POSITION : Piping SP3D/PDMS Designer

NAME : Deni Cahyono

DATE OF BIRTH : December 21th, 1979

RELIGION : Moslem

STATUS : Married

NATIONALITY : Indonesian

ADDRESS : Jl.Pangkalan Jati 1 No.99 Rt.003,Rw.002


Kalia 1 No.99 Blok C 3B Cinere–Depok 16513

CONTACT PERSON : 0815 995 7820

EDUCATION : Machine of Senior Technical High School

Qualification Summary : Deni has career spans of more than 21 years in Engineering Design
for Oil & Gas Industry, Petrochemical Plant, Onshore and Offshore Projects. He has worked
with many high-profile Local and International contractors to execute several EPC Projects.
More than 15 years as a Piping Designer and more than 6 years as a Piping Draftsman. The
main responsibility are to prepare Piping route study, Pipe Support selection and location,
Isometric drawing and production, He is familiar using PDMS (Plant Design Management
System), MDS( Multi Discipline Support), PDS (Plant Design System), Autocad, Microstation
and SmartPlant 3D (SP3D), Perform line checking for line pipe installation , Check condition
line configuration between isometric drawing with actual installation, Make punch list and
distribute to our superior , Construction team, and also supervisor area.

 In House Training Microstation in TRIPATRA Engineering


 In House Training PDS in Rekayasa Engineering
 In House Training Isoplan in Rekayasa Industri
 In House Training English Language in Rekayasa Engineering
 In House Training Piping Design in Rekayasa Engineering
 In House Training PDMS in KBR ( Kellogg Brown & Root , Inc.)

Deni cahyono (Piping Design) 1


Confidential - Page 1 of 7
DENI CAHYONO
Jl. Pangkalan Jati I No.99 Cinere – Depok
Kalia 1 Blok C 3B Rt.003 Rw.002
Mobile : +62815 995 7820
. Email: ined.2008@gmail.com

WORK EXPERIENCES :

 June 2019 – Present : PT Rekayasa Engineering, Jakarta


Piping Designer
RDMP RU-V Balik Papan Project.
PT. Pertamina , Indonesia.
Responsibilities :
 To preparing :
 Design as per P&ID
 3D Modeling of pipe routing elements as per
the projects Basis of Design.
 3D Modeling of pipe supports as per the
project pipe support standard
 Prepare drawing loading data
 Isometric Production completed with Pipe
Support as per Stress Calculation
 Check To Do List.

 Sept’ 2018 – March2019 : PT. TRIPATRA ENG. & CONSTRUCTORS


Piping Designer
Tangguh Expansion Project (TRAIN 3 ).
BP Berau Ltd.
The Tangguh Expansion Project consists of offshore and onshore developments. The new
offshore facilities comprise two (2) wellhead platforms with interconnecting subsea pipelines to
the onshore facility. The new onshore facilities comprise one (1) additional natural gas
liquefaction train of a similar design and capacity to the existing trains, an onshore receiving
facility (ORF), a new LNG and condensate loading jetty(s), additional boil off gas (BOG)
recovery facilities, utilities, flares and the infrastructure to support three (3) train operation at
the SITE.
 To preparing :
 Designing and Modeling pipe route as per P&ID,
 Isometric Production completed with Pipe
Support as per Stress Calculation
 Check To Do List.

 August’ 2017 – August’ 2018 : PT. IKPT , Jakarta


Piping Line Checker
Synthetic Rubber Indonesia (SRI) U3 Project .
Synthetic Rubber Indonesia (company) Cilegon
 To preparing :
 Perform line checking for line pipe installation ,
Check condition line configuration between
isometric drawing with actual installation, Make

Deni cahyono (Piping Design) 2


Confidential - Page 2 of 7
DENI CAHYONO
Jl. Pangkalan Jati I No.99 Cinere – Depok
Kalia 1 Blok C 3B Rt.003 Rw.002
Mobile : +62815 995 7820
. Email: ined.2008@gmail.com

punch list and distribute to our superior ,


Construction team, and also supervisor area.
 Comment at Punch list if any material no
completed ,and killing punch list

