OF POWER INTAKE
CALCULATION NOTE FOR TEMPORARY SLAB FORM FOR POWER INTAKE
2. Calculation
2.1 Maximum Pressure on Slab Form Will Be Appied form Pouring Concrete
135 = 6*(1,500*1.00) * a2
100*22 *100 10
a = 6,000
= 77 cm.
M = W L2
10
2
= 1,500*(0.50) * L
1
100 10
From Fb = M
S
Section Property of 100x100x2.30 mm.
1 = 2 L2 = 46,200*10*100
1,500*0.50
L = 248 Cm.
L = 1 * WL 4
360 128 EI
= 237 Cm.
Use beam for frame support as spacing not more than 237 cm.
Use 121.9 cm. (Equalize the width of manufactured scaffolding)
M = W L2
10
= 1,500*1.219 *1.2192
10
272 Kg-m
S = M
Fb
= 272*100
1,650
3 3
= 16.47 cm < 28.00 cm
= 1 * (18.29)*(121.9)4
128 (2.0 106))*140
(2 0*10 140.00
00
= 0.113 Cm.
Allowable = L
360
= 121.9
360
= 0.339 > 0.189 Ok.
4.3 Check Shear Stress
V = 5 WL
8
= 5 *(1,600)*1.219*1.219
8
= 1,393 Kg.
v = V
bwd
= 1,393
(2*0.23)*10
= 302.845 Ksc < 0.4 Fy = 0.40*2,500 =1,000 Ksc Ok.
350
300
DB 28
v = 1,780 Kg.
V = 1780/(pi()*(2.50/2)^2)
362.62 Ksc < 0.40*(4,000) =1,600 Ok
DRAWINGS
MANUFACTURED SCAFFOLDING INFORMATION