0% found this document useful (0 votes)
221 views9 pages

Sump Discharge Piping - ISOMETRIC Drawing

The document is a bill of materials listing 10 items including pipes, elbows, flanges, and other fittings. It provides the item number, description, size, quantity, and weight for each component. The total fabrication weight of all items is listed as 24.4.

Uploaded by

Ilham Kelana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
221 views9 pages

Sump Discharge Piping - ISOMETRIC Drawing

The document is a bill of materials listing 10 items including pipes, elbows, flanges, and other fittings. It provides the item number, description, size, quantity, and weight for each component. The total fabrication weight of all items is listed as 24.4.

Uploaded by

Ilham Kelana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

8 7 6 5 4 3 2 1

PT DISCRIPTION SIZE Q'TY WEIGHT

N
H H
SEE ISO DWG 1 PIPE SMLS, BE, A53-B, S-40 80 1.1 M 12.0
J910-XJ00-P11GMR-131503(1OF7)
P11GMR40BR003
E 3061592 2 ELBOW LR 90D, BW, A234-WPB, S-40 80 1 2.1
N 7930647
EL +16144 3 FLANGE, WNRF, A105, CL150 X S-40 80 2 10.4
282
DN80X80 TOTAL FABRICATION WEIGHT 24.4

4 PIPE SMLS, PE, A53-B, S-80 40 0.2 M 1.1

5 PIPE SMLS, PE, A53-B, S-80 25 0.1 M 0.4

179
<6>
G 6 SWAGE-CON, BLE X PSE, A105, S-40 x S-80 80X40 1 -
STEM UP G

1
P11GMR40AA101
7 COUPLING-HALF, SW, A105, CL3000 80X25 1 0.5
44 241
9
8 COUPLING-FULL, SW, A105, CL3000 40 1 0.5

P11GMR40AA201 9 SPIRAL WOUND, 304 SS HOOP WITH GRAPHITE 80 1 -

109
FILLER, CS OUTER RING, 4.5mm THK

<5>
250
STEM UP 10 STUD BOLTS WITH 2 HEAVY [Link](Hot Dip 5/8 4 -

1
100 75 P11GMR40AA301 Galva), ASTM A193 Gr.B7/A194 Gr.2H -
110 mm Length
<4> 5
75 TOTAL ERECTION WEIGHT 2.3

90
PG TOTAL WEIGHT 26.7
F PI1GMR40CP501
7
15 9
DN80X25 3 21 F
CUT PIPE LENGTH
70
70
F3 G9 B10 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (MM) NO (MM) (MM)

F3 <1> 200 40 <2> 197 80


<3> 487 80 <4> 100 25
<5> 199 80 <6> 179 80

<3>
1

164
13
49

6
487
E
E

114
EL
114 +1
61
44

1
D D

<2>
197
6
DN80X40

FOR INFORMATION
8
203
17 DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
VENDOR DOCUMENT OTHER
4
740

<1>

C C
GR
200

ID A [Link].2023 FOR INFORMATION [Link] [Link] [Link]


F LIN
E
REV. DATE DESCRIPTION DRAWN CHKD. APPD.
NO.

Project

E JAWA 9&10
LIN
DN40

15 COAL FIRED STEAM POWER PLANT


ID 82
GR 01 52
23 83
24
Owner

CONN TO
FLY ASH STORAGE SILO WASH WATER SUMP/P11GMR40AP001
9 40 MM RFFE
Owner's Engineer
E 3060648
N 7929299
B EL +15400 B

EPC Contractor

Sub Contractor

GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR001 HBD1 25 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE

P11GMR40BR001 HBD1 40 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water


PIPING ISOMETRIC DRAWING FOR
P11GMR40BR001 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.

