Weekly Inspection Sheet for Hydro Power Plant

The document is a weekly inspection sheet for the control and instrumentation systems at the Patrind Hydro Power Plant from September 9th, 2022. It contains inspection criteria and results for the excitation system, governor system, and uninterruptible power supply. Technicians check components like alarm displays, touch functions, status screens, oil and air pressures, and communication signals as part of routine maintenance and monitoring of the plant's electrical systems.

Uploaded by

Nazim Mirza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views1 page

Weekly Inspection Sheet for Hydro Power Plant

The document is a weekly inspection sheet for the control and instrumentation systems at the Patrind Hydro Power Plant from September 9th, 2022. It contains inspection criteria and results for the excitation system, governor system, and uninterruptible power supply. Technicians check components like alarm displays, touch functions, status screens, oil and air pressures, and communication signals as part of routine maintenance and monitoring of the plant's electrical systems.

Uploaded by

Nazim Mirza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PATRIND HYDRO POWER PLANT

Revision No. 00 Issue No. 01


C&I Weekly Inspection Sheet
Date of Issue: 09-09-2022

Documents Number PHPP-CWI-F53 Page 5 of 15

C&I Weekly Inspection Sheet (Tuesday)


Technician Name: Date:
Excitation System (AVR)
Inspection Result
Inspection part Contents of inspection Criteria Remarks
U-1 U-2 U-3
Excitatio Check the Alarm on Display ☑ ☒
n System Check touch Function of HMI ☑ ☒
Cubicle
Check logout Status of Screen On/OFF
Governor System
Inspection Result
Inspection part Contents of inspection Criteria Remarks
U-1 U-2 U-3
Check Alarm ☑ ☒
Check the touch function of HMI ☑ ☒
Governor Check if any trouble event on HMI ☑ ☒
Record value of Oil Level in Pressure Tank mm
Record value of Air Pressure in Pressure Tank MPa
Power House UPS(200Ah)
Inspection Result
Inspection part Contents of inspection Criteria Remarks
DC UPS
Check the Alarm o, ᇫ, x
UPS
Check communication Blinking status on Display o, ᇫ, x