWVSHUPLOOLRQSHUYROXPH
a

% (QFORVXUHDQGFRQGXFWRU IRUHDFKUDWLQJ


The proposal data listed in Table B.4 for enclosures and conductors should be provided with the bid.


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH%²(QFORVXUHDQGFRQGXFWRU IRUHDFKUDWLQJ
User requirements Supplier proposal
Inductance (H/m)
Capacitance (pF/m)
5HVLVWDQFH
²(QFORVXUH ŸP
²&RQGXFWRU ŸP
6XUJHLPSHGDQFH Ÿ
Weight of gas for largest gas zone (kg)
Length of longest bus sections (m)
Bus enclosure data (for each rating)
Enclosure material type
Outside diameter (mm)
Wall thickness (mm)
SF6JDVSUHVVXUHDWƒ& N3D

% 6)6JDVV\VWHP
The proposal data listed in Table B.5 for SF6 gas systems should be provided with the bid.

7DEOH%²6)6JDVV\VWHP
User requirements Supplier proposal
Total quantity of SF6 gas required
with the original equipment (kg)
Total quantity of SF6 gas re-
quired per segmented bus sec-
tion (total kg and kg/ft)
Total quantity of SF6 gas re-
quired per circuit breaker (kg)
Total quantity of SF6 gas required
per disconnect switch (kg)
Total quantity of SF6 gas required
SHU&7VXUJHDUUHVWHUDQG97 NJ
Total quantity of SF6 gas required
per cable connection, air bushing
and transformer connection (kg)
*XDUDQWHHGPD[LPXP6)6 gas
leakage rate from the com-
SOHWH*,6 NJ\U  \U
*DVGHQVLW\PRQLWRU-
ing system supplier
Number of gas monitors required
*DVGHQVLW\WUDQVGXF-
er supplier and type

% &LUFXLWEUHDNHUV
The proposal data listed in Table B.6 for circuit breakers should be provided with the bid.

52
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH%²&LUFXLWEUHDNHUV
User requirements Supplier proposal
9ROWDJHUDQJHIDFWRU
5DWHGPD[LPXPFRQWLQXRXV
YROWDJHEUHDNHUFORVHG N9
5DWHGPD[LPXPFRQWLQXRXV
YROWDJHEUHDNHURSHQHG N9
Full wave withstand volt-
DJH EUHDNHUFORVHG  N9
Full wave withstand (break-
HURSHQHG  N9
Chopped wave withstand
#PLFURVHFRQG N9
Chopped wave withstand
#PLFURVHFRQG N9
Switching wave withstand
ZHW EUHDNHUFORVHG  N9
Switching wave withstand
EUHDNHURSHQ  N9
Low frequency phase-to-ground
ZLWKVWDQGYROWDJH N9
5DWHGFRQWLQXRXVFXUUHQW $UPV
5DWHGVKRUWFLUFXLWFXUUHQW N$UPV
Asymmetrical interrupting capability
at rated maximum voltage (kA, rms)
5DWHGVKRUWWLPHFXUUHQW
and duration (A, s)
5DWHGSHDNZLWKVWDQGFXUUHQW
(closing and latching) (kA rms)
5DWHGLQWHUUXSWLQJWLPH PV
5DWHGSHUPLVVLEOHWULSSLQJGHOD\ V
5DWHGFDSDFLWRUVZLWFK-
ing current (A rms)
5DWHGRSHUDWLQJGXW\F\FOH
Type of operating mechanism
Number of trip coils
Breaker operating time for rated
control voltage and gas pressure
Opening time from energizing of
trip coil to contact parting (ms)
759DQGWLPHWRSHDN#7
759DQGWLPHWRSHDN#7
759DQGWLPHWRSHDN#7
759DQGWLPHWRSHDN#7
*DVSUHVVXUHDWƒ& N3D
Maximum foundation load-
ing during operation:
Horizontal (N)
9HUWLFDO 1
Motor capacity
Table continues


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH%²&LUFXLWEUHDNHUV(continued)
User requirements Supplier proposal
Number and type
3RZHURIHDFK :
9ROWDJHDQGQXPEHURI3KDVH 9
Current, start/run (A)
Control circuit:
5DWHGGFFRQWUROYROWDJH 9
&ORVLQJYROWDJHUDQJH 9
Maximum closing current (A)
Maximum tripping cur-
rent per trip coil (A)
7ULSSLQJYROWDJHUDQJH 9
Number of operations before the
breaker must be removed from
service for maintenance inspection.
No-load mechanical
Full load non-fault
5DWHGVKRUWFLUFXLWFXUUHQW
Expected number of hours required
to perform a complete mainte-
nance inspection of one breaker
(including gas handling time)
Maximum guaranteed noise
level, during operation, at
the LCC location (db)
Number of breaker opera-
tions without recharging
Number of full re-closing oper-
ations without overheating the
closing resistors (specify the closing
duty for the thermal rating)

% 'LVFRQQHFWVZLWFKHV
The proposal data listed in 7DEOH% for disconnect switches should be provided with the bid.

