You are on page 1of 39

FORMATO FE - 03

VALORIZACION DE OBRA 6
MES DE Jan-16

PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E.P. N°54164 DEL CENTRO POBLADO DE ANCATIRA , DISTRITO DE SAN JERONIMO, PROVINCIA DE ANDAHUAYLAS-REGION APURIMAC.

COMPONENTE : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E.P. N°54164 DEL CENTRO POBLADO DE ANCATIRA , DISTRITO DE SAN JERONIMO, PROVINCIA DE ANDAHUAYLAS-REGION APURIMAC.

SUB META : FECHA 1/31/2016

FTE - FTO : RECURSOS ORDINARIOS DISTRITO SAN JERONIMO

MODALIDAD : ADMINISTRACION DIRECTA PROVINCIA ANDAHUAYLAS

AÑO : 2016 REGION APURIMAC

AVANCES
PRESUPUESTO SALDO
PARTIDA Descripción Und. ANTERIOR ACTUAL ACUMULADO
Metrado Precio S/. Parcial S/. Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. %
1 TRABAJOS PRELIMINARES
1.01 ALMACEN OFICINA Y CASETA DE GUARDIANIA m2 105.00 90.75 9,528.75 105.00 9,528.75 100.00% 0.00 0.00 0.00% 105.00 9,528.75 100.00% 0.00 0.00 0.0%
1.02 CARTEL DE OBRA DE 5.40 X 3.60 und 2.00 1,055.78 2,111.56 2.00 2,111.56 100.00% 0.00 0.00 0.00% 2.00 2,111.56 100.00% 0.00 0.00 0.0%
1.03 INSTALACION PROVISIONAL Y DEFINITIVA DE AGUA Y DESAGUE GLB 1.00 2,084.00 2,084.00 1.00 2,084.00 100.00% 0.00 0.00 0.00% 1.00 2,084.00 100.00% 0.00 0.00 0.0%
1.04 INSTALACION PROVISIONAL Y DEFINITIVA DE LUZ GLB 1.00 1,848.00 1,848.00 1.00 1,848.00 100.00% 0.00 0.00 0.00% 1.00 1,848.00 100.00% 0.00 0.00 0.0%
1.05 CERCO PERIMETRICO CON TRIPLAY DE 6MM H=2.40M m 197.00 51.42 10,129.74 197.00 10,129.74 100.00% 0.00 0.00 0.00% 197.00 10,129.74 100.00% 0.00 0.00 0.0%
2 OBRAS PRELIMINARES
2.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 8,200.00 8,200.00 1.00 8,200.00 100.00% 0.00 0.00 0.00% 1.00 8,200.00 100.00% 0.00 0.00 0.0%
2.02 LIMPIEZA DE TERRENO MANUAL m2 4,627.00 1.52 7,033.04 4,627.00 7,033.04 100.00% 0.00 0.00 0.00% 4,627.00 7,033.04 100.00% 0.00 0.00 0.0%
2.03 TRAZO Y REPLANTEO PRELIMINAR m2 4,625.95 1.65 7,632.82 4,625.95 7,632.82 100.00% 0.00 0.00 0.00% 4,625.95 7,632.82 100.00% 0.00 0.00 0.0%
3 MOVIMIENTO DE TIERRAS
3.01 EXCAVACION MASIVA CON MAQUINARIAS EN TERRENO NORMAL m3 2,988.62 11.61 34,697.88 2,988.62 34,697.88 100.00% 0.00 0.00 0.00% 2,988.62 34,697.88 100.00% 0.00 0.00 0.0%
3.02 EXCAV. ZANJAS P/CIMIENTOS m3 1,060.33 25.41 26,942.99 1,060.33 26,942.99 100.00% 0.00 0.00 0.00% 1,060.33 26,942.99 100.00% 0.00 0.00 0.0%
3.03 RELLENO COMPACTADO A MANO-MAT. PROPIO m3 535.85 13.80 7,394.73 535.85 7,394.73 100.00% 0.00 0.00 0.00% 535.85 7,394.73 100.00% 0.00 0.00 0.0%
3.04 RELLENO COMPACTADO A MANO-MAT. DE PRESTAMO PARA BASE m3 292.56 49.85 14,584.12 240.00 11,964.00 82.03% 20.00 997.00 6.84% 260.00 12,961.00 88.87% 32.56 1,623.12 11.1%
3.05 NIVELACION DE TERRENO Y APISONADO C/20cm m2 1,994.38 2.80 5,584.26 1,600.00 4,480.00 80.23% 80.00 224.00 4.01% 1,680.00 4,704.00 84.24% 314.38 880.26 15.8%
3.06 ACARREO INTERNO MATERIAL PROCEDENTE DE EXCAVACIONES m3 4,560.18 9.53 43,458.52 4,560.18 43,458.52 100.00% 0.00 0.00 0.00% 4,560.18 43,458.52 100.00% 0.00 0.00 0.0%
3.07 ELIMINACION DE MATERIAL EXCEDENTE ACARREADO m3 4,560.18 14.90 67,946.68 4,560.18 67,946.68 100.00% 0.00 0.00 0.00% 4,560.18 67,946.68 100.00% 0.00 0.00 0.0%
3.08 REFINE Y NIVELACION EN TERRENO NORMAL DE ZANJAS m2 8.75 3.77 32.99 8.75 32.99 100.00% 0.00 0.00 0.00% 8.75 32.99 100.00% 0.00 0.00 0.0%
4 CONCRETO SIMPLE
4.01 CONCRETO CICLOPEO 1:12(C:H)+60% P.G. EN FALZA ZAPATA m3 86.45 160.75 13,896.84 86.45 13,896.84 100.00% 0.00 0.00 0.00% 86.45 13,896.84 100.00% 0.00 0.00 0.0%
4.02 SOLADO CONCRETO f´c=100 kg/cm2 h=2" m2 132.91 44.37 5,897.22 132.91 5,897.22 100.00% 0.00 0.00 0.00% 132.91 5,897.22 100.00% 0.00 0.00 0.0%
4.03 CONCRETO CICLOPEO 1:10(C:H)+30% P.G.-CIMIENTOS CORRIDOS m3 126.52 218.16 27,601.60 0.00 0.00 0.00% 123.00 26,833.68 97.22% 123.00 26,833.68 97.22% 3.52 767.92 2.8%
4.04 CONCRETO CICLOPEO 1:8(C:H)+25% P.M.-SOBRECIMIENTOS m3 32.86 253.82 8,340.53 0.00 0.00 0.00% 30.00 7,614.60 91.30% 30.00 7,614.60 91.30% 2.86 725.93 8.7%
4.05 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS m2 499.52 33.70 16,833.82 0.00 0.00 0.00% 460.00 15,502.00 92.09% 460.00 15,502.00 92.09% 39.52 1,331.82 7.9%
4.06 FALSO PISO DE 4" DE CONCRETO 1:8 m2 865.62 37.15 32,157.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 865.62 32,157.78 100.0%
5 CONCRETO ARMADO
5.01 ZAPATAS
05.01.01 CONCRETO F'C=210 KG/CM2 ZAPATAS m3 155.04 456.72 70,809.87 155.04 70,809.87 100.00% 0.00 0.00 0.00% 155.04 70,809.87 100.00% 0.00 0.00 0.0%
05.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 4,226.15 4.28 18,087.92 4,226.15 18,087.92 100.00% 0.00 0.00 0.00% 4,226.15 18,087.92 100.00% 0.00 0.00 0.0%
5.02 SOBRECIMIENTO REFORZADO
05.02.01 CONCRETO EN SOBRECIMIENTOS REFORZADOS f'c=175 kg/cm2 m3 4.74 361.12 1,711.71 0.00 0.00 0.00% 4.74 1,711.71 100.00% 4.74 1,711.71 100.00% 0.00 0.00 0.0%
05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS REFORZADOS m2 63.18 47.40 2,994.73 0.00 0.00 0.00% 63.18 2,994.73 100.00% 63.18 2,994.73 100.00% 0.00 0.00 0.0%
05.02.03 ACERO ESTRUCTURAL TRABAJADO PARA SOBRECIMIENTOS REFORZADOS kg 387.39 4.28 1,658.03 0.00 0.00 0.00% 387.39 1,658.03 100.00% 387.39 1,658.03 100.00% 0.00 0.00 0.0%
5.03 VIGAS DE CIMENTACIÓN
05.03.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 103.90 471.06 48,943.13 103.90 48,943.13 100.00% 0.00 0.00 0.00% 103.90 48,943.13 100.00% 0.00 0.00 0.0%
05.03.02 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION kg 29,787.40 4.28 127,490.07 29,787.40 127,490.07 100.00% 0.00 0.00 0.00% 29,787.40 127,490.07 100.00% 0.00 0.00 0.0%
5.04 COLUMNAS
05.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 C/ADIT/PLASTIFICANTE-CARAVISTA m3 124.43 526.79 65,548.48 124.43 65,548.48 100.00% 0.00 0.00 0.00% 124.43 65,548.48 100.00% 0.00 0.00 0.0%
05.04.02 ENCOF. Y DESENCOF. CARAVISTA C/ADITIVO EN COLUMNAS m2 1,330.91 58.04 77,246.02 1,330.91 77,246.02 100.00% 0.00 0.00 0.00% 1,330.91 77,246.02 100.00% 0.00 0.00 0.0%
05.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 65,555.90 4.28 280,579.25 65,555.90 280,579.25 100.00% 0.00 0.00 0.00% 65,555.90 280,579.25 100.00% 0.00 0.00 0.0%
AVANCES
PRESUPUESTO SALDO
PARTIDA Descripción Und. ANTERIOR ACTUAL ACUMULADO
Metrado Precio S/. Parcial S/. Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. %
5.05 COLUMNAS DE CONFINAMIENTO
05.05.01 CONCRETO EN COLUMNAS DE CONFINAMIENTO F'C=175 KG/CM2 m3 40.16 458.25 18,403.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 40.16 18,403.32 100.0%
05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 644.01 42.78 27,550.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 644.01 27,550.75 100.0%
05.05.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS DE CONFINAMIENTO kg 4,004.93 4.28 17,141.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,004.93 17,141.10 100.0%
5.06 GARGOLA DE CONCRETO
05.06.01 GARGOLA DE CONCRETO TERMINADO S/DISEÑO und 12.00 110.82 1,329.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 1,329.84 100.0%
5.07 VIGAS
05.07.01 VIGAS: CONCRETO f`c=210 kg/cm2, C/ADITIVO PLASTIFICANTE - CARAVISTA m3 188.15 514.05 96,718.51 188.15 96,718.51 100.00% 0.00 0.00 0.00% 188.15 96,718.51 100.00% 0.00 0.00 0.0%
