A B C D E

17.00
4.25 4.25 4.25 4.25
APEX LINE OF ROOF

4.13

TOP LINE OF COLUMN

3.90

STAGE FLOOR LINE

0.80 FINISHED FLOOR LINE


EXISTING PAVEMENT
1.60
NATURAL GRADE LINE

1 FRONT ELEVATION
A-3 SCALE 1:150MTS

APEX LINE OF ROOF

4.13

TOP LINE OF COLUMN

4.70

FINISHED FLOOR LINE

1.60
NATURAL GRADE LINE

2 RIGHT SIDE ELEVATION


A-3 SCALE 1: 150MTS

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MICHELLE A. COLBONGAN
REGION II FRONT ELEVATION ENGINEERING ASSISTANT
BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI- PURPOSE RIGHT SIDE ELEVATION
ISABELA FOURTH BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PREPARED: MARLON S. LUCAS ANACLETO SANTOS A. BUMAGAT JR. EMMANUEL A. MANSIBANG EVELYN C. COSTALES, Ph.D A 5
DISTRICT ENGINEERING OFFICE VILLA SANCHEZ, SAN GUILLERMO, ISABELA
BRGY. VILLA SANCHEZ, SAN GUILLERMO, ISABELA
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 3 6 20
QUEZON, SAN ISIDRO, ISABELA JOSE C. BAYAUA JR.
ARCHITECT II DATE: DATE: DATE: DATE: