You are on page 1of 5

PENGADAAN BARANG / JASA

RELOKASI PEMBANGKIT KE HALMAHERA TIMUR

PANEL ATS JAKABARING FENIHALTIM

0 14/02/23 FOR APPROVAL YNR ZFK JHD


REV. DATE DESCRIPTION PREP. CHECK APPROVAL

OWNER :

PT. PEMBANGKITAN JAWA BALI

OWNER’S DWG NO. :

CONSULTANT :

CONTRACTOR :

PROJECT :
PENGADAAN BARANG / JASA RELOKASI PEMBANGKIT KE HALMAHERA TIMUR

TITLE :
PANEL ATS JAKABARING FENIHALTIM
DATE SIGNATURE SCALE SHEET OF
DRAWN 13-02-2023 -
NONE 1 OF 5
JOB NO. 22420
DOC NO. 22420-00-E-25-CM-000 REV 0
INT. REV. 0A
SHEET 2 OF 2

JOB NO. : 22420 REV


PANEL ATS JAKABARING FENIHALTIM 00
.
DOC. NO. :
22420-00-E-25-CM-000 0

DATE BY CHKD APVD


14-02-2023 YNR ZFK JHD

REVISION HISTORICAL SHEET

Rev No Date Description

0 14/02/2023 ISSUE FOR APPROVAL

PT. PEMBANGKITAN JAWA BALI SERVICES


Please confirm to PJBS that
there will be no link between
ATS Jk1, 2 and 3 and not to
be monitored in PC.
When synchro back from
DEG to UAT, both breaker
will be momentary parallel
to avoid power
interruption. Voltage
sensing from ATS panel
shall be sent to DEG for
sync purpose. Please
coordinated with PJBS.
Notes : Equipment RTU akan digunakan untuk future pembangkit