05.07.02 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 815.68 65.88 53,737.00 815.68 53,737.00 100.00% 0.00 0.00 0.00% 815.68 53,737.00 100.00% 0.00 0.00 0.0%
05.07.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 34,189.84 4.28 146,332.52 34,189.84 146,332.52 100.00% 0.00 0.00 0.00% 34,189.84 146,332.52 100.00% 0.00 0.00 0.0%
5.08 VIGUETAS DE CONFINAMIENTO
05.08.01 CONCRETO EN VIGAS DE CONFINAMIENTO F'C=175 KG/CM2 m3 25.30 448.78 11,354.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 25.30 11,354.13 100.0%
05.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CONFINAMIENTO m2 420.70 46.89 19,726.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 420.70 19,726.62 100.0%
05.08.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES kg 1,755.68 4.28 7,514.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,755.68 7,514.31 100.0%
5.09 LOSAS ALIGERADAS
05.09.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 95.96 499.25 47,908.03 95.96 47,908.03 100.00% 0.00 0.00 0.00% 95.96 47,908.03 100.00% 0.00 0.00 0.0%
05.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 1,011.05 50.08 50,633.38 1,011.05 50,633.38 100.00% 0.00 0.00 0.00% 1,011.05 50,633.38 100.00% 0.00 0.00 0.0%
05.09.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 12,257.28 4.24 51,970.87 12,257.28 51,970.87 100.00% 0.00 0.00 0.00% 12,257.28 51,970.87 100.00% 0.00 0.00 0.0%
05.09.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 11,962.53 5.12 61,248.15 11,962.53 61,248.15 100.00% 0.00 0.00 0.00% 11,962.53 61,248.15 100.00% 0.00 0.00 0.0%
5.1 CUNETA DE CONCRETO
05.10.01 CONCRETO EN CUNETAS DE F'C=210 KG/CM2 C/ADITIVO/PLASTIFICANTE-CARAVISTA m3 29.50 507.25 14,963.88 29.50 14,963.88 100.00% 0.00 0.00 0.00% 29.50 14,963.88 100.00% 0.00 0.00 0.0%
05.10.02 ENCOF. Y DESENCOF. CARAVISTA C/ADITIVO EN CUNETAS m2 498.50 66.43 33,115.36 498.50 33,115.36 100.00% 0.00 0.00 0.00% 498.50 33,115.36 100.00% 0.00 0.00 0.0%
05.10.03 ACERO ESTRUCTURAL TRABAJADO PARA CUNETA kg 2,524.95 4.28 10,806.79 2,524.95 10,806.79 100.00% 0.00 0.00 0.00% 2,524.95 10,806.79 100.00% 0.00 0.00 0.0%
5.11 LOSA MACIZA
05.11.01 CONCRETO EN LOSAS MACISAS F´C=210KG/CM2 m3 0.63 497.83 313.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.63 313.63 100.0%
05.11.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA MACISA m2 13.11 50.08 656.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.11 656.55 100.0%
05.11.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSA MACISA kg 56.38 4.24 239.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 56.38 239.05 100.0%
5.12 ESCALERA
05.12.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 20.00 506.92 10,138.40 5.00 2,534.60 25.00% 15.00 7,603.80 75.00% 20.00 10,138.40 100.00% 0.00 0.00 0.0%
05.12.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 104.00 70.04 7,284.16 50.00 3,502.00 48.08% 54.00 3,782.16 51.92% 104.00 7,284.16 100.00% 0.00 0.00 0.0%
05.12.03 ACERO ESTRUCTURAL TRABAJADO PARA ESCALERAS kg 2,195.98 4.28 9,398.79 2,195.98 9,398.79 100.00% 0.00 0.00 0.00% 2,195.98 9,398.79 100.00% 0.00 0.00 0.0%
5.13 CISTERNA DE CONCRETO ARMADO
05.13.01 CONCRETO EN TANQUE CISTERNA F'C=210 KG/CM2 + IMPERMEABILIZANTE m3 5.17 528.81 2,733.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.17 2,733.95 100.0%
05.13.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNA m2 155.04 37.55 5,821.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 155.04 5,821.75 100.0%
05.13.03 ACERO ESTRUCTURAL TRABAJADO PARA CISTERNA kg 506.89 4.28 2,169.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 506.89 2,169.49 100.0%
05.13.04 CAJA PARA REBOSE F'C=175 KG/CM2, INC. ENCOFRADO, ACERO Y ACABADO PULIDO m3 0.30 709.95 212.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.30 212.99 100.0%
5.14 TANQUE ELEVADO DE CONCRETO ARMADO
05.14.01 CONCRETO EN TANQUE ELEVADO F'C=210 KG/CM2 m3 17.20 538.19 9,256.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.20 9,256.87 100.0%
05.14.02 ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO m2 68.36 46.24 3,160.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 68.36 3,160.97 100.0%
05.14.03 ACERO ESTRUCTURAL TRABAJADO PARA TANQUE ELEVADO kg 330.40 4.28 1,414.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 330.40 1,414.11 100.0%
5.15 TANQUE SEPTICO
05.15.01 CONCRETO TANQUE SUB TERRANEO f'c= 210 kg/cm2 m3 4.31 526.95 2,271.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.31 2,271.15 100.0%
05.15.02 ENCOF. Y DESENCOF. NORMAL TANQUE SUB TERRANEO m2 36.45 37.55 1,368.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.45 1,368.70 100.0%
05.15.03 ACERO ESTRUCTURAL TRABAJADO PARA CISTERNA SUBTERRANEA kg 173.25 4.17 722.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 173.25 722.45 100.0%
05.15.04 CONCRETO TAPAS DE INSPECCION f'c= 210 kg/cm2 m3 0.17 491.68 83.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.17 83.59 100.0%
05.15.05 ENCOF. Y DESENCOF. NORMAL PARA TAPAS DE INSPECCION m2 1.32 35.66 47.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.32 47.07 100.0%
05.15.06 ACERO ESTRUCTURAL TRABAJADO PARA TAPAS DE INSPECCION kg 17.11 4.13 70.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.11 70.66 100.0%
5.16 POZO PERCOLADOR
05.16.01 CONCRETO POZO PERCOLADOR F'C=210 KG/CM2 m3 3.54 491.68 1,740.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.54 1,740.55 100.0%
05.16.02 ENCOFRADO Y DESENCOFRADO NORMAL POZO PERCOLADOR m2 18.24 50.08 913.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.24 913.46 100.0%
05.16.03 ACERO ESTRUCTURAL TRABAJADO PARA POZO PERCOLADOR kg 53.86 4.13 222.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 53.86 222.44 100.0%
05.16.04 TAPA DE CONCRETO PARA POZO PERCOLADOR und 2.00 112.10 224.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 224.20 100.0%
AVANCES
PRESUPUESTO SALDO
PARTIDA Descripción Und. ANTERIOR ACTUAL ACUMULADO
Metrado Precio S/. Parcial S/. Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. %
5.17 CAJA DE DISTRIBUCION DE CAUDALES
05.17.01 CONCRETO EN MUROS TABIQUES Y PLACAS f'c=210kg/cm2 m3 0.53 531.18 281.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.53 281.53 100.0%
05.17.02 ENCOFRADO Y DESENCOFRADO NORMAL CAJA DE DISTRIBUCION DE CAUDALES m2 8.64 37.55 324.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.64 324.43 100.0%
05.17.03 TAPA DE CONCRETO PARA CAJA DISTRIBUCION DE CAUDALES und 1.00 112.10 112.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 112.10 100.0%
6 ESTRUCTURA METALICA
6.01 TIJERALES METALICOS (TIPO 1) und 66.00 901.79 59,518.14 48.00 43,285.92 72.73% 18.00 16,232.22 27.27% 66.00 59,518.14 100.00% 0.00 0.00 0.0%
6.02 CORREAS METALICAS CON TUBO RECTANGULAR 25mmX50mm m 1,131.00 17.30 19,566.30 810.00 14,013.00 71.62% 321.00 5,553.30 28.38% 1,131.00 19,566.30 100.00% 0.00 0.00 0.0%
7 MUROS Y TABIQUES DE ALBAÑILERIA
7.01 MURO DE SOGA LADRILLO ARTESANAL KK M:1:1:4 e=1.5 cm m2 1,600.28 45.67 73,084.79 0.00 0.00 0.00% 1,200.00 54,804.00 74.99% 1,200.00 54,804.00 74.99% 400.28 18,280.79 25.0%
7.02 MURO DE CABEZA LADRILLO ARTESANAL K-K M:1:1:4 e=1.5cm m2 30.14 70.68 2,130.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.14 2,130.30 100.0%
8 FLETE TERRESTRE
