LIFTING PLAN ( Critical Lifting) DATE: 12/05/2023

This form is designed to be used as a check list for lift calculations:


AREA / EQUIPMENT: PLTU Jawa 9 & 10 Zona 2A
MAX .WEIGHT ( Kg )
1 DESCRIPTION OF LOAD:
2,270
PIPE RACK 4A & 4B COLUMN INSTALLATION (Tailing)
TOP STRUCTURE OF PIPE RACK

2 TYPE OF CRANE TO BE USED:


STC250 Mobil Crane
LENGTH
Boom Length 45.1 M
LENGTH TYPE OFFSET
JIB: N/A
3 LIFTING GEAR :
a WEIGHT OF MAIN BLOCK: RATING # SHEAVES #LINE PRTS
500
b WEIGHT OF MAIN AUX BLOCK RATING HOOK #LINE PRTS

c WEIGHT AND DESCRIPTION OF SLINGS: QTY. - EA. Kg / m LENGTH


2 1.37 6 16
d WEIGHT AND DESCRIPTION OF SHACKLES: (all) QTY. - EA. TON-RAT'G WT. - EA.
- - -

e WEIGHT OF SPREADER BARS: (upper & lower) QTY. - EA. TON-RAT'G WT. - EA.
- - - 0
f WEIGHT OF MAIN LINE BELOW BOOM: # PARTS LGTH.- M. WT./ M
2 16 2.37 76
4 WEIGHT OF OTHER RIGGING / SCAFFOLDING 700
TOTAL WEIGTH 3,562
5 DINAMIC LOAD = Total Weigth x 1,25 4,453

6 CRANE CONDITION 100%


7 LIFTING CAPACITY ( 5,000 Kg x 100% ) = 5,000 Kg
8 WORKING RADIUS = 26 M

Lifting Capacity 5,000 Kg


9 Safety Factor =
Total Load 3,562 Kg

= 1.4

Total Load 3,562 Kg


10 Safety Factor From SWL = x 100%
Lifting Capacity 5,000 Kg

= 71% Accepted

Prepared by, Approved by,


PT HANS JAYA UTAMA PT. DOOSAN HII

Ilham Kelana
Date : 12/05/2023 Date :