LAPORAN SITE SURVEY PONDASI

ENGINE PLTG SAMBERA 2 X 20 MW


Samarinda, 21 Januari 2023
By Engineering

1
The information contained in this document is strictly confidential. It is strictly forbidden to use,
disclose, copy, modify, or distribute this document without permission of PT REKADAYA ELEKTRIKA
INFORMASI UMUM

MAS TEGAR DAN MAS


ARIEL TOLONG DI CEK
LAGI ISI INFORMASINYA :
• LOKASI : SAMARINDA – KALIMANTAN TIMUR
• PEMILIK ASET : PT PLN INDONESIA POWER
• KAPASITAS : 2 X 20 MW
• FUEL : DUAL FUEL (HSD B0 & LNG)
TERAKHIR MENGGUNAKAN HSD B0 TAHUN 2018
• STATUS PLTG : STANDBY OPERASI
• FIRE FIGHTING MENGGUNAKAN C02 MELALUI GAS & HEAT DETECTOR
• POWER UNTUK START UP DARI SISTEM 20 KV
• PEMAKAIAN SENDIRI DI SUPPLY DARI AUXALARY TRANSFORMER DENGAN
KAPASITAS 1 MVA UNTUK 2 ENGINE
• DEMIN WATER HANYA UNTUK WASHING COMPRESSOR ( TIDAK MENAMBAH
KEBUTUHAN DEMIN WATER PADA PROYEK RELOKASI PLTG JAKABARING)
2
The information contained in this document is strictly confidential. It is strictly forbidden to use,
disclose, copy, modify, or distribute this document without permission of PT REKADAYA ELEKTRIKA
GENERAL LAYOUT PLTG SAMBERA 2 X 20 MW

Rencana Engine PLTG Sambera (Unit #1) yang


Direlokasi Ke Halmahera Timur

3
The information contained in this document is strictly confidential. It is strictly forbidden to use,
disclose, copy, modify, or distribute this document without permission of PT REKADAYA ELEKTRIKA
PONDASI ENGINE EX PLTG JAKABARING (UNIT 1)

Drawing Layout Foundation Engine Ex Jakabaring Unit 1 Foundation Engine Ex Jakabaring Unit 1

Foundation GT Engine Ex Jakabaring Unit 1 telah selesai konstruksi


100% sesuai dengan drawing approved

4
The information contained in this document is strictly confidential. It is strictly forbidden to use,
disclose, copy, modify, or distribute this document without permission of PT REKADAYA ELEKTRIKA
PONDASI ENGINE PLTG SAMBERA (UNIT 1)

Drawing Layout Foundation Engine Sambera Unit 1 Foundation Engine Sambera Unit 1

5
The information contained in this document is strictly confidential. It is strictly forbidden to use,
disclose, copy, modify, or distribute this document without permission of PT REKADAYA ELEKTRIKA
HASIL SURVEY PONDASI ENGINE PLTG SAMBERA (UNIT 1)

Plot Hasil Pengukuran Lapangan Foundation Engine Plot Hasil Pengukuran Lapangan Foundation Engine
Sambera Unit 1 Sambera Unit 1 terhadap Drawing Approved Engine Ex
Jakabaring

Keterangan :

Foundation Engine PLTG Sambera

Foundation Engine PLTG Jakabaring

Sole Plate Engine PLTG Sambera Unit 1


masih berada didalam area Foundation
Engine Ex Jakabaring  AMAN

The information contained in this document is strictly confidential. It is strictly forbidden to use,
disclose, copy, modify, or distribute this document without permission of PT REKADAYA ELEKTRIKA
KESIMPULAN

• Civil :Engine PLTG Sambera Unit 1 & support engine (sole plate) dapat ditempatkan diatas pondasi Ex Jakabaring di Halmahera Timur
• Electrical : xxxxxxx mas ariel
• Mechanical : xxxxxxx mas tegar

The information contained in this document is strictly confidential. It is strictly forbidden to use,
disclose, copy, modify, or distribute this document without permission of PT REKADAYA ELEKTRIKA
DOKUMENTASI SURVEY PLTG SAMBERA 2 X 20 MW

8
The information contained in this document is strictly confidential. It is strictly forbidden to use,
disclose, copy, modify, or distribute this document without permission of PT REKADAYA ELEKTRIKA
Thank You!
Terima Kasih

The information contained in this document is strictly confidential. It is strictly forbidden to use,
disclose, copy, modify, or distribute this document without permission of PT REKADAYA ELEKTRIKA
LAMPIRAN DRAWING APPROVED EX JAKABARING

10
The information contained in this document is strictly confidential. It is strictly forbidden to use,
disclose, copy, modify, or distribute this document without permission of PT REKADAYA ELEKTRIKA
LAMPIRAN AS BUILD DRAWING ENGINE SAMBERA UNIT 1

11
The information contained in this document is strictly confidential. It is strictly forbidden to use,