You are on page 1of 15

SKETSA SITUASI LOKASI

Nama Project : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA KECAMATAN TUGALA OYO
Lokasi : DESA HAREFA, KECAMATAN TUGALA OYO, PROVINSI SUMATERA UTARA
0
Date : 19 Desember 2022
Drawing by : INDRA GINTING

BOR - 01

BOR - 02

Catatan :
DINAS PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT KABUPATEN
GEOLOGIC DRILLING LOG
NIAS UTARA PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA KECAMATAN TUGALA OYO

LOCATION
KOORDINAT
:
:
DESA HAREFA, KCAMATAN TUGALA OYO, PROVINSI SUMATERA UTARA
X: 329350 / Y: 124553 BORING MACHINE : TOHO
BORE HOLE
NUMBER 01
START : 15 Desember 2022 DRILLING METHODE : DRYING Company Name
16 Desember 2022
FINISH : DRILL MASTER : INDRA GINTING
CV. DANRU SEJAHTERA
TOTAL DEPTH : 35.00 METER LOGGED BY : INDRA GINTING CV. ARYA TECHNO CONSULTANT
FINAL GWL : 4.60 METER CHECKED BY : PATUH SEMBIRING, ST
CONSULTANT

End of Depth (M)

N / 15 cm

N / 15 cm
N / 15 cm
ROCK/SOIL (M)

SOIL SAMPLE
SOIL TYPE

NO.OF BLOW
TICKNESS OF
DEPTH (M)

DEPTH (M)
G.W.L (m)

GRAPH
DATE

SOIL AND/OR ROCK DESCRIPTION

CM
N - VOLUE

N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0

"01 "01

"02 "02
Lempung, Coklat Kekuningan, Plastis Sedang, 1 1 1 2

"03 Kekakuan Lunak, Kadar Air Sedang "03

"04 "04
1 1 1 2
5.00 5.00
"05 "05
UDS

"06 "06
1 1 2 3

"07 "07
15 Desember 2022
Sore : 3.10 Meter

"08 "08
1 1 2 3

"09 "09

"10 "10
1 1 2 3

"11 "11
UDS

"12 "12
2 1 2 3

"13 "13

"14 "14
1 2 2 4

"15 "15
Lempung, Abu - abu Gelap, Plastis Sedang,
"16 Kekakuan Lunak, Kadar Air Sedang "16
2 3 3 6

"17 "17
UDS

"18 "18
1 3 2 5

"19 "19

"20 "20
2 3 4 7

"21 "21
Pagi : 2.00 Meter / Sore : 4.60 Meter

"22 "22
3 3 4 7
16 Desember 2022

"23 "23

"24 "24
3 4 5 9

"25 "25

21.00 26.00
"26 "26
11 14 21 35

"27 "27

"28 Pasir Halus, Abu - abu Gelap, Tidak Berplastis, "28


29 47 14/3cm 60
Kepadatan Sangat Padat, Kadar Air Rendah
"29 "29

"30 "30
20 32 29/7cm 60

Legend :

Silt Undisturbed Sample (UDS)

Clay Disturbed Sample (DS)

Sand SPT (Pengawas Pekerjaan) (Konsultan) (Kontraktor)


DINAS PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT KABUPATEN
GEOLOGIC DRILLING LOG
NIAS UTARA PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA KECAMATAN TUGALA OYO

LOCATION
KOORDINAT
:
:
DESA HAREFA, KCAMATAN TUGALA OYO, PROVINSI SUMATERA UTARA
X: 329350 / Y: 124553 BORING MACHINE : TOHO
BORE HOLE
NUMBER 01
START : 15 Desember 2022 DRILLING METHODE : DRYING Company Name
FINISH : 16 Desember 2022 DRILL MASTER : INDRA GINTING CV. DANRU SEJAHTERA
TOTAL DEPTH : 35.00 METER LOGGED BY : INDRA GINTING CV. ARYA TECHNO CONSULTANT
FINAL GWL : 4.60 METER CHECKED BY : PATUH SEMBIRING, ST
CONSULTANT
End of Depth (M)

N / 15 cm

N / 15 cm

N / 15 cm
ROCK/SOIL (M)

SOIL SAMPLE
NO.OF BLOW
TICKNESS OF

SOIL TYPE
DEPTH (M)

DEPTH (M)
G.W.L (m)

