Professional Documents
Culture Documents
Boring Naai 2
Boring Naai 2
Nama Project : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA KECAMATAN TUGALA OYO
Lokasi : DESA HAREFA, KECAMATAN TUGALA OYO, PROVINSI SUMATERA UTARA
0
Date : 19 Desember 2022
Drawing by : INDRA GINTING
BOR - 01
BOR - 02
Catatan :
DINAS PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT KABUPATEN
GEOLOGIC DRILLING LOG
NIAS UTARA PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA KECAMATAN TUGALA OYO
LOCATION
KOORDINAT
:
:
DESA HAREFA, KCAMATAN TUGALA OYO, PROVINSI SUMATERA UTARA
X: 329350 / Y: 124553 BORING MACHINE : TOHO
BORE HOLE
NUMBER 01
START : 15 Desember 2022 DRILLING METHODE : DRYING Company Name
16 Desember 2022
FINISH : DRILL MASTER : INDRA GINTING
CV. DANRU SEJAHTERA
TOTAL DEPTH : 35.00 METER LOGGED BY : INDRA GINTING CV. ARYA TECHNO CONSULTANT
FINAL GWL : 4.60 METER CHECKED BY : PATUH SEMBIRING, ST
CONSULTANT
N / 15 cm
N / 15 cm
N / 15 cm
ROCK/SOIL (M)
SOIL SAMPLE
SOIL TYPE
NO.OF BLOW
TICKNESS OF
DEPTH (M)
DEPTH (M)
G.W.L (m)
GRAPH
DATE
CM
N - VOLUE
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
"01 "01
"02 "02
Lempung, Coklat Kekuningan, Plastis Sedang, 1 1 1 2
"04 "04
1 1 1 2
5.00 5.00
"05 "05
UDS
"06 "06
1 1 2 3
"07 "07
15 Desember 2022
Sore : 3.10 Meter
"08 "08
1 1 2 3
"09 "09
"10 "10
1 1 2 3
"11 "11
UDS
"12 "12
2 1 2 3
"13 "13
"14 "14
1 2 2 4
"15 "15
Lempung, Abu - abu Gelap, Plastis Sedang,
"16 Kekakuan Lunak, Kadar Air Sedang "16
2 3 3 6
"17 "17
UDS
"18 "18
1 3 2 5
"19 "19
"20 "20
2 3 4 7
"21 "21
Pagi : 2.00 Meter / Sore : 4.60 Meter
"22 "22
3 3 4 7
16 Desember 2022
"23 "23
"24 "24
3 4 5 9
"25 "25
21.00 26.00
"26 "26
11 14 21 35
"27 "27
"30 "30
20 32 29/7cm 60
Legend :
LOCATION
KOORDINAT
:
:
DESA HAREFA, KCAMATAN TUGALA OYO, PROVINSI SUMATERA UTARA
X: 329350 / Y: 124553 BORING MACHINE : TOHO
BORE HOLE
NUMBER 01
START : 15 Desember 2022 DRILLING METHODE : DRYING Company Name
FINISH : 16 Desember 2022 DRILL MASTER : INDRA GINTING CV. DANRU SEJAHTERA
TOTAL DEPTH : 35.00 METER LOGGED BY : INDRA GINTING CV. ARYA TECHNO CONSULTANT
FINAL GWL : 4.60 METER CHECKED BY : PATUH SEMBIRING, ST
CONSULTANT
End of Depth (M)
N / 15 cm
N / 15 cm
N / 15 cm
ROCK/SOIL (M)
SOIL SAMPLE
NO.OF BLOW
TICKNESS OF
SOIL TYPE
DEPTH (M)
DEPTH (M)
G.W.L (m)
GRAPH
DATE
CM
SOIL AND/OR ROCK DESCRIPTION N - VOLUE
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
60
"31 "31
"32 "32
Pasir Halus, Abu - abu Gelap, Tidak Berplastis, 27 41 20/5cm 60
"34 "34
25 32 30/10cm 60
9.00 35.00 .
