H H
SEE ISO DWG 1 PIPE SMLS, BE, A53-B, S-40 80 1.1 M 12.0
J910-XJ00-P11GMR-131503(1OF7)
P11GMR40BR003
E 3061592 2 ELBOW LR 90D, BW, A234-WPB, S-40 80 1 2.1
N 7930647
EL +16144 3 FLANGE, WNRF, A105, CL150 X S-40 80 2 10.4
282
DN80X80 TOTAL FABRICATION WEIGHT 24.4
179
<6>
G 6 SWAGE-CON, BLE X PSE, A105, S-40 x S-80 80X40 1 -
STEM UP G
1
P11GMR40AA101
7 COUPLING-HALF, SW, A105, CL3000 80X25 1 0.5
44 241
9
8 COUPLING-FULL, SW, A105, CL3000 40 1 0.5
109
FILLER, CS OUTER RING, 4.5mm THK
<5>
250
STEM UP 10 STUD BOLTS WITH 2 HEAVY [Link](Hot Dip 5/8 4 -
1
100 75 P11GMR40AA301 Galva), ASTM A193 Gr.B7/A194 Gr.2H -
110 mm Length
<4> 5
75 TOTAL ERECTION WEIGHT 2.3
90
PG TOTAL WEIGHT 26.7
F PI1GMR40CP501
7
15 9
DN80X25 3 21 F
CUT PIPE LENGTH
70
70
F3 G9 B10 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (MM) NO (MM) (MM)
<3>
1
164
13
49
6
487
E
E
114
EL
114 +1
61
44
1
D D
<2>
197
6
DN80X40
FOR INFORMATION
8
203
17 DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
VENDOR DOCUMENT OTHER
4
740
<1>
C C
GR
200
Project
E JAWA 9&10
LIN
DN40
CONN TO
FLY ASH STORAGE SILO WASH WATER SUMP/P11GMR40AP001
9 40 MM RFFE
Owner's Engineer
E 3060648
N 7929299
B EL +15400 B
EPC Contractor
Sub Contractor
GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR001 HBD1 25 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
J910-XJ00-P11GMR-131501 1OF1 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
N
H H
GR
ID
F LIN
E 4 PIPE SMLS, PE, A53-B, S-80 40 0.2 M 1.1
151
EL +16144
<6>
Galva), ASTM A193 Gr.B7/A194 Gr.2H -
110 mm Length
STEM UP
1
P11GMR40AA102 241
0
93 TOTAL ERECTION WEIGHT 2.3
TOTAL WEIGHT 26.4
P11GMR40AA202
F
<5> 1 7 F
DN80X25
109
250 CUT PIPE LENGTH
75 100
STEM UP PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
P11GMR40AA302 75 NO (MM) (MM) NO (MM) (MM)
<4> 5
<1> 200 40 <2> 197 80
<3> 486 80 <4> 100 25
91
161
PG
<5> 201 80 <6> 151 80
9
PI1GMR40CP502 15 9
3 21
70
70
F3 G9 B10
E F3
E
<3>
1
13
26
486
D 114 D
114
EL
+1
2
61
44 FOR INFORMATION
1
<2>
DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
197
6 VENDOR DOCUMENT OTHER
DN80X40
8
203
17
4
C C
740
<1>
Project
200
JAWA 9&10
COAL FIRED STEAM POWER PLANT
DN40
Owner
CONN TO
FLY ASH STORAGE SILO WASH WATER SUMP/P11GMR40AP002
40 MM RFFE
E 3059828 9 Owner's Engineer
N 7929871
B EL +15400 B
EPC Contractor
Sub Contractor
GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR002 HBD1 25 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
J910-XJ00-P11GMR-131502 1OF1 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
N
H H
1
GR N 7920491
1916
2030
ID EL +25230 CUT PIPE LENGTH
L
<1>
F INE
18
DN80 P11GMR40AA102 70
41
<1
93
2>
SEE ISO DWG STEM UP 28 86
46 25 35
J910-XJ00-P11GMR-131502(1OF1) P11GMR40AA101 11
1
P11GMR40BR002
E 3060758 37
TRIM 0.0° 16
N 7931198 11
EL +16144 46
SEE ISO DWG
J910-XJ00-P11GMR-131501(1OF1)
3507
18
P11GMR40BR001
<1
68
E 3061592
1>
N 7930647
6000
1
EL +16144
7056
80
E
69
75
E
6 5
DN80X25 P11GMR40BR003-G-068
25
25
228
4 66 P11GMR40BR003-G-066
42
128
10
1
4
<3>
<6>
41
44
P11GMR40BR003-U-067
32
9
74
34
<9> 4
1
00
592
STEM UP 114
75
992
P11GMR40AA401
1
1017
828
60 24
8
<4>
16
D D
8
114
<8
746 24
930
>
698 69
4
6 114 702
44
EL +15917 61
<7> 4
25 6 114 EL
+1 FOR INFORMATION
24 1
<5>
3
DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
SUMP PUMP OPENING 3
4
53 2
4 76
2
42 61
8
Project
JAWA 9&10
COAL FIRED STEAM POWER PLANT
Owner
Owner's Engineer
B B
EPC Contractor
Sub Contractor
GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.
