You are on page 1of 2

POC-M1.

2-RA-0071
PENTA-OCEAN CONSTRUCTION CO. LTD.
Revision: D
PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 11 of 14
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023

Risk Assessment – Working at Height

Initial Risk Residual Risk Risk Owner (Action Officer)


Possible Accident / Level Level
Additional Risk
No Work Activity Hazard Ill Health & Persons- Existing Risk Control
Control Follow-up
at-Risk F S R S L R Name Designation
Period
3 Movement and Sudden movement of Serious Injury/ Operator must be trained 3 3 9 Cordon off the work 3 2 8 Site Ongoing
use of boom lift/ boom lift Death and authorized. area for movement Supervisor
Forklift Person run over by Do pre-checks on of boom lift.
boom lift equipment functions. Provide banksman to Boom Lift
PPE-Wear Helmet, Boots guide boom lift Operator
& Body harness. operator

Provide banksman to
guide Boom lift operator

The boom lift operates at


a very slow speed below
15 km/h

Work on stable ground.

Topple of boom lift Serious Injury/ Provide steel plate to All operators Site Ongoing
during movement on site Death cover Step 2-4 trench operating the boom Supervisor
opening for access (if lift must be briefed
required). about the hazard Boom Lift
involved Operator
Boom lift is not allowed to
move when platform is Close monitoring by
elevated at height. Supervisor.

Provide banksman to
guide boom lift operator
POC-M1.2-RA-0071
PENTA-OCEAN CONSTRUCTION CO. LTD.
Revision: D
PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 12 of 14
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023

Risk Assessment – Working at Height

Initial Risk Residual Risk Risk Owner (Action Officer)


Possible Accident / Level Level
Additional Risk
No Work Activity Hazard Ill Health & Persons- Existing Risk Control
Control Follow-up
at-Risk F S R S L R Name Designation
Period
Improper and unstable Serious Injury/ Maintenance of boom lift 3 3 9 Application and 3 2 8 Site Ongoing
working access Death at least once a month approval of PTW for Supervisor
Standard PPE to be used working at height
by boom lift operator

Stable and level access Conduct TBM prior


platform provided for to commencement of
boom lift work.

Man cage is not damaged;


check railings are stable
and intact.

Falling from height Serious Injury/ Ensure only authorized 3 5 15 Application and 2 5 10 Site Ongoing
Death operator to operate the approval of PTW for Supervisor
boom lift. working at height
Boom Lift
To inspect the machine Operator to work Operator
daily before operating. within the platform
Conduct TBM prior
No obstruction to working to commencement of
access of boom lift. work.
Allowed only 02 persons
on the boom lift

Safety Harness is hooked


and secured on the
designated anchorage
point of boom lift