8.01 FLETE TERRESTRE ANDAHUAYLAS - ANCATIRA GLB 1.00 62,895.64 62,895.64 1.00 62,895.64 100.00% 0.00 0.00 0.00% 1.00 62,895.64 100.00% 0.00 0.00 0.0%
9 PRUEBAS DE LABORATORIO
9.01 DISEÑO DE MEZCLAS und 30.00 413.00 12,390.00 30.00 12,390.00 100.00% 0.00 0.00 0.00% 30.00 12,390.00 100.00% 0.00 0.00 0.0%
9.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 250.00 70.80 17,700.00 100.00 7,080.00 40.00% 80.00 5,664.00 32.00% 180.00 12,744.00 72.00% 70.00 4,956.00 28.0%
9.03 ESTUDIO DE SUELOS (CAP. PORTANTE) und 8.00 826.00 6,608.00 8.00 6,608.00 100.00% 0.00 0.00 0.00% 8.00 6,608.00 100.00% 0.00 0.00 0.0%
1 REVOQUES ENLUCIDOS Y MOLDURAS
1.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-CAL-ARENA m2 106.60 16.97 1,809.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 106.60 1,809.00 100.0%
1.02 TARRAJEO MUROS INT. Y EXT. FROTACHADO MEZ.C:A 1:4,E=1.5 CM. m2 3,740.25 21.66 81,013.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,740.25 81,013.82 100.0%
1.03 TARRAJEO DE MUROS EXT. FROTACHADO MEZ.C:A 1:4,E=1.5 CM. A PARTIR DEL 2DO PISO m2 811.30 25.14 20,396.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 811.30 20,396.08 100.0%
1.04 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m 1,342.40 8.52 11,437.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,342.40 11,437.25 100.0%
1.05 EMPORRADO DE ESTRUCTURAS CARAVISTA m2 2,870.70 7.08 20,324.56 0.00 0.00 0.00% 1,500.00 10,620.00 52.25% 1,500.00 10,620.00 52.25% 1,370.70 9,704.56 47.7%
1.06 BRUÑAS S/DISEÑO m 1,278.40 4.70 6,008.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,278.40 6,008.48 100.0%
1.07 TARRAJEO PULIDO CON IMPERMEABILIZANTE MEZ.C:A 1:4,E=1.5 CM. m2 149.41 30.42 4,545.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 149.41 4,545.05 100.0%
2 CIELORRASOS
2.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 1,123.93 33.54 37,696.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,123.93 37,696.61 100.0%
2.02 FALSO CIELO RASO SISTEMA DRYWALL DE 1.20X2.40X15mm m2 1,039.50 57.90 60,187.05 520.00 30,108.00 50.02% 0.00 0.00 0.00% 520.00 30,108.00 50.02% 519.50 30,079.05 50.0%
2.03 VESTIDURA DE FONDO DE ESCALERA m2 165.20 34.17 5,644.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 165.20 5,644.88 100.0%
3 PISOS Y PAVIMENTOS
3.01 CONTRAPISO
03.01.01 CONTRAPISO DE 40mm m2 1,448.00 20.21 29,264.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,448.00 29,264.08 100.0%
3.02 PISOS
03.02.01 PISO MACHIHEMBRADO DE MADERA TORNILLO m2 799.50 132.30 105,773.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 799.50 105,773.85 100.0%
03.02.02 PISO DE CERAMICO TRANSITO INTENSO ANTIDESLIZANTE 0.30X0.30 m2 547.70 73.06 40,014.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 547.70 40,014.96 100.0%
03.02.03 PISO DE CEMENTO PULIDO Y BRUÑADO e=2"S/COLOREAR m2 5.30 38.22 202.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.30 202.57 100.0%
03.02.04 PISO DE CEMENTO PULIDO Y BRUÑADO C/IMPERMEABILIZANTE S/COLOREAR m2 132.00 42.32 5,586.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.00 5,586.24 100.0%
03.02.05 PISO DE CEMENTO FROTACHADO E=2" S/COLOREAR m2 354.10 31.89 11,292.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 354.10 11,292.25 100.0%
03.02.06 PROTECCION CON LADRILLO PASTELERO m2 8.14 75.12 611.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.14 611.48 100.0%
3.03 REVESTIMIENTO DE GRADAS Y ESCALERAS
03.03.01 REVESTIMIENTO CON CEMENTO PULIDO DE PASO Y CONTRAPASO m2 64.80 30.02 1,945.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 64.80 1,945.30 100.0%
3.04 VEREDAS Y RAMPAS
03.04.01 VEREDA DE F'C=175KG/CM2 e=6" BRUÑADO S/COLOREAR m2 483.71 87.99 42,561.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 483.71 42,561.64 100.0%
03.04.02 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" m 515.66 13.55 6,987.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 515.66 6,987.19 100.0%
AVANCES
PRESUPUESTO SALDO
PARTIDA Descripción Und. ANTERIOR ACTUAL ACUMULADO
Metrado Precio S/. Parcial S/. Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. %
3.05 LOSA MULTIDEPORTIVA
03.05.01 LOSA DE CONCRETO f'c=175 kg/cm2 m2 615.00 65.90 40,528.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 615.00 40,528.50 100.0%
03.05.02 ENCOFRADO Y DESENCOFRADO m2 121.60 31.18 3,791.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 121.60 3,791.49 100.0%
03.05.03 CURADO DE LOSA m2 615.00 1.47 904.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 615.00 904.05 100.0%
03.05.04 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" m 320.00 13.55 4,336.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 320.00 4,336.00 100.0%
4 ESTRADO
4.01 CONCRETO PARA ESTRADO F'C=140KG/CM2 + 30%P.G. m3 5.32 222.73 1,184.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.32 1,184.92 100.0%
4.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESTRADO m2 6.40 32.34 206.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.40 206.98 100.0%
4.03 ACABADO DE PISO CON CEMENTO PULIDO Y COLOREADO m2 13.90 38.22 531.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.90 531.26 100.0%
5 SARDINELES DE CONCRETO SIMPLE
5.01 EXC. DE ZANJA PARA SARDINELES m 873.85 1.11 969.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 873.85 969.97 100.0%
5.02 CONCRETO f´c= 175kg/cm2 PARA SARDINELES INC. ACABADO PULIDO S/COLOR m 688.74 28.34 19,518.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 688.74 19,518.89 100.0%
5.03 ENCOFRADO Y DESENCOFRADO NORMAL SARDINELES m2 653.88 25.09 16,405.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 653.88 16,405.85 100.0%
6 CONTRAZOCALOS
6.01 CONTRAZOCALO DE MADERA TORNILLO 3/4"X3" RODON 3/4" m 465.20 22.83 10,620.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 465.20 10,620.52 100.0%
6.02 CONTRAZOCALO DE LOSETA CERAMICA DE 10 x 30 h=10 cm, RODON 3/4" PVC m 348.00 20.88 7,266.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 348.00 7,266.24 100.0%
6.03 CONTRAZOCALO CEMENTO SIN COLOREAR H = 0.20 M MEZ. 1:5 m 741.35 14.04 10,408.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 741.35 10,408.55 100.0%
7 ZOCALOS Y ENCHAPES
7.01 ZOCALO DE CERAMICO DE 20 X 30 CM, RODON 3/4" PVC m2 106.20 71.41 7,583.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 106.20 7,583.74 100.0%
8 CUBIERTAS y TECHOS
0 COBERTURA DE TECHO CON TEJA ANDINA FIBRO CEMENTO m2 1,082.80 70.77 76,629.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,082.80 76,629.76 100.0%
8.02 CUMBRERA CON TEJA ANDINA FIBRO CEMENTO m 128.30 51.28 6,579.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 128.30 6,579.22 100.0%
9 CARPINTERIA DE MADERA Y MELAMINE
9.01 PUERTA APANELADA DE MADERA TORNILLO m2 97.70 275.21 26,888.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 97.70 26,888.02 100.0%
9.02 PUERTAS CONTRAPLACADAS DE 45 MM C/TRIPLAY DE 6MM+ MARCO DE 2"X4". m2 39.70 196.41 7,797.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 39.70 7,797.48 100.0%
9.03 DIVISOR DE BAÑOS DE MELAMINE EN RETICULA DE ALUMINIO INC PUERTAS Y ACC. DE INST. m2 25.00 150.12 3,753.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 25.00 3,753.00 100.0%
10 CERRAJERIA
10.01 CERRADURA DE PERILLA CON BOTON INTERIOR und 19.00 88.18 1,675.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.00 1,675.42 100.0%
