EPC CPF PHASE 2 oo
AT BADRA OILFIELD,
ao sasune incenNc
DOCUMENT DETAILS
EMPLOYER CONTRACT NO. +080-13-80-206-00
a : EPO GPF PHASE 7 AT BADRA OLFELD,
IRAQ
EMPLOYER + Gazprom NeftBadra BV.
EMPLOYER JOB NO
CONTRACTOR jamsung Engineering Co. id
‘CONTRACTOR JOB NO.
DOCUMENT NO. i
REVISION NO, No. of pages
TP FOR INSTALLATION OF LOCAL
DOCUMENT DESCRIPTION ‘PANELS AND INSTRUMENT JUNCTION
rrr BOXES.
oe ee POH
Teed Cantucton [aun | oats [nse [akon [ON
lo
3 [ReteuedtorApprov | wapnots [avatdatan| WSiong | BKKim | ON Ken
‘A [Issued for Approval ‘antar2015 | AvAbsstan | HS. Jong | BKKim | DN Ken
ev [Descpion —=~—* a» [Prepared [haces | Arpved | ttEPC CPF PHASE 2 AT BADRA OILFIELD, IRAQ
TP FOR INSTALLATION OF LOCAL PANELS AND
INSTRUMENT JUNCTION BOXES.
‘SUMMARY OF DOCUMENT REVISIONS
Rev. | Date Revised | Section Revised Revision Description
A ‘nar 2018 Issued fr Approval | Issued for Employer's Approval
8 4ingri2015 | Re-tssuedfor Approval _ | Re-‘ssued for Employer's Approval
0 2aiug 2015
{ssved for Construction
tssued for Employers ConstructionEPG GPF PHASE 2 AT BADRA OILFIELD, IRAQ
TIP FOR INSTALLATION OF LOCAL PANELS AND | gauge
INSTRUMENT JUNCTION BOXES
[Doene: osesoasre2=0an-TP-0023 [Revo [Page Sarvs | Mans mene
‘TABLE OF CONTENTS:
ORDER OF PRECEDENCE...
DEFINITIONS AND ABBERVIATIONS:
VERIFYING DOCUMENT LIST:
Noomeroen
INSPECTION AND TEST PLAN:EPC CPF PHASE 2 AT BADRA OILFIELD, IRAQ
A gnzmanyFFFOR ETALLATIONOF LOCAL PANELS ART) gg
—
1.0 PURPOSE
INSTRUMENT JUNCTION BOXES
[Dec Na" GBO962514250.04-T0-0023
‘The purpose ofthis Inspection and test plan (ITP) is to monitor, control and carry
‘out Quality Inspection
per approvedielated cods and Specification for CPF
PHASE 2 AT BADRA OIL FIIELD, IRAQ.
20 SCOPE
The scope ofthis Inspection and test plan (ITP) isto make sure inspection and
Quality checks on instrument local panels and junction boxs are cared in|
sequence in order to minimize/avoid rework as much as possible. Itis also to
ensure that related parties involved in each activity understand the methadology
‘and ingpection requirements.
30 REFERENCES
Doe. No.
Description
(8000-26 14.250-0A-PL-0001
Project quality plan
(8090-26 14-250-0A-PP-0001
‘Non-conformance contol procedure
(8000-26 14-250-0A PP-0002
Corrective and Preventive Action Procedure
Contract, Appendixt Annex 1.2
Quality Assurance & Quality Control
(6B090.26 14-250-IN-MS-0004
‘ethed statement of instrument work or junction box and
panel instalation,
(GB090-26 14-250-HS-PL-0001
HSE plan
(8090-26 14-250-IN-DW-5000
Instrumentation Identification and Symbolization
(6B090-2614-250-IN-SP-3101
Specifications for instrument cable
(GB090-2614-250-IN-SK-4101
Instrumentation Process Hook up drawings
(68090-2614-250-IN-DL-4001
Instrument indox
“GB080-2644-250:IN-DB-000%
Design Basis for instrument
(6B080-2614-250-IN-DD-5100
Instrument Mounting Details
(6B090-2614-250-IN-SP-2000
‘Specification for Field InstrumentEPC CPF PHASE 2 AT BADRA OILFIELD, IRAQ
TIP FOR INSTALLATION OF LOCAL PANELS AND
INSTRUMENT JUNCTION BOXES
4, ORDER OF PRECEDENCE
Inthe event of apparent technical confict occuring in applying this
‘method statement and reference documents, the following order of
precedence shall apply
4) Iraqi Laws and Regulations
2) Contract, project standards and specifications, data sheets and drawings
3) Other specications and standards referenced in tis document.
