Professional Documents
Culture Documents
L (44) Series - Staircases
L (44) Series - Staircases
-3W02
1a
200
L[44]06 L[44]06
10
1450
Paking slot
2550 350 350 350 350 350 350 350 350 350 2400
150mm high concrete upstand to SE's details
Stair 1
3100
3100
200
100 100 2550 350 350 350 350 350 350 350 350 350 2400
1000 1400
Stair1
1450
100
11
12
13
350
14
15
16
17
18
19
20
1
1a
200
L[44]06 L[44]06
10
1450
2550 350 350 350 350 350 350 350 350 350 2400
3100 150mm high concrete upstand to SE's de
3100
200
Stair 1
2550 350 350 350 350 350 350 350 350 2750
1450
Door to opening schedule
rwp
200
11
12
13
14
15
16
17
18
19
-1D01
FHR 1
6355
1000 1145
-2850
1350
8800
1a
200
200
14
13
12
11
10
L[44]06 L[44]06
1
6
1450
1800 300 300 300 300 300 300 300 300 300 300 300 300 300 2400
150mm high concrete upstand to SE's details
3100
200
Stair 1
1800 300 300 300 300 300 300 300 300 300 300 300 300 300 2400
1450
Door to opening schedule
16
17
18
19
20
21
22
23
24
25
26
27
28
0D01
200
FHR FHR 1
6439 1000
1W01
1a
200
L[44]06 L[44]06
12
11
10
1450
1850 350 350 350 350 350 350 350 350 350 350 350
150mm high concrete upstand to SE's details
Stair 1
3100
3100
200
1850 350 350 350 350 350 350 350 350 350 350 350
1450
Door to opening schedule
14
15
16
17
18
19
20
21
22
23
24
200
FHR 1
1D01
1a
200
L[44]06 L[44]06
12
11
10
1450
1850 350 350 350 350 350 350 350 350 350 350 350
150mm high concrete upstand to SE's details
Stair 1
3100
3100
200
1850 350 350 350 350 350 350 350 350 350 350 350
1450
Railing to detail A[44]series
13
14
15
16
17
18
19
20
21
22
23
24
200
FHR 1
8300
3600
3600
300 Tread=350mm encased in 150mm thick
concrete sorround.
12. All reinforced concrete work to
Weather guard textured paint to
plastered wall to Architect's approval
Fixed Structural Engineer's drawings.
13. All sanitary works to the entire
satisfaction of MoH.
+7.800 14. All roads, storm water drainage
24
23
and foul sewerage to
Second Floor Level 22
21
Civil Engineer's drawings.
20
19
18
1800
17
Revisions:
16
15
STAIR:
14 Riser No: 24 rev date description
13
12 Riser Height=150mm
3600
11 Tread=350mm
10
9
8
7
1800
6
5
4
3
+4.200 1
2
28
27
First Floor Level 26
25
24
23
22
21
2100
20
19
18
17
STAIR:
16 Riser No: 28
15
14 Riser Height=150mm
4200
13 Tread=300mm
12
Window to openong schedule 11
10
9
8
2100
7
6
5
4
3
2
±0.000 1
19
18
0 Ground Floor 17
16
15
1350
14
13
STAIR: Tel:+256 701-650587
12 Riser No: 19
11
1000mm high concrete guardrail with
10
Riser Height=150mm
precast concrete coping to detail L[21]series
Tread=350mm
3000
9
8
7
6 Client:
5
ENTERPRISE UGANDA LIMITED
1650
4
3
2
1
-3,000 20
19
18
Basement 1 17
16 Location:
15
PLOT 2A, & 2-4,BUTABIKA ROAD
1350
14
13
BUTABIKA,KAMPALA DISTRICT
Door to openong schedule 12
11
STAIR:
10 Riser No: 20
3000
9
8 Riser Height=150mm
7 Tread=350mm
6 Project title:
5
1650
3
4 PROPOSED OFFICE BUILDING
2
1 Drawing title:
-6,000 20
19
18
Basement 2 17 L(44)06 Staircase 1 Section
16
15
1350
14
13
STAIR:
12 Riser No: 20
11
10
Riser Height=150mm
Tread=350mm
3000
9
Handrail to detail A[44]series 8
1650
7
6 Grass to Landscape Architect's(LA) details
Concrete upstand to detail A[44]series 5 Architect:
4
3 JULIUS
2400 2 3150
DDAMULIRA
-9,000 1
REG.NO. 196
PRAC.NO. 3101
Basement 3 Date:
OCTOBER 2020
Published: 9/9/2021 11:51:39
Drawn: Checked:
CGO R.R
Scale:
L[44]10
B
200 2050
200 2050
200
2a
200
835
2a
835
835
835
10
11
250 250 250 250 250 250 250 250 250
915
1165
FHR
Stair 2
915
FHR
-3D04 Stair 2
Door to opening schedule
Door to opening schedule
3
3
1000 800
