You are on page 1of 13

CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED

FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
DISCREPANCIES : Civil Works
1. GENERAL DETAILS
1 CPN-03 Civil CPN-03_Civil CP N-01
Drawings 28- Works Vol_1- _01_ALT03_2
Aug-2020 4_ALIGNMENT 0201014
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
2. VIADUCT GENERAL DETAILS / STANDARD DRAWINGS (VIA00)
27 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-VIA00-ST-0062 20.1Add.Notes 7 Refer to Drainage Dreawwing Uten
Drawings 28- Works Vol_2- 03_03_ST_VIA 20.2 Web Thickness 300 to 300 (500)
28 Aug-2020 4_BR_VIA 00 -[TYP. CP Uten
29 N01- MCRP-DWG-VIA00-ST-0063 20.1Add.Notes 7 Refer to Drainage Dreaw Uten
30 03]_20201014 MCRP-DWG-VIA00-ST-0203 20.1Revised.Notes 5 A Temporary prestress system Uten
shall povide a minimum compressive stress of 0.21
mPa and average stress of 0.28 mPa across the joint
until the epoxy has cured.
31 MCRP-DWG-VIA00-ST-0301 Pilecap for pier type P1:20.1 Add. Type 13 R9, Type Uten
25 R9
32 MCRP-DWG-VIA00-ST-0303 Pilecap for for pier type: Delete Table 3, Table 5, Uten
Revised Table 4
33 MCRP-DWG-VIA00-ST-0321 20.1 Specify bar size ; P01 N20 Uten

1/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
20.2 Change bar size from P01 N16 to P01 N20
20.3 Add. Table 3 – Pile rienforcement for Type P23
20.4 Revised Notes 1 Concrete exposure
classification: B2 to : Moderate
20.5 Table 1 Pile rienforcement for Type P1:Add.
Type 23 R9
20.6 Table 2 Pile rienforcement for Type P2 : Add.
Type 19 r9
34 MCRP-DWG-VIA00-ST-0322 20.1 Specify bar size ; P01 N20 Uten
20.2 Table 1 Pile rienforcement for Type P1:Add.
Type 11 R9
20.6 Table 2 Pile rienforcement for Type P1 : Add.
Type 13 r9
35 MCRP-DWG-VIA00-ST-0323 (New drawing No.) 1500 Dia. Pile details P3 Piers Uten
36 MCRP-DWG-VIA00-ST-0324 (New drawing No.) 1500 Dia. Pile details P5 Piers Uten
37 MCRP-DWG-VIA00-ST-0341 20.2 Revised Notes 1 Concrete exposure Uten
classification: B2 to : Moderate
20.3 Add. Table 2 and Specify rienforcement detail
20.4 Add. Pilecap type A and A1
20.5 Add. Pilecap type 5B
38 MCRP-DWG-VIA00-ST-0342 20.1 Table 1 6 Pile Pilecap rienforcement Uten
Delete 9 Pile Pilecap detail
39 MCRP-DWG-VIA00-ST-0343 Change 12 Pile Pilecap detail to9 Pile Pilecap detail Uten
20.1 Table 2 9 Pile Pilecap rienforcement

40 MCRP-DWG-VIA00-ST-0344 Change 3&8 Pile Pilecap detail to12 Pile Pilecap detail Uten
41 MCRP-DWG-VIA00-ST-0345 (New drawing No.) 3 Pile Pile cap detail Uten
42 MCRP-DWG-VIA00-ST-0400 20.1 Add. Pier type 7 &12 Uten
20.2 Add. Pier type 23
20.3 Add. Pier type 13
20.4 Add. Pier type 5E
43 MCRP-DWG-VIA00-ST-0400 Table 1-Pier type P1 Dimensions Uten
20.1 Add. Type 13 r9, Type 23 r9, Type 25 r9
44 MCRP-DWG-VIA00-ST-0421 20.1-20.4 Add. Table 1: Pier dimensions and details Uten
45 MCRP-DWG-VIA00-ST-0422 20.1 Change From Bearing arangment Type 12& 13 Uten
to Bearing arangment Type1-8
46 MCRP-DWG-VIA00-ST-0423 20.1 Change by deleted Bearing arangment Type Uten
12,15&17
Revised Table 1- Pier type3 Bearing arangment
dimension.
47 MCRP-DWG-VIA00-ST-0424 (New drawing No.) Pier type 23 concrete details Uten
48 MCRP-DWG-VIA00-ST-0447 20.1 Change Bearing arrangement for portal pier- Uten
Type 1-6 and Add. Bearing setout dimension-P5D
49 MCRP-DWG-VIA00-ST-0448 Change from Bearing arangment for portal pier-Type Uten
9,10,16. Table 1 Bearing arangment type 1

