IRRIGATION OPERATIONAL SCHEDULE for junauray month

Irrigation Cycle @ 5.5 Bar


IRRIGATION
SPRINKLER STATION
FLOW /GPM CONTROLLER PROG. NO. STAGE FLOW RUN TIME TOTAL FLOW (L)
NO. NO.
GPM
SP1 29.5 A 1 A
SP2 59 A 2 B
SP3 59 A 3 C 206.5 10 7743.75
SP4 29.5 A 4 D
SP5 29.5 A 5 A
SP6 29.5 A 6 B
SP7 29.5 A 7 C
SP8 29.5 A 8 D 206.5 10 7743.75
SP9 59 A 9 A
SP10 59 A 10 B
SP11 29.5 A 11 C
SP12 29.5 A 12 D
SP13 29.5 A 13 A 147.5 10 5531.25
SP14 29.5 A 14 B
SP15 29.5 A 15 C
SP16 29.5 A 16 D
SP17 29.5 A 17 A
SP18 59 A 18 B 177 10 6637.50
SP19 29.5 A 19 C
SP20 29.5 A 20 D
SP21 29.5 A 21 E
SP22 29.5 A 22 F
SP23 29.5 A 23 A 147.5 10 5531.25
SP24 29.5 A 24 B
SP25 29.5 A 25 C
SP26 59 A 26 D
SP27 29.5 A 27 E
177 10 6637.50

2 / 38 Revision (2)