Storm Sewer
• To design a storm sewer system, it is
necessary to determine the flow which
each segment must carry.
Where,
Q=Actual amount of rainfall that appears as runoff (m3/hr)
A =Area drained (m2)
I =Intensity of rainfall (m3/m2/hr)
C =Co-efficient of runoff
Run-off coefficient “C”
• C for an area is variant i.e. tends to
increase as the rainfall continues.
1 in 20 yrs
‘I’ Intensity )mm/hr)
1 in 15 yrs
1 in 10 yrs
1 in 5 yrs
me
A
t Ti
Inle
Sewer
Inlet
Sewer
Case 1
Sewer
Inlet
Sewer
e
duration is equal or greater then the inlet time.
tim
et
Inl
•So sewer line between M1 and M2 should be
designed for that run off.
e
B
tim
Or
et
Inl
Inlet time of area B to M2
Sewer
Time of Concentration
• Defined as the time required for the
A
me
maximum runoff rate to develop or it is
ti
the time required for storm water to run
et
Inl
from the farthest point of the area to
reach the point for which the maximum
runoff is to be estimated. M1
Time of flow
me
B
t ti
e
Inl
M2
Sewer
•So storm water sewers must be designed taking
into consideration the time of concentration at
various manholes
n
mi
10
A
n
mi
200m
10
B
Problem 3
(Design of Storm Sewer)
A B C
1 Ha 0.5 Ha 1 Ha