2/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
dimensions. Table 2 Bearing arangment type 2
dimensions. Table 3 Bearing arangment type 3
dimensions Table 11 Bearing arangment type 3
dimension: to Table 1 Bearing setout dimension-P5D
50 MCRP-DWG-VIA00-ST-0449 Cancelled Uten
51 MCRP-DWG-VIA00-ST-0460 (New drawing No.) Pier type P13 Concrete details Uten
52 MCRP-DWG-VIA00-ST-0471 20.1Revsed table 1: Bearing setout dimension-P5D Uten
20.2 Add. More detail
53 MCRP-DWG-VIA00-ST-0472 (New drawing No.) Pier type P5E Concrete details Uten
54 MCRP-DWG-VIA00-ST-0472 Table 1 Pier type 6 dimension 20.1 Add. Pile cap Uten
dimension
55 MCRP-DWG-VIA00-ST-0502 20.1 Add. More detail for inspection platform Uten
56 MCRP-DWG-VIA00-ST-0503 (New drawing No.) Inspection platform details sheet Uten
2
57 MCRP-DWG-VIA00-ST-0504 (New drawing No.) Inspection platform details sheet Uten
3
58 MCRP-DWG-VIA00-ST-0505 (New drawing No.) Inspection platform details sheet Uten
4
59 MCRP-DWG-VIA00-ST-0505 (New drawing No.) Inspection platform details sheet Uten
5
60 MCRP-DWG-VIA00-ST-0510 (New drawing No.) Pier type P12 concrete details Uten
sheet 1
61 MCRP-DWG-VIA00-ST-0601 20.1 Change lap splicing to coupler and specify more Uten
detail of reinforcement.
62 MCRP-DWG-VIA00-ST-0603 Table 1: Vertical reinforcement-bar sizes Uten
20.1Add. P1-type 11 R9
20.2 Add. P1-type 13, P1-type 13r9
63 MCRP-DWG-VIA00-ST-0621 Specify more detail of reinforcement. Uten
64 MCRP-DWG-VIA00-ST-0622 Improved reinforcement details for pier type 3 Uten
65 MCRP-DWG-VIA00-ST-0623 Improved reinforcement details for specific P3- type Uten
2
66 MCRP-DWG-VIA00-ST-0624 Improved reinforcement details for specific P3- type Uten
3
67 MCRP-DWG-VIA00-ST-0625 (New drawing No.) Pier type P3 reinforcement Uten
details sheet 5
68 MCRP-DWG-VIA00-ST-0626 (New drawing No.) Pier type P3 reinforcement Uten
details sheet 6
69 MCRP-DWG-VIA00-ST-0627 (New drawing No.) Pier type P3 reinforcement Uten
details sheet 7
70 MCRP-DWG-VIA00-ST-0628 (New drawing No.) Pier type P3 reinforcement Uten
details sheet 8
71 MCRP-DWG-VIA00-ST-0646 Specify more reinforcement details of pier type P5D Uten
72 MCRP-DWG-VIA00-ST-0647 (New drawing No.) Pier type P5D reinforcement Uten
details sheet 3
73 MCRP-DWG-VIA00-ST-0648 (New drawing No.) Pier type P5D reinforcement Uten
3/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
details sheet 4
74 MCRP-DWG-VIA00-ST-0649 (New drawing No.) Pier type P5D reinforcement Uten
details sheet 5
75 MCRP-DWG-VIA00-ST-0660 (New drawing No.) Pier type P13 reinforcement Uten
details sheet 1
76 MCRP-DWG-VIA00-ST-0660 (New drawing No.) Pier type P13 reinforcement Uten
details sheet 1
77 MCRP-DWG-VIA00-ST-0661 (New drawing No.) Pier type P13 reinforcement Uten
details sheet 2
78 MCRP-DWG-VIA00-ST-0662 (New drawing No.) Pier type P13 reinforcement Uten
details sheet 3
79 MCRP-DWG-VIA00-ST-0663 (New drawing No.) Pier type P13 reinforcement Uten
details sheet 4
80 MCRP-DWG-VIA00-ST-0671 Specify more detail of reinforcement Uten
81 MCRP-DWG-VIA00-ST-0680 (New drawing No.) Pier type P12 reinforcement Uten
details sheet 1
82 MCRP-DWG-VIA00-ST-0681 (New drawing No.) Pier type P12 reinforcement Uten
details sheet 2
83 MCRP-DWG-VIA00-ST-0690 (New drawing No.) Pier type P23 reinforcement Uten
details sheet 1
84 MCRP-DWG-VIA00-ST-0691 (New drawing No.) Pier type P23 reinforcement Uten
details sheet 2
85 MCRP-DWG-VIA00-ST-0692 (New drawing No.) Pier type P23 reinforcement Uten
details sheet 3
86 MCRP-DWG-VIA00-ST-0781 Specify more detail of bearing type 1 Uten
87 MCRP-DWG-VIA00-ST-0802 Precast segmental construction typical details: Uten
Revised shear key spacing
88 MCRP-DWG-VIA00-ST-0804 Precast segmental construction typical details: Uten
Cancelled typical shear key details-type B
89 MCRP-DWG-VIA00-ST-0821 Precast segmental construction 10.3 wide box: Uten
Revised segment layout.
90 MCRP-DWG-VIA00-ST-0901 Precast segmental construction type A1 segment Uten
concrete: Revised web thickness.
3. GENERAL ARRANGEMENT DRAWINGS (VIA03)
91 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-VIA03-ST-0001 Drawing Deleted of Abutment Detail sheet 1,2 BK
Drawings 28- Works Vol_2- 03_02_ST_VIA referred to MCRP-DWG-VIA03-ST-0161 and 0162. Pls
Aug-2020 4_BR_VIA 03_20201014 confirm P-1142 in detail and change.
92 MCRP-DWG-VIA03-ST-0012 Pls clarify of disappear detail of viaducts BK
93 MCRP-DWG-VIA03-ST-0018 to Pls clarify of disappear detail of river training for BK
0021 construction
94 MCRP-DWG-VIA03-ST-0027 Note for change pier type P-966 to 969 and piling BK
depth.All rights reserves to Variation Cost.
95 MCRP-DWG-VIA03-ST-0028 Note for change pier type P-975 to 978 and piling BK
depth.All rights reserves to Variation Cost.

