PT DELTA REKA INVENSI

Office : Jalan Mulya Sari I No 2, Tangkerang Selatan, Pekanbaru, Riau


Client : PT Riau Andalan Pulp and Paper
Job : Supply Manpower Electrical PD
Area Job : Pulp Dryer Electrical

Summary Progress

Deducation Total Total Overtime Unit Rate Total Price


No Name Classification Monthly Wage Net Pay Due
Absent Monthly Wage (/Day) Total Amount Monthly Wage (/Hours) Overtime(/Hours) Overtime
1 2 3=(1/30) 4=(2*3) 5=(1-4) 6 7 8=(6*7) 9=(5+8)
1 Faijer L. Siahaan Electrician 4.879.860 0 162.662 0 4.879.860
300 25.264 7.579.200 17.176.258
2 Manner Hasibuan Electrician 4.879.860 1 162.662 162.662 4.717.198
GRAND TOTAL 17.176.258

Prepared by PT. Riau Andalan Pulp And Paper


PT. Delta Reka Invensi Checked by

Cindy Stefany William W


Manager Planner/Supervisor Area