J910-XJ00-P11GMR-131501 1OF1 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1

PT DISCRIPTION SIZE Q'TY WEIGHT

N
H H

1 PIPE SMLS, BE, A53-B, S-40 80 1.1 M 11.7

2 ELBOW LR 90D, BW, A234-WPB, S-40 80 1 2.1

3 FLANGE, WNRF, A105, CL150 X S-40 80 2 10.4

TOTAL FABRICATION WEIGHT 24.1

GR
ID
F LIN
E 4 PIPE SMLS, PE, A53-B, S-80 40 0.2 M 1.1

5 PIPE SMLS, PE, A53-B, S-80 25 0.1 M 0.4


E
LIN 15
G ID 63 6 SWAGE-CON, BLE X PSE, A105, S-40 x S-80 80X40 1 -
GR 02
23 42 G
82
TRIM 0.0° 24
7 COUPLING-HALF, SW, A105, CL3000 80X25 1 0.5
DN80

282 8 COUPLING-FULL, SW, A105, CL3000 40 1 0.5


SEE ISO DWG
J910-XJ00-P11GMR-131503(1OF7) 9 SPIRAL WOUND, 304 SS HOOP WITH GRAPHITE 80 1 -
P11GMR40BR003 FILLER, CS OUTER RING, 4.5mm THK
E 3060758
N 7931198
10 STUD BOLTS WITH 2 HEAVY [Link](Hot Dip 5/8 4 -

151
EL +16144

<6>
Galva), ASTM A193 Gr.B7/A194 Gr.2H -
110 mm Length
STEM UP

1
P11GMR40AA102 241
0
93 TOTAL ERECTION WEIGHT 2.3
TOTAL WEIGHT 26.4
P11GMR40AA202
F
<5> 1 7 F
DN80X25

109
250 CUT PIPE LENGTH
75 100
STEM UP PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
P11GMR40AA302 75 NO (MM) (MM) NO (MM) (MM)
<4> 5
<1> 200 40 <2> 197 80
<3> 486 80 <4> 100 25

91

161
PG
<5> 201 80 <6> 151 80

9
PI1GMR40CP502 15 9
3 21
70
70
F3 G9 B10

E F3
E

<3>
1
13
26

486
D 114 D
114

EL
+1
2
61
44 FOR INFORMATION

1
<2>
DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT

197
6 VENDOR DOCUMENT OTHER
DN80X40

8
203
17
4

C C
740
<1>

A [Link].2023 FOR INFORMATION [Link] [Link] [Link]

REV. DATE DESCRIPTION DRAWN CHKD. APPD.


NO.

Project
200

JAWA 9&10
COAL FIRED STEAM POWER PLANT
DN40

Owner

CONN TO
FLY ASH STORAGE SILO WASH WATER SUMP/P11GMR40AP002
40 MM RFFE
E 3059828 9 Owner's Engineer
N 7929871
B EL +15400 B

EPC Contractor

Sub Contractor

GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR002 HBD1 25 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE

P11GMR40BR002 HBD1 40 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water


PIPING ISOMETRIC DRAWING FOR
P11GMR40BR002 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.

J910-XJ00-P11GMR-131502 1OF1 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1

PT DISCRIPTION SIZE Q'TY WEIGHT

N
H H

1 PIPE SMLS, BE, A53-B, S-40 80 23.1 M 260.1

2 TEE, BW, A234-WPB, S-40 80X80 1 2.5

3 ELBOW LR 90D, BW, A234-WPB, S-40 80 6 12.3

TOTAL FABRICATION WEIGHT 274.7

4 PIPE SMLS, PE, A53-B, S-80 25 2.5 M 7.9

5 COUPLING-HALF, SW, A105, CL3000 80X25 1 0.5

G 6 ELBOW LR 90D, SW, A105, CL3000 25 3 1.4


G
DN80 TOTAL ERECTION WEIGHT 9.7
SEE ISO DWG
J910-XJ00-P11GMR-131503(2OF7) TOTAL WEIGHT 284.4
P11GMR40BR003
E 3062180

1
GR N 7920491

1916
2030
ID EL +25230 CUT PIPE LENGTH
L

<1>
F INE

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


156302 2 4377 NO (MM) (MM) NO (MM) (MM)
P11GMR40BR003-G-069 114
42 DN80X80 00
82 1998 4149 32
24 114 3 114 +2 <1> 1916 80 <2> 4150 80
3 114 EL
86 799 <3> 6000 80 <4> 828 80
E 114 799 P11GMR40BR003-G-064
L IN 3 <5> 702 80 <6> 128 25
ID 49 <2> 1 114
GR 114 <7> 698 25 <8> 168 25
3
F 23 114 <13> 1
65
<14> 1
1004
2930 <9> 449 25 <10> 992 25
F
86 446 <11> 6000 80 <12> 1841 80
STEM UP
P11GMR40BR003-G-065 <13> 799 80 <14> 799 80