1000 800
L[44]10
L[44]10
L(44)07 Typical Staircase Basement 3 and 2 -Staircase 2 L(44)08 Basement 1 -Staircase 2(Fire Escape)
1 2
1 : 50 1 : 50
L[44]10
Drainage channel with grating
to detail A[93]series
and to SE's details
2a
835
835
Retaining wall to SE's details
10
11
1165
915
Stair 2
FHR
Door to opening schedule
L[44]10
L(44)09 Ground Floor Level -Staircase 2(Fire Escape)
1
1 : 50
Riser Height=150mm
Riser Height=150mm
Tread=250mm
Tread=250mm
Tread=250mm
To detail A[27]series
Riser No: 19
Riser No: 20
Riser No: 20
STAIR:
STAIR:
STAIR:
4200 3000 3000 3000
2a
10
10
3075 3000 1500 150
835
10
900
11
11
11
9
12
12
12
8
8
3300
13
13
13
7
7
14
14
14
6
6
15
15
15
4000
5
16
16
16
4700
2250
4
4
17
17
17
3
3
18
18
18
19
19
2
2
1
1
19
20
20
915
500
0 Ground Floor
Basement 1
Basement 2
Basement 3
1 : 50
Handrail to detail A[44]series
+4.200
±0.000
-3,000
-6,000
-9,000
Door to openong schedule
1
NOTES Revisions: Client: Project Title:
rev date description Architect: Drawn: Checked:
1. This drawing is copyright. 7. Walls below 200mm thick to be reinforced with hoop iron at every alternate course. ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING
JULIUS DDAMULIRA C.G.O R.R
2. Do not scale off this drawing. 8. Depth of foundations to be decided on site.
3. All levels and dimensions to be checked on site before any Reg. No. 196 Date: Scale:
9. pv denotes permanent air vents over doors and windows as shown on drawings. Drawing Title:
building work commences. Location: Prac.No. 3101 MARCH 2020
11. Drain pipes passing under tarmac, driveways, and buildings to be encased in 150mm Staircase 2 Section
4. Any discrepancies to be reported to the office of the consultant. thick concrete surround. PLOT 2A,&2-4,BUTABIKA ROAD,
BUTABIKA,KAMPALA DISTRICT Published: 9/9/2021 11:48:30 1 : 50 @ A3
5. All work to be strictly in accordance to with the standard specifications and notes. 12. All reinforced concrete work to Structural Engineer's drawings.
6. This drawing is to be read in conjunction with specifications and all other relevant 13. All sanitary works to the entire satisfaction of MoH.
Job no. Drawing no.
TEL:+256 701-650587 L(44)10
drawings. 14. All roads, storm water drainage and foul sewerage to Civil Engineer's drawings.
E F
1938
200 2450 300 2450 200
702 1000 798
770 1260 1540 1260 770
200
134
FHR
PWD marking to Architect's approval
2016
2000
Lift 1 Lift 2
237
8000
D11
200
200
2179
L[44]17 L[44]17
20
19
18
17
16
15
14
13
12
11
2300 280 280 280 280 280 280 280 280 280 1330
1000
1400
Room
Services
Door to opening schedule
1063
3050
3050
250
975
1900
3700
3700
Stair 3
1400
W8
200
150mm high concrete upstand to SE's details
280 280 280 280 280 280 280 280 280 1330 1000 285
10
1
9
7
-1D03
F
-2850
1938
200 2450 300 2450 200
702 1000 798
770 1260 1540 1260 770
200
134
FHR
PWD marking to Architect's approval -1D04
2016
2000
Lift 1 Lift 2
237
8000
D11
200
200
2179
L[44]17 L[44]17
19
18
17
16
15
14
13
12
11
1000
1400
2580 280 280 280 280 280 280 280 280 1330 Room
Services
1063
3050
3050
-1D05
250
975
1900
Stair 3
10
1
9
1400
W8
200
150mm high concrete upstand to SE's details
280 280 280 280 280 280 280 280 280 1330 1000 285
Line of 2m setback
L(44)12 Typical Staircase Basement 1 -Staircase 3
1
1 : 50
NOTES Revisions: Client: Project Title:
rev date description Architect: Drawn: Checked:
1. This drawing is copyright. 7. Walls below 200mm thick to be reinforced with hoop iron at every alternate course. ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING
JULIUS DDAMULIRA C.G.O R.R
2. Do not scale off this drawing. 8. Depth of foundations to be decided on site.
3. All levels and dimensions to be checked on site before any Reg. No. 196 Date: Scale:
9. pv denotes permanent air vents over doors and windows as shown on drawings. Drawing Title:
building work commences. Location: Prac.No. 3101 MARCH 2020
11. Drain pipes passing under tarmac, driveways, and buildings to be encased in 150mm Typical Staircase
4. Any discrepancies to be reported to the office of the consultant. thick concrete surround. PLOT 2A,&2-4,BUTABIKA ROAD, Basement 1
BUTABIKA,KAMPALA DISTRICT Published: 9/9/2021 11:48:41 1 : 50 @ A3
5. All work to be strictly in accordance to with the standard specifications and notes. 12. All reinforced concrete work to Structural Engineer's drawings. -Staircase 3
6. This drawing is to be read in conjunction with specifications and all other relevant 13. All sanitary works to the entire satisfaction of MoH.
Job no. Drawing no.
TEL:+256 701-650587 L(44)12
drawings. 14. All roads, storm water drainage and foul sewerage to Civil Engineer's drawings.
E F
±0.000
0D13
F
200
±0.000
1260 534
Office
757
200
200
pwd
1000
FHR
0D19
92
2000
2000
750
713 1000 0D20
200
Duct
150
200
750
L[44]17 0D21 L[44]17
1550 300 300 300 300 300 300 300 300 300 300 300 300 300 1500
150
750
19
18
17
16
15
28
27
26
25
24
23
22
21
20
0D22
150
Stair 3
750
3900
10
11
12
13
14
0D21
1
9
150mm high concrete upstand to SE's details
108
1550 300 300 300 300 300 300 300 300 300 300 300 300 300 1500
100
742
425 900 675
0D24
251
0W06
0D15
750
7
PWR
200
rwp
0W05
200
F
200 1550 200 2450 300 2450 200 525 100
200
757
100
200
1D10
200
pwd
1000
FHR
Lift 1 Ladies'
Lift 2
2400
92
2000
2000
750
513 1000
200
Duct
150
Store
200
750
L[44]17 L[44]17
1550 350 350 350 350 350 350 350 350 350 350 350 1550
150
1400
750
24
23
22
21
20
19
18
17
16
15
14
13
150
Stair 3
250
750
3900
10
11
12
1
9
150mm high concrete upstand to SE's details
108
1400
1550 350 350 350 350 350 350 350 350 350 350 350 1550
100
742
900 675
251
750
7
200
PWR rwp
200
F
200 2450 300 2450 200 525 100
757
200
200
pwd
1000
FHR
1000 420
Lift 1 Ladies'
Lift 2
92
2000
2000
200
3D10
750
2400
200
Duct
150
Store
200
750
L[44]17 L[44]17
1400 280 280 280 280 280 280 280 280 280 1480
150
1400
Private
Washroom
750
24
23
22
21
20
19
18
17
16
150
Stair 3
250
750
10
11
12
13
14
15
1
9
150mm high concrete upstand to SE's details
108
1400
280 280 280 280 280 280 280 280 280 280 280 280 280 280 1480
100
742
3D07 3D08 900 675
100
251
3D09
750
7
750
PWR rwp
200
5600
200
Lift 1 shaft Lift 2 shaft
2000
2400
2400
200
L[44]17 L[44]17
1400 280 280 280 280 280 280 280 280 280 1480
1450
1450
1650
4D01
Door to opening schedule
24
23
22
21
20
19
18
17
16
Stair 3
300
3350
10
11
12
13
14
15
6
9
150mm high concrete upstand to SE's details
Railing to detail A[44]series
2100
1800
1400 280 280 280 280 280 280 280 280 280 1480
200
4W05
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Tread=350mm
Tread=350mm
Tread=300mm
Tread=280mm
Tread=280mm
Tread=280mm
Riser No: 24
Riser No: 24
Riser No: 24
Riser No: 28
Riser No: 19
Riser No: 20
Riser No: 20
Parapet detail A[27]series
STAIR:
STAIR:
STAIR:
STAIR:
STAIR:
STAIR:
STAIR:
To detail A[27]series
150 2850 150 3150
150
2300
28
24
24
19
20
20
E
1
19
19
27
23
23
2
2
2
18
18
18
3
3
26
3
3
22
22
3
17
17
17
4
4
4
25
4
21
21
4
16
16
16
5
5
5
24
5
19980 1650
20
20
15
15
15
6
6
5
5
6
23
14
14
14
24
7
19
19
7
22
6
7
23
13
13
13
8
8
8
18
