You are on page 1of 22

GRID LOCATION Components Per Assembly 24.01.

2019
TS-1 C-E/4-2
Mark : TS-1 Qty : 8 Pcs
TS-1 C-E/6-4
TS-1 C/5-3 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-1 D-F/2 TS-1 TS6110 G350 1 5753 0.00 8.82 70.57
TS-1 D-F/6 Total 0.00 8.82 70.57
TS-1 E-G/4-2
TS-1 E-G/6-4
TS-1 G/5-3

61
A-A

5753
A
TS-1

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-1
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-2 B-C/5-3
Mark : TS-2 Qty : 8 Pcs
TS-2 B-E/4-1
TS-2 B-E/7-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-2 D-F/2-1 TS-2 TS6110 G350 1 6501 0.00 9.97 79.73
TS-2 D-F/7-6 Total 0.00 9.97 79.73
TS-2 E-H/4-1
TS-2 E-H/7-4
TS-2 G-H/5-3

61
A-A

6501
A
TS-2

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-2
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-3 B-C/5-3
Mark : TS-3 Qty : 8 Pcs
TS-3 B-E/4-1
TS-3 B-E/7-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-3 D-F/2-1 TS-3 TS6110 G350 1 7246 0.00 11.11 88.88
TS-3 D-F/7-6 Total 0.00 11.11 88.88
TS-3 E-H/4-1
TS-3 E-H/7-4
TS-3 G-H/5-3

61
A-A

7246
A
TS-3

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-3
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-4 B-C/5-3
Mark : TS-4 Qty : 8 Pcs
TS-4 B-D/3-1
TS-4 B-D/7-5 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-4 D-F/2-1 TS-4 TS6110 G350 1 7992 0.00 12.25 98.02
TS-4 D-F/7-6 Total 0.00 12.25 98.02
TS-4 F-H/3-1
TS-4 F-H/7-5
TS-4 G-H/5-3

61
A-A

7992
A
TS-4

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-4
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-5 A-B/5-3
Mark : TS-5 Qty : 8 Pcs
TS-5 A-D/3-1>
TS-5 A-D/i-5 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-5 D-F/1> TS-5 TS6110 G350 1 8901 0.00 13.65 109.17
TS-5 D-F/i-7 Total 0.00 13.65 109.17
TS-5 F-i/3-1>
TS-5 F-i/i-5
TS-5 H-i/5-3

61
A-A

8901
A
TS-5

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-5
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-6 B-D/3-1
Mark : TS-6 Qty : 8 Pcs
TS-6 B-D/7-5
TS-6 B/5-3 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-6 D-F/1 TS-6 TS6110 G350 1 8320 0.00 12.76 102.05
TS-6 D-F/7 Total 0.00 12.76 102.05
TS-6 F-H/3-1
TS-6 F-H/7-5
TS-6 H/5-3

61
A-A

8320
A
TS-6

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-6
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-7 B-D/3-1
Mark : TS-7 Qty : 8 Pcs
TS-7 B-D/7-5
TS-7 B/5-3 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-7 D-F/1 TS-7 TS6110 G350 1 8654 0.00 13.27 106.15
TS-7 D-F/7 Total 0.00 13.27 106.15
TS-7 F-H/3-1
TS-7 F-H/7-5
TS-7 H/5-3

61
A-A

8654
A
TS-7

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-7
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-8 C-E/4-2
Mark : TS-8 Qty : 8 Pcs
TS-8 C-E/6-4
TS-8 C/5-3 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-8 D-F/2 TS-8 TS6110 G350 1 5955 0.00 9.13 73.04
TS-8 D-F/6 Total 0.00 9.13 73.04
TS-8 E-G/4-2
TS-8 E-G/6-4
TS-8 G/5-3

61
A-A

5955
A
TS-8

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-8
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-9 C-E/4-2
Mark : TS-9 Qty : 8 Pcs
TS-9 C-E/6-4
TS-9 C/5-3 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-9 D-F/2 TS-9 TS6110 G350 1 5709 0.00 8.75 70.02
TS-9 D-F/6 Total 0.00 8.75 70.02
TS-9 E-G/4-2
TS-9 E-G/6-4
TS-9 G/5-3

61
A-A

5709
A
TS-9

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-9
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-10 C-D/5-3
Mark : TS-10 Qty : 8 Pcs
TS-10 C-E/4-2
TS-10 C-E/6-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-10 D-F/3-2 TS-10 TS6110 G350 1 5126 0.00 7.86 62.87
TS-10 D-F/6-5 Total 0.00 7.86 62.87
TS-10 E-G/4-2
TS-10 E-G/6-4
TS-10 F-G/5-3

61
A-A

5126
A
TS-10

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-10
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-11 C-D/5-3
Mark : TS-11 Qty : 8 Pcs
TS-11 C-E/4-2
TS-11 C-E/6-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-11 D-F/3-2 TS-11 TS6110 G350 1 4543 0.00 6.97 55.73
TS-11 D-F/6-5 Total 0.00 6.97 55.73
TS-11 E-G/4-2
TS-11 E-G/6-4
TS-11 F-G/5-3

61
A-A

4543
A
TS-11

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-11
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-12 C-D/5-3
Mark : TS-12 Qty : 8 Pcs
TS-12 C-E/4-2
TS-12 C-E/6-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-12 D-F/3-2 TS-12 TS6110 G350 1 3961 0.00 6.07 48.58
TS-12 D-F/6-5 Total 0.00 6.07 48.58
TS-12 E-G/4-2
TS-12 E-G/6-4
TS-12 F-G/5-3

61
A-A

3961
A
TS-12

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-12
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-13 D-E/4-3
Mark : TS-13 Qty : 8 Pcs
TS-13 D-E/5-4
TS-13 D-F/3 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-13 D-F/5 TS-13 TS6110 G350 1 3378 0.00 5.18 41.43
TS-13 D/5-3 Total 0.00 5.18 41.43
TS-13 E-F/4-3
TS-13 E-F/5-4
TS-13 F/5-3

61
A-A

3378
A
TS-13

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-13
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-14 D-E/4-3
Mark : TS-14 Qty : 8 Pcs
TS-14 D-E/5-3
TS-14 D-E/5-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-14 D-F/4-3 TS-14 TS6110 G350 1 2795 0.00 4.29 34.28
TS-14 D-F/5-4 Total 0.00 4.29 34.28
TS-14 E-F/4-3
TS-14 E-F/5-3
TS-14 E-F/5-4

61
A-A

2795
A
TS-14

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-14
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-15 D-E/4-3
Mark : TS-15 Qty : 8 Pcs
TS-15 D-E/5-3
TS-15 D-E/5-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-15 D-F/4-3 TS-15 TS6110 G350 1 2982 0.00 4.57 36.58
TS-15 D-F/5-4 Total 0.00 4.57 36.58
TS-15 E-F/4-3
TS-15 E-F/5-3
TS-15 E-F/5-4

61
A-A

2982
A
TS-15

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-15
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-16 D-E/4-3
Mark : TS-16 Qty : 8 Pcs
TS-16 D-E/5-3
TS-16 D-E/5-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-16 D-F/4-3 TS-16 TS6110 G350 1 2705 0.00 4.15 33.18
TS-16 D-F/5-4 Total 0.00 4.15 33.18
TS-16 E-F/4-3
TS-16 E-F/5-3
TS-16 E-F/5-4

61
A-A

2705
A
TS-16

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-16
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-17 D-E/4-3
Mark : TS-17 Qty : 8 Pcs
TS-17 D-E/5-3
TS-17 D-E/5-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-17 D-F/4-3 TS-17 TS6110 G350 1 2335 0.00 3.58 28.64
TS-17 D-F/5-4 Total 0.00 3.58 28.64
TS-17 E-F/4-3
TS-17 E-F/5-3
TS-17 E-F/5-4

61
A-A

2335
A
TS-17

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-17
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-18 D-E/4-3
Mark : TS-18 Qty : 8 Pcs
TS-18 D-E/5-3
TS-18 D-E/5-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-18 D-F/4-3 TS-18 TS6110 G350 1 1919 0.00 2.94 23.53
TS-18 D-F/5-4 Total 0.00 2.94 23.53
TS-18 E-F/4-3
TS-18 E-F/5-3
TS-18 E-F/5-4

61
A-A

1919
A
TS-18

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-18
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-19 D-E/4-3
Mark : TS-19 Qty : 8 Pcs
TS-19 D-E/5-3
TS-19 D-E/5-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-19 D-F/4-3 TS-19 TS6110 G350 1 1502 0.00 2.30 18.43
TS-19 D-F/5-4 Total 0.00 2.30 18.43
TS-19 E-F/4-3
TS-19 E-F/5-3
TS-19 E-F/5-4

61
A-A

1502
A
TS-19

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-19
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-20 D-E/4-3
Mark : TS-20 Qty : 8 Pcs
TS-20 D-E/5-3
TS-20 D-E/5-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-20 D-F/4-3 TS-20 TS6110 G350 1 1086 0.00 1.67 13.32
TS-20 D-F/5-4 Total 0.00 1.67 13.32
TS-20 E-F/4-3
TS-20 E-F/5-3
TS-20 E-F/5-4

61
A-A

1086
A
TS-20

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-20
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-21 D-E/4
Mark : TS-21 Qty : 8 Pcs
TS-21 D-E/4-3
TS-21 D-E/5-4 Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-21 E-F/4 TS-21 TS6110 G350 1 670 0.00 1.03 8.22
TS-21 E-F/4-3 Total 0.00 1.03 8.22
TS-21 E-F/5-4
TS-21 E/4-3
TS-21 E/5-4

61
A-A

670
A
TS-21

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-21
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019
0
GRID LOCATION Components Per Assembly 24.01.2019
TS-22 E/4
Mark : TS-22 Qty : 8 Pcs
Mark Size Grade Qty. Length Area U. Weight T. Weight
TS-22 TS6110 G350 1 254 0.00 0.39 3.11
Total 0.00 0.39 3.11

61
A-A

254
A
TS-22

SHOP NOTE :
DRAWN RZA
NS BlueScope Pte. Ltd. (Myanmar) 1. ALL DIMENSIONS ARE CRITICALS
2. ALL DIMENSIONS ARE IN MILIMETER
CUSTOMER : AMATA GROUP NAME : TOP_SPAN (RO
Diamond Condo Building A Room 301 3. MATERIAL : __________ CHECKED IN
Pyay Road, Yangon, Myanmar
Tekla structures

Telp : +95 11221343


4. ALL WELDS SHALL REFER TO BBV's
WELDING MAP.
BUILDING : BALAR LOBBY
DESIGN IN ASSEMBLY MARK : TS-22
Mobile : +95 9786001676 5. SURFACE PREP: _________
0 24.01.2019 F0R FABRICATION RZA IN IN CREATE DATE
Web : www.nsbluescope.com 6. PAINT NOTE: ___________ ERECTION DWG REF :
REV No DATE REVISION DESCRIPTION DRAWN CHK'D APRV'D LOCATION : ANDAMAN SEA- MYANMAR APPROVED IN 24.01.2019