J910-XJ00-P11GMR-131503 1OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
N
H H
75
7
3 PIPE SMLS, PE, A53-B, S-80 25 0.4 M 1.3
2 STEM N 55 W
17 6 P11GMR40AA501
4 COUPLING-HALF, SW, A105, CL3000 80X25 2 1.0
299
5 ELBOW LR 90D, SW, A105, CL3000 25 2 1.0
100
<9>
DN25
G 6 PIPE NIPPLE, PE X TE, A53-B, S-80 25 2 -
3
G
24 44 7 CAP, THRD, A105, CL3000 25 2 0.7
55
24
5 +2
EL
25
TOTAL ERECTION WEIGHT 3.8
TOTAL WEIGHT 296.7
5
200
EL +25344
100
CUT PIPE LENGTH
<8>
114
14019
1116 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
4884
75
NO (MM) (MM) NO (MM) (MM)
6000
4 114
2 114 1791 DN80X25 <1> 4367 80 <2> 100 25
P11GMR40BR003-U-062 <10> 1 2
114 <3> 100 25 <4> 1130 80
F <11> 1 278
<12> 1 2434 <5> 3872 80 <6> 757 80
F
472
3349
<7> 472 80 <8> 100 25
700
2751 P11GMR40BR003-G-059
0 3979 P11GMR40BR003-U-060 <9> 100 25 <10> 6000 80
523
30
1
P11GMR40BR003-G-061 <11> 6000 80 <12> 1791 80
985 44
GR P11GMR40BR003-G-063 46
<7>
ID 114 +2 <13> 295 80
295
F LIN 757 EL
E 114
<13>
114
<6> 1
114
114
1
P11GMR40BR003-G-057
2
20
1 68
42 6700 24 2 7
E 9 9 56 80 P11GMR40BR003-U-056
LIN 48
4 5
ID 11 TRIM 0.0°
GR 114
23 114
2 4367 DN80
SEE ISO DWG
2
DN80
J910-XJ00-P11GMR-131503(1OF7) 80 114
40
E P11GMR40BR003 <1> 1
E 3062180 886 E
N 7920491 0 1991
EL +25230 70
586 39
98
38
0
P11GMR40BR003-U-058
23
10
13
58
75
3872
4100
<5>
11
64
15
0
D D
<4
>
1
4
DN80X25
114 FOR INFORMATION
114
200
100
DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
3
VENDOR DOCUMENT OTHER
<2>
2
24
299
100
75 100 45
03
+2
C EL C
6 25
<3> 3 A [Link].2023 FOR INFORMATION [Link] [Link] [Link]
DN25 5
REV. DATE DESCRIPTION DRAWN CHKD. APPD.
NO.