10.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" pza 208.00 10.49 2,181.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 208.00 2,181.92 100.0%
10.03 CHAPA PARA EXTERIOR CON LLAVE INTERIOR Y EXTERIOR 3 GOLPES INC. MANIJA und 31.00 112.49 3,487.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 31.00 3,487.19 100.0%
11 ESTRUCTURA DE CONCRETO
11.01 PIRAMIDE DE CONCRETO und 2.00 119.07 238.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 238.14 100.0%
11.02 LOSA INCLINADA P/ABDOMINALES und 2.00 745.42 1,490.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,490.84 100.0%
12 CARPINTERIA METALICA
12.01 POSTE DE VOLEY C/NET INCLUYE ANCLAJES EMPOTRADOS und 4.00 170.39 681.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 681.56 100.0%
12.02 ARCO DE FUTBOL INCL ESTRUCTURA TABLERO DE BASQUET und 2.00 1,538.01 3,076.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 3,076.02 100.0%
12.03 BARRAS FIJAS und 2.00 768.22 1,536.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,536.44 100.0%
12.04 BARRAS PARALELAS und 2.00 792.85 1,585.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,585.70 100.0%
12.05 PASAMANOS PARA MINIGIMNASIO und 2.00 1,193.48 2,386.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 2,386.96 100.0%
12.06 PASAMANOS DE TUBO F° G ° D=2" EN ESCALERA Y RAMPAS m 55.60 36.89 2,051.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 55.60 2,051.08 100.0%
12.07 PUERTA DE FIERRO EN INGRESO PRINCIPAL INC. PINTURA und 2.00 4,000.00 8,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 8,000.00 100.0%
12.08 LETRAS DE BRONCE DE 0.25X 0.25M PARA NOMBRE DE INSTITUCION und 18.00 150.00 2,700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 2,700.00 100.0%
12.09 ASTA DE BANDERA S/PLANOS, INC. ANCLAJES, PINTURA E INSTALACION und 2.00 759.72 1,519.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,519.44 100.0%
12.1 CANTONERA DE FIERRO ESTRIADO EN ESCALERA. m 132.00 50.04 6,605.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.00 6,605.28 100.0%
12.11 VENTANA DE ALUMINIO GRIS INC. TODOS SUS ACCESORIOS m2 255.30 152.53 38,940.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 255.30 38,940.91 100.0%
12.12 VENTANA DE REJA METALICA (VM)SEGÚN DISEÑO INC. ACCESORIO DE FIJACION Y PINTURA m2 1.03 122.83 126.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.03 126.51 100.0%
12.13 PUERTA METALICA (PUERTA CASETA)SEGÚN DISEÑO INC. ACCESORIOS, CERRAJERIA Y PINTU m2 1.44 622.94 897.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.44 897.03 100.0%
12.14 ESCALERA DE GATO METALICA CON F°G° 1" INC. ACCE. E INSTALACION. m 10.95 95.00 1,040.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.95 1,040.25 100.0%
12.15 TAPA METALICA C/PLANCHA ESTRIADA DE 85X85X1/16" SEGÚN DISEÑO INC. ACCES. Y PINTU und 1.00 235.00 235.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 235.00 100.0%
12.16 TAPA METALICA C/PLANCHA ESTRIADA DE 30X25X1/16" SEGÚN DISEÑO INC. ACCES. Y PINTU und 1.00 105.00 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 105.00 100.0%
12.17 REJILLA METALICA DE 30X25 SEGÚN DISEÑO INC. ACCES. Y PINTURA und 1.00 65.00 65.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 65.00 100.0%
13 VIDRIOS, CRISTALES Y SIMILARES
13.01 VIDRIO CRUDO DE 4MM TRASPARENTE p2 3,061.90 6.75 20,667.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,061.90 20,667.83 100.0%
14 PINTURA
14.01 PINTURA AL TEMPLE EN CIELO RASO 2 MANOS m2 1,405.23 6.04 8,487.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,405.23 8,487.59 100.0%
14.02 PINTURA MUROS INTERIORES Y EXTERIORES C/LATEX (2 MANOS) m2 5,857.82 7.62 44,636.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,857.82 44,636.59 100.0%
14.03 PINTURA EN CERCOS C/ESMALTE (2 MANOS) m2 434.93 5.51 2,396.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 434.93 2,396.46 100.0%
14.04 PINTURA CARPINTERIA MADERA C/BARNIZ (2 MANOS) m2 274.80 16.02 4,402.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 274.80 4,402.30 100.0%
14.05 PINTURA CONTRAZOCALO C/ESMALTE H=0.20 M m 1,134.70 6.01 6,819.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,134.70 6,819.55 100.0%
14.06 PINTURA DE TRAFICO EN LOSAS DEPORTIVAS m 460.62 2.17 999.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 460.62 999.55 100.0%
AVANCES
PRESUPUESTO SALDO
PARTIDA Descripción Und. ANTERIOR ACTUAL ACUMULADO
Metrado Precio S/. Parcial S/. Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. %
14.07 PINTURA CEMENTICA RAYA, IMPERMEABILIZANTE EN ELEMENTOS CARAVISTA m2 2,870.70 26.08 74,867.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,870.70 74,867.86 100.0%
15 VARIOS
15.01 JUNTA CON WATERSTOP m 63.64 37.77 2,403.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 63.64 2,403.68 100.0%
15.02 JUNTA DE CONSTRUCCION CON TECNOPOR E=1" m2 264.79 14.61 3,868.58 220.00 3,214.20 83.08% 22.00 321.42 8.31% 242.00 3,535.62 91.39% 22.79 332.96 8.6%
15.03 JUNTA CON ESPUMA DE POLIURETANO SIMILAR AL SIKA BOOM m 1,871.00 4.52 8,456.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,871.00 8,456.92 100.0%
15.04 TAPAJUNTA CON ACERO LAC DE 1/4"X6" EN PISO INC. PINTURA EPOXICA m 42.00 27.75 1,165.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 42.00 1,165.50 100.0%
15.05 TAPAJUNTA CON ACERO LAC DE 1/8" EN TECHO INC. PINTURA EPOXICA m 42.00 33.23 1,395.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 42.00 1,395.66 100.0%
15.06 MESA DE CONCRETO ARMADO, REV. CON MAYOLICA, PARA TRABAJO m2 20.80 317.31 6,600.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.80 6,600.05 100.0%
15.07 SARDINEL, REV. CON MAYOLICA DE 30X30 CM BLANCA m 16.70 55.16 921.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.70 921.17 100.0%
15.08 FILTRO PIEDRA 6" m3 1.85 39.86 73.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.85 73.74 100.0%
15.09 FILTRO CON PIEDRA CHANCADA DE 1/2" m3 10.62 122.26 1,298.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.62 1,298.40 100.0%
16 EQUIPAMIENTO LOSA DEPORTIVA
16.01 REDES PARA LOSA MULTIPLE GLB 2.00 432.00 864.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 864.00 100.0%
16.02 SUMINISTRO DE DIVERSAS PELOTAS und 3.00 880.00 2,640.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 2,640.00 100.0%
16.03 SUMINISTRO Y ESPARCIDO DE ARENA FINA m3 37.56 128.12 4,812.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 37.56 4,812.19 100.0%
16.04 SUMINISTRO Y COLOC. DE TACO DE MADERA 8" x 4" und 2.00 288.29 576.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 576.58 100.0%
17 AREAS VERDES Y EQUIPAMIENTO AFÍN
17.01 SEMBRADO DE GRASS m2 2,348.84 12.18 28,608.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,348.84 28,608.87 100.0%
17.02 SEMBRADO DE ARBOLES Y ARBUSTOS TIPICOS DE LA ZONA GLB 1.00 5,138.16 5,138.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 5,138.16 100.0%
1 SALIDAS PARA ALUMBRADO
1.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3/4) pto 283.00 74.47 21,075.01 270.00 20,106.90 95.41% 0.00 0.00 0.00% 270.00 20,106.90 95.41% 13.00 968.11 4.6%
1.02 SALIDA DE PARED C/PVC SAP 20 MM (TW 2.5 MM2) pto 5.00 63.89 319.45 5.00 319.45 100.00% 0.00 0.00 0.00% 5.00 319.45 100.00% 0.00 0.00 0.0%
