Professional Documents
Culture Documents
Sheet 1 of 1
Doc. No. : 26071-203-V1A-MWB0-30005
ISOMETRIC DRAWING
FOR
WASTE WATER TREATMENT PLANT (UNIT 334)
Vendor to ensure, prior to as-built drawing that all drawings are all included, refer to e-mail
discussion "[RDMP-BPN] WWTP - ISOD and Spool Drawing".
04/01/2022
Boris Metheny
RE-ISSUED FOR
002 27 JAN 22 Y.H. LEE Y.H. ROH T.S KIM
CONSTRUCTION
RE-ISSUED FOR
001 12 NOV 21 Y.H. LEE Y.H. ROH T.S KIM
CONSTRUCTION
ISSUED FOR
000 31 AUG 21 Y.H. LEE Y.H. ROH T.S KIM
CONSTRUCTION
00A 26 MAY 21 ISSUED FOR APPROVAL Y.H. LEE Y.H. ROH T.S KIM
1 of 450
Doc. No. : 26071-203-V1A-MWB0-30005
REVISION LOG
2 of 450
Job Number 26071
1. ALL DIMENSIONS, ELEVATIONS AND COORDINATES ARE IN MM, UNLESS OTHERWISE NOTED
2. DIMENSIONS MAY BE SLIGHTLY DIFFERENT FROM ACTUAL DIMENSIONS BY 1 MM OR 2 MM DUE TO COMPUTER ROUND-OFF CALCULATION
3. ALL DIMENSIONS SHOWN ON THE ISO DRAWINGS FOR PIPES 1-1/2" AND BELOW MAY BE FIELD ADJUSTED.
4. FIELD RUN (1-1/2" AND SMALLER SIZE) THE TYPE AND LOCATION OF SUPPORTS FOR FIELD RUN PIPING SHALL BE CHANGED BY FIELD ADJUSTMENT.
5. HANDRAIL SHOULD BE MODIFIED AT SITE WHERE REQUIRED TO RESOLVE ANY CLASH WITH PIPING.
6. VALVE HANDLE ORIENTATION ARE SUBJECTED TO ADJUST IN FIELD BY CONTRACTOR TO MATCH ISOMETRIC DRAWING.
7. PIPE SUPPORT NUMBERING SYSTEM AND DETAIL DRAWINGS ARE SPECIFIED AT '26071-100-PH-P50-00001 STANDARD PIPE SUPPORT DRAWINGS'.
8. FOR WELDED SUPPORT ATTACHMENTS SUCH AS PADS, SHOES, STANCHIONS, DUMMY LEGS, TRUNNIONS, LUGS ETC., WELDING SHALL BE PERFORMED BEFORE PRESSURE TESTING/PHWT (IF AP
9. BOLT HOLES OF FLANGE SHALL BE STRADDLE TO CENTER LINE OF PIPE, UNLESS OTHERWISE NOTED.
H: HYDROSTATIC TEST
P: PNEUMATIC TEST
S: SERVICE TEST
V: VISUAL EXAMINATION
11. INSULATION STATUS OF FLANGE IS NOT INDICATED ON THE ISOMETRIC DRAWINGS AND SHALL BE APPLIED IN THE FIELD ACCORDING TO 26070-100-3SS-NN00-J0001 TABLE 8.1.1.
3 of 450
Job Number 26071
4 of 450
Job Number 26071
5 of 450
Job Number 26071
6 of 450
Job Number 26071
7 of 450
Job Number 26071
8 of 450
Job Number 26071
9 of 450
Job Number 26071
10 of 450
Job Number 26071
11 of 450
002
BILL OF MATERIALS
N
FIELD MATERIALS
21
1 1183 1 2 1247 1
5 SEE ISO
1
3 1302 1 4 252 1
334-IA-002 SHT 15
1"N 5 1909 1
PD AREA : V_KOLON_210401334
24 E 1531500
N 2763625
F3 EL +103617
2X1"NPD
12
47
2 2
1 24
87
6
FS-AS1
24 2
EL
+ 10
22
67
1
1
1190
SB3-A
GU-SG1
547
CONN TO
air manifold/PipingPort1
1"NPD
1"RFFE 150
E 1531200
N 2764275
EL +101050
F4 G5 B6
PROJECT
RDMP RU V BALIKPAPAN
CONTRACTOR
C) RDMP BALIKPAPAN JO
002 27 JAN 22 RE-ISSUED FOR CONSTRUCTION Y.H.LEE Y.H.ROH T.S.KIM OWNER
001 12 NOV 21 RE-ISSUED FOR CONSTRUCTION Y.H.LEE Y.H.ROH T.S.KIM
PT PERTAMINA
000 31 AUG 21 ISSUED FOR CONSTRUCTION Y.H.LEE Y.H.ROH T.S.KIM BALIKPAPAN, INDONESIA
00A 26 MAY 21 ISSUED FOR APPROVAL Y.H.LEE Y.H.ROH T.S.KIM CA NO.