18
DN80 P11GMR40AA102 70

41
<1
93

2>
SEE ISO DWG STEM UP 28 86
46 25 35
J910-XJ00-P11GMR-131502(1OF1) P11GMR40AA101 11

1
P11GMR40BR002
E 3060758 37
TRIM 0.0° 16
N 7931198 11
EL +16144 46
SEE ISO DWG
J910-XJ00-P11GMR-131501(1OF1)

3507
18
P11GMR40BR001

<1

68
E 3061592

1>
N 7930647

6000
1
EL +16144

7056
80
E

69
75
E
6 5
DN80X25 P11GMR40BR003-G-068
25
25

228
4 66 P11GMR40BR003-G-066
42
128
10

1
4

<3>
<6>

41
44

P11GMR40BR003-U-067

32
9

74

34
<9> 4
1

00
592

STEM UP 114
75
992

P11GMR40AA401

1
1017

828
60 24
8

<4>
16

D D
8

114
<8

746 24
930
>

698 69
4

6 114 702
44
EL +15917 61
<7> 4
25 6 114 EL
+1 FOR INFORMATION
24 1
<5>

3
DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
SUMP PUMP OPENING 3
4

6 VENDOR DOCUMENT OTHER


EL.15300
DN25
<10>

53 2
4 76
2
42 61
8

C FLY ASH STORAGE SILO WASH WATER SUMP C


E 3060079
N 7928049 A [Link].2023 FOR INFORMATION [Link] [Link] [Link]

EL +14900 REV. DATE DESCRIPTION DRAWN CHKD. APPD.


NO.

Project

JAWA 9&10
COAL FIRED STEAM POWER PLANT

Owner

Owner's Engineer

B B

EPC Contractor

Sub Contractor

GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE

P11GMR40BR401 HBD1 25 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water


PIPING ISOMETRIC DRAWING FOR

ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.

J910-XJ00-P11GMR-131503 1OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1

PT DISCRIPTION SIZE Q'TY WEIGHT

N
H H

1 PIPE SMLS, BE, A53-B, S-40 80 24.7 M 278.7

2 ELBOW LR 90D, BW, A234-WPB, S-40 80 7 14.3

TOTAL FABRICATION WEIGHT 293.0


100

75
7
3 PIPE SMLS, PE, A53-B, S-80 25 0.4 M 1.3
2 STEM N 55 W
17 6 P11GMR40AA501
4 COUPLING-HALF, SW, A105, CL3000 80X25 2 1.0

299
5 ELBOW LR 90D, SW, A105, CL3000 25 2 1.0

100
<9>
DN25
G 6 PIPE NIPPLE, PE X TE, A53-B, S-80 25 2 -

3
G
24 44 7 CAP, THRD, A105, CL3000 25 2 0.7
55
24
5 +2
EL
25
TOTAL ERECTION WEIGHT 3.8
TOTAL WEIGHT 296.7
5

200
EL +25344

100
CUT PIPE LENGTH

<8>
114
14019
1116 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
4884
75
NO (MM) (MM) NO (MM) (MM)
6000
4 114
2 114 1791 DN80X25 <1> 4367 80 <2> 100 25
P11GMR40BR003-U-062 <10> 1 2
114 <3> 100 25 <4> 1130 80
F <11> 1 278
<12> 1 2434 <5> 3872 80 <6> 757 80
F