"35 "35
"36
STOP BOR "36
0 0 0
"37 "37
"38 "38
0 0 0
"39 "39
"40 "40
0 0 0
"41 "41
"42 "42
0 0 0
"43 "43
"44 "44
0 0 0
"45 "45
"46 "46
0 0 0
"47 "47
"48 "48
0 0 0
"49 "49
"50 "50
0 0 0
"51 "51
"52 "52
0 0 0
"53 "53
"54 "54
0 0 0
"55 "55
"56 "56
0 0 0
"57 "57
"58 "58
0 0 0
"59 "59
"60 "60
0 0 0
Legend :
LOCATION
KOORDINAT
:
:
DESA HAREFA, KCAMATAN TUGALA OYO, PROVINSI SUMATERA UTARA
X: 329332 / Y: 124511 BORING MACHINE : TOHO
BORE HOLE
NUMBER 02
START : 18 Desember 2022 DRILLING METHODE : DRYING Company Name
19 Desember 2022
FINISH : DRILL MASTER : INDRA GINTING
CV. DANRU SEJAHTERA
TOTAL DEPTH : 30,45 METER LOGGED BY : INDRA GINTING CV. ARYA TECHNO CONSULTANT
FINAL GWL : 6.10 METER CHECKED BY : PATUH SEMBIRING, ST
CONSULTANT
N / 15 cm
N / 15 cm
N / 15 cm
ROCK/SOIL (M)
SOIL SAMPLE
SOIL TYPE
NO.OF BLOW
TICKNESS OF
DEPTH (M)
DEPTH (M)
G.W.L (m)
GRAPH
DATE
CM
N - VOLUE
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
"01 "01
Lempung, Coklat Kekuningan, Plastis Sedang,
"02 Kekakuan Lunak, Kadar Air Sedang "02
2 1 1 2
3.00 3.00
"03 "03
"04 "04
1 1 1 2
"05 "05
"06 "06
1 1 2 3
"07 "07
UDS
18 Desember 2022
Sore : 7.00 Meter
"08 "08
2 1 2 3
"09 "09
"10 "10
2 1 3 4
"11 "11
"13 "13
UDS
"14 "14
2 3 4 7
"15 "15
"16 "16
2 3 4 7
"17 "17
"18 "18
2 4 4 8
"19 "19
UDS
"20 "20
2 3 5 8
18.00 21.00
"21 "21
Pagi : 4.10 Meter / Sore : 6.10 Meter
"22 "22
17 21 26 47
19 Desember 2022
"23 "23
"24 "24
29 37 24/9cm 60
"25 "25
Pasir Halus, Abu - abu Gelap, Tidak
"26
Berplastis, Kepadatan Sangat Padat 31 48 13/3cm
"26
60
"27 "27
"28 "28
21 36 25/5cm 60
"29 "29
"30 "30
30.45 30.45 26 30 31/7cm 60
STOP BOR
Legend :
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
DEPTH ( m )
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
BH - 01 BH - 02
38.0
40.0
Grafik 4.1.1. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT
titik BH - 01.
Dia. 20 cm
Dia. 30 cm
4
Dia. 40 cm
6
Dia. 50 cm
8
10 Dia. 60 cm
12
14
16
18
Kedalaman (m)
20
22
24
26
28
30
32
34
36
38
40
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
Dia. 20 cm
Dia. 30 cm
Dia. 40 cm
Dia. 50 cm
Dia. 60 cm
10
12
14
16
Kedalaman (m)
18
20
22
24
26
28
30
32
34
36
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm
Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi
(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 2 2.00 1.00 3.14 0.25 1.10 7.07 0.38 2.43 12.57 0.50 4.29 19.63 0.63 6.67 28.27 0.75 9.58
4.00 2 2.00 3.00 3.27 0.75 1.24 7.35 1.13 2.68 13.07 1.51 4.66 20.42 1.88 7.18 29.41 2.26 10.25
6.00 3 2.33 5.00 3.35 1.47 1.41 7.54 2.20 2.95 13.40 2.93 5.05 20.94 3.67 7.71 30.16 4.40 10.93
8.00 3 2.50 7.00 3.59 2.20 1.64 8.08 3.30 3.35 14.36 4.40 5.67 22.44 5.50 8.58 32.31 6.60 12.09
10.00 3 2.60 9.00 4.56 2.94 2.11 10.25 4.41 4.30 18.22 5.88 7.25 28.47 7.35 10.96 41.00 8.82 15.43
12.00 3 2.67 11.00 5.34 3.69 2.52 12.02 5.53 5.11 21.36 7.37 8.60 33.38 9.22 12.97 48.07 11.06 18.23
14.00 4 2.86 13.00 5.97 4.67 2.92 13.43 7.00 5.88 23.88 9.34 9.83 37.31 11.67 14.77 53.72 14.00 20.71
16.00 6 3.25 15.00 6.91 6.13 3.53 15.55 9.19 7.02 27.65 12.25 11.67 43.20 15.32 17.46 62.20 18.38 24.41
18.00 5 3.44 17.00 11.94 7.36 5.45 26.86 11.04 11.16 47.75 14.72 18.86 74.61 18.40 28.55 107.44 22.07 40.23