GRAPH
DATE

CM
SOIL AND/OR ROCK DESCRIPTION N - VOLUE

N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
60

"31 "31

"32 "32
Pasir Halus, Abu - abu Gelap, Tidak Berplastis, 27 41 20/5cm 60

"33 Kepadatan Sangat Padat, Kadar Air Rendah "33

"34 "34
25 32 30/10cm 60
9.00 35.00 .
"35 "35

"36
STOP BOR "36
0 0 0

"37 "37

"38 "38
0 0 0

"39 "39

"40 "40
0 0 0

"41 "41

"42 "42
0 0 0

"43 "43

"44 "44
0 0 0
"45 "45

"46 "46
0 0 0
"47 "47

"48 "48
0 0 0

"49 "49

"50 "50
0 0 0

"51 "51

"52 "52
0 0 0

"53 "53

"54 "54
0 0 0

"55 "55

"56 "56
0 0 0

"57 "57

"58 "58
0 0 0

"59 "59

"60 "60
0 0 0

Legend :

Silt Undisturbed Sample (UDS)

Clay Disturbed Sample (DS)

Sand SPT (Pengawas Pekerjaan) (Konsultan) (Kontraktor)


DINAS PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT KABUPATEN
GEOLOGIC DRILLING LOG
NIAS UTARA PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA KECAMATAN TUGALA OYO

LOCATION
KOORDINAT
:
:
DESA HAREFA, KCAMATAN TUGALA OYO, PROVINSI SUMATERA UTARA
X: 329332 / Y: 124511 BORING MACHINE : TOHO
BORE HOLE
NUMBER 02
START : 18 Desember 2022 DRILLING METHODE : DRYING Company Name
19 Desember 2022
FINISH : DRILL MASTER : INDRA GINTING
CV. DANRU SEJAHTERA
TOTAL DEPTH : 30,45 METER LOGGED BY : INDRA GINTING CV. ARYA TECHNO CONSULTANT
FINAL GWL : 6.10 METER CHECKED BY : PATUH SEMBIRING, ST
CONSULTANT

End of Depth (M)

N / 15 cm

N / 15 cm
N / 15 cm
ROCK/SOIL (M)

SOIL SAMPLE
SOIL TYPE

NO.OF BLOW
TICKNESS OF
DEPTH (M)

DEPTH (M)
G.W.L (m)

GRAPH
DATE

SOIL AND/OR ROCK DESCRIPTION

CM
N - VOLUE

N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0

"01 "01
Lempung, Coklat Kekuningan, Plastis Sedang,
"02 Kekakuan Lunak, Kadar Air Sedang "02
2 1 1 2
3.00 3.00
"03 "03

"04 "04
1 1 1 2

"05 "05

"06 "06
1 1 2 3

"07 "07
UDS
18 Desember 2022
Sore : 7.00 Meter

"08 "08
2 1 2 3

"09 "09

"10 "10
2 1 3 4

"11 "11

Lempung, Abu - abu Gelap, Plastis Sedang,


"12 "12
Kekakuan Lunak, Kadar Air Sedang 1 2 2 4

"13 "13
UDS

"14 "14
2 3 4 7

"15 "15

"16 "16
2 3 4 7

"17 "17

"18 "18
2 4 4 8

"19 "19
UDS

"20 "20
2 3 5 8
18.00 21.00
"21 "21
Pagi : 4.10 Meter / Sore : 6.10 Meter

"22 "22
17 21 26 47
19 Desember 2022

"23 "23

"24 "24
29 37 24/9cm 60

"25 "25
Pasir Halus, Abu - abu Gelap, Tidak
"26
Berplastis, Kepadatan Sangat Padat 31 48 13/3cm
"26
60

"27 "27

"28 "28
21 36 25/5cm 60

"29 "29

"30 "30
30.45 30.45 26 30 31/7cm 60
STOP BOR
Legend :

Silt Undisturbed Sample (UDS)

Clay Disturbed Sample (DS)

Sand SPT (Pengawas Pekerjaan) (Konsultan) (Kontraktor)


GENERALIZED SOIL PROFILE (SPT Value/blows)

Pukulan SPT (Value/Blows)

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00


0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0
DEPTH ( m )

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

BH - 01 BH - 02
38.0

40.0
Grafik 4.1.1. : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT
titik BH - 01.

Dia. 20 cm

Dia. 30 cm
4

Dia. 40 cm
6

Dia. 50 cm
8

10 Dia. 60 cm

12

14

16

18
Kedalaman (m)

20

22

24

26

28

30

32

34

36

38

40
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360

Daya Dukung Izin Pondasi Tiang Pancang ( ton)


Grafik 4.1.2 : Daya Dukung Izin Pondasi Tiang Pancang dari Data SPT
titik BH - 02
0

Dia. 20 cm

Dia. 30 cm

Dia. 40 cm

Dia. 50 cm

Dia. 60 cm

10

12

14

16
Kedalaman (m)

18

20

22

24

26

28

30

32

34

36
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360

Daya Dukung Izin Pondasi Tiang Pancang ( ton)


Tabel - 4.1.2. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 01.