002
ISOMETRIC ID : EXTRACTION DATE :
SUB SYSTEM NO : EXTRACTION NO : TOTAL SHEET :
002
BILL OF MATERIALS
N
FIELD MATERIALS
1
TE 9 GSKT, 304 SS WND FLEXIBLE 2 I21435692 1 1SA1S25 NI
2
E 1566500 GRAPHITE FILL 304 SS I/R CS
490
78
NUT AS A193 GR B7 W/A194 GR
2H B18.31.2/B18.2.2 MECH
2
GALV. B695 CL.50 W/2 WASHER,
95MM BOLT LENGTH
1410
6
6 15 BOLT/NUTS, STUD BOLT W/H HEX 1/2 I118657558 8 1SA1S25 NI
334 NUT AS A193 GR B8 CL.2
45 XV W/A194 GR 8
1
0 0065C B18.31.2/B18.2.2 W/2 WASHER,
23
06 334 75MM BOLT LENGTH
+1
4
EL 14 PG 127
(VG8SD002) GATE VA FEML RP, SS 3/4 I126590830 1 1SA1S25 NI
F7 0069A 13
STEM WEST F8 G10 B12 A182-F316/316L 316SS TRIM -
HF(CoCr) CL800 SWE x FTE RP
SLD WDG BB OS&Y-RS API-602
45 7 F8 G10 B12
1 B16.11 HW
61 INSTRUMENTS
SEE ISO
334-IA-284 SHT 2
INSTRUMENT 3/4 334-PG-0069A 1 1SA1S25 NI
161
5 100
E 1566300 17 INSTRUMENT 3/4 334-XV-0065C 1 1SA1S25 NI
48
2
N 2846285 8
FT-B3AD
EL +104730
5
CUT PIPE LENGTH
4
3 LENGTH NPD REMARKS LENGTH NPD REMARKS
2X3/4"NPD
2X1"NPD NO (MM) (IN) NO (MM) (IN)
21 11
7 5 1 60 2 2 490 2
3 2845 2 4 1410 2
5 100 1 6 72 1
7 559 2
45
17
0
EL
+1
04
73
0
45
PROJECT
RDMP RU V BALIKPAPAN
CONTRACTOR
C) RDMP BALIKPAPAN JO
OWNER
002 27 JAN 22 RE-ISSUED FOR CONSTRUCTION Y.H.LEE Y.H.ROH T.S.KIM
PT PERTAMINA
001 12 NOV 21 RE-ISSUED FOR CONSTRUCTION Y.H.LEE Y.H.ROH T.S.KIM BALIKPAPAN, INDONESIA
000 31 AUG 21 ISSUED FOR CONSTRUCTION Y.H.LEE Y.H.ROH T.S.KIM CA NO.
002
ISOMETRIC ID : EXTRACTION DATE :
SUB SYSTEM NO : EXTRACTION NO : TOTAL SHEET :
002
BILL OF MATERIALS
N
FIELD MATERIALS
6
SIZE MATERIAL MAT'L
DESCRIPTION (IN) CODE QTY CLASS TYPE
1
HOT DIP GALV.
8 GSKT, 304 SS WND FLEXIBLE 2 I21435692 6 1SA1S25 NI
4
GRAPHITE FILL 304 SS I/R CS
1260
5
45 O/R RF B16.20 CL150 4.5MM
6 THK (3.2MM RING) SPR WND
9 BOLT/NUTS, STUD BOLT W/H HEX 5/8 I111781926 8 1SA1S25 NI
NUT AS A193 GR B7 W/A194 GR
45 45 2H B18.31.2/B18.2.2 MECH
F7 G8 B10
GALV. B695 CL.50 W/2 WASHER,
2
1 105MM BOLT LENGTH
G8 B9 BOLT/NUTS, STUD BOLT W/H HEX 5/8 I111781993 8 1SA1S25 NI
11 NUT AS A193 GR B7 W/A194 GR
STEM UP 2H B18.31.2/B18.2.2 MECH
11 GALV. B695 CL.50 W/2 WASHER,
6
45 95MM BOLT LENGTH
0 6 (VG1CB101) GATE VA FLGD, CS 2 I115754488 1 1SA1S25 NI
5 45 45
A216-WCB 13CR TRIM -
TAIL W
F7 G8 HF(CoCr) CL150 RF FP FLEX
Open EL
+1 WDG BB OS&Y-RS API-600 B16.5
178 033 HW
80
6
INSTRUMENTS
1 GU-AG2
2 0 1 4 INSTRUMENT 2 334-XV-0066 1 1SA1S25 NI
23
45
SEE ISO
334-IA-288 SHT 1
AREA : V_KOLON_210401334 CUT PIPE LENGTH
FT-B3AD E 1566300
1
5 N 2846661 LENGTH NPD REMARKS LENGTH NPD REMARKS
6 EL +104778
FL-A2AA 20 NO (MM) (IN) NO (MM) (IN)
9
45 11 1 378 2 2 110 2
4
3 510 2 4 1260 2
4 5 2320 2 6 260 2
3
2"N 2X1/2"NPD
PD
260
3
1
G8 B9
SEE ISO F7 G8 B10 G8
6
334-IA-002 SHT 19
AREA : V_KOLON_210401334 18
2
E 1564690 SEE ISO
N 2847225 334-IA-284 SHT 1
EL +103075 E 1566300
N 2846285
2X2"NPD EL +104730
5
TAIL W
334 Open
178
XV
0066 7
PROJECT
RDMP RU V BALIKPAPAN
CONTRACTOR
C) RDMP BALIKPAPAN JO
OWNER
002 27 JAN 22 RE-ISSUED FOR CONSTRUCTION Y.H.LEE Y.H.ROH T.S.KIM
PT PERTAMINA
001 12 NOV 21 RE-ISSUED FOR CONSTRUCTION Y.H.LEE Y.H.ROH T.S.KIM BALIKPAPAN, INDONESIA
000 31 AUG 21 ISSUED FOR CONSTRUCTION Y.H.LEE Y.H.ROH T.S.KIM CA NO.
002
ISOMETRIC ID : EXTRACTION DATE :
SUB SYSTEM NO : EXTRACTION NO : TOTAL SHEET :