7DEOH%²'LVFRQQHFWVZLWFKHV
User requirements Supplier proposal
5DWHGIXOOZDYHLPSXOVH
withstand voltage:
$FURVVWKHRSHQJDS N93HDN
3RZHUIUHTXHQF\²PLQ
withstand voltage:
$FURVVWKHRSHQJDS N9UPV
Number of open-close operations
before inspection or servicing
0D[LPXPFRQWUROYROWDJH 9GF
0LQLPXPFRQWUROYROWDJH 9GF
Table continues

54
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH%²'LVFRQQHFWVZLWFKHV(continued)
User requirements Supplier proposal
Motor Current, start/run (A)
5DWHGSHDNZLWKVWDQGFXU-
rent (kA rms)
Short term withstand current (kA rms)
Maximum opening cur-
rent (A) at rated voltage
Maximum closing current (A)
Heater power per three
 SROHVZLWFK :
Main current carry-
ing contact material
%DVHPDWHULDODQGVSHFL¿FDWLRQ
Contact insert material
3ODWLQJPDWHULDO
Control data for operating mechanism
Operating time (s)

% *URXQGLQJVZLWFKHVLQFOXGLQJIDVWDFWLQJ KLJKVSHHG


The proposal data listed in 7DEOH% for grounding switches should be provided with the bid.

7DEOH%²*URXQGLQJVZLWFKHVLQFOXGLQJIDVWDFWLQJ KLJKVSHHG
User requirements Supplier proposal
5DWHGPD[LPXPRSHQLQJFXU-
rent (kA at rated voltage)
5DWHGSHDNZLWKVWDQGFXUUHQW
(close and latch) (kA rms)
5DWHGVKRUWWHUPZLWK-
stand current (kA rms)
5DWHGVKRUWFLUFXLWPDN-
ing current (kA)
Number of open-close oper-
ations before internal visual
inspection or servicing
*URXQGLQJVZLWFKLQWHUUXSWLQJFDSDF-
ity (kA at rated voltage):
Inductive
Capacitive
5HODWHGYROWDJHWREHVWDWHG
Number of fault making oper-
ations before maintenance

% 9ROWDJHWUDQVIRUPHUV
The proposal data listed in 7DEOH% for voltage transformers should be provided with the bid.

55
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH%²9ROWDJHWUDQVIRUPHUV
User requirements Supplier proposal
Type
1RPLQDOYROWDJH N9
5DWHGIUHTXHQF\ +]
%,/ N9
$SSOLHGWHVWYROWDJH N9UPV
0D[LPXP3RZHUIUHTXHQF\¿HOGWHVW
YROWDJHZLWK97FRQQHFWHG
N9UPV
5DWLRRIKLJKYROWDJHWR
low-voltage windings
Thermal rating of each sec-
RQGDU\ZLQGLQJ 9$
Thermal rating of the pri-
PDU\ZLQGLQJ 9$
,(((6WG&DFFX-
UDF\FODVVL¿FDWLRQ
List of burdens for which the above
DFFXUDF\FODVVL¿FDWLRQVDSSO\
Table of current versus time for
back-feeding capacitive cur-
UHQWGXULQJ*,6¿HOGWHVWV
Number of secondary windings

% &XUUHQWWUDQVIRUPHUV
The proposal data listed in 7DEOH% for current transformers should be provided with the bid.

7DEOH%²&XUUHQWWUDQVIRUPHUV
User requirements Supplier proposal
Type
5DWHGIUHTXHQF\ +]
%,/ N9
5DWHGSULPDU\FXUUHQW
5DWHGVHFRQGDU\FXUUHQW
5HOD\DFFXUDF\FODVV
Metering accuracy class
Thermal rating factor
Number of secondary windings

% 0HWDOHQFORVHGVXUJHDUUHVWHUV
The proposal data listed in 7DEOH% for metal-enclosed surge arresters should be provided with the bid.

56
&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH%²0HWDOHQFORVHGVXUJHDUUHVWHUV
User requirements Supplier proposal
Supplier
Type
Application
'XW\F\FOHYROWDJHUDWLQJ N9
Maximum continuous operating
YROWDJH 0&29 UDWLQJ N9
5DWHGIUHTXHQF\ +]
IEEE energy class
Discharge counter

% 6)6WRDLUEXVKLQJ
The proposal data listed in 7DEOH% for SF6-to-air bushings should be provided with the bid.

7DEOH%²6)6WREXVKLQJ
User requirements Supplier proposal
Application
Name of the supplier
Type designation of the supplier
Material
5DWHGLQVXODWLRQOHYHO²%,/ N9
5DWHGSRZHUIUHTXHQF\ZLWKVWDQG N9
5DWHGVKRUWGXUDWLRQSRZ-
er frequency withstand:
'U\²PLQ N9UPV
:HW²V N9UPV
5DWHGPLQLPXPFRQWLQXRXVFXUUHQW $
External strike distance:
3KDVHWRJURXQG PP
3KDVHWRSKDVH PP
External creep distance (mm)
Cantilever strength (nM)
Acceptable terminal load (N)

% 6)6WRFDEOH
The proposal data listed in 7DEOH% for SF6-to-cable should be provided with the bid.

7DEOH%²6)6WRFDEOH
User requirements Supplier proposal
%,/ N9
Cable type
Cable size
Table continues


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG
IEEE Std C37.123-2016
,(((*XLGHIRU6SHFL¿FDWLRQVIRU+LJK9ROWDJH*DV,QVXODWHG6XEVWDWLRQV5DWHGN9DQG$ERYH

7DEOH%²6)WRFDEOH(continued)
User requirements Supplier proposal
Cable ampacity (A)
Cathodic protection isolation
Termination type supplier drawing

% 6)6WRWUDQVIRUPHUFRQQHFWLRQ
The proposal data listed in 7DEOH% for SF6-to-transformer connections should be provided with the bid.

7DEOH%²6)6WRWUDQVIRUPHUFRQQHFWLRQ
User requirements Supplier proposal
%,/ N9
*DVWRRLOEXVKLQJW\SH
Ampacity (A)
Circulating current isolation
Termination type supplier drawing


&RS\ULJKW‹,((($OOULJKWVUHVHUYHG