You are on page 1of 3

BE Form 01

Department of Education

Cordillera Administrative Region


Schools Division of Mountain Province
BANGUITAN ANTIONAL HIGH SCHOOL
Banguitan, Besao
School Year 2021-2022

BRIGADA ESKWELA

PHYSICAL FACILITIES AND MAINTENANCE NEEDS ASSESSMENT FORM


Instruction: Conduct an ocular inspection of the school physical listed below. Then provide the needed information to facilitate the improvement to be done on these identified facilities. (If needed you may use separate forms for each classroom or school facility).

Nature of improvement
CONDITION Needed Material Resources Needed (Indicate Manpower Needed (Indicate quantity and nature of
FACILITIES Remarks
(Check One) (e.g. repair, repainting, kind and quality) labor services needed)
replacement, etc)

If Unsatisfactory, describe the


Satisfactory Unsatisfactory
problem

Roof/ Ceiling/ Window / Water drips in time of strong rain, Roof sealing, Replacement of 2 L Vulcaseal 4 Days Carpentry/ Roof Sealing

Dilapidated Ceiling Ceiling 1 kg 1” Common Nail


● Roof, ceiling, window and Door maintenance
4 pcs ¼” Marine Plywood
and other school safety related task on school 8 pcs 2”x 3”x 8 lumber
facilities. 1 gal flat wall QDE

1 gal Gloss White QDE

2 pcs. grinding discs

1 pc 2” paint brush

Water facilities / Unorganized pipeline and shortage of Rearrange water system and 2 units 6 drums water tank 6 Days Plumbing

10 Days Welding/ metal works


● Installation of water system for water system
handwashing facilities and no school installation of Water tanks and 9 pcs ½”GI Pipe
water tank additional handwashing facilities
9 pcs ½” Coupling
for handwashing
4 pcs ½” Union

2 pcs wrench

2 pcs Teflon

4 pcs 1/2'” Faucet

Fence and Gate / No installed Exit gate Install school exit gate 4 pcs 2”x2”x6mm angle bar 6 days masonry works
6 Days Welding/ metal works
● Construction of exit gate and other mainte-
8 pcs 1”x1”x6mm angle bar
4 Days Carpentry works
4 pcs 3” GI Pipe S40
nance of fence and exit gate and compost pit
4 pcs 2” GI Pipe S40

2 pcs 1” GI Pipe S20

20 pcs 12 mm RSB

1 pair ¾ butt hinge


10 kg welding rod

8 pcs 2x3x9 lumber

 Classroom facilities/ Wall Classroom restruc- / Delamination of wall paint Wall needs to repainted 20 pcs laminating sheet 16 Days Painting/Carpentry

turing for releasing and receiving learning 2 packs special paper

materials and Triage maintenance and sig- 1 bottle black Epson Ink

nages 1 bottle Cyan Epson Ink

1 bottle Magenta Epson Ink

1 bottle Yellow Epson Ink

1 Quarter L Latex Hansa Yellow

1 Quarter L Toluidine Red

1 Quarter L Thalo Blue

2 Piece 1” Paint Brush

4 Pieces Chinese paint Brush

School Garden / Presence of weeds Deweeding and cultivation 5 Speeding fork 20 Days Gardening works

5 Sanggap
● School gardening/ landscaping
5 Sickle
5 Hand fork

School Clinic / Delaminated signages Reinstall signages 2 Thermal Scanner and alcohol 4 Days Painting

dispenser 1 Day Clinic works and device installation


● School Clinic Improvement
2 alcohol dispensers
4 boxes Face mask
2 galloon disinfectants
6 bottle Liquid Hand soap
6 Handwashing soap

4 boxes surgical gloves

4 boxes face mask

10 bottles 250 ml alcohol

6 boxes Liquid hand soap

6 pcs Handwashing soap

Learning Materials / No localized reading materials Printing of localized reading 56 Reading materials

Unprinted and unencoded e-copies of materials and activity sheets 112 Activity sheets
● Preparation of e-copies and printed copies of
Activity Sheets and encoding of e-copies of

Learning Materials Activity sheets

● School Grounds / Fully grown weeds Deweeding 5 Speeding fork 10 days deweeding
5 Sanggap
5 Sickle
5 Hand fork
Electricity / Shortage of electrical outlets Rearrangement of electrical 100 meters # 12 duplex electrical 2 Days Electrical Works
● Rearrangement electrical wiring and network wirings and installation of
wire
cable outlets
8 pcs amco boxes

16 pcs outlet

2 pcs single pole switch

16 pcs two gang switch plates

1 pc single gang switch plates

4 Pcs Combination plier

4 pcs electrical Tape

1-unit Electric drill

2 Pcs Claw Hammer

Prepared by: Noted:

NORMAN D. POLILIN March 25, 2021 OSCAR C. MOCO


School Physical Facilities Coordinator Date of Inspection School Head