5. DEFINITIONS AND ABBREVIATIONS
DEFINITIONS
5.1Inspection and Test Plan
RF lis a document submited to the SECL representative formulated in an orderly
‘manner by the construcon supervisor or site qually manager to record main
‘working processes for tests and quality inspections, and to enable the ower or
‘oumer’s representative to assign inspection points.
5.2Witness Point
‘A Wiiness Point is defined in the Site Quality Manual as an inspection / text
‘activity onthe ITP that requires a request for the presence ofthe subproject QA,
representative,
5.3Hold Point
‘A Hold Point where further progress is not allowed without Owner's witten
Permission and the process / inspection cannot proceed without the QA
representative
S4inspector
Person that inspects whether processes quality of materials or specifications are
consistent with prescribed or desired requisites.EPC CPF PHASE 2 AT BADRA OILFIELD, IRAQ
TTP FOR INSTALLATION OF LOCAL PANELS AND | oom
INSTRUMENT JUNCTION BOXES:
[Becno:eoo-sereamnan.oo [revo [Page baliy | nasmeenomrenne
5.5Surveillance visit
‘Monitoring or observation to verify whether or not materials, tems, or installation
conform to specified requirements. Surveillance activity’ may include audit,
Inspection, witness of testing, review of quality documentation and personnel
qualfication, and evaluation of personnel performance. No formal notification,
(RFI) required to inspection parties.
5.6Review Point
‘An activity that requires the review and acceptance of the Subcontractor's
«documentation. No formal notification (RFI) required to inspection partes
5.7 Nonconformity
Non-utfilment of contract, Project, Cods and Regulations requirements. (1S
9000)EPC CPF PHASE 2 ATBADRA OILFIELD. IRAQ [SC
pr rece PHASE AT SADRA ORFIELD, RAG
-nzpnomTPFOR INSTALLATION OF LOCAL PANELS AND | garam
INSTRUMENT JUNCTION BOX!
a yoann ON TIS ae Far | aonsnncome
ABBREVIATIONS
rr Central Processing Facies
e Employer (GAZ PROM Net Badra BV)
c Contractor -
pna Gazprom Net Bada
se ‘su contactor
NA Not Appicable
awac ‘Qvaty Assurance! Qualty Cont!
AFC ‘Approved For Constucton
NCR Non-Gonfomance Report
car Carrectv Action Request
1. Inspection and Test Plan
RFI Request or Inspection
mR : Inspection and test record
R Review point
8 ‘Suvellance Point
w Wares Point
4 Hold pointEPC CPF PHASE 2 AT BADRA OILFIELD, IRAQ
TTPFON MSTALLATION OF LOCAL PANELS AND
Asana INSTRUMENT JoNeTiON SOxES =_
Doe No GBOR0.214-280-0A-7P-0029 [Re 0 [pean ort
6. VERIFYING DOCUMENT LIST (ITR NO.)
INSPECTION AND TEST PLAN FOR INSTALLATION OF LOCAL
SG2614-Q61N-008 | PANELS AND INSTRUMENT JUNCTION BOXES[EPC GPF PHASE 2 AT BADRA OILFIELD, IRAQ
TTP FOR INSTALLATION OF LOCAL PANELS AND
INSTRUMENT JUNCTION BOXES
Deco: GBOSORete0aA THANE [Rev :0 Poms
7. \NSPECTION AND TEST PLANwet sn pu eum
e|s|m ne08 Sugino ene) | °F
soseg
vonoune yu
s | s | m | womconses iesmueg eon) | °F
pop veteran
seamen snes sung
s | s | s | susie muessomeg | oF
ms 20
s [ou | a | aentouso wormed een | 02
sso ese
saiou 3901 +] senoet098 our Buneont @
s | a |» | “emaas | pos orungptau eres |
«| esas «
= 7 om ‘wou
a ea ouen 9g oF vonoy ‘nog ano | ue
a i | ea Teoravoerver eo A]
‘saxoa
inf INSWMLSNI ONY STNVd 1V9O7 JO NOL TIVISNI WO all
woud7v3
‘val “TTaIsUO WOVE Iv Z aSvHd
449.943. | stamep note,
sexca vorune pu | org
‘seveg e000 GoueS
onrsoniso8
270 uogaune
wounssl pre seueg | 09
2207) ueneresu
3 [9 [28] wounsoa ol ea
Sioa wonveRTe) | Buxkyuon i ae
SRO thes oa] oy] Re aLvOwe Tee ET |
a '$3XO8 NOMLONN? IN3WNISNI ONY S13NVd 1V9OT JO NOUWTIVASNI YO dil tiowarua 92
Yul 'GTSISO VUGVE LY 2 38VHd 469 9dEPC CPF PHASE 2 AT BADRA OILFIELD, IRAQ
Asnuman perecren ae es atroemarcoye
arene
LOCAL PANELS AND INSTRUMENT JUNCTION BOXES.