4/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
96 MCRP-DWG-VIA03-ST-0029 Note for change pier type P-981 to 985 and piling BK
depth.All rights reserves to Variation Cost.
97 MCRP-DWG-VIA03-ST-0030 Note for change pier type P-989 to 990 and piling BK
depth.All rights reserves to Variation Cost.
98 MCRP-DWG-VIA03-ST-0033 Note for change pier type P-1020 to 1021 and piling BK
depth.All rights reserves to Variation Cost.
99 MCRP-DWG-VIA03-ST-0034 Note for change pier type P-1020 to 1021 and piling BK
depth.All rights reserves to Variation Cost.
100 MCRP-DWG-VIA03-ST-0041 Note for change pier type P-1092 to 1093 and piling BK
depth.All rights reserves to Variation Cost.
101 MCRP-DWG-VIA03-ST-0042 Note for change pier type P-1101 to 1107 and piling BK
depth.All rights reserves to Variation Cost.
102 MCRP-DWG-VIA03-ST-0043 Note for change pier type P-1109 to 1118 and piling BK
depth.All rights reserves to Variation Cost.
103 MCRP-DWG-VIA03-ST-0044 Note for change pier type P-1120 to 1121 and piling BK
depth.All rights reserves to Variation Cost.
104 MCRP-DWG-VIA03-ST-0045 Note for change pier type P-1130 to 1131 and piling BK
depth.All rights reserves to Variation Cost.
105 MCRP-DWG-VIA03-ST-0046 Note for additional stair at P-1142 and pls clarify for BK
detail of interface work CP-N03 and Cp-N04.
All rights reserves to Variation Cost.
106 MCRP-DWG-VIA03-ST-0083 Note for change number of pile foundation from 2 BK
and increase change to 3. All rights reserves to
Variation Cost.
107 MCRP-DWG-VIA03-ST-0093 Note for change number of pile foundation from 3 BK
and decrease change to 2. All rights reserves to
Variation Cost.
108 MCRP-DWG-VIA03-ST-0095 Note for change number of pile foundation from 2 BK
and increase change to 3. All rights reserves to
Variation Cost.
109 MCRP-DWG-VIA03-ST-0101 to Note addition of Column Pilecap Reinforcement BK
0111 Type. Change for information of Pier Schedule. All
rights reserves to Variation Cost.
110 MCRP-DWG-VIA03-ST-0150 Note for change pier type P-974 and P-977. BK
All rights reserves to Variation Cost.
111 MCRP-DWG-VIA03-ST-0151 Note for change pier type P-988. BK
All rights reserves to Variation Cost.
112 MCRP-DWG-VIA03-ST-0153 Note for change pier type P-1120. BK
All rights reserves to Variation Cost.
113 MCRP-DWG-VIA03-ST-0161 to Drawing Deleted of Abutment Detail sheet 1,2 Pls BK
0162 confirm P-1142 in detail and change.
114 MCRP-DWG-VIA03-ST-0216 Note for additional provide information bore hole BK
NBH-474 to 479 totally 6 nos. All rights reserves to
Variation Cost.

