Professional Documents
Culture Documents
S/O MURUGARAJ S,
5/189 YOGEESWARAR COLONY,
SANKARAPERI (P.O), TUTICORIN – 2.
MAIL. ID: mudayasankar93@gmail.com
CONTACT NO. 9750443352
D.O.B : 30 MAY 1993
PASSPORT NO. L6879324
CAREER OBJECTIVE To associate myself with a team to promote my skills, knowledge and
decision-making ability along with the development of an esteem
organisation
WORK EXPERIENCE
RESPONSIBILITY:
Job order, work order and purchase order are prepared for the
Production Department.
Cutting plans are prepared for the materials in Auto CAD - 2010.
Material fabrications are followed up from initial to the final stage of
dispatch.
Finally preparation of dispatch documents for the job along with the
Quality Department.
RESPONSIBILITY:
Preparation of Manual MTO (P&ID components) with the help of
approved P&IDs, PMS (Piping Material Specification), Construction
standards and instrumentation hook-up drawings.
Non P&ID components are periodically checked with help of software’s
such as “NAVI’S WORK” and SPR (Smart Plant Reviewer).
Layout and the DCN changes are manually updated in MTO periodically.
MTO components (P&ID and non P&ID) are analysed by comparing with
the help of PDMS and SP-3D models.
Isometric checking are done with the P&ID and ensure the following
criteria
1. ISO checking is performed as per ISO check list.
2. WBS and line break ups are checked as per the revised P&ID.
3. It is necessary to ensure that SP items and instrumentation
components are not be reported in BOM
3. Currently working as DESIGN ENGINEER in M/s STAFFORD CONTROLS PVT.LTD.,
Chennai
RESPONSIBILITY:
Preparation of GA drawing (General Assembly) for the butterfly valves as
per standards (ANSI, API, BS )
Preparation of work order and Bill of Material for the approved drawings
COURSE SUMMARY
1. PIPING
Conceptual preparation of P&ID from process flow diagram and piping
material specification.
Preparation of piping layout from the process P&ID and General Assembly
Drawing.
Drafting of isometrics from the piping layout.
Calculation of pipe wall thickness by using internal design pressure.
Basics knowledge in ASME and ASTM standards.
SOFTWARE SKILLS
MS OFFICE
AUTO CAD
PDMS (Plant Design Management System)
SPR (Smart Plant Reviewer)
PROJECT DETAILS
Mini Project : Design of gear arrangement to produce indexing and rotation at time
Description : Design of gear arrangement which obtain 60 degree forward motion
and 120 degree reverse motion. That is both rotating and indexing
motions at a time.
CO-CURRICULAR PROFILE
I hereby declare that the information furnished above is true to the best of my
knowledge