7 Project
SEE ISO DWG
7 JAWA 9&10
STEM UP 15 25 J910-XJ00-P11GMR-131503(3OF7)
P11GMR40AA402 5 P11GMR40BR003 COAL FIRED STEAM POWER PLANT
E 3079309
N 7911169
EL +20544 Owner
Owner's Engineer
B B
EPC Contractor
Sub Contractor
GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
J910-XJ00-P11GMR-131503 2OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
472
586
TOTAL FABRICATION WEIGHT 354.6
1
1798
<1>
4
114 1570 74
<2> 1 27
E L+
2 114
114 CUT PIPE LENGTH
2
114 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
1188
NO (MM) (MM) NO (MM) (MM)
92 41
15 <1> 472 80 <2> 1570 80
1650
6
G <3> 6000 80 <4> 6000 80
<5> 6000 80 <6> 3668 80 G
<7> 6972 80
2000
P11GMR40BR003-G-046
6000
7
27
11
<3>
P11GMR40BR003-U-047
1
4000
F
F
P11GMR40BR003-G-048
6000
2000
P11GMR40BR003-U-049
P11GMR40BR003-G-050
2000
2189
<4>
6
1
4000
E
E
6000
P11GMR40BR003-U-051
<5>
1
18
76
9
4000
3668
P11GMR40BR003-G-052
D D
2000
P11GMR40BR003-G-053
<6>
114
FOR INFORMATION
1
114 DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
VENDOR DOCUMENT OTHER
2
GRID LINE
2587
7200
F
6972
91
C 96 C
22
P11GMR40BR003-G-054 A [Link].2023 FOR INFORMATION [Link] [Link] [Link]
3300
REV. DATE DESCRIPTION DRAWN CHKD. APPD.
NO.
P11GMR40BR003-G-055 Project
<7> 1
JAWA 9&10
COAL FIRED STEAM POWER PLANT
E 114
LIN
GRID 17 44
63 05
23 31 +2 Owner
EL
SEE ISO DWG
J910-XJ00-P11GMR-131503(2OF7)
P11GMR40BR003 DN80 2 114
E 3079309
N 7911169 Owner's Engineer
EL +20544
B B
59 98
EPC Contractor
Sub Contractor
GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
PIPING ISOMETRIC DRAWING FOR
ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.
J910-XJ00-P11GMR-131503 3OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
N
H H
SEE ISO DWG 1 PIPE SMLS, BE, A53-B, S-40 80 35.6 M 401.5
DN J910-XJ00-P11GMR-131503(5OF7)
80
P11GMR40BR003
2 ELBOW 45D, BW, A234-WPB, S-40 80 1 1.1
E 3101642
N 7962083
EL +28444 3 ELBOW LR 90D, BW, A234-WPB, S-40 80 1 2.1
17 60
36 00
TOTAL FABRICATION WEIGHT 404.5
P11GMR40BR003-G-034 36
00
<1 17
> 459
1 4 PIPE SMLS, PE, A53-B, S-80 25 0.1 M 0.4
P11GMR40BR003-U-035
5 COUPLING-HALF, SW, A105, CL3000 80X25 1 0.5
36 60
00 00
G 6 PIPE NIPPLE, PE X TE, A53-B, S-80 25 1 -
G
7 CAP, THRD, A105, CL3000 25 1 0.4
P11GMR40BR003-G-036 18
00 <2
> TOTAL ERECTION WEIGHT 1.1
1 54
25 TOTAL WEIGHT 405.6
P11GMR40BR003-U-037
<3 2
> 34
1 31°
CUT PIPE LENGTH
13
4
<4
>
<1> 6000 80 <2> 6000 80
1
<3> 5425 80 <4> 134 80
F <5> 6000 80 <6> 6000 80
13
F
33
<7> 100 25 <8> 6000 80
P11GMR40BR003-G-038
16
94
17
00
60
00
P11GMR40BR003-U-039
<5
>
E
38
1
E
00
18
28
2
P11GMR40BR003-G-040
60
00
38
00
<6
P11GMR40BR003-U-041 D
>
D
1
38
FOR INFORMATION
00
15
6 71
58
6 VENDOR DOCUMENT OTHER
7
64
100
19
0 0
P11GMR40BR003-U-043 75
STEM S 60 E
P11GMR40AA502
350
15
00
C P11GMR40BR003-G-044
C
<7> 4
100
A [Link].2023 FOR INFORMATION [Link] [Link] [Link]
5 Project
DN80X25 GR
ID
F LIN
E JAWA 9&10
13
COAL FIRED STEAM POWER PLANT
6
<8
114
>
75
1
74 Owner
67
15
85 21
E 47
LIN
ID
GR 3
23 114
Owner's Engineer
DN80
SEE ISO DWG
J910-XJ00-P11GMR-131503(3OF7)
B P11GMR40BR003 B
E 3092226
N 7928953
EL +28330 EPC Contractor
Sub Contractor
GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.
