You are on page 1of 6
Feauans Disclaimer ) a. 6 customer name: GUNLUL fewwsee- customer address: ©. LPoveafer All valuables must be packed away. | authorise employees of Contractor EQUANS and their sub- contractors) to undertake activities as necessary to facilitate the works within my home. In doing so | absolve the contractor of any liability in respect of any damage, loss or consequential loss that may result from such actions. This does not absolve EQUANS of their responsibility where they have not shown due care and attention. | understand that all carpets and laminate flooring within my home is my responsibilty and must be uplifted prior to works start. If this is not carried out prior to my commencement date | understand gt my works may be cancelled, | also understand that the contractor cannot be held liable for any damage that may be caused if the carpet and/or laminate is left in place. All domestic appliances such as cookers, washing machines, fridge/freezers, tumble driers and dishwashers are required to be moved from the kitchen area, Due to the sensitivity of these appliances, particularly older appliances, it is possible that they may develop a fault following eo movement. Where this occurs the contractor (EQUANS) will not be held liable for repair or renewal In the event that the movement of the appliance results in dents/scratches or marks the contractor will not renew the appliance where itis in working order and fit for purpose. This does not absolve EQUANS of responsibility where we have not shown due care and attention Fixtures such as blinds, curtains/curtain rails, bathroom fitings and shelving etc. are the responsibility of the resident to remove prior to work commencing — however if the resident is unable to remove these items, due to disability ete., the contractor will remove the items in the presence of the resident, and the resident will then be responsible for the safe storage of the items. The resident should confirm where these items are to be placed following removal. If the resident isn't available, pa we can't be held responsible for loss of fixtures and fitings. Please note that we have to remove these items to carry out the works. However, we are not responsible for refitting these items following completion of the works. if window blinds are fitted in the window reveal it is possible they may not fit with new plastering, making the reveal slightly smaller. In certain circumstances and with prior agreement EQUANS may move large furniture however wardrobes or drawers must be emptied to allow them to be moved easily. In the event that furniture wy is not to a good standard and they are affected due to movement, the contractor will not be liable for any damage. Where furniture is old or not in a good standard the contractor recommends that itis moved by the tenant prior to works start. We endeavour to keep any damage to decorations to a minimum however there will be times when therefore bring to your attention that we will not make good the damage caused in these cases. understand that if any issues arise, | must tell an EQUANS representative immediately Dp REG-FOR-1135 Version No: 7 Published: 04/08/21 ‘Security Clas Intemal UNCONTROLLED COPY IF PRINTED OR DOWNLOADED Page 1 of 2 Ferouans Disclaimer I have received, read and understood my customer information booklet. x The Liaison Officer/Tenancy Officer (RLO) has explained the importance of providing access during the whole programme of work Itis my responsibilty to ensure all services ie. gas. electric and water are available for use including ensuring enough credit is on meters. | understand the electricity may be turned off for up to 8 hours at a time and during this time | will rat avoid opening my fridge and freezer doors or remove all foodstuffs that may be damaged. The work has been explained to me and | understand everything that is involved. oy |am aware that contact and emergency numbers, along wih site working hours and information yf about workers carrying identification on site, are in the customer information booklet. Where protective flooring has been installed, | must ensure that | or any member of my family or visitors are wearing suitable footwear (i. not stocking feet) when walking in these areas, especialy on stairs. Ifthe protective flooring becomes tom, rucked or damaged in any way | must inform EQUANS immediately. Please ensure that electrical items such as computers are switched off and unplugged prior to work ps commencing. Please inform your EQUANS RLO or EQUANS representative of any essential equipment in your ow home that may be affected by the electricity being switched off e.g. “Careline” alarm system. During pre-condition surveys photographic records may be required. By signing this disclaimer you consent to EQUANS taking and keeping them securely for the period of the works contract. w We strongly advise that you notify your insurance company of the works. wa Your signature i few pate 417125 ‘ur representatives signature 7 Pili pate GS 2S Factsheets left with the customer (tick appropriate) Heating Bathroom 0 ‘itenen 9 Windows & Doors 1 Electric Storage Heaters Extermal Works Communal Works ©] Environmental Works 3 Electrical Rewire 0 Extemal Wall Insulation] Solar Panels REG-FOR-135 Version No: 7 Published: 04/08/21 ‘Security Classification: Internal UNCONTROLLED COPY IF PRINTED OR DOWNLOADED Page 2 of 2 Improving homes and communities together 8 | Fequans 63 Prremal irr ‘Sage Green Cloudburst | _ Rice Pudding Pinky Beige Pale Blue White se room Flooring Forest Pine | Bluebell Blackbird Oystershell Bathroom/wet room Wall Tiles ‘Shark grey Black Gloss Cream Gloss | White Shark | Rewer Improving homes and communities together wa | (FEQUANS OPTION 3- MARK FAN ON DRAWING ‘OPTION 4 MARK FAN ON DRAWING Were TD Yemous w WC AAW PEs GBOKEd PRINT T SSawe sign OR DATE s(x v % e ' ! i a tr 7

You might also like