1.03 SUMINISTRO Y COLOC. DE POSTE MET. P/ALUMBRADO DE PARQUE H=3.2M IN C. INST, CABLE und 7.00 1,062.09 7,434.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 7,434.63 100.0%
1.04 SUM. Y COLOC. DE POSTE CONCRETO ARMADO CENTRIFUGADO 8/200/120 und 4.00 1,049.31 4,197.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 4,197.24 100.0%
2 SALIDAS PARA INTERRUPTORES
2.01 INTERRUPTOR BIPOLAR SIMPLE C/PVC SAP 20MM(TW 2.5MM2) pto 21.00 67.08 1,408.68 15.00 1,006.20 71.43% 0.00 0.00 0.00% 15.00 1,006.20 71.43% 6.00 402.48 28.6%
2.02 INTERRUPTOR BIPOLAR DOBLE C/PVC SEL 20 MM (TW 2.5 MM2) pto 22.00 62.51 1,375.22 16.00 1,000.16 72.73% 0.00 0.00 0.00% 16.00 1,000.16 72.73% 6.00 375.06 27.3%
2.03 INTERRUPTOR BIPOLAR DOBLE ADOSADO C/PVC SEL 20 MM (TW 2.5 MM2) pto 2.00 67.08 134.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 134.16 100.0%
2.04 INTERRUPTOR BIPOLAR TRIPLE C/PVC SEL 20 MM (TW 2.5 MM2) pto 1.00 62.51 62.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 62.51 100.0%
2.05 INTERRUPTOR DE CONMUTACION SIMPLE C/PVC SEL 20 MM (TW 2.5 MM2) pto 12.00 76.91 922.92 8.00 615.28 66.67% 0.00 0.00 0.00% 8.00 615.28 66.67% 4.00 307.64 33.3%
2.06 INTERRUPTOR DE CONMUTACION SIMPLE ADOSADO C/PVC SEL 20 MM (TW 2.5 pto 18.00 81.48 1,466.64 14.00 1,140.72 77.78% 0.00 0.00 0.00% 14.00 1,140.72 77.78% 4.00 325.92 22.2%
3 SALIDAS PARA TOMACORRIENTE
3.01 TOMACORRIENTE BIPOLAR DOBLE 16 A C/TIERRA PVC SAP 20 MM. pto 239.00 79.27 18,945.53 210.00 16,646.70 87.87% 0.00 0.00 0.00% 210.00 16,646.70 87.87% 29.00 2,298.83 12.1%
4 INSTALACIONES DE REDES ESPECIALES
4.01 SALIDAS ESPECIALES
04.01.01 SALIDA SIMPLE DE DATA CON PLACA DE COMPUTO EN TECHO pto 1.00 94.43 94.43 1.00 94.43 100.00% 0.00 0.00 0.00% 1.00 94.43 100.00% 0.00 0.00 0.0%
04.01.02 SALIDA DOBLE DE DATA CON PLACA DE COMPUTO EN PARED pto 18.00 86.37 1,554.66 18.00 1,554.66 100.00% 0.00 0.00 0.00% 18.00 1,554.66 100.00% 0.00 0.00 0.0%
04.01.03 SALIDA PARA TELEFONIA EXTERNA y/o INTERNET pto 1.00 141.46 141.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 141.46 100.0%
04.01.04 SALIDA PARA CATV pto 3.00 126.36 379.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 379.08 100.0%
04.01.05 SALIDA PARA VGA PROYECTOR MULTIMEDIA pto 4.00 143.41 573.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 573.64 100.0%
04.01.06 SALIDA PARA CENSOR CONTRA INCENDIO pto 31.00 70.05 2,171.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 31.00 2,171.55 100.0%
04.01.07 SALIDA P/TIMBRE, INC. 03 ARTEFACTOS SIMPLE TIPO ALARMA C/PULSADOR INTER, INC. CABLE pto 1.00 534.47 534.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 534.47 100.0%
04.01.08 SALIDA PARA PARLANTES pto 8.00 176.08 1,408.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 1,408.64 100.0%
04.01.09 SALIDA PARA MICROFONO pto 1.00 176.08 176.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 176.08 100.0%
04.01.10 SALIDA PARA ESTACION MANUAL Y ESTROBO/SIRENA pto 1.00 91.02 91.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 91.02 100.0%
04.01.11 SALIDAS DE FUERZA PARA BOMBA DE 1.4HP pto 2.00 66.31 132.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 132.62 100.0%
04.01.12 SALIDA PARA CONTROL DE NIVELES DE ALMACENAMIENTO pto 2.00 105.27 210.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 210.54 100.0%
4.02 CAJAS DE PASE
04.02.01 CAJAS DE PASO 200X200X75 und 5.00 30.50 152.50 2.00 61.00 40.00% 2.00 61.00 40.00% 4.00 122.00 80.00% 1.00 30.50 20.0%
04.02.02 CAJAS DE PASO 200X200X100 pza 5.00 46.68 233.40 2.00 93.36 40.00% 2.00 93.36 40.00% 4.00 186.72 80.00% 1.00 46.68 20.0%
04.02.03 CAJAS DE PASO 300X150X100 pza 1.00 50.22 50.22 0.00 0.00 0.00% 1.00 50.22 100.00% 1.00 50.22 100.00% 0.00 0.00 0.0%
04.02.04 CAJAS DE PASO 150X150X100 pza 9.00 43.14 388.26 5.00 215.70 55.56% 3.00 129.42 33.33% 8.00 345.12 88.89% 1.00 43.14 11.1%
4.03 EQUIPOS ELECTRICOS MECANICOS Y ESPECIALES
04.03.01 SWITCH ADMINISTRABLE DE 48 PUERTOS 10/100/1000 T+ 4 PUERTOS SFP 1000MBPS eqp 1.00 4,578.28 4,578.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 4,578.28 100.0%
04.03.02 PATCH PANEL CAT6 DE 48 PUERTOS und 1.00 628.91 628.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 628.91 100.0%
04.03.03 UPS RACKEABLE DE 15KW und 1.00 32.24 32.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 32.24 100.0%
04.03.04 INSTALACION Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE DATA GLB 1.00 2,596.00 2,596.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,596.00 100.0%
4.04 INSTALACION DE PARARAYOS
04.04.01 PARARRAYOS PDC. CON DISPOSITIVO DE CEBADO NO RADIOACTIVO R=103 METROS GLB 1.00 12,068.96 12,068.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 12,068.96 100.0%
04.04.02 POZO DE PROTECCION A TIERRA C/3 DOSIS DE THOR-GEL (5/8") und 3.00 873.39 2,620.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 2,620.17 100.0%
4.05 SISTEMA MULTIMEDIA
04.05.01 SISTEMA MULTIMEDIA GLB 1.00 4,023.80 4,023.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 4,023.80 100.0%
AVANCES
PRESUPUESTO SALDO
PARTIDA Descripción Und. ANTERIOR ACTUAL ACUMULADO
Metrado Precio S/. Parcial S/. Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. %
4.06 SISTEMA DETECCION CONTRAINCENDIO
04.06.01 SISTEMA DETECCION CONTRAINCENDIO GLB 1.00 17,453.38 17,453.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 17,453.38 100.0%
AVANCES
PRESUPUESTO SALDO
PARTIDA Descripción Und. ANTERIOR ACTUAL ACUMULADO
Metrado Precio S/. Parcial S/. Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. %
4.07 CANALIZACIONES Y/O TUBERIA
04.07.01 ENTUBADO PARA DISTRIBUCION DE TELEFONO EXTERNO Y/ O TV POR CABLE 20 mm PVC-P m 5.00 12.86 64.30 0.00 0.00 0.00% 5.00 64.30 100.00% 5.00 64.30 100.00% 0.00 0.00 0.0%
5 TABLEROS
5.01 TABLEROS DE DISTRIBUCION GLB 1.00 10,020.96 10,020.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 10,020.96 100.0%
5.02 TABLERO GENERAL und 1.00 2,566.57 2,566.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,566.57 100.0%
5.03 TABLERO DE BOMBAS und 1.00 542.64 542.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 542.64 100.0%
5.04 TABLERO ESTABILIZADO und 1.00 843.54 843.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 843.54 100.0%
6 CAJAS DE PASE
6.01 CAJA DE PASE DE FIERRO GALVANIZADO DE 200 x 200 x 100 und 16.00 30.50 488.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.00 488.00 100.0%
6.02 CAJA PORTAMEDIDOR pza 1.00 568.53 568.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 568.53 100.0%
6.03 BUZONETA DE CONCRETO, PARA REDES ELECTRICAS EXTERIORES und 4.00 422.41 1,689.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,689.64 100.0%
7 CABLES Y CONDUCTORES
7.01 CABLE N2XOH 4MM2 m 1,975.50 4.08 8,060.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,975.50 8,060.04 100.0%
7.02 CABLE N2XOH 6MM2 m 292.95 6.51 1,907.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 292.95 1,907.10 100.0%
7.03 CABLE N2XOH 10MM2 m 79.47 14.56 1,157.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 79.47 1,157.08 100.0%
7.04 CABLE N2XOH 16MM2 m 279.96 23.29 6,520.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 279.96 6,520.27 100.0%
7.05 CABLE N2XOH 25MM2 m 411.48 32.88 13,529.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 411.48 13,529.46 100.0%