D = 0.20 m 0.30 m 0.40 m 0.50 m 0.60 m

Ap = 0.031 m2 0.071 m2 0.126 m2 0.196 m2 0.283 m2

Ak = 0.628 m 0.942 m 1.257 m 1.571 m 1.885 m

D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm

Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi

(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 2 2.00 1.00 3.14 0.25 1.10 7.07 0.38 2.43 12.57 0.50 4.29 19.63 0.63 6.67 28.27 0.75 9.58

4.00 2 2.00 3.00 3.27 0.75 1.24 7.35 1.13 2.68 13.07 1.51 4.66 20.42 1.88 7.18 29.41 2.26 10.25

6.00 3 2.33 5.00 3.35 1.47 1.41 7.54 2.20 2.95 13.40 2.93 5.05 20.94 3.67 7.71 30.16 4.40 10.93

8.00 3 2.50 7.00 3.59 2.20 1.64 8.08 3.30 3.35 14.36 4.40 5.67 22.44 5.50 8.58 32.31 6.60 12.09

10.00 3 2.60 9.00 4.56 2.94 2.11 10.25 4.41 4.30 18.22 5.88 7.25 28.47 7.35 10.96 41.00 8.82 15.43

12.00 3 2.67 11.00 5.34 3.69 2.52 12.02 5.53 5.11 21.36 7.37 8.60 33.38 9.22 12.97 48.07 11.06 18.23

14.00 4 2.86 13.00 5.97 4.67 2.92 13.43 7.00 5.88 23.88 9.34 9.83 37.31 11.67 14.77 53.72 14.00 20.71

16.00 6 3.25 15.00 6.91 6.13 3.53 15.55 9.19 7.02 27.65 12.25 11.67 43.20 15.32 17.46 62.20 18.38 24.41

18.00 5 3.44 17.00 11.94 7.36 5.45 26.86 11.04 11.16 47.75 14.72 18.86 74.61 18.40 28.55 107.44 22.07 40.23

20.00 7 3.80 19.00 20.89 9.07 8.78 47.01 13.61 18.39 83.57 18.15 31.48 130.57 22.68 48.06 188.02 27.22 68.12

22.00 7 4.09 21.00 29.69 10.80 12.06 66.80 16.19 25.50 118.75 21.59 43.90 185.55 26.99 67.25 267.19 32.39 95.54

24.00 9 4.50 23.00 38.17 13.01 15.32 85.88 19.51 32.53 152.68 26.01 56.10 238.56 32.52 86.02 343.53 39.02 122.31

26.00 35 6.85 25.00 46.81 21.51 19.90 105.32 32.26 41.56 187.24 43.02 71.02 292.56 53.77 108.27 421.29 64.52 153.33

28.00 60 10.64 27.00 52.24 36.11 24.64 117.54 54.17 50.01 208.96 72.22 84.10 326.50 90.28 126.89 470.16 108.33 178.39

30.00 60 13.93 29.00 59.48 50.78 29.98 133.83 76.16 59.84 237.92 101.55 99.62 371.76 126.94 149.31 535.33 152.33 208.91

32.00 60 16.81 31.00 69.12 65.49 36.14 155.51 98.24 71.48 276.46 130.99 118.35 431.97 163.74 176.74 622.04 196.48 246.64

34.00 60 19.35 33.00 75.40 80.25 41.18 169.65 120.38 80.63 301.59 160.51 132.63 471.24 200.64 197.21 678.58 240.76 274.35

Proyek : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA KECAMATAN TUGALA OYO

Lokasi : DESA HAREFA, KCAMATAN TUGALA OYO, PROVINSI SUMATERA UTARA

DDTSPT
Tabel - 4.1.3. : Daya Dukung Izin Pondasi Tiang Pancang Dari Data SPT titik BH - 02.