J910-XJ00-P11GMR-131503 4OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
N
H H
GR
ID
F L IN
E
E
LIN 88
ID 11
GR 7
23
48
85
F 20
F
DN80
P11GMR40BR003-G-023 <8 60
> 00
1
36
00
E
25 E
36 18
P11GMR40BR003-U-024 00 6
<7 60
P11GMR40BR003-G-025 > 00
1
35
00 114
P11GMR40BR003-U-030
2
<2 60 P11GMR40BR003-G-031
> 00
P11GMR40BR003-U-026 35 1
97
60
00
<6 114
> 12
1
P11GMR40BR003-G-027 1 11
4
36 29
<3>
03 00
472
700
10 <1
72 > D
D 1
P11GMR40BR003-U-028 <5 2 36 60
> 00 00
1 114
34
97
1 EL
114 >
<4
114
+2
77
44
P11GMR40BR003-G-032
FOR INFORMATION
2 36
P11GMR40BR003-A-029 25
3 96 00
90 DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
11
VENDOR DOCUMENT OTHER
17 DN
2 P11GMR40BR003-U-033 64 80
Project
JAWA 9&10
COAL FIRED STEAM POWER PLANT
Owner
Owner's Engineer
B B
EPC Contractor
Sub Contractor
GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
PIPING ISOMETRIC DRAWING FOR
ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.
J910-XJ00-P11GMR-131503 5OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
N
H H
2637
80
E 3100452
N 7999383
114
0 SEE ISO DWG EL +27744
10
J910-XJ00-P11GMR-131503(7OF7)
P11GMR40BR003-G-021
CUT PIPE LENGTH
P11GMR40BR003
E 3100338
N 8034430 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
6
56 EL +8774 NO (MM) (MM) NO (MM) (MM)
3350
<15> 1
2
35
<1> 6000 80 <2> 6000 80
3
4
25 DN80X25 <3> 6000 80 <4> 742 80
<13>
F
<7> 6000 80 <8> 6000 80
35
200
6000
5 0 P11GMR40BR003-A-020
<11> 6000 80 <12> 3845 80
<13> 100 25 <14> 150 25
2 5 <15> 452 80
57 25
+8 75 100
EL
<1 7
1
2>
1
<1>
<14> 3
114
DN25 6
57 STEM UP
20
38 P11GMR40AA403
45
<1 P11GMR40BR003-U-009
1>
6700
1 24
P11GMR40BR003-G-008 50
E
P11GMR40BR003-G-010
E
18970
1
60 24
50
00
<2>
6000
<1 P11GMR40BR003-U-011
0>
1 32
50
P11GMR40BR003-U-012
32
60 50
00
P11GMR40BR003-A-013
<9 P11GMR40BR003-G-019
>
1 32
50
D D
34 P11GMR40BR003-U-014
07
3
6000
1
32
60 50
<3>
00
FOR INFORMATION
<8
>
1 32
50
DOCUMENT TYPE BASIC ENGINEERING DOCUMENT DETAIL ENGINEERING DOCUMENT
P11GMR40BR003-G-016 VENDOR DOCUMENT OTHER
32 114
60 50 114
00
1
P11GMR40BR003-U-015 P11GMR40BR003-U-017
742
<4>
<7 86
> 0
1 0
26
53 114 68
63
52 2
4
C 2 C
79 <5
0 > 114
1 1 A [Link].2023 FOR INFORMATION [Link] [Link] [Link]
>
60
00 <6
REV. DATE DESCRIPTION DRAWN CHKD. APPD.