5/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
4. BC01 / BALANCED CANTILEVER BRIDGE (50m+70m+50m SPAN)

115 CPN-03 Civil CPN-03_Civil CP N-


Drawings 28- Works Vol_2- 03_04_ST_BC
Aug-2020 4_BR_VIA 01 -[TYP. CP
N01-
03]_20201014
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
5. BC02 / BALANCED CANTILEVER BRIDGE (60m+90m+60m SPAN)
148 CPN-03 Civil CPN-03_Civil CP N-
Drawings 28- Works Vol_2- 03_05_ST_BC
Aug-2020 4_BR_VIA 02 -[TYP. CP
N01-

6/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
03]_20201014
149
150
151
6. BC03 / BALANCED CANTILEVER BRIDGE (70m+90m+70m SPAN)
152 CPN-03 Civil CPN-03_Civil CP N-
Drawings 28- Works Vol_2- 03_06_ST_BC
Aug-2020 4_BR_VIA 03 -[TYP. CP
N01-
03]_20201014
153
154
155
156
157
158
159
160
161
162
163
164
165
166
7. CIS40 (2-CELL CAST-IN-SITU BOX GIRDERS - VERTICAL WEB)
167 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-CIS40-ST-0001 (New drawing No.) Natee
Drawings 28- Works Vol_2- 03_07_ST_CIS MCRP-DWG-CIS40-ST-0090 drainages details
Aug-2020 4_BR_VIA 40 -[TYP. CP MCRP-DWG-CIS40-ST-0100 camber details
168 N01- MCRP-DWG-CIS40-ST-0032 change bar bending shape No. B52 N12 Natee
169 03]_20201014 MCRP-DWG-CIS40-ST-0041 change standard of tendon from pr EN 10138 to Natee
ASTM A416/416M
170 MCRP-DWG-CIS40-ST-0042 change SECTION 2, dead end to stressing end Natee
171 MCRP-DWG-CIS40-ST-0043 change TYPICAL TENDON LAYOUT, dead end to Natee
stressing end
172 MCRP-DWG-CIS40-ST-0080 change ELEVATION of bearing from MIN.30@eadges Natee
to 66.5
8. CIS50 (3-CELL CAST-IN-SITU BOX GIRDERS - VERTICAL WEB)
173 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-CIS50-ST-0001 (New drawing No.) Natee
Drawings 28- Works Vol_2- 03_08_ST_CIS MCRP-DWG-CIS50-ST-0090 drainages details
Aug-2020 4_BR_VIA 50 -[TYP. CP MCRP-DWG-CIS50-ST-0100 camber details
N01-
174 03]_20201014 MCRP-DWG-CIS50-ST-0032 change bar bending shape No. B52 N12 Natee
175 MCRP-DWG-CIS50-ST-0041 change standard of tendon from pr EN 10138 to Natee

