NTPC Journey- Major Milestones
• Incorporated as 100% GoI Owned Company
1975
2004 • GoI divested its 10.5% equity, Stock listed on NSE and BSE
• Accorded Maharatna Status, GoI divested its 5% equity
2010
• GoI further divested its 9.5% equity; GoI share reduces to 74.96%
2013
5
Under Construction Projects: 16,314.5* MW
Uttar Pradesh
Rajasthan Bihar
1360 Solar; 2919.5
2026 2230
Jharkhand
Gujrat 4380 West Bengal
426 160 Thermal; 11140
Odisha
Maharashtra 250
23 Telangana
Under Construction Commercial
1682.5
449
5521 7020
22817
2004.5
18146 16822
Tamilnadu
9212.5
Kerala 230
92 Northern Western Eastern Southern
NTPC Share in All India Capacity NTPC Share in All India Generation
(as on 31.10.2021) (GW) (till 31.10.2021 for FY 2021-22) (BU)
17%
23.6%
83% 76.4%
7
Performance Highlights
172.14
FY16 FY17 FY18 FY19 FY20 FY21 till Oct'21 FY16 FY17 FY18 FY19 FY20 FY21 till Oct'21
2 NTPC stations are amongst the top 10 in the country in terms of PLF till Oct’21 with
Korba STPS ranked 1 with PLF 95.57%
8
Financial Performance
FY16 FY17 FY18 FY19 FY20 FY21 Q2FY22 FY16 FY17 FY18 FY19 FY20 FY21 Q2FY22
9
Power Allocation from NTPC & JV Stations (MW)
As on 01.11.2021
10
Coal Mining
Other Mines:
Mandakini-B, Kerandari, Banai, Bhalumuda, Banhardih, Chatti Bariatu & Badam
6.919 MMT till October, FY22, 11 MMT coal extracted during FY21
Coal Blocks allocated - 10 Nos; Total Mining Capacity of ~103 MMTPA
11
NTPC Energy Technology Research Alliance (NETRA)
Delivery of: Process & Plant, Hardware
re
Vision Gr or /& Software , IPR
tu
ap
Hy een
C
dr
n
og
bo
Delivering sustainable en Sustainable: Environment Protection,
ar
C
technology solutions Energy Efficiency , Availability &
Technology Project Reliability, Renewable,
thru applied research Focus Areas
and provide advanced Nature of Delivery : Tech Development &
er
scientific services for
As
at Deployment, Technology Adaption
h
W
power sector ,Technology Adoption
Environment
Education
Sustainability
Health
Woman
Empowerment Sanitation
Skill Drinking
Training Water
13
NTPC CSR: Focus Areas
Education Health
Sanitation Water
14
Major CSR Activities
• Contribution of ₹ 250 Crore to PM Cares Fund to support Government of India in its efforts to fight COVID-19
• Established 1200+ beds with 750 oxygen supported beds and 15 ICU beds
• Installation under progress of PSA Type big Oxygen Generation Plants at NTPC Stations.
• Proactive relief measures like regular sanitization of villages, distribution of PPE kits to health professionals, distribution of face
masks to villagers and supply of groceries to the community.
• Mobile Health Clinics (MCH) operational at Various locations providing healthcare to underserved areas.
• Revived MSW Plant at Varanasi & Pilot Project done for Mechanized Sweeping, Collection & transportation of MSW. Varanasi
jumped from 428th in 2014 to 27th in 2020 in Swachch Survekshan rankings. Varanasi is also the cleanest city along the banks
of the river Ganga.
• Support committed for Setting up of Tele-Recording Room at AIIMS, New Delhi
• Construction of Burn Unit at AIIMS Patna, AIIMS Bhubaneshwar and KGH Lucknow
• Setting up Library (Pustakalaya Project) in selected Primary Schools of Arunachal Pradesh
• Capacity building of farmers at Jhanor, Rihand, Kahalgaon & Ramagundam improving incomes by 30% to 300%.
• Committed to providing training to 8000 no. of youth in Ladakh and J&K UTs in association with NSDC and NSDF.
Face Mask Stitching, Mouda MCH, Simhadri MSW Plant, Karsada Increasing Farm Productivity, Rihand
15
NTPC - Recent Initiatives
16
NTPC Initiatives
10 TPD MSW to Charcoal at Dadri, 24 TPD Waste to Energy plant at Varanasi, 600
TPD Waste Management plant at Varanasi already operational with other similar
projects under pipeline
Biomass Pallets: 52,595 MT bio-mass pellets co-fired with coal at NTPC Plants till
Oct’21.Biomass Pallets: POs placed for 4.1 LMT for Dadri (4 years) and 4 LMT for
other stations. Award for another 20 MMT over four years is in progress.
At NTPC Simhadri, waste heat from flue gas is used for distillation of sea water
instead of steam or electricity as used in conventional systems.
Air Cooled Condensors are being implemented at North Karanpura & Patratu
Fleet of NTPC’s Electric Buses flagged off by Hon’ble LG of Andaman & Nicobar
Islands on 26th Jan, 2021
17
NTPC Future Plan - key destinations
18
Future Scenario: Long term
Present @ 2021 NTPC @ 2032
Power generation portfolio (GW) 67.66 GW Fuel Type 130 GW
0 0 1 2
Other
0 2% 82.7 % (55.9 GW) Coal 65.4% (85 GW)
NTPC
RE
0.8 0
6 0 1.9 % (1.3 GW) Solar 23.1% (30 GW)
0.8 2 2
2017
Green
Green
Coal Mining
Coal Mining
76 Hydrogen
Hydrogen
23%
Renewables
Renewables EV
EV
Integrated Energy Transport
Transport
2032
Company with
85 Power Generation
Power
Power as Main Stream CCU
Trading CCU and
and By
By
Trading Products
Products
65%
Energy mix Waste
Waste to
to Global
Global
Energy
Energy and
and Presence
Biomass Presence
Biomass Consultancy
Consultancy
19
Renewable Energy – Focused Approach
UMREPPs
• Rajasthan (5000 MW), Gujarat (4750 MW), AP (4000 MW), Maharashtra (2500
NTPC REL, RE Subsidiary operationalized. MW), DVC (2000 MW), MP (550 MW), Maharashtra Floating Solar (140 MW)
Business Plan of 60 GW by 2032. •THDC’s UMREPPs in UP (2000 MW)