Daily Construction Progress Report

This daily progress report summarizes work activities at a construction site on November 3rd at 6:00 PM. It lists the tasks and workers for tiling, painting, plumbing, fabrication, and landscaping. Two workers were doing drainage gutter cleaning and waterproofing coating work. Another two workers were working on electrical connections and fittings. The plumber was fixing drainage pipes and cleaning pressure valves. No issues or progress items are reported.

Uploaded by

Adnan Sayyed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
161 views10 pages

Daily Construction Progress Report

This daily progress report summarizes work activities at a construction site on November 3rd at 6:00 PM. It lists the tasks and workers for tiling, painting, plumbing, fabrication, and landscaping. Two workers were doing drainage gutter cleaning and waterproofing coating work. Another two workers were working on electrical connections and fittings. The plumber was fixing drainage pipes and cleaning pressure valves. No issues or progress items are reported.

Uploaded by

Adnan Sayyed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

03-Nov-21 DAILY PROGRESS REPORT

TIME 06.00 PM

WORKS AT SITE
ITEMS DESCRIPTION

TILING/
1st podium tiles gap filling
Shanti bhai

External Painting/
Ground podium below ramp ceiling painting work.
Bhushan Gore

Internal Painting/
No work.
Awadhraj

Sagar Construction RG garden side drainage gutter cleaning and waterproofing coating work in progress.

Electrical/
RG garden Electrical connection and fittings conceal piping on flooring in progress.
Munna bhai

Plumbing/ Garden drainage pipe fixing from side drain to rainwater outlet & Building no 04 pressure valves
Sattar Bhai cleaning.

Fabrication/
No work.
Nazim Bhai

Aluminium Sliding Work/


No work.
Khan Sahab

RG Garden Garden Grass watering and cement godown debris cleaning.

Tapas Carpenter

SL.NO ISSUE AT SITE DATE OF RESOLVE


1
2
3
4

SL.NO PROGRESS AT SITE TIMELINE

4
NOTES:-
S REPORT

LABOUR REPORT

g work in progress. 2

oring in progress. 2

Building no 04 pressure valves


2

F RESOLVE

TIMELINE