 July 2016 – July 2017 : PT. IKPT , Jakarta


Piping Designer
PETRONAS RAPID Project .
Pengerang, Malaysia, PETRONAS (company)
 To preparing :
 As Piping Designer, with SmartPlant 3D (SP3D)
Involve in the Pipe routing, modeling.
 Update model as per stress sketch.
 Check To Do List.
 Extract isometric drawing.
 2D GA (General Arrangement Drawing) by
Autocad
 Special Support by Autocad

 November 2015 – June 2016 : PT. RekindWorleyParsons (ECM) , Jakarta


Piping Designer
DED Petapahan Waterflood Facilities Project.
CGS (Centra Gathering Station) Duri Area 3 HO Pitless
Operation and Improvement Project.
PT. Chevron Pacific Indonesia
 To Prepare :
 Piping Plan Drawings by Auto cad
 Isometric Drawings by Auto cad
 Section & Detail Drawings by Auto cad

 April 2014 – October 2015 : PT KBR (Kellogg Brown Root), Jakarta


Piping Designer
Shah Deniz Project – Shah Deniz is 100 km southeast of
Baku in the Caspian Sea, in Azerbaijan’s - BP client.
Description Project : Shah Deniz is a giant high pressure / medium temperature gas-condensate field in the
Caspian Sea, approximately 100km to the south of Baku in water depths ranging from 50m to 550m. The field is
approx 21km long and 10km wide. Shah Deniz Stage 1 (SD1) entered the operate Stage with first gas achieved
during 4Q of 2006. SD1, via the Shah Deniz Alpha (SDA) platform, provides production from the Shah Deniz
reservoir via dry trees. Production is routed via a 26” diameter gas export pipeline and 12” diameter condensate
pipeline to the SD1 onshore terminal located at the Sangachal Terminal (ST).
The second stage of the development, Shah Deniz Stage 2 (SD2) will have a planned plateau gas production
capacity of 16 bcma, equivalent to a peak daily sales gas capacity of 1,777 mmscfd ex the SD2 onshore terminal at
Sangachal. Including fuel requirements, this results in a SD2 onshore terminal gas processing capacity of 1,800

Deni cahyono (Piping Design) 3


Confidential - Page 3 of 7
DENI CAHYONO
Jl. Pangkalan Jati I No.99 Cinere – Depok
Kalia 1 Blok C 3B Rt.003 Rw.002
Mobile : +62815 995 7820
. Email: ined.2008@gmail.com

mmscfd (Million Standard Cubic Feet per Day). The associated peak stabilised condensate production will be
approximately 105,000 bpd.

 To preparing :
 Pipe support and Cable Rack support modeling
and detail with PDMS-Multi Discipline Support
 Frame and ancillary selection
 Shoe and Trunnion calculation
 Update model as per stress sketch

 April 2013 – March 2014 : PT. JGC Indonesia , Jakarta


Piping Designer
FLNG FEED - ABADI LNG Project.
INPEX Masela, LTD (company)
 To preparing :
 As Piping Designer, with SmartMarine 3D
(SM3D) . Involve in the Pipe routing, equipment
modeling.
 Drafting for Equipment Layout Drawing and
Section Drawing.
 Standard Pipe Support Drawing

 March 2012 – Jan 2013 : PT KBR (Kellogg Brown Root), Jakarta


Piping Designer
Quad 204 Project – Nort Sea , British Territory.
 To preparing :
 Pipe support details with PDMS- MDS (Multi
Discipline Support) Check for load on Shoe,
trunnion, and Frame as per stress isometric sketch
 General judgement type of support (visual stress
for non critical line).

 August’ 2010 – February 2012 : PT KBR (Kellogg Brown Root), Jakarta


Piping Designer ( July 2012 – Nov 2012 )
Gorgon Project Barrow Island LNG Plant-Australia
 To preparing :
 Update model as per stress isometric sketch.
 Pipe Support details with PDMS-Multi Discipline
Support.

