Risk / Impact Assessment Control Sheet: GRP Pipe Installation Work at Nad Al Shiba
Risk / Impact Assessment Control Sheet: GRP Pipe Installation Work at Nad Al Shiba
CONTROL SHEET
Severity (S)
1-3 Acceptable Low – L Minor / <3 Days Injury Minor 2 2 4 6 8 10
4-9 Before task commences Medium - M Moderate / >3 Days Injury Moderate 3 3 6 9 12 15
Major / Permanent Disability
10-16 Before task commences High - H Injury Major 4 4 8 12 16 20
20-25 Immediate Very High - VH Catastrophic / Fatality Catastrophic 5 5 10 15 20 25
Working group Designation May Very
Unlikely Likely Certain or Imminent
Happen Likely
Fill in & enclosed herewith WI HSE 07 and 45
Note: *Mandatory
Document Name: Risk / Impact Assessment Control Sheet – GRP Pipe Installation Work at Nad Al Shiba Page 1 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
٭Scope / Activity: GRP Pipe Installation Work at Nad Al Shiba Risk Assessment Date 24/10/2022
Severity
Control Measures Residual Risk Monitored By
of Risk
No. Hazard /Aspect Risk / Impact People at Risk
H&S H&S
H&S Environmental
LOW
HIGH
and staff System in place for Site Supervisor/Site
01 Engineering Services a fixed position for work surfaces angles etc. Ability
associated with disposal of Rep
prolonged periods of to take breaks as needed to
this work contaminated earth.
time alleviate stress
HIGH
LOW
signed as 2. Team work if it looks like two or Site Supervisor/Site
02 Site Preparation barriers, barricades during this project. This
material even three workers would do the Rep
and posting safety training should include
handlers job more effectively and safe
signage lifting with the legs while
than one, then that is probably
keeping the back
true.
straight and keeping the
load as close the body
as possible
All personnel to be fully briefed
on task & Risk Assessment, TBT
Unfamiliar with site
Damage to the Workers (tool box tool) should be
LOW
situation, roles & re –
HIGH
Site Supervisor/Site
03 property, Injury to conducting prior to start the task
possibilities, process Rep
work personnel. & must cover emergency
steps involved in the task
preparedness. IMS induction to
be given to all staff
Formation of dust shall be
Exposure to dust
MEDIUM
LOW
casing possible Site Supervisor/Site
04 Dust exposure frequently. eating, drinking shall
respiratory diseases Rep
not be done work area, proper
.irritation eyes
PPE shall be used
Document Name: Risk / Impact Assessment Control Sheet – GRP Pipe Installation Work at Nad Al Shiba Page 2 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
MEDIUM
Use mechanical aid for handling
LOW
Site Supervisor/Site
05 Manual Handling Personal Injury Workers materials Tool Box Talk use of
Rep
appropriate PPE
HIGH
LOW
Heat stress for site Site Supervisor/Site
Work on hot environment worker, dehydration, Workers be air conditioned.
06 Rep
tired and weakness Drink plenty of cold water.
Appropriate PPE protect body
against direct sun light.
MEDIUM
Site Supervisor/Site
LOW
Improper barricading and Property Workers supervision in the work area All activities should be Rep
07 closure of area during damage/serious injury .HSE assistant shall be present in carried out in the day
works the work area ,the area should be time busy hours to
properly cordon off and closed reduce noise.
No person shall be
required to enter any
confined spaces unless
positive steps have
Inspection and tests as below been taken. Gas test at
Fatality. Severe injury needs to be conducted and
Hazardous gasses atmosphere shall be
to body. Explosion, certified.
MEDIUM
explosions and done before and during
suffocation, fatality, Workers
VERY
HIGH
Document Name: Risk / Impact Assessment Control Sheet – GRP Pipe Installation Work at Nad Al Shiba Page 3 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
Correct measures
Suffocation. Burns to Nobody is allowed to enter until should have done. Gas
MEDIUM
Hazardous environment, body- fatality, coma Workers the testing is over
VERY
HIGH
test at atmosphere shall Site Supervisor/Site
09 lack of oxygen less than and death be done before and Rep
19.5% and above 23.5%
Measures and checks have been during progress of work
done. by trained gas tester.
MEDIUM
Harmful gasses (H2S, Explosion, suffocation, Workers
VERY
HIGH
fatality, severe injury Ventilation Fans to be positioned certified for toxic Site Supervisor/Site
10 CO) reducing oxygen
to body from flames, such that they are effective. allowable limits, Rep
level.
coma, death flammable atmosphere
Supervisor to check if ventilation is or oxygen level in the
up to standard air.
MEDIUM
Oxygen readings to be taken on
VERY
work by trained gas
HIGH
a continuous basis. Site Supervisor/Site
11 Changing conditions. Suffocation Workers tester ensure that gases Rep
all allowable limit O2
Foreman to monitor. level, Toxic gas level,
LEL ,monitor 8hrs once
every day.
MEDIUM
area in time. Other Fatality. Workers available and used.
VERY
HIGH
Document Name: Risk / Impact Assessment Control Sheet – GRP Pipe Installation Work at Nad Al Shiba Page 4 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
A breathing apparatus
and oxygen resuscitator
Not using correct Users to be trained/instructed as should be made
MEDIUM
personal protective Fatality. Workers to use of equipment.
VERY
available as standby.
HIGH
Site Supervisor/Site
13 equipment Rep
Foreman to comply with use
page instructions.
HIGH
of completeness
LOW
Not receiving first aid Foreman to instruct and check if Site Supervisor/Site
14 Fatality. Workers procedures.
treatment immediately. a procedure is complied with. Rep
MEDIUM
Knowing the amount confined space should always be considered when all
VERY
HIGH
known. reasonably practicable Site Supervisor/Site
15 workers in the confined Fatality. Workers
steps have been taken Rep
space at all times.
Supply first aider with register to deal with.
makes sure it is used.
MEDIUM
barricading of work area. persons to be allowed
VERY
HIGH
Document Name: Risk / Impact Assessment Control Sheet – GRP Pipe Installation Work at Nad Al Shiba Page 5 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
HIGH
LOW
Not having fire Fatality. Increases Workers useable and pressures Site Supervisor/Site
17
extinguishers available. injury to people. are correct. Expired Rep
Foreman to check if all is in date need to be check.
order.
HIGH
LOW
Occupational disease, Workers chemicals as per MS & TDS ,
18 GRP lamination and Site Supervisor/Site
repair work serious personal injury First aid measures shall be taken Rep
,chemical spillage as per MSDS, follow up proper
PPE and Tools kit .
LOW
19 (3 METER) Workers follow appropriate criteria for
working at heights before shall be moved to
start of work. replace it
Scaffolds must be able to
support up to four times the
load it is likely to bear without
being overturned
Each scaffold must have a
guardrail
Above 1.8 meter height, Full body
harness shall be used
Document Name: Risk / Impact Assessment Control Sheet – GRP Pipe Installation Work at Nad Al Shiba Page 6 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
MEDIUM
LOW
Access & Egress using if require before use and fix Site Supervisor/Site
20 Slip, trip, Fall in water Workers
ladder properly inside the tank and Rep
make sure that ladder is reaching
the top portion of the
Ground.
Entry person to wear
appropriate PPE’s.
MEDIUM
LOW
accessories, saw cutter, Injury/sharp edge Workers good working condition needs to Rep
21 generator, hammer, etc. be check prior to application.
electrical cable and accessories
should be without damage and
plugging way should be proper,
Document Name: Risk / Impact Assessment Control Sheet – GRP Pipe Installation Work at Nad Al Shiba Page 7 of 7