20.00 7 3.80 19.00 20.89 9.07 8.78 47.01 13.61 18.39 83.57 18.15 31.48 130.57 22.68 48.06 188.02 27.22 68.12
22.00 7 4.09 21.00 29.69 10.80 12.06 66.80 16.19 25.50 118.75 21.59 43.90 185.55 26.99 67.25 267.19 32.39 95.54
24.00 9 4.50 23.00 38.17 13.01 15.32 85.88 19.51 32.53 152.68 26.01 56.10 238.56 32.52 86.02 343.53 39.02 122.31
26.00 35 6.85 25.00 46.81 21.51 19.90 105.32 32.26 41.56 187.24 43.02 71.02 292.56 53.77 108.27 421.29 64.52 153.33
28.00 60 10.64 27.00 52.24 36.11 24.64 117.54 54.17 50.01 208.96 72.22 84.10 326.50 90.28 126.89 470.16 108.33 178.39
30.00 60 13.93 29.00 59.48 50.78 29.98 133.83 76.16 59.84 237.92 101.55 99.62 371.76 126.94 149.31 535.33 152.33 208.91
32.00 60 16.81 31.00 69.12 65.49 36.14 155.51 98.24 71.48 276.46 130.99 118.35 431.97 163.74 176.74 622.04 196.48 246.64
34.00 60 19.35 33.00 75.40 80.25 41.18 169.65 120.38 80.63 301.59 160.51 132.63 471.24 200.64 197.21 678.58 240.76 274.35
Proyek : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA KECAMATAN TUGALA OYO
DDTSPT
Tabel - 4.1.3. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 02.
D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm
Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi
(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 2 2.00 1.00 3.14 0.25 1.10 7.07 0.38 2.43 12.57 0.50 4.29 19.63 0.63 6.67 28.27 0.75 9.58
4.00 2 2.00 3.00 3.52 0.75 1.32 7.92 1.13 2.87 14.07 1.51 4.99 21.99 1.88 7.71 31.67 2.26 11.01
6.00 3 2.33 5.00 3.77 1.47 1.55 8.48 2.20 3.27 15.08 2.93 5.61 23.56 3.67 8.59 33.93 4.40 12.19
8.00 3 2.50 7.00 4.49 2.20 1.94 10.10 3.30 4.03 17.95 4.40 6.86 28.05 5.50 10.45 40.39 6.60 14.78
10.00 4 2.80 9.00 5.97 3.17 2.62 13.43 4.75 5.43 23.88 6.33 9.23 37.31 7.92 14.02 53.72 9.50 19.81
12.00 4 3.00 11.00 6.91 4.15 3.13 15.55 6.22 6.43 27.65 8.29 10.87 43.20 10.37 16.47 62.20 12.44 23.22
14.00 7 3.57 13.00 13.82 5.83 5.77 31.10 8.75 12.12 55.29 11.67 20.76 86.39 14.59 31.72 124.41 17.50 44.97
16.00 7 4.00 15.00 22.78 7.54 9.10 51.25 11.31 19.34 91.11 15.08 33.38 142.35 18.85 51.22 204.99 22.62 72.85
18.00 8 4.44 17.00 31.57 9.49 12.42 71.04 14.24 26.53 126.29 18.99 45.90 197.33 23.74 70.52 284.16 28.48 100.42
20.00 8 4.80 19.00 40.37 11.46 15.75 90.83 17.19 33.72 161.48 22.92 58.41 252.31 28.65 89.83 363.33 34.38 127.98
22.00 47 8.64 21.00 48.69 22.79 20.79 109.56 34.19 43.36 194.78 45.58 74.04 304.34 56.98 112.84 438.25 68.37 159.76
24.00 60 12.92 23.00 54.39 37.33 25.60 122.39 56.00 52.00 217.58 74.67 87.46 339.97 93.33 131.99 489.55 112.00 185.58
26.00 60 16.54 25.00 61.78 51.96 30.99 139.02 77.94 61.93 247.14 103.91 103.16 386.15 129.89 154.70 556.06 155.87 216.53
28.00 60 19.64 27.00 72.13 66.65 37.37 162.29 99.97 74.09 288.52 133.29 122.83 450.82 166.62 183.60 649.18 199.94 256.38
30.00 60 22.33 29.00 75.40 81.39 41.41 169.65 122.08 80.97 301.59 162.78 133.09 471.24 203.47 197.77 678.58 244.16 275.03
Proyek : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA KECAMATAN TUGALA OYO
DDTSPT
DOCUMENTATIONS
PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA, KECAMATAN TUGALA OYO
LOCATION : DESA HAREFA, KECAMATAN TUGALA OYO
PROVINSI : SUMATERA UTARA
DOCUMENTATIONS
PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA, KECAMATAN TUGALA OYO