7/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
ASTM A416/416M
176 MCRP-DWG-CIS50-ST-0043 change TYPICAL TENDON LAYOUT, dead end to Natee
stressing end
177 MCRP-DWG-CIS50-ST-0080 change ELEVATION of bearing from MIN.30@eadges Natee
to 66.5
9. CIS60 - 55-56m SINGLE CELL CAST IN SITU BOX GIRDERS
178 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-CIS60-ST-0001 (New drawing No.) Natee
Drawings 28- Works Vol_2- 03_09_ST_CIS MCRP-DWG-CIS60-ST-0090 drainages details
Aug-2020 4_BR_VIA 60 -[TYP. CP MCRP-DWG-CIS60-ST-0100 camber details
N01-
03]_20201014
179 MCRP-DWG-CIS60-ST-0031 change dimension & number of rebar Natee
180 MCRP-DWG-CIS60-ST-0033 change dimension & number of rebar Natee
181 MCRP-DWG-CIS60-ST-0034 change shape, dimension & number of rebar Natee
182 MCRP-DWG-CIS60-ST-0041 change standard of tendon from pr EN 10138 to Natee
ASTM A416/416M
183 MCRP-DWG-CIS60-ST-0042 change TYPICAL TENDON LAYOUT, dead end to Natee
stressing end
10. CIS70 MAINTENANCE RAMPS (SINGLE CELL CAST-IN-SITU BOX GIRDERS - VERTICAL WEB)
184 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-CIS70-ST-0001 (New drawing No.) Natee
Drawings 28- Works Vol_2- 03_10_ST_CIS MCRP-DWG-CIS70-ST-0100 maintenance ramp
Aug-2020 4_BR_VIA 70 -[TYP. CP bridges (CIS70) abutment concrete details sheet 1
N01- MCRP-DWG-CIS70-ST-0130 maintenance ramp
03]_20201014 bridges (CIS70) drainage details
MCRP-DWG-CIS70-ST-0140 maintenance ramp
bridges (CIS70) camber details
185 MCRP-DWG-CIS70-ST-0002 change slope of approach ramp structure from 3% to Natee
3.5%
change number of piles MT01-ABUT & MT01-1 from
4 piles to 6 piles
186 MCRP-DWG-CIS70-ST-0003 change number of piles MT01-2, MT01-3 & MT01-4 Natee
from 4 piles to 6 piles
187 MCRP-DWG-CIS70-ST-0004 change length of maintenance ramp bridge from Natee
47502 to 31744
188 MCRP-DWG-CIS70-ST-0005 change number of piles MT03-1&MT03-2 from 24 Natee
piles to 21 piles
remodel substation (SS19)
189 MCRP-DWG-CIS70-ST-0033 change dimension & number of rebar Natee
190 MCRP-DWG-CIS70-ST-0034 change shape, dimension & number of rebar Natee
191 MCRP-DWG-CIS70-ST-0041 change standard of tendon from pr EN 10138 to Natee
ASTM A416/416M
192 MCRP-DWG-CIS70-ST-0080 add new table 5 bearing schedule Natee
change ELEVATION of bearing from MIN.30@eadges
to 66.5
193 MCRP-DWG-CIS60-ST-0113 change dimension of rebar Natee

8/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
11. MAINTENANCE ROAD
194 CPN-03 Civil CPN-03_Civil CP N-
Drawings 28- Works Vol_3- 03_01_RD_VI
Aug-2020 4_ROADS A03_2020101
4
195
196
197
12. EXISTING ROAD REALIGNMENT AND WIDENING
198 CPN-03 Civil CPN-03_Civil CP N-
Drawings 28- Works Vol_3- 03_02_RD_VI
Aug-2020 4_ROADS A03_2020101
4
199
200
201
202
203
13. ANGELES STATION ROAD NETWORK
204 CPN-03 Civil CPN-03_Civil CP N-
Drawings 28- Works Vol_3- 03_03_CW_A
Aug-2020 4_ROADS NG_20201014
205
206
207
208
209
210
14. CLARK STATION ROAD NETWORK
211 CPN-03 Civil CPN-03_Civil CP N-
Drawings 28- Works Vol_3- 03_04_CW_CL
Aug-2020 4_ROADS A_20201014
212
213
214
215
216
217
218
219
15. DRAINAGE MAIN ALIGNMENT VIA00
220 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-VIA00-DR-0001 (New drawing No.) Natee
Drawings 28- Works Vol_4- 03_00_DR_VI MCRP-DWG-VIA00-DR-0304 drainages details
Aug-2020 4_DRAINAGE A00-[TYP. CP manhole connection type 1C, type2A and type 2B