Piping Designer ( August 2007 – July 2010 )
G & I Olympic Dam Project – Australia
RGP5 Project – Australia
Deni cahyono (Piping Design) 4
Confidential - Page 4 of 7
DENI CAHYONO
Jl. Pangkalan Jati I No.99 Cinere – Depok
Kalia 1 Blok C 3B Rt.003 Rw.002
Mobile : +62815 995 7820
. Email: ined.2008@gmail.com

 To preparing :
 Piping routing System from P&ID use PDS and
Microstation V8
 Equipment Layout update/revision & making
Piping Information and extract lay out , isometric
drawing manager 2D from PDS .

 October 2006 – July 2007 : PT Rekayasa Engineering, Jakarta


Piping Designer
Wayang Windu Unit 2 Geothermal Power Project
PT Magma Nusantara Limited, Bandung, West Java
 To preparing :
 Routing piping system from P&ID
 Check Isometric drawing as per P&ID

 April – Sept’ 2006 : PT Rekayasa Engineering, Jakarta


Sr. Piping Drafter
Lahendong II Goethermal Power Plant Project
PT PLN, North Sulawesi
 To preparing :
 Drafting for Overall Layout Drawing
 Redraw Piping Layout Drawing (include New Pipe
Routing & Existing)

 Dec.. 2005 – March’ 2006 : PT Rekayasa Engineering, Jakarta


Sr. Piping Drafter
MFO Supply System Project
PT Styrindo Mono Indonesia, Merak, Banten
 To preparing :
 Redraw Piping Layout Drawing (include New Pipe
Routing & Existing)
 Isometric Drawing
 Material take off

 Juni – Nov. 2005 : PT Rekayasa Engineering, Jakarta


Sr. Piping Drafter
Paper Mill-2 Project
PT Bukit Muria Jaya, Karawang, West Java

Deni cahyono (Piping Design) 5


Confidential - Page 5 of 7
DENI CAHYONO
Jl. Pangkalan Jati I No.99 Cinere – Depok
Kalia 1 Blok C 3B Rt.003 Rw.002
Mobile : +62815 995 7820
. Email: ined.2008@gmail.com

 To preparing :
 Piping Layout and Section Drawing
 Pipe Support Standard and Special Drawing

 Jan.2004 – Mei 2005 : PT Rekayasa Engineering, Jakarta


Sr. Piping Drafter
Gas Musi Barat (Sumbangsel) Project
PT Pertamina Pagar Dewa, Sumatra Selatan
 To preparing :
 Piping Layout and Section Drawing Using
Microstation.
 Pipe Support Standard and Special Drawing
 Pipeline Drawing by Autocad

 2004 Sep ‘ - Dec 2004 : PT Rekayasa Engineering, Jakarta


Piping Drafter
Vico Project Service
Vico , Kalimantan
 April 2003 – August 2004 : PT Rekayasa Engineering, Jakarta
Piping Drafter
Balongan Blue Sky Project
Pertamina UP-VI Indramayu, West Java
 To Prepare :
 Piping Lay-Out Drawing
 Isometric Drawing for Tie-in using Isoplan
 Special and Standard Pipe Support Drawing
 Material take off

 January 2000 – March 2003 : PT Tripatra Engineering & Constractor


Piping Drafter
Pase B Field Development Project
Exxon Mobile Aceh, Indonesia
 To Prepare :
 P&ID Drawing using Auto CAD
 Isometric Drawing using Auto CAD
 Section & Detail Drawing by Auto cad
 Special and Standard Pipe Support Drawing

Deni cahyono (Piping Design) 6


Confidential - Page 6 of 7
DENI CAHYONO
Jl. Pangkalan Jati I No.99 Cinere – Depok
Kalia 1 Blok C 3B Rt.003 Rw.002
Mobile : +62815 995 7820
. Email: ined.2008@gmail.com

Duri Steamflood Project Area 11


PT. Caltex Pacifik Indonesia .
 To Prepare :
 P&ID Drawing using Auto CAD
 Piping Plan Drawings by Microstation
 Isometric by Microstation
 Section & Detail Drawing by Microstation

Deni cahyono (Piping Design) 7