7.06 CABLE N2XOH 50MM2 m 150.00 58.33 8,749.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 150.00 8,749.50 100.0%
7.07 CABLE NYY 4MM2 m 667.11 3.86 2,575.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 667.11 2,575.04 100.0%
7.08 CABLE DE COBRE DESNUDO DE 1X50mm2 Cu.TB m 14.00 43.94 615.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.00 615.16 100.0%
8 CANALIZACIONES Y/O TUBERIAS
8.01 TUBERIA PVC SAP (ELECTRICAS) D=20 MM m 378.02 12.86 4,861.34 360.00 4,629.60 95.23% 0.00 0.00 0.00% 360.00 4,629.60 95.23% 18.02 231.74 4.8%
8.02 TUBERIA PVC SAP (ELECTRICAS) D=25 MM m 93.32 13.28 1,239.29 85.00 1,128.80 91.08% 0.00 0.00 0.00% 85.00 1,128.80 91.08% 8.32 110.49 8.9%
8.03 TUBERIA PVC SAP (ELECTRICAS) D=35 MM m 187.16 14.29 2,674.52 165.00 2,357.85 88.16% 0.00 0.00 0.00% 165.00 2,357.85 88.16% 22.16 316.67 11.8%
8.04 TUBERIA F°G° (ELECTRICAS) D= 25 MM m 14.00 18.14 253.96 12.00 217.68 85.71% 0.00 0.00 0.00% 12.00 217.68 85.71% 2.00 36.28 14.3%
8.05 TRAZO Y REPLANTEO DE OBRAS LONGITUDINALES m 232.70 2.09 486.34 232.70 486.34 100.00% 0.00 0.00 0.00% 232.70 486.34 100.00% 0.00 0.00 0.0%
8.06 EXCAVACION DE ZANJAS PARA INSTALACIONES ELECTRICAS EXTERIORES m3 70.04 19.06 1,334.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 70.04 1,334.96 100.0%
8.07 RELLENO MANUAL CON MATERIAL PROPIO EN ZANJAS PARA INSTALACIONES ELECTRICAS m3 42.78 13.80 590.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 42.78 590.36 100.0%
8.08 ELIMINACION DE MATERIAL EXEDENTE PRODUCTO DE LAS EXCAVACIONES m3 35.44 23.53 833.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.44 833.90 100.0%
8.09 CONCRETO DE PROTECCION PARA CONDUCTOS - F'C =100KG/CM2 m3 2.00 505.96 1,011.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,011.92 100.0%
8.1 SOLADO DE CONCRETO MEZCLA C:A:P-1:3:5 m3 1.25 315.27 394.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.25 394.09 100.0%
9 PRUEBAS DE AISLAMIENTO Y RESISTIVIDAD
9.01 PRUEBA DE AISLAMIENTO Y RESISTIVIDAD GLB 1.00 1,344.00 1,344.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,344.00 100.0%
10 ARTEFACTOS DE ALUMBRADO
10.01 LUMINARIA BCS640 W21L125 1XLED48/840 LIN-PC o similar POTENCIA=42W FLUJO LUMINOS pza 127.00 190.73 24,222.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 127.00 24,222.71 100.0%
10.02 LUMINARIA BCW216 1X25 LT-GA/840 o similar POTENCIA=25W FLUJO LUMINOSO = 1729 IM pza 113.00 120.73 13,642.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 113.00 13,642.49 100.0%
10.03 LUMINARIA TCW216V1XTL-D18W_25-740 o similar POTENCIA=26W FLUJO LUMINOSO = 825 pza 38.00 90.73 3,447.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 38.00 3,447.74 100.0%
10.04 LUMINARIA RVP251 1XCDM-TD150W S-942 o similar POTENCIA=157W FLUJO LUMINOSO = 99 pza 4.00 519.20 2,076.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2,076.80 100.0%
10.05 LAMPARA AHORRADORA DE 70 W pza 2.00 74.41 148.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 148.82 100.0%
10.06 INSTALACION DE LUMINARIA TIPO URBANA POTENCIA=80W FLUJO LUMINOSO = 3471 IM pza 11.00 164.89 1,813.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.00 1,813.79 100.0%
10.07 INSTALACION DE REFLECTORES CoreLine Tempo LED potencia=120w /flujo luminoso =12000 pza 16.00 623.67 9,978.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.00 9,978.72 100.0%
11 SISTEMA DE ENERGIA PARA EMERGENCIAS
11.01 TOMACORRIENTE BIPOLAR SIMPLE 16 A PVC SAP 20 MM. P/LUCES DE EMERGENCIA pto 34.00 74.03 2,517.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 34.00 2,517.02 100.0%
11.02 ARTEFACTO PARA LUCES DE EMERGENCIA und 34.00 130.29 4,429.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 34.00 4,429.86 100.0%
12 SISTEMA DE PUESTA A TIERRA
12.01 POZO DE PROTECCION A TIERRA C/3 DOSIS DE THOR-GEL (5/8") und 2.00 873.39 1,746.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,746.78 100.0%
AVANCES
PRESUPUESTO SALDO
PARTIDA Descripción Und. ANTERIOR ACTUAL ACUMULADO
Metrado Precio S/. Parcial S/. Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. %
1 SISTEMA DE DESAGUE
1.01 SALIDA DE DESAGUE Y VENTILACION
01.01.01 SALIDA DE PVC SAL PARA DESAGUE DE 2" pto 50.00 50.77 2,538.50 50.00 2,538.50 100.00% 0.00 0.00 0.00% 50.00 2,538.50 100.00% 0.00 0.00 0.0%
01.01.02 SALIDA DE PVC SAL PARA DESAGUE DE 4" pto 11.00 116.17 1,277.87 11.00 1,277.87 100.00% 0.00 0.00 0.00% 11.00 1,277.87 100.00% 0.00 0.00 0.0%
01.01.03 SALIDA DE PVC SAL PARA VENTILACION DE 2" pto 4.00 926.48 3,705.92 4.00 3,705.92 100.00% 0.00 0.00 0.00% 4.00 3,705.92 100.00% 0.00 0.00 0.0%
01.01.04 REBOSE DE CISTERNA C/TUB. DE FºGº D=4" und 1.00 85.60 85.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 85.60 100.0%
01.01.05 INSTALACION DE REBOSE Y VENTILACION P/T.E. C/TUB. DE F°G° D=2" und 1.00 210.37 210.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 210.37 100.0%
1.02 REDES DE DISTRIBUCION DE DESAGUE
01.02.01 TRAZO Y REPLANTEO DE OBRAS LONGITUDINALES m 105.85 2.09 221.23 105.85 221.23 100.00% 0.00 0.00 0.00% 105.85 221.23 100.00% 0.00 0.00 0.0%
01.02.02 EXCAVACION DE ZANJAS PARA TUBERIAS m3 57.16 19.06 1,089.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 57.16 1,089.47 100.0%
01.02.03 RELLENO MANUAL CON MATERIAL PROPIO EN ZANJAS PARA TUBERIAS m3 47.63 13.80 657.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 47.63 657.29 100.0%
01.02.04 CAMA DE APOYO PARA TUBERIA m 105.85 3.16 334.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 105.85 334.49 100.0%
01.02.05 TUBERIA PVC SAL 2" DESAGUE m 91.88 14.08 1,293.67 91.88 1,293.67 100.00% 0.00 0.00 0.00% 91.88 1,293.67 100.00% 0.00 0.00 0.0%
01.02.06 TUBERIA PVC SAL 4" DESAGUE m 166.45 23.94 3,984.81 166.45 3,984.81 100.00% 0.00 0.00 0.00% 166.45 3,984.81 100.00% 0.00 0.00 0.0%
01.02.07 ABRAZADERA DE FIJACION P/TUB.4D" pza 6.00 12.72 76.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 76.32 100.0%
01.02.08 FALZA COLUMNA DE CONCRETO f`c=210 kg/cm2 INC. ENCOFRADO Y ACERO m 3.30 43.30 142.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.30 142.89 100.0%
01.02.09 EMPALME A LA RED EXISTENTE DE DESAGUE und 1.00 176.94 176.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 176.94 100.0%
1.03 ADITAMENTOS VARIOS
01.03.01 SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION und 46.00 39.41 1,812.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 46.00 1,812.86 100.0%
01.03.02 REGISTRO DE BRONCE DE 2" PROVISION Y COLOCACION und 4.00 41.10 164.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 164.40 100.0%
01.03.03 REGISTRO DE BRONCE 4" PROVISION Y COLOCACION und 3.00 54.92 164.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 164.76 100.0%
01.03.04 SOMBRERO DE VENTILACION PVC DE 2" und 2.00 13.48 26.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 26.96 100.0%
01.03.05 Tee PVC SAL 4" und 4.00 17.54 70.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 70.16 100.0%
1.04 CAJA DE REGISTRO EXTERIOR
01.04.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 12.00 193.54 2,322.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 2,322.48 100.0%
01.04.02 CAJAS DE REGISTRO DE DESAGUE 24" X 24" pza 7.00 348.70 2,440.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 2,440.90 100.0%
