You are on page 1of 6
D'INTAN TRADE SDN. BHD ace LOT 2152, JALAN TOK KENALI WAKAF STAN, KUBANG A Kwan 1561296.) 16150 KOTA BHARU, KELANTAN CSR/4D/2020/SM-066 Ter 0764500 FO. F650 SITE MEMO CENTRAL SPINE ROAD (CSR), PAKEJ 4 : KG. RELONG KE RAUB. SEKSYEN 4D : KUALA DONG KE KG. TANAH BERCANGKUL TO :T &T Konsult Sdn Bhd Date : 17-11-2020 ATTN :lr. Shaari bin Mohd cc. WpP JKR Ir. Nasrollah bin Mohamad , DTSB HQ, File SUBJECT: Method of Statement - Surface Drainage Hereby the Method of Statement for Surface Drainage as per JKR Standard Road Specification for Road Works for your further review and approval. Thank you Prepared by : + — BDU ALIN BIN ABDUL HAN ——$§$ mn PENGURUS PROJEK Name: y TRADE SDN BHD Company: DINTAN ‘Company Date Date \F-4->010 D'INTAN TRADE SDN. BHD LOT 2152, JALAN TOK KENALI WAKAF STAN, KUBANG KERIAN, 16150 KOTA BHARU, KELANTAN (561296-M) Tel 09-7643500 Fax : 09-7646500 CENTRAL SPINE ROAD (CSR) PAKEJ 4: KG. RELONG KE RAUB. SEKSYEN 4D : KUALA DONG KE KG. TANAH BERCANGKUL METHOD OF STATEMENT FOR SURFACE DRAINAGE IMPORTANT : The information contained herein is the propriety of D'Intan Trade Sdn. Bhd. The holder agrees to following Not to be produced, revealed, published, or distributed in whole or any portion of it without authorization and to maintain this document in confidence. This approval shall not relieve the Contractor of his full responsibility to the contractual requirement of the works carried out. $.0/S.0.R shall have full authority to review this approval based on the actual site condition. Prepared By Reviewed By = oe UL HAMID Name ‘QURRATU MAILAA BT. NASARUDDIN Name PENGURUS PROJEK Company aac Company D’INTAN TRADE SON BHO Date DP INTAN TRADE SON BHD Date: ‘Approved By "agreed By Name Name Company Company Date Date DOCUMENT REF : D'INTAN TRADE SDN BHD CENTRAL SPINE ROAD PAKEJ 4: KG. RELONG KE RAUB, SEKSYEN 4D: KUALA DONG KE KG. TANAH SECTION BERCANGKUL ‘CONTRACT/SPECIFICATION REF: PROJECT WORK: METHOD STATEMENT | OTHER REFERENCES JKR/IP/CA/T/2019/42 METHOD STATEMENT FOR SURFACE DRAINAGE METHOD STATEMENT SURFACE DRAINAGE CONTENTS 1.0 Objective 2.0 References 3.0 Equipments, Machineries and Manpower 4.0 Construction Methodology 5.0 Quality Control Procedure 6.0 Environmental, Health and Safety Plan 7.0 Emergency Response Plan REV:0 ISSUE: METHOD STATEMENT FOR SURFACE ORAINAGE PAGE 10F 4 DOCUMENT REF: D'INTAN TRADE SDN BHD. SECTION + CENTRAL SPINE ROAD PAKEJ 4: KG, RELONG KE RAUB, SEKSYEN 40: KUALA DONG KE KG. TANAH BERCANGKUL ‘CONTRACT/SPECIFICATION REF: |, pROJECT WORK: METHOD STATEMENT | OTHER REFERENCES : sKR/IP/CI/T/2019/42 METHOD STATEMENT FOR SURFACE DRAINAGE METHOD STATEMENT [SURFACE DRAINAGE 1.0 OBJECTIVE 1.1 To ensure that works are carried out in accordance with the specifications and drawing. 1.2. To ensure routine inspection is carried out. 1.3. To eliminate/minimize errors and poor quality of work. 2.0 REFERENCES 2.1 Construction drawing no 2.1.1 KPKR/J/R/060953/P4/DR/SD/(01-13) - Drainage Standard Details 2.1.2 KPKR/I/R/060953/P4/S4D/DR/LA/(01-20) - Drainage Layout Plan CH 314000 - CH 44+661.984 2.2 JKR Standard specification for road works :Section 3: 3.0 EQUIPMENTS, MACHINERIES AND MANPOWER 3.1. Excavators/ Backhoe complete with slings 3.2 Tipper/ Dump Trucks 3.3 Calibrated surveying equipment 3.4 Proctor Test apparatus 3.5. Mobile crane complete with concrete skips 3.6 Poker vibrator complete with petrol engines nage Works REV:0 ISSUE: METHOD STATEMENT FOR SURFACE DRAINAGE PAGE20F 4 DOCUMENT REF D'INTAN TRADE SDN BHD SECTION ‘CENTRAL SPINE ROAD PAKEJ 4: KG, RELONG KE RAUB, SEKSYEN 40: KUALA DONG KE KG. TANAH BERCANGKUL CCONTRACT/SPECIFICATION REF: PROJECT WORK: METHOD STATEMENT | OTHER REFERENCES IKR/IP/CA/T/2019/42 METHOD STATEMENT FOR SURFACE DRAINAGE METHOD STATEMENT ‘SURFACE DRAINAGE 4.0 CONSTRUCTION METHODOLOGY 4.1 To carry out survey and setting out works in order to identify the required extend of surface drain alignment, length, and invert levels. 4.2 Keeping to the specified line and gradient, the surface drain should be excavated as per construction drawing. Refer dwg 43. Excavated surface drain trench should be cleared from any form of unsuitable materials/ debrics, 4.4. Reinforced with steel wire fabrics to ms should be placed along the surface drain alignment prior to concreting works. 45. Concrete works shall be carry out using concrete Grade 20/20 as per construction drawing. Refer dwg 5.0 QUALITY CONTROL PROCEDURE 5.1 The work shall be carried out in accordance with the Quality Control Procedure. 6.0 ENVIRONMENTAL, HEALTH AND SAFETY PLAN 6.1 The work shall be carried out in accordance with the Environment, Health, and Safety Plan. 6.2. All workers are required to wear Personnel Protective Equipment (PPE) i.e. safety helmets, safety boots and safety vest when working at roadside within reserve. 6.3. Barriers will be located at the work area to avoid public from entering the site if required. REV:0 ISSUE; METHOD STATEMENT FOR SURFACE ORAINAGE PAGE 3.OF 4 DOCUMENT REF : D'INTAN TRADE SDN BHD. SECTION CENTRAL SPINE ROAD PAKEJ 4: KG. RELONG KE RAUB, SEKSYEN 4D: KUALA DONG KE KG. TANAH BERCANGKUL ‘CONTRACT/SPECIFICATION REF: PROJECT WORK : METHOD STATEMENT | OTHER REFERENCES JKR/IP/CS/T/2019/42 METHOD STATEMENT FOR SURFACE DRAINAGE METHOD STATEMENT ‘SURFACE DRAINAGE 7.0 EMERGENCY RESPONSE PLAN 7.1 The work shall be carried out in accordance with the emergency response plan when health and safety of worker are threatened, 7.2 The plan will be used to manage emergency incident to protect life, the environment, property, and restore the condition to normal condition in the shortest possible time. REV:0 ISSUE: METHOD STATEMENT FOR SURFACE DRAINAGE PAGE 4.0F 4

You might also like