Professional Documents
Culture Documents
RD5700011F en 1036431 48737 661
RD5700011F en 1036431 48737 661
Shift No 4452582 Service No. 04335559 Date of Works 15/09/23 Night Weekend
Shift Location TGA Day of the Week FRIDAY
Job Description TGA (TONKIN GAP) ASP Customer Name TONKIN GAP ALLIANCE
Map Ref Distance Duration Full Customer Contact TONKIN GAP ALLIANCE
Plant to Supply Product Job Number 17060748 Phone No 08 9200 2500
Shift Plan Layer Product Short Description Blinder Type Mass Depth (mm) Surface Area (M2)
(Tonnes) Preparation
Asphalt Area (M2)
Shift Plan Material Being Removed Length(M) Width(M) Area Depth(mm) Volume(M3) Volume Hours A Hours B
(Tonnes) Rate Rate
Profiling
Dump Site
Material Removed Location Quantity (Loads) Distance (Kms) Removal
Labour (Includes internal and external employees via agencies) – Excludes subcontractor First Hour Data
Start 08:30 Finish 16:30 Planned Start
Lunch .50 Total 7.50 Planned worked hours (include all travel time) Actual Start
Crew 287 170616 Asphalt Crew 3 (WA) Delay
Amend / Complete the labour table below where actual work deviates from the original shift plan
Address People On Site Int / Planned Planned Planned Planned Actual Actual Actual Actual Additional
Book Number Ext Start Finish Lunch Total Start Finish Lunch Total Allowances
1125354 1 Supervisor Sal EMP 08:30 16:30 .50 7.50
1125357 1 Project Engineer Sal EMP 08:30 16:30 .50 7.50
1125363 1 Project Manager Sal EMP 08:30 16:30 .50 7.50
1051681 Jones, Ryan EMP 08:30 16:30 .50 7.50
1127256 Klein, Jason EMP 08:30 16:30 .50 7.50
1088070 Phillips, Stuart EMP 08:30 16:30 .50 7.50
1138123 Heslington, Matthew EMP 08:30 16:30 .50 7.50
1038537 Watson, Jerome EMP 08:30 16:30 .50 7.50
1137168 Bosworth, Phillip EMP 08:30 16:30 .50 7.50
1038533 Swan, Rory EMP 08:30 16:30 .50 7.50
Plant (Includes internal and externally hired leased plant(Dry hire only) – Excludes subcontractor
Internal
Start 08:30 Hours equipment available on site Site Establishment
Finish 16:30 (Internal and long term lease) Float Moves
Equipment Type Unit Number Planned Planned Planned Actual Actual Actual Break Actual
Start Finish Total Start Finish Hours Down Total
Hours
Trailer - Tag Along TB003 08:30 16:30 8.00
Profiler/Cold Milling Machine PR014 08:30 16:30 8.00
Tack Coater TC006 08:30 16:30 8.00
Field Report : Asphalt Page 2 of 6
Equipment Type Unit Number Planned Planned Planned Actual Actual Actual Break Actual
Start Finish Total Start Finish Hours Down Total
Hours
Truck Medium Single Axle ≥ 8t TM088 08:30 16:30 8.00
ROLLER HAMM HD+90 VO RT101 08:30 16:30 8.00
ROLLER HAMM HD14VV RT134 08:30 16:30 8.00
PAVER ASPHALT - TRACK PA112 08:30 16:30 8.00
RUBBER TYRED ROLLER RR204 08:30 16:30 8.00
SKIDSTEER SS137 08:30 16:30 8.00
MATERIAL TRANSFER VEHICLE MT021 08:30 16:30 8.00
PAVER ASPHALT PA140 08:30 16:30 8.00
External
Equipment Type Description Hire Company PO No. Qty. Start Finish Total B/D Docket
Hours No.
Sherrin Roller HD70 RA08046 06:30 17:00 10.50
Miscellaneous Items
Item Description Quantity
Subcontractors Excluding dry hire of equipment (Amend details below when actual work deviates from original plan)
External Asphalt Crew Contractor Name PO Number No. Of People Start Finish Total Tonnes Area (M2) Docket No.
Laid
Subcontractors Excluding dry hire of equipment (Amend details below when actual work deviates from original plan)
External Profiling Crew Contractor Name PO Number No. Of Start Finish Total Docket No.
People
Plant Hire (Inc. Driver) Contractor Name PO Number No. Of People Start Finish Total Docket No.
Traffic Control Contractor Name PO Number No. Of People Start Finish Total After No. No. Docket No.
Care Arrow Var.
Signs Boards Msg.
Boards
Field Report : Asphalt Page 3 of 6
Other Subcontract Service PO Number No. Of People Start Finish Total Service Type Docket No.
Driver / Company Name Rego No. Truck Id No. Travel To Site Hours To Be Paid Additional
Hours Kms Start Finish Total
Field Report : Asphalt Page 4 of 6
Location
Machine No.
Site Map
Comments
Float move
In Intermediate
Work Description Key CH-Chases Pa - Patch Mill – Mill M/F – Mill and Fill 00 – Hot Spot Removal
Material Being Removed Key AC – Asphalt BC – Base Course TAR – Tar SG – Subgrade/Spoil
Field Report : Asphalt Page 5 of 6
Customer Name
Site Conditions
Customer Signature
Summary Of Works
1 2 3 4 5 6 7
Street Name
Chainage Start
Chainage End
Pavement Layer
Mix Type
Blinder Type
Mix Description
Tonnes Laid
Depth (mm)
Area(M2)
RPM
Was Anyone Injured? (If yes, details, name, etc.) All Contractor Dockets Attached?
Foreman's comments
Foreman's signature
Foreman's name
Supervisor's Name
Reviewed by
Date Reviewed