472
3349
<7> 472 80 <8> 100 25

700
2751 P11GMR40BR003-G-059
0 3979 P11GMR40BR003-U-060 <9> 100 25 <10> 6000 80
523

30

1
P11GMR40BR003-G-061 <11> 6000 80 <12> 1791 80
985 44
GR P11GMR40BR003-G-063 46

<7>
ID 114 +2 <13> 295 80
295

F LIN 757 EL
E 114
<13>

114
<6> 1
114
114
1

P11GMR40BR003-G-057
2
20
1 68
42 6700 24 2 7
E 9 9 56 80 P11GMR40BR003-U-056
LIN 48
4 5
ID 11 TRIM 0.0°
GR 114
23 114
2 4367 DN80
SEE ISO DWG
2
DN80

J910-XJ00-P11GMR-131503(1OF7) 80 114
40
E P11GMR40BR003 <1> 1
E 3062180 886 E
N 7920491 0 1991
EL +25230 70

586 39

98
38

0
P11GMR40BR003-U-058

23
10

13
58
75

3872
4100
<5>
11
64

15
0
D D

<4
>
1
4
DN80X25
114 FOR INFORMATION
114

200
100
DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT

3
VENDOR DOCUMENT OTHER

<2>
2

24

299
100
75 100 45
03
+2
C EL C
6 25
<3> 3 A [Link].2023 FOR INFORMATION [Link] [Link] [Link]

DN25 5
REV. DATE DESCRIPTION DRAWN CHKD. APPD.
NO.

7 Project
SEE ISO DWG
7 JAWA 9&10
STEM UP 15 25 J910-XJ00-P11GMR-131503(3OF7)
P11GMR40AA402 5 P11GMR40BR003 COAL FIRED STEAM POWER PLANT
E 3079309
N 7911169
EL +20544 Owner

Owner's Engineer

B B

EPC Contractor

Sub Contractor

GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE

P11GMR40BR402 HBD1 25 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water


PIPING ISOMETRIC DRAWING FOR
P11GMR40BR501 HBD1 25 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.

J910-XJ00-P11GMR-131503 2OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1

PT DISCRIPTION SIZE Q'TY WEIGHT


SEE ISO DWG
N J910-XJ00-P11GMR-131503(4OF7)
H P11GMR40BR003 H
E 3092226
N 7928953 1 PIPE SMLS, BE, A53-B, S-40 80 30.7 M 346.4
EL +28330
DN80
2 ELBOW LR 90D, BW, A234-WPB, S-40 80 4 8.2
P11GMR40BR003-U-045

472
586
TOTAL FABRICATION WEIGHT 354.6

1
1798

<1>
4
114 1570 74
<2> 1 27
E L+
2 114
114 CUT PIPE LENGTH
2
114 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
1188
NO (MM) (MM) NO (MM) (MM)

92 41
15 <1> 472 80 <2> 1570 80

1650
6
G <3> 6000 80 <4> 6000 80
<5> 6000 80 <6> 3668 80 G
<7> 6972 80

2000
P11GMR40BR003-G-046

6000
7
27
11

<3>
P11GMR40BR003-U-047

1
4000
F
F
P11GMR40BR003-G-048

6000
2000
P11GMR40BR003-U-049
P11GMR40BR003-G-050

2000

2189
<4>

6
1
4000
E
E

6000
P11GMR40BR003-U-051

<5>
1
18
76
9

4000

3668
P11GMR40BR003-G-052
D D

2000
P11GMR40BR003-G-053

<6>
114
FOR INFORMATION

1
114 DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
VENDOR DOCUMENT OTHER

2
GRID LINE

2587

7200
F

6972
91
C 96 C
22
P11GMR40BR003-G-054 A [Link].2023 FOR INFORMATION [Link] [Link] [Link]

3300
REV. DATE DESCRIPTION DRAWN CHKD. APPD.
NO.

P11GMR40BR003-G-055 Project

<7> 1
JAWA 9&10
COAL FIRED STEAM POWER PLANT
E 114
LIN
GRID 17 44
63 05
23 31 +2 Owner
EL
SEE ISO DWG
J910-XJ00-P11GMR-131503(2OF7)
P11GMR40BR003 DN80 2 114
E 3079309
N 7911169 Owner's Engineer
EL +20544
B B

59 98
EPC Contractor

Sub Contractor

GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
PIPING ISOMETRIC DRAWING FOR

ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.

