PT Delta Reka Invensi provided a job summary for PT Riau Andalan Pulp and Paper for a shutdown of the hydraulic system at their Hydraulic Area. The summary outlines 30 normal hours and 51 overtime hours of work by millwrights at a normal rate of 29,101/hour and overtime rate of 24,233/hour for a total cost of Rp2,108,913.
PT Delta Reka Invensi provided a job summary for PT Riau Andalan Pulp and Paper for a shutdown of the hydraulic system at their Hydraulic Area. The summary outlines 30 normal hours and 51 overtime hours of work by millwrights at a normal rate of 29,101/hour and overtime rate of 24,233/hour for a total cost of Rp2,108,913.
PT Delta Reka Invensi provided a job summary for PT Riau Andalan Pulp and Paper for a shutdown of the hydraulic system at their Hydraulic Area. The summary outlines 30 normal hours and 51 overtime hours of work by millwrights at a normal rate of 29,101/hour and overtime rate of 24,233/hour for a total cost of Rp2,108,913.
Office : Jalan Mulya Sari I No 2, Tangkerang Selatan, Pekanbaru, Riau
Client : PT Riau Andalan Pulp and Paper Job : Shutdown Hydraulic Area Job : Hydraulic
Summary Progress
Time Quantity Unit Rate Total Price
No Classification Total Amount Normal (/Hours) Overtime (/Hours) Normal (/Hours) Overtime (/Hours) Normal Overtime A Manpower 1 Mill Wright 30 51 29.101 24.233 873.030 1.235.883 2.108.913 GRAND TOTAL 2.108.913