9/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
N01- MCRP-DWG-VIA00-DR-
04]_20201014 0305,0351,0421,0422,0451,0452,0461,0463,0501,05
02
cancel drawing no. 0410,0411
221 MCRP-DWG-VIA00-DR-0305 change dimension and spacing rebar of manhole Natee
222 MCRP-DWG-VIA00-DR-0406 add a new geotextile fabric Natee
16. DRAINAGE MAIN ALIGNMENT VIA03
223 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-VIA03-DR-0001 (New drawing No.) Natee
Drawings 28- Works Vol_4- 03_01_DR_VI MCRP-DWG-VIA03-DR-3011,3012,3013
Aug-2020 4_DRAINAGE A03_2020101
4
224 MCRP-DWG-VIA03-DR-0005 add a new schedule of drainage crossing Natee
225 MCRP-DWG-VIA03-DR-0105 change dimension of at-grade drainage elements Natee
226 MCRP-DWG-VIA03-DR-0106 change dimension of at-grade drainage elements Natee
227 MCRP-DWG-VIA03-DR-0107 change dimension of at-grade drainage elements Natee
228 MCRP-DWG-VIA03-DR-0108 change dimension of at-grade drainage elements Natee
229 MCRP-DWG-VIA03-DR-0109 change dimension of at-grade drainage elements Natee
230 MCRP-DWG-VIA03-DR-0110 change dimension of at-grade drainage elements Natee
231 MCRP-DWG-VIA03-DR-0111 change dimension of at-grade drainage elements Natee
232 MCRP-DWG-VIA03-DR-0112 change dimension of at-grade drainage elements Natee
233 MCRP-DWG-VIA03-DR-0113 change dimension of at-grade drainage elements Natee
234 MCRP-DWG-VIA03-DR-0114 change dimension of at-grade drainage elements Natee
235 MCRP-DWG-VIA03-DR-0115 change dimension of at-grade drainage elements Natee
236 MCRP-DWG-VIA03-DR-0116 change dimension of at-grade drainage elements Natee
237 MCRP-DWG-VIA03-DR-0117 change dimension of at-grade drainage elements Natee
238 MCRP-DWG-VIA03-DR-0118 change dimension of at-grade drainage elements Natee
239 MCRP-DWG-VIA03-DR-0119 change dimension of at-grade drainage elements Natee
240 MCRP-DWG-VIA03-DR-0120 change dimension of at-grade drainage elements Natee
241 MCRP-DWG-VIA03-DR-0121 change dimension of at-grade drainage elements Natee
242 MCRP-DWG-VIA03-DR-0122 change dimension of at-grade drainage elements Natee
243 MCRP-DWG-VIA03-DR-0123 change dimension of at-grade drainage elements Natee
244 MCRP-DWG-VIA03-DR-0124 change dimension of at-grade drainage elements Natee
245 MCRP-DWG-VIA03-DR-0125 change dimension of at-grade drainage elements Natee
246 MCRP-DWG-VIA03-DR-0126 change dimension of at-grade drainage elements Natee
247 MCRP-DWG-VIA03-DR-0127 change dimension of at-grade drainage elements Natee
248 MCRP-DWG-VIA03-DR-0128 change dimension of at-grade drainage elements Natee
249 MCRP-DWG-VIA03-DR-0129 change dimension of at-grade drainage elements Natee
250 MCRP-DWG-VIA03-DR-0130 change dimension of at-grade drainage elements Natee
251 MCRP-DWG-VIA03-DR-0131 change dimension of at-grade drainage elements Natee
252 MCRP-DWG-VIA03-DR-0132 change dimension of at-grade drainage elements Natee
253 MCRP-DWG-VIA03-DR-0133 change dimension of at-grade drainage elements Natee
254 MCRP-DWG-VIA03-DR-0134 change dimension of at-grade drainage elements Natee
255 MCRP-DWG-VIA03-DR-0135 change dimension of at-grade drainage elements Natee
256 MCRP-DWG-VIA03-DR-0136 change dimension of at-grade drainage elements Natee