1.05 PRUEBAS HIDRAULICAS
01.05.01 PRUEBA HIDRAULICA DE SIST. DE DESAGUE GLB 1.00 1,653.00 1,653.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,653.00 100.0%
2 SISTEMA DE AGUA FRIA
2.01 SALIDAS DE AGUA FRIA
02.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 51.00 67.85 3,460.35 40.00 2,714.00 78.43% 0.00 0.00 0.00% 40.00 2,714.00 78.43% 11.00 746.35 21.6%
02.01.02 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 3/4" pto 3.00 68.66 205.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 205.98 100.0%
2.02 REDES DE DISTRIBUCION DE AGUA FRIA
02.02.01 TRAZO Y REPLANTEO DE OBRAS LONGITUDINALES m 74.65 2.09 156.02 74.65 156.02 100.00% 0.00 0.00 0.00% 74.65 156.02 100.00% 0.00 0.00 0.0%
02.02.02 EXCAVACION DE ZANJAS PARA TUBERIAS m3 11.94 19.06 227.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.94 227.58 100.0%
02.02.03 RELLENO MANUAL CON MATERIAL PROPIO EN ZANJAS PARA TUBERIAS m3 7.47 13.80 103.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.47 103.09 100.0%
02.02.04 CAMA DE APOYO PARA TUBERIA m 74.65 3.16 235.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 74.65 235.89 100.0%
02.02.05 RED DE DISTRIBUCION TUBERIA DE 1 1/2"PVC-SAP m 10.70 14.41 154.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.70 154.19 100.0%
02.02.06 RED DE DISTRIBUCION TUBERIA 1"PVC-SAP m 11.65 12.59 146.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.65 146.67 100.0%
02.02.07 RED DE DISTRIBUCION TUBERIA 3/4"PVC-SAP m 74.88 9.69 725.59 74.88 725.59 100.00% 0.00 0.00 0.00% 74.88 725.59 100.00% 0.00 0.00 0.0%
02.02.08 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 81.95 8.09 662.98 81.95 662.98 100.00% 0.00 0.00 0.00% 81.95 662.98 100.00% 0.00 0.00 0.0%
02.02.09 EMPALME A LA RED EXISTENTE DE AGUA und 1.00 141.98 141.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 141.98 100.0%
AVANCES
PRESUPUESTO SALDO
PARTIDA Descripción Und. ANTERIOR ACTUAL ACUMULADO
Metrado Precio S/. Parcial S/. Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. %
2.03 LLAVES Y VALVULAS
02.03.01 VALVULA COMPUERTA DE BRONCE DE 1/2" und 7.00 85.51 598.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 598.57 100.0%
02.03.02 VALVULA DE COMPUERTA DE BRONCE DE 3/4" und 1.00 94.47 94.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 94.47 100.0%
02.03.03 VALVULA DE COMPUERTA DE BRONCE DE 1" und 1.00 117.56 117.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 117.56 100.0%
02.03.04 CAJA DE MADERA PARA VALVULAS EN NICHO DE MAYOLICA (PARED) pza 8.00 108.70 869.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 869.60 100.0%
02.03.05 CAJA DE VALVULAS (BYPASS) EN PISO pza 1.00 104.97 104.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 104.97 100.0%
02.03.06 GRIFO DE RIEGO DE 1/2" INCLUYE MURETE, VALVULA COMPUERTA, ETC. und 3.00 219.86 659.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 659.58 100.0%
2.04 PRUEBAS HIDRAULICAS Y DESINFECCION
02.04.01 PRUEBA HIDRAULICA + DESINFECCION DE SIST. DE AGUA FRIA GLB 1.00 1,653.00 1,653.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,653.00 100.0%
2.05 SISTEMA BOMBEO
02.05.01 EQUIPO DE BOMBEO P/AGUA POTABLE INC. 02 BOMBAS DE 1.4HP TABLERO (TB), GLB 1.00 11,493.75 11,493.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 11,493.75 100.0%
02.05.02 INSTALACION DE SUCCION E IMPULSO GLB 1.00 765.43 765.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 765.43 100.0%
02.05.03 INSTALACION DE ALIMENTADOR A LOS SERVICIOS GLB 1.00 315.71 315.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 315.71 100.0%
02.05.04 INSTALACION DE SISTEMA DE LLENADO DE CISTERNA GLB 1.00 412.21 412.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 412.21 100.0%
3 APARATOS Y ACCESORIOS SANITARIOS
3.01 APARATOS SANITARIOS
03.01.01 INODORO TANQUE BAJO BLANCO CON ACCESORIOS pza 20.00 367.02 7,340.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 7,340.40 100.0%
03.01.02 URINARIO TIPO PICO DE LORO, DE LOZA BLANCA VITRIFICADA und 3.00 237.03 711.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 711.09 100.0%
03.01.03 LAVATORIO DE PEDESTAL BLANCO pza 10.00 261.39 2,613.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 2,613.90 100.0%
03.01.04 LAVADERO DE Aºlº DE DOS POZAS und 1.00 532.52 532.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 532.52 100.0%
3.02 ACCESORIOS SANITARIOS
03.02.01 PAPELERA DE LOSA DE COLOR 15 X 15 CM pza 3.00 25.31 75.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 75.93 100.0%
03.02.02 JABONERA DE CERAMICA PARA BAÑO und 3.00 25.31 75.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 75.93 100.0%
03.02.03 ESPEJO BISELADO DE 0.60 x 0.90 m und 12.00 103.52 1,242.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 1,242.24 100.0%
03.02.04 DISPENSADOR DE PAPEL TOALLA INTERFOLIADO DE ACERO INOXIDABLE. CAPACIDAD DE 300 und 2.00 76.63 153.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 153.26 100.0%
03.02.05 DUCHA CROMADA INC. GRIFERIA pza 1.00 129.50 129.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 129.50 100.0%
03.02.06 PASAMANO PARA MINUSVALIDOS CON TUBO DE ACERO INOXIDABLE DE 1 1/2" und 1.00 140.40 140.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 140.40 100.0%
4 SISTEMA DE AGUAS PLUVIALES
4.01 TRAZO Y REPLANTEO DE OBRAS LONGITUDINALES m 383.40 2.09 801.31 0.00 0.00 0.00% 383.40 801.31 100.00% 383.40 801.31 100.00% 0.00 0.00 0.0%
4.02 EXCAVACION DE ZANJAS PARA TUBERIAS m3 183.28 19.06 3,493.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 183.28 3,493.32 100.0%
4.03 RELLENO MANUAL CON MATERIAL PROPIO EN ZANJAS PARA TUBERIAS m3 76.05 13.80 1,049.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 76.05 1,049.49 100.0%
4.04 CAMA DE APOYO PARA TUBERIA m 169.00 3.16 534.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 169.00 534.04 100.0%
4.05 CUNETA DE MORTERO P/EVACUACION PLUVIAL EN TECHO A=0.10M m 504.40 38.31 19,323.56 0.00 0.00 0.00% 504.40 19,323.56 100.00% 504.40 19,323.56 100.00% 0.00 0.00 0.0%
4.06 SUMINISTRO Y COLOCACION DE BAJANTES C/TUB. 4" PVC SAL m 304.00 19.88 6,043.52 0.00 0.00 0.00% 100.00 1,988.00 32.89% 100.00 1,988.00 32.89% 204.00 4,055.52 67.1%
4.07 ABRAZADERA DE FIJACION P/TUB.4D" pza 201.00 12.72 2,556.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 201.00 2,556.72 100.0%
4.08 FALZA COLUMNA DE CONCRETO f`c=210 kg/cm2 INC. ENCOFRADO Y ACERO m 63.20 43.30 2,736.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 63.20 2,736.56 100.0%
4.09 CUNETA PLUVIAL CONCRETO F'C=175 KG/CM2 INC. ENCOFRADO Y ACABADO PULIDO m 383.40 84.33 32,332.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 383.40 32,332.12 100.0%
4.1 TUBERIA PVC SAL 8" DESAGUE m 69.00 40.28 2,779.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 69.00 2,779.32 100.0%
4.11 TUBERIA PVC SAL 12" DESAGUE m 100.00 52.28 5,228.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 100.00 5,228.00 100.0%
4.12 SUMIDERO SIFÓNICO PLANO DE 4"PARA CUBIERTAS ALTO IMPACTO PROVISION Y COLOCACI und 4.00 100.18 400.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 400.72 100.0%
-0.03
Costo Directo 3,473,105.00 1,785,404.53 184,627.82 1,970,032.35 1,503,072.66

