PT DELTA REKA INVENSI

Office : Jalan Mulya Sari I No 2, Tangkerang Selatan, Pekanbaru, Riau


Client : PT Riau Andalan Pulp and Paper
Job : Supply Manpower Instrumen PD
Area Job : Pulp Dryer Instrumen

Summary Progress

Deducation Total Total Overtime Unit Rate Total Price


No Name Classification Monthly Wage Net Pay Due
Absent Monthly Wage (/Day) Total Amount Monthly Wage (/Hours) Overtime(/Hours) Overtime
1 2 3=(1/30) 4=(2*3) 5=(1-4) 6 7 8=(6*7) 9=(5+8)
1 Bei Diva Al Instrumen 4.879.860 0 162.662 0 4.879.860
2 Edoni Jaya Instrumen 4.879.860 2 162.662 325.324 4.554.536 425 25.264 10.737.200 25.051.456
3 Freddy Antonius Instrumen 4.879.860 0 162.662 0 4.879.860
GRAND TOTAL 25.051.456

Prepared by PT. Riau Andalan Pulp And Paper


PT. Delta Reka Invensi Checked by

Cindy Stefany William W


Manager Planner/Supervisor Area