Doc No: G80002614260.0A7P.0023 | Rav.:0 | Pape: of2
Cha ae FoR
oo
<@_C INSPECTION & TEST RECORD
INSTALLATION OF LOCAL
PANELS AND INSTRUMENT
Subcontract JUNCTION BOXES
TAG Wo:
Equip Panel Description
Mate:
Model No: Sino.
‘rea
Location
Layout Drawing No
General Arrangement Drawing No:
“Typical Inetalation Drawing No-
Temp.
Ex Clase (Gas Group = 1P Rating
‘Certifying Authority: ‘Certiiate No
sz, Area Classification Drawing No-
ae Aree
Clase
SLNO
Chocks to be performed
*+-SUPPORTIFRAME INSTALLATION CHECKS
rey
Fabrication as por project drawing.
12
Fixing point and orientation corect as per the drawing
13
‘Sharp edges removed.
14
‘Location a per layoutbest ft and aligned with trenchveabletayistub
plocation
18
‘Access/Enits not obstructed
16
‘Area clears fr maintenance.
7
Fixing a8 per drawing
2: LOCAL PANELS AND JUNCTION BOX INSTALLATION CHECKS:
[ea
Name plate detis correct and complies wth data sheetcrawing,
22
BoltediClamped and secured as per detail rawing.
23
Location, orientation as per project crawing and akgrment correct
24
arth bonding saps, bus bars installed and propery connected as par
sawing
25
10 tag installed with correct identification,
acceptanes
5 ‘Su Contractor 6 ‘contactor ae
Employer
sionaTuReT EPC CPF PHASE 2 AT BADRA OILFIELD, IRAQ.
"TNSPECTION AND TESTPLAN FORINSTALLATIONOF | D>
GAZPROM LOCAL PANELS AND INSTRUMENT JUNCTION BOXES
‘Doc No: GB080-2614-250-0A-TP-0023 Rev.:0 | Page:20f2 =
2.5 | Exo paint workundamaged,ilerrceen andre of debi
27 | Severs and seas undamaged and her visible physical
amagen
Ze | Teminals undamaged raled and arbored coved we por
cave
29 Lamp ating tf, celour and positon are comech
2.10 _| Ped crcut boars are lean and underage file ony)
2.11 | Unused cabo enties are blanked of wh coect type of pugs.
2.12 _| No uneuthorsedmocicatons on lctial ndoeues
Enclosure glass pars and gist metal soning gasket andlor
2ia_| conpoure
Seatac,
Sire | Enclosure ange faces ae dean and undamaged and gaskets,
fay ary ar ears
718 [Enos age pap denies oe wan marina valoe
pemited
‘bets acetic fare prot tanged jane ae win
2.16. | minmum daance spite for pectic gas Qoup HATTON,
iscomm, to-do).
2.47 Breathing an cranng device are salfatry.
28 | Ebner is dequaliy protected apanstcorason wear,
\ralon and ater adverse facies
29 Noundve accumulation of dist anda
729 | Where appeabe, sealing ofr, cic, pes, and/or ona
aro astfactoy
Enos ice aro saltocloy wih sable oak ee
2.21 | appeals) and ning screws bot ihtoned and I at
tanta
Zaz | isin complies wit hazardous ara Gasnction
reguroments,
Remare
: ‘ub concn ao ‘onan oe Eaeioe
cna