18
21
8
7
9
22
12
12
12
9
20
17
17
9
21
8
10
11
11
11
19
10
16
16
1881
20
11
10
10
10
1330
1330
18
11
19
12
15
15
10
10
17
12
18
13
11
11
14
14
13
14
16
17
13
13
15
16
8000
12
14
12
1550
1550
15
1:50 @ A3
F
0 Ground Floor
Basement 1
Basement 2
Basement 3
+15,000
+11.400
+7.800
+4.200
±0.000
-3,000
-6,000
-9,000
NOTES Revisions: Client: Project title: Architect: Drawn: Checked:
1. This drawing is copyright. 10. A single layer of 3-ply bituminous felt to be provided between rev date description ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING JULIUS CGO R.R
6. This drawing is to be read in conjunction with specifications and all DDAMULIRA
2. Do not scale off this drawing. other relevant drawings. masonry and r.c. work. REG.NO. 196 Date: Scale:
11. Drain pipes passing under tarmac, driveways, and buildings to be
3. All levels and dimensions to be checked on site before any 7. Walls below 200mm thick to be reinforced with hoop iron at every encased in 150mm thick concrete sorround.
PRAC.NO. 3101 MARCH 2020
alternate course. Location: Drawing title:
building work commences. Published: 9/9/2021 11:58:53 1 : 50 @ A1
12. All reinforced concrete work to Structural Engineer's drawings. PLOT 2A,&2-4,BUTABIKA ROAD
4. Any discrepancies to be reported to the office of the consultant. 8. Depth of foundations to be decided on site.
13. All sanitary works to the entire satisfaction of MoH. BUTABIKA,KAMPALA DISTRICT Staircase 3 Section Job no. Drawing no.
5. All work to be strictly in accordance to with the standard 9. pv denotes permanent air vents over doors and windows as
specifications and notes. 14. All roads, storm water drainage and foul sewerage to L(44)17
shown on drawings. Civil Engineer's drawings.
Tel:+256 701-650587
J K
L[44]23
Paking slot
91
600
Ramp
200
6
1000
Door to opening schedule Stair 4
2400
FHR
1450 200 1450
20
1
17
4
Railing to detail A[44]series 16
5
8100
15
6
14
7
13
8
12
9
11
10
Paking slot
2550
2550 7
200
200 3100 200
L(44)18 Typical Staircase Basement 3 and 2 -Staircase 4(Fire Escape)
L[44]23
1
1 : 50
L[44]20
600
Ramp
200
200
6
1000
Door to opening schedule
Stair 4
3340
3100
FHR
1450 200 1450
17
4
Railing to detail A[44]series 16
5
1800
8100
8100
15
6
14
7
13
8
12
9
11
Paking slot
10
3360
to detail A[43]series
2550
2550
7
200
200
L[44]23
L(44)19 Basement 1 Floor Plan-Staircase 4(Fire Escape) 200 3100 200
1
1 : 50
L[44]23
200 2500 200 3100 200
200
200
0D44 6
630
1000
Door to opening schedule
Stair 4
2300
3340
870
FHR
1037 1200 263 1450 200 1450
28
200
1
300 300 300 300 300 300 300 300 300 300 300 300 300
300 300 300 300 300 300 300 300 300 300 300 300 300
27
150mm high concrete upstand to SE's details
2
3100
26
3
25
4
2100
24
Railing to detail A[44]series 5
23
796 1000 224
1800
6
8100
22
7
21
8
200
20
0D39 9
19
1000 10
18
226 1000 474 11
17
12
200
16
0D40 13
15
14
3360
1800
1800
Railing to detail A[44]series
2500
200
200
L[44]23
487 800 614
L(44)20 Ground Floor Plan-Staircase 4(Fire Escape) 200 1500 200 3100 200
1
1 : 50
L[44]23
200
6
1000
Door to opening schedule
Stair 4
3340
3100
FHR
1450 200 1450
24
150mm high concrete upstand to SE's details 1
350 350 350 350 350 350 350 350 350 350 350
350 350 350 350 350 350 350 350 350 350 350
23
2
22
3
21
Railing to detail A[44]series 4
20
5
1800
8100
19
6
18
7
17
8
16
9
15
10
14
11
13
12
3360
1850
1850
Railing to detail A[44]series
200
L[44]23
200 3100 200
L[44]23
200
6
1000
Door to opening schedule
Stair 4
3340
3100
FHR
24