J910-XJ00-P11GMR-131503 3OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1

PT DISCRIPTION SIZE Q'TY WEIGHT

N
H H

SEE ISO DWG 1 PIPE SMLS, BE, A53-B, S-40 80 35.6 M 401.5
DN J910-XJ00-P11GMR-131503(5OF7)
80
P11GMR40BR003
2 ELBOW 45D, BW, A234-WPB, S-40 80 1 1.1
E 3101642
N 7962083
EL +28444 3 ELBOW LR 90D, BW, A234-WPB, S-40 80 1 2.1
17 60
36 00
TOTAL FABRICATION WEIGHT 404.5
P11GMR40BR003-G-034 36
00
<1 17
> 459
1 4 PIPE SMLS, PE, A53-B, S-80 25 0.1 M 0.4
P11GMR40BR003-U-035
5 COUPLING-HALF, SW, A105, CL3000 80X25 1 0.5
36 60
00 00
G 6 PIPE NIPPLE, PE X TE, A53-B, S-80 25 1 -
G
7 CAP, THRD, A105, CL3000 25 1 0.4
P11GMR40BR003-G-036 18
00 <2
> TOTAL ERECTION WEIGHT 1.1
1 54
25 TOTAL WEIGHT 405.6
P11GMR40BR003-U-037

<3 2
> 34
1 31°
CUT PIPE LENGTH

34 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (MM) NO (MM) (MM)

13
4
<4
>
<1> 6000 80 <2> 6000 80

1
<3> 5425 80 <4> 134 80
F <5> 6000 80 <6> 6000 80

13
F

33
<7> 100 25 <8> 6000 80

P11GMR40BR003-G-038
16
94

17
00

60
00
P11GMR40BR003-U-039

<5
>
E

38

1
E

00

18
28
2
P11GMR40BR003-G-040

60
00
38
00

<6
P11GMR40BR003-U-041 D

>
D

1
38
FOR INFORMATION

00
15
6 71

P11GMR40BR003-G-042 DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT

58
6 VENDOR DOCUMENT OTHER
7

64
100

19
0 0
P11GMR40BR003-U-043 75

STEM S 60 E
P11GMR40AA502

350
15
00
C P11GMR40BR003-G-044
C
<7> 4

100
A [Link].2023 FOR INFORMATION [Link] [Link] [Link]

REV. DATE DESCRIPTION DRAWN CHKD. APPD.


NO.

5 Project
DN80X25 GR
ID
F LIN
E JAWA 9&10

13
COAL FIRED STEAM POWER PLANT

6
<8
114

>
75

1
74 Owner
67
15
85 21
E 47
LIN
ID
GR 3
23 114
Owner's Engineer

DN80
SEE ISO DWG
J910-XJ00-P11GMR-131503(3OF7)
B P11GMR40BR003 B
E 3092226
N 7928953
EL +28330 EPC Contractor

Sub Contractor

GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE

P11GMR40BR502 HBD1 25 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water


PIPING ISOMETRIC DRAWING FOR

ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.

J910-XJ00-P11GMR-131503 4OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1

PT DISCRIPTION SIZE Q'TY WEIGHT

N
H H

1 PIPE SMLS, BE, A53-B, S-40 80 38.6 M 434.8

2 ELBOW LR 90D, BW, A234-WPB, S-40 80 3 6.2

TOTAL FABRICATION WEIGHT 440.9

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (MM) NO (MM) (MM)

<1> 6000 80 <2> 6000 80


G <3> 472 80 <4> 962 80
<5> 1072 80 <6> 6000 80 G
<7> 6000 80 <8> 6000 80
<9> 6000 80

GR
ID
F L IN
E
E
LIN 88
ID 11
GR 7
23
48
85
F 20
F

DN80

SEE ISO DWG <9


J910-XJ00-P11GMR-131503(6OF7) >
1
P11GMR40BR003
E 3100452 17
36
N 7999383
EL +27744
18
P11GMR40BR003-G-022 00

P11GMR40BR003-G-023 <8 60
> 00
1
36
00

E
25 E
36 18
P11GMR40BR003-U-024 00 6

<7 60
P11GMR40BR003-G-025 > 00
1
35
00 114
P11GMR40BR003-U-030
2
<2 60 P11GMR40BR003-G-031
> 00
P11GMR40BR003-U-026 35 1
97
60
00
<6 114
> 12

