You are on page 1of 1

GS Engineering & Construction Corp.

Permit To Work Permit No :


GS-AMBSD-SF-IR-13-001

Work Activity: Hot Work


A. Application (By Contractors/subcontractors Nominated Person)
Requesting Request By: Date:
Company:

Plant Area: Description of Work: (attach drawing/sketch as necessary)

Time Date Time Date


Permit is required from
To
(1 Week :)

B. Precautions to be taken prior to commencement and during the work (by Nominated or Competent Person)
A risk assessment and/or a method statement shall be attached to the Permit to Work request.
Yes No Other Control Measures
Fire extinguishers
Fire Blanket
Earthing against static electricity
Smoking I naked light prohibi.ted
Danger area demarcated
Fire watchmen
Rubbish or any flammable substances
Compressed gas storage
Leaking from any hoses
Adequate ventilation and lighting shall be maintained
at all times
Others
C. Prepared (to be completed by Subcontractor’s Nominated person)
I certify that have read and understood this permit and that the work will be earned out In accordance with its requirements.
Signed Date

D. GS E&C – Health Safety Environment Manager


Permission is given for the work to proceed subject to the conditions specified above:
Signed Date

E. GS E&C - Construction Manager


Signed Date

F. GS E&C – Project Manager


Signed Date

You might also like