D = 0.20 m 0.30 m 0.40 m 0.50 m 0.60 m

Ap = 0.031 m2 0.071 m2 0.126 m2 0.196 m2 0.283 m2

Ak = 0.628 m 0.942 m 1.257 m 1.571 m 1.885 m

D = 20 cm D. = 30 cm D = 40 cm D. = 50 cm D. = 60 cm

Deth SPT Li Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi Qp Qs Qi

(m) N Nk (m) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton)
2.00 2 2.00 1.00 3.14 0.25 1.10 7.07 0.38 2.43 12.57 0.50 4.29 19.63 0.63 6.67 28.27 0.75 9.58

4.00 2 2.00 3.00 3.52 0.75 1.32 7.92 1.13 2.87 14.07 1.51 4.99 21.99 1.88 7.71 31.67 2.26 11.01

6.00 3 2.33 5.00 3.77 1.47 1.55 8.48 2.20 3.27 15.08 2.93 5.61 23.56 3.67 8.59 33.93 4.40 12.19

8.00 3 2.50 7.00 4.49 2.20 1.94 10.10 3.30 4.03 17.95 4.40 6.86 28.05 5.50 10.45 40.39 6.60 14.78

10.00 4 2.80 9.00 5.97 3.17 2.62 13.43 4.75 5.43 23.88 6.33 9.23 37.31 7.92 14.02 53.72 9.50 19.81

12.00 4 3.00 11.00 6.91 4.15 3.13 15.55 6.22 6.43 27.65 8.29 10.87 43.20 10.37 16.47 62.20 12.44 23.22

14.00 7 3.57 13.00 13.82 5.83 5.77 31.10 8.75 12.12 55.29 11.67 20.76 86.39 14.59 31.72 124.41 17.50 44.97

16.00 7 4.00 15.00 22.78 7.54 9.10 51.25 11.31 19.34 91.11 15.08 33.38 142.35 18.85 51.22 204.99 22.62 72.85

18.00 8 4.44 17.00 31.57 9.49 12.42 71.04 14.24 26.53 126.29 18.99 45.90 197.33 23.74 70.52 284.16 28.48 100.42

20.00 8 4.80 19.00 40.37 11.46 15.75 90.83 17.19 33.72 161.48 22.92 58.41 252.31 28.65 89.83 363.33 34.38 127.98

22.00 47 8.64 21.00 48.69 22.79 20.79 109.56 34.19 43.36 194.78 45.58 74.04 304.34 56.98 112.84 438.25 68.37 159.76

24.00 60 12.92 23.00 54.39 37.33 25.60 122.39 56.00 52.00 217.58 74.67 87.46 339.97 93.33 131.99 489.55 112.00 185.58

26.00 60 16.54 25.00 61.78 51.96 30.99 139.02 77.94 61.93 247.14 103.91 103.16 386.15 129.89 154.70 556.06 155.87 216.53

28.00 60 19.64 27.00 72.13 66.65 37.37 162.29 99.97 74.09 288.52 133.29 122.83 450.82 166.62 183.60 649.18 199.94 256.38

30.00 60 22.33 29.00 75.40 81.39 41.41 169.65 122.08 80.97 301.59 162.78 133.09 471.24 203.47 197.77 678.58 244.16 275.03

Proyek : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA KECAMATAN TUGALA OYO

Lokasi : DESA HAREFA, KCAMATAN TUGALA OYO, PROVINSI SUMATERA UTARA

DDTSPT
DOCUMENTATIONS
PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA, KECAMATAN TUGALA OYO
LOCATION : DESA HAREFA, KECAMATAN TUGALA OYO
PROVINSI : SUMATERA UTARA
DOCUMENTATIONS
PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA, KECAMATAN TUGALA OYO

LOCATION : DESA HAREFA, KECAMATAN TUGALA OYO


PROVINSI : SUMATERA UTARA
DOCUMENTATIONS
PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA, KECAMATAN TUGALA OYO

LOCATION : DESA HAREFA, KECAMATAN TUGALA OYO


PROVINSI : SUMATERA UTARA
DOCUMENTATIONS
PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA, KECAMATAN TUGALA OYO
LOCATION : DESA HAREFA, KECAMATAN TUGALA OYO
PROVINSI : SUMATERA UTARA
DOCUMENTATIONS
PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA, KECAMATAN TUGALA OYO

LOCATION : DESA HAREFA, KECAMATAN TUGALA OYO


PROVINSI : SUMATERA UTARA
DOCUMENTATIONS
PROJECT : PEMBANGUNAN JEMBATAN SUNGAI NA'AI II DI DESA HAREFA, KECAMATAN TUGALA OYO

LOCATION : DESA HAREFA, KECAMATAN TUGALA OYO


PROVINSI : SUMATERA UTARA

You might also like