INSPECTION FORM
Doe. No
Form Horizontal Lifeline
Date 06-Jan-2022
Rev. No 09
Horizontal Lifeline (for construction processes)
Tiang lifeline terpasang dalam kondisi baik dan tidak beng!
Dynabolts on lifeline must fully installed
Dynabolt pada tiang lifeline terpasang pent
Th turnbuckle installed and working pi
| Turnbuckle terpasang dan dapat ber
‘Anchor point are available on each lifel
Titik. angkur ‘tersedia pada setiap tiang |
bend of the wire slings, Itis
| Pada setiap tekukan wire sling wajib t
Wire clips/clamps must be install
(min. 3 pes) “a
Wire clip/clamp horus terpasang ¢
(min. 3 pcs) 4
Inspect
Project Name: Nestle Batik and Spark Project Rotating Day/Date:
On Me (6-0) tot
1
6 Le
al Uo
3
Ending Point
No. ITEMS CHECK YES. NO REMARKS
1 | Wire Sings have been inspected and the wite slings in good condition |
Wire sling telah dilokukan pemeriksaan dan dalam kondisi yang baik
2, | The lifeline post installed in good condition and there are not bent |__/ |