Gastos Generales 301,713.00 155,100.34 16,038.85 171,139.19 130,573.81

Costo de Supervision 149,656.00 76,933.03 7,955.61 84,888.64 OK 64,767.36

SUB TOTAL 3,924,474.00 2,017,437.89 208,622.28 2,226,060.17 1,698,413.83

Equipamiento y Moviliario 268,305.00 0.00 0.00 0.00 268,305.00

Capacitacion 15,000.00 0.00 0.00 0.00 15,000.00

Mitigacion Ambiental 15,000.00 0.00 0.00 0.00 15,000.00

Expediente Tecnico 60,000.00 60,000.00 0.00 60,000.00 0.00


48.51% 4.87% 53.38% 46.62%
PRESUPUESTO TOTAL 4,282,779.00 2,077,437.89 208,622.28 2,286,060.17 1,996,718.83
Item Descripción Und. Metrado

01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES


01.01 CONSTRUCCIONES PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X5.40M EN BANNER und 1.00
01.01.02 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00
01.01.03 CERCO PROVISIONAL DE ARPILLERA m 700.86
01.01.04 HABILITACION DE SSHH. EN OBRA GLB 1.00
01.02 INSTALACIONES PROVISIONALES
01.02.01 AGUA PARA EL PERSONAL OBRERO GLB 1.00
01.02.02 INSTALACIONES PROVISIONALES DE ENERGIA ELECTRICA GLB 1.00
01.03 TRABAJOS PRELIMINARES
01.03.01 LIMPIEZA DE TERRENO AL INICIO Y FINAL DE OBRA m2 2,473.42
01.03.02 TRAZO Y REPLANTEO m2 2,473.42
01.03.03 CONTROL TOPOGRAFICO m2 2,473.42
01.03.04 MOVILIZACION Y DESMOVILIZACIÓN DE HERRAMIENTAS Y EQUIPOS GLB 1.00
01.04 ELIMINACION DE OBSTRUCCIONES
01.04.01 TALA Y RETIRO DE ARBOLES und 210.00
01.04.02 ELIMINACION DE RAICES und 210.00
01.05 REMOCIONES
01.05.01 REUBICAION DE POSTES DE SUB ESTACION und 1.00
01.06 DEMOLICION
01.06.01 DEMOLICION DE MUROS DE ADOBE m3 118.80
01.06.02 ELIMINACION DE DEMOLICIONES m3 148.50
01.06.03 DEMOLICION DE ALBAÑILERIA m2 219.00
01.07 SEGURIDAD Y SALUD EN OBRA
01.07.01 SEGURIDAD Y SALUD DEL PERSONAL
01.07.01.01 EQUIPO DE SEGURIDAD INDIVIDUAL GLB 1.00
01.07.01.02 EQUIPO DE SEGURIDAD COLECTIVA GLB 1.00
01.07.01.03 CAPACITACION DE SEGURIDAD Y SALUD GLB 1.00
02 MUROS DE CERCO QUINTA NANCY
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION MANUAL DE ZANJA Y ZAPATA m3 226.56
02.01.02 PERFILADO Y NIVELADO DE ZANJA m 591.75
02.01.03 EXCAVACION DE ZANJA PARA CIMENTACIÓN CORRIDA m3 188.34
02.01.04 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 75.50
02.01.05 ACARREO DE MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m3 417.08
02.01.06 ELIMINACION DE MATERIAL EXEDENTE CON EQUIPO m3 417.08
02.02 CONCRETO SIMPLE
02.02.01 CONCRETO EN SOLADOS MEZCLA 1:8 CEMENTO - HORMIGON E= 4" m2 117.08
02.02.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 179.48
02.02.03 SOBRECIMIENTOS SIMPLES
02.02.03.01 CONCRETO F'C=100 KG/CM2. EN SOBRECIMIENTOS m3 124.68
02.02.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 795.40
02.03 CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 58.86
02.03.01.02 ACERO GRADO 60 EN ZAPATAS kg 1,042.75
02.03.02 COLUMNAS
02.03.02.01 ENCOFRADO Y DESENCOFRADO COLUMNAS m2 1,158.15
02.03.02.02 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS m3 82.50
02.03.02.03 ACERO GRADO 60 EN COLUMNAS kg 12,237.47
02.03.03 VIGAS
02.03.03.01 ENCOFRADO Y DESENCOFRADO VIGAS m2 290.30
02.03.03.02 CONCRETO F'C=210 KG/CM2. PARA VIGAS m3 26.12
02.03.03.03 ACERO GRADO 60 EN VIGAS kg 3,934.38
02.03.04 ALBAÑILERIA
02.03.04.01 MURO DE LADRILLO KK - SOGA / CARAVISTA m2 162.50
02.03.04.02 MURO DE LADRILLO KK - SOGA m2 1,557.23
02.03.04.03 CERCO HORNAMENTAL m2 32.40
02.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
02.03.05.01 TARRAJEO EN MUROS INTERIORES INCLUYE BRUNAS m2 1,719.73
02.03.05.02 TARRAJEO EN COLUMNAS m2 1,176.68
02.03.05.03 TARRAJEO EN VIGAS m2 348.45
02.03.06 PINTURA
02.03.06.01 PINTURA LATEX EN INTERIORES Y EXTERIORES m2 1,719.73
02.03.06.02 PINTURA LATEX EN COLUMNAS m2 1,176.68
02.03.06.03 PINTURA LATEX EN VIGAS m2 348.45
02.04 MUROS REFORZADOS
02.04.01 CONSTRUCCION DE MURO DE CONTENCION TIPO I
02.04.01.01 MOVIMIENTO DE TIERRAS
02.04.01.01.01 CORTE DE TERRENO EN FORMA MANUAL