NO.
2 Project
P11GMR40BR003-G-018 2
JAWA 9&10
4 COAL FIRED STEAM POWER PLANT
77 114
+8
EL
Owner
114
Owner's Engineer
B B
EPC Contractor
Sub Contractor
GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.
J910-XJ00-P11GMR-131503 6OF7 A
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
N
H H
100
6 1 PIPE SMLS, BE, A53-B, S-40 80 27.6 M 311.2
2
114
5 2 ELBOW LR 90D, BW, A234-WPB, S-40 80 7 14.3
75 114
350
P11GMR40AA503 46
37
100
1 1
3 PIPE SMLS, PE, A53-B, S-80 25 0.1 M 0.4
3
> >
<6 114 <9
<5>
4 COUPLING-HALF, SW, A105, CL3000 80X25 1 0.5
744
75
3114
0
1044
4 40 5 PIPE NIPPLE, PE X TE, A53-B, S-80 25 1 -
DN80X25 GR
930
ID
F LIN
G E 6 CAP, THRD, A105, CL3000 25 1 0.4
P11GMR40BR003-G-001 G
8 6
11 TOTAL ERECTION WEIGHT 1.1
SUMP PIT OPENING
EL.5300 TOTAL WEIGHT 326.6
8
55 88
1
2 114 33
20
DN80
12 E
<10>
26 LIN 36
ID 30 CUT PIPE LENGTH
GR 0
2 23
1
114
4172
<4
<7>
4400
> 24
50
P11GMR40BR003-G-002 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
1
114 38 NO (MM) (MM) NO (MM) (MM)
00
<8
114 > <1> 1442 80 <2> 3592 80
1
2 <3> 6000 80 <4> 4500 80
FLY ASH SILO WASH WATER SUMP
22 E 3105612 <5> 100 25 <6> 958 80
P11GMR40BR003-G-003 22 N 8051200 <7> 4172 80 <8> 2222 80
F EL +5000 <9> 3746 80 <10> 930 80
114 F
45
00 EL
114 + 60
4 4
P11GMR40BR003-U-004
38
00
<3
>
1
E
P11GMR40BR003-G-005 E
60
0 0
14
3 20
38
00
<2
>
1 D
D
P11GMR40BR003-U-006
19
50 FOR INFORMATION
67
0
2
114
C C
EL A [Link].2023 FOR INFORMATION [Link] [Link] [Link]
+1
04
44 REV. DATE DESCRIPTION DRAWN CHKD. APPD.
NO.
Project
114
JAWA 9&10
COAL FIRED STEAM POWER PLANT
1442
<1>
1670
Owner
EPC Contractor
2
Sub Contractor
GENERAL NOTES :
LINE NO. SPEC. NPD DP(barg) DT(degC) OP(barg) OT(degC) [Link] [Link](mm) P&ID NO. FLUID 1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MILLIMITERS UNLESS OTHERWISE NOTED.
2. ELEVATION SHOWN ON THIS DRAWING IS CENTER OF PIPE, UNLESS OTHERWISE NOTED.
P11GMR40BR003 HBD1 80 5 60.0 3.0 50.0 N/A N/A J910-XG02-P11GMR-110001 Water DRAWING TITLE
ERECTION NOTES
A FLY ASH STORAGE SILO WASH WATER A
1. ALL DEBRIS INSIDE OF PIPELINES SHOULD BE REMOVED BEFORE FINAL WELDING.
2. PIPING SYSTEMS SHALL BE CONSTRUCTED, INSPECTED OF AND TESTED IN ACCORDANCE WITH ASME B31.1, CHAPTER V & VI. FROM ZONE 2A AREA
3. VALVE HAND WHEEL ORIENTATION SHOULD BE CHECKED AND ADJUSTED WHEN OPERATION AND ACCESS OF IT IS NOT FEASIBLE.
DRAWING NUMBER SHEET NO. REV. NO.
J910-XJ00-P11GMR-131503 7OF7 A