1
P11GMR40BR003-G-027 1 11
4
36 29

<3>
03 00

472
700
10 <1
72 > D
D 1
P11GMR40BR003-U-028 <5 2 36 60
> 00 00
1 114
34
97
1 EL
114 >
<4
114
+2
77
44
P11GMR40BR003-G-032
FOR INFORMATION
2 36
P11GMR40BR003-A-029 25
3 96 00
90 DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
11
VENDOR DOCUMENT OTHER

17 DN
2 P11GMR40BR003-U-033 64 80

114 SEE ISO DWG


J910-XJ00-P11GMR-131503(4OF7)
P11GMR40BR003
E 3101642
N 7962083
C EL +28444 C
A [Link].2023 FOR INFORMATION [Link] [Link] [Link]

REV. DATE DESCRIPTION DRAWN CHKD. APPD.


NO.

Project

JAWA 9&10
COAL FIRED STEAM POWER PLANT

Owner

Owner's Engineer

B B

EPC Contractor

Sub Contractor

GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
PIPING ISOMETRIC DRAWING FOR

ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.

J910-XJ00-P11GMR-131503 5OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1

PT DISCRIPTION SIZE Q'TY WEIGHT

N
H H

1 PIPE SMLS, BE, A53-B, S-40 80 54.2 M 611.1

2 ELBOW LR 90D, BW, A234-WPB, S-40 80 5 10.2

TOTAL FABRICATION WEIGHT 621.3

3 PIPE SMLS, PE, A53-B, S-80 25 0.3 M 0.9

GR 4 COUPLING-HALF, SW, A105, CL3000 80X25 1 0.5


ID
F LIN
GRID LINE E
23 5 ELBOW LR 90D, SW, A105, CL3000 25 1 0.5

G 88117 6 PIPE NIPPLE, PE X TE, A53-B, S-80 25 1 -


2 G
7 CAP, THRD, A105, CL3000 25 1 0.4
48
85
20 SEE ISO DWG
114 TOTAL ERECTION WEIGHT 2.1
DN80 J910-XJ00-P11GMR-131503(5OF7)
DN P11GMR40BR003 TOTAL WEIGHT 623.3

2637
80
E 3100452
N 7999383
114
0 SEE ISO DWG EL +27744
10
J910-XJ00-P11GMR-131503(7OF7)
P11GMR40BR003-G-021
CUT PIPE LENGTH
P11GMR40BR003
E 3100338
N 8034430 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
6
56 EL +8774 NO (MM) (MM) NO (MM) (MM)

3350
<15> 1
2
35
<1> 6000 80 <2> 6000 80
3

4
25 DN80X25 <3> 6000 80 <4> 742 80
<13>

F <5> 632 80 <6> 452 80


175

F
<7> 6000 80 <8> 6000 80
35
200

114 0 <9> 6000 80 <10> 6000 80


15

6000
5 0 P11GMR40BR003-A-020
<11> 6000 80 <12> 3845 80
<13> 100 25 <14> 150 25
2 5 <15> 452 80
57 25
+8 75 100
EL
<1 7

1
2>
1

<1>
<14> 3
114
DN25 6
57 STEM UP
20
38 P11GMR40AA403
45

<1 P11GMR40BR003-U-009
1>

6700
1 24
P11GMR40BR003-G-008 50
E
P11GMR40BR003-G-010
E

18970

1
60 24
50
00

<2>
6000
<1 P11GMR40BR003-U-011
0>
1 32
50
P11GMR40BR003-U-012

32
60 50
00

P11GMR40BR003-A-013
<9 P11GMR40BR003-G-019
>
1 32
50
D D
34 P11GMR40BR003-U-014
07
3

6000

1
32
60 50

<3>
00
FOR INFORMATION
<8
>
1 32
50
DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
P11GMR40BR003-G-016 VENDOR DOCUMENT OTHER