10/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
257 MCRP-DWG-VIA03-DR-0137 change dimension of at-grade drainage elements Natee
258 MCRP-DWG-VIA03-DR-0138 change dimension of at-grade drainage elements Natee
259 MCRP-DWG-VIA03-DR-0139 change dimension of at-grade drainage elements Natee
260 MCRP-DWG-VIA03-DR-0140 change dimension of at-grade drainage elements Natee
17. DRAINAGE MAIN ALIGNMENT VIA03 (SAPANG BALEN)
261 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-VIA03-RIV-4001 (New drawing No.) Natee
Drawings 28- Works Vol_4- 03_02_RIV_VI MCRP-DWG-VIA03-RIV-4006 SAPANG BALEN RIVER
Aug-2020 4_DRAINAGE A03_2020101 TYPICAL CROSSECTION DETAIL 2
4
262 MCRP-DWG-VIA03-RIV-4001 at details of concrete slope protection, add a new Natee
line of 12 mm@0.15m OC.BM.
18. ANGELES STATION ROAD NETWORK
263 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-ANG-DR-2001 cancel drawing no. 2012,2013,2014 Natee
Drawings 28- Works Vol_4- 03_03_DR_AN add new drawing no.
Aug-2020 4_DRAINAGE G_20201014 2021,2031,2041,2042,2043,2044,2051
264 MCRP-DWG-ANG-DR-2004- change dimension of at-grade drainage elements and Natee
2005 add new that elements
19. CLARK STATION ROAD NETWORK
265 CPN-03 Civil CPN-03_Civil CP N- MCRP-DWG-CLA-DR-2001 cancel drawing no. 2012,2013,2014 Natee
Drawings 28- Works Vol_4- 03_04_DR_CL add new drawing no.
Aug-2020 4_DRAINAGE A_20201014 2021,2031,2041,2042,2043,2044,2051
266 MCRP-DWG-CLA-DR-2004 change structure type and dimension of at-grade Natee
drainage elements
DISCREPANCIES : Architecture Works
1. GENERAL STATION
267 CPN-03 Arch CPN-03_Arch PDF CP N-
Drawings 28- 1-4_ARCH 03_00_AR_ST
Aug-2020 A_20201014
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
2. ANGELES STATION

11/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
283 CPN-03 Arch CPN-03_Arch PDF CP N-
Drawings 28- 1-4_ARCH 03_01_AR_AN
Aug-2020 G_20201014
284
285
286
287
288
289
290
291
292
293
3. CLARK STATION
294 CPN-03 Arch CPN-03_Arch PDF CP N-
Drawings 28- 1-4_ARCH 03_02_AR_CL
Aug-2020 A_20201014
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
4. SUBSTATION
313 CPN-03 Arch CPN-03_Arch PDF CP N-
Drawings 28- 1-4_ARCH 03_03_AR_PS
Aug-2020 S_20201014
314
315
316
317
318

12/12
CONTRACT FINALIZATION CLARIFICATIONS RESPONSE LOG ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED
FOR TEXT DOCUMENTS [HELD IN ELECTRONIC FOLDERS] NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT (NSCR-EX)
Batch 2 - [Date DD-MM-YYYY] PACKAGE: CP N-03
Remar Clarification
Reference Question Enquirer Date
Query k Request
No. Primary Folder Sub-folder No. Sub-folder
Drawing No.
No. / File No. /File Name
319
320
321
322
323
324
325
5. BATTERY POST
326 CPN-03 Arch CPN-03_Arch PDF CP N-
Drawings 28- 1-4_ARCH 03_04_AR_BP
Aug-2020 _20201014
327
328
329
330
331
332
333
334
335

13/12

You might also like