350 350 350 350 350 350 350 350 350 350 350
350 350 350 350 350 350 350 350 350 350 350
23
2
22
3
21
Railing to detail A[44]series 4
20
5
1800
8100
19
6
18
7
17
8
16
9
15
10
14
11
13
12
3360
1850
1850
Railing to detail A[44]series
200
L(44)22 Third Floor Plan-Staircase 4(Fire Escape) L[44]23
200 3100 200
1
1 : 50
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Window to openong schedule
Tread=350mm
Tread=300mm
Tread=350mm
Tread=350mm
Tread=350mm
To detail A[27]series
Riser No: 24
Riser No: 24
Riser No: 28
Riser No: 19
Riser No: 20
Riser No: 20
STAIR:
STAIR:
STAIR:
STAIR:
STAIR:
STAIR:
6
2400
19
24
20
20
28
24
1
1
2
27
2
2
23
23
19
19
26
3
22
22
18
18
18
3
3
3
25
17
17
17
21
21
4
4
24
16
16
16
20
20
5
23
5
6
19
19
22
15
15
15
6
6
6
7
21
14
14
14
18
18
7
7
3150
20
13
13
13
17
17
8
8
19
10
12
12
12
16
16
9
9
11
11
11
18
11
15
15
10
10
17
12
14
14
11
11
16
13
13
13
10
10
10
15
2550
2550
14
12
12
7
Basement 1
Basement 2
Basement 3
+15,000
+11.400
+7.800
+4.200
±0.000
-3,000
-6,000
-9,000
1 : 50
1
NOTES Revisions: Client: Project title: Architect: Drawn: Checked:
1. This drawing is copyright. 10. A single layer of 3-ply bituminous felt to be provided between rev date description ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING JULIUS CGO R.R
6. This drawing is to be read in conjunction with specifications and all DDAMULIRA
2. Do not scale off this drawing. other relevant drawings. masonry and r.c. work. REG.NO. 196 Date: Scale:
11. Drain pipes passing under tarmac, driveways, and buildings to be
3. All levels and dimensions to be checked on site before any 7. Walls below 200mm thick to be reinforced with hoop iron at every encased in 150mm thick concrete sorround.
PRAC.NO. 3101 MARCH 2020
alternate course. Location: Drawing title:
building work commences. Published: 9/9/2021 11:53:42 1 : 50 @ A1
12. All reinforced concrete work to Structural Engineer's drawings. PLOT 2A,&2-4,BUTABIKA ROAD
4. Any discrepancies to be reported to the office of the consultant. 8. Depth of foundations to be decided on site.
13. All sanitary works to the entire satisfaction of MoH. BUTABIKA,KAMPALA DISTRICT Staircase 4 Section Job no. Drawing no.
5. All work to be strictly in accordance to with the standard 9. pv denotes permanent air vents over doors and windows as
specifications and notes. 14. All roads, storm water drainage and foul sewerage to L(44)23
shown on drawings. Civil Engineer's drawings.
Tel:+256 701-650587
D
200
200
200
200 1200
1200
Store
0W01a
200
5
L[44]26 L[44]26
900
200 7800 200
1800
1800
5500
1800 300 300 300 300 300 300 300 300 300 300 300 300
13
12
11
10
1
4100
200
Upstand to detail A[44]series
200
Glass railing to detail A[44]series
14
15
16
17
18
19
20
21
22
23
24
25
26
1800 300 300 300 300 300 300 300 300 300 300 300 300
1800
Stair 5
±0.000
200
200
L(44)24 Ground Floor plan -Staircase 5
1
1 : 50
200
200
200
300
306
400
100
Store
1500
1500
1000
800
1D04
394
200
200
200
L[44]26 L[44]26
900
1800 300 300 300 300 300 300 300 300 300 300 300 300
1800
1800
13
12
11
10
1
3600
3800
200
200
14
15
16
17
18
19
20
21
22
23
24
25
26
1800 1800 300 300 300 300 300 300 300 300 300 300 300 300
1800
Upstand to detail A[44]series
+4,200
+4.200 26
First Floor Level 25
24
23
22
2100
21
STAIR: 20 Handrail to detail A[44]series
Riser No: 26 19
Riser Height=150mm 18
Tread=300mm 17
16
Upstand to detail A[44]series
15
14
13
4200
12
11
10
9
8
7
2100
6
3600 1800
5
4
Wall finish to Architect's approval
3
2
1
±0.000
0 Ground Floor