32 114
60 50 114
00

1
P11GMR40BR003-U-015 P11GMR40BR003-U-017

742

<4>
<7 86
> 0
1 0
26
53 114 68
63
52 2
4
C 2 C
79 <5
0 > 114
1 1 A [Link].2023 FOR INFORMATION [Link] [Link] [Link]
>
60
00 <6
REV. DATE DESCRIPTION DRAWN CHKD. APPD.
NO.
2 Project

P11GMR40BR003-G-018 2
JAWA 9&10
4 COAL FIRED STEAM POWER PLANT
77 114
+8
EL

Owner
114

Owner's Engineer

B B

EPC Contractor

Sub Contractor

GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE

P11GMR40BR403 HBD1 25 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water


PIPING ISOMETRIC DRAWING FOR

ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.

J910-XJ00-P11GMR-131503 6OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1

PT DISCRIPTION SIZE Q'TY WEIGHT

N
H H
100
6 1 PIPE SMLS, BE, A53-B, S-40 80 27.6 M 311.2
2
114
5 2 ELBOW LR 90D, BW, A234-WPB, S-40 80 7 14.3
75 114

2 74 TOTAL FABRICATION WEIGHT 325.5


39
STEM NORTH 114

350
P11GMR40AA503 46
37

100
1 1
3 PIPE SMLS, PE, A53-B, S-80 25 0.1 M 0.4

3
> >
<6 114 <9

<5>
4 COUPLING-HALF, SW, A105, CL3000 80X25 1 0.5

744
75

3114
0

1044
4 40 5 PIPE NIPPLE, PE X TE, A53-B, S-80 25 1 -
DN80X25 GR

930
ID
F LIN
G E 6 CAP, THRD, A105, CL3000 25 1 0.4
P11GMR40BR003-G-001 G
8 6
11 TOTAL ERECTION WEIGHT 1.1
SUMP PIT OPENING
EL.5300 TOTAL WEIGHT 326.6
8
55 88

1
2 114 33
20

DN80
12 E

<10>
26 LIN 36
ID 30 CUT PIPE LENGTH
GR 0
2 23

1
114

4172
<4

<7>

4400
> 24
50
P11GMR40BR003-G-002 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
1
114 38 NO (MM) (MM) NO (MM) (MM)
00
<8
114 > <1> 1442 80 <2> 3592 80
1
2 <3> 6000 80 <4> 4500 80
FLY ASH SILO WASH WATER SUMP
22 E 3105612 <5> 100 25 <6> 958 80
P11GMR40BR003-G-003 22 N 8051200 <7> 4172 80 <8> 2222 80
F EL +5000 <9> 3746 80 <10> 930 80
114 F
45
00 EL
114 + 60
4 4

P11GMR40BR003-U-004

38
00
<3
>
1

E
P11GMR40BR003-G-005 E

60
0 0
14
3 20

38
00

<2
>
1 D
D

P11GMR40BR003-U-006

19
50 FOR INFORMATION

P11GMR40BR003-G-007 DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT


35
92 VENDOR DOCUMENT OTHER

67
0

2
114
C C
EL A [Link].2023 FOR INFORMATION [Link] [Link] [Link]
+1
04
44 REV. DATE DESCRIPTION DRAWN CHKD. APPD.
NO.

Project
114
JAWA 9&10
COAL FIRED STEAM POWER PLANT

1442
<1>

1670
Owner

SEE ISO DWG


J910-XJ00-P11GMR-131503(6OF7) 114
P11GMR40BR003
E 3100338 Owner's Engineer
N 8034430
B EL +8774 114 B
80
DN

EPC Contractor
2

Sub Contractor

GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE

P11GMR40BR503 HBD1 25 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water


PIPING ISOMETRIC DRAWING FOR

ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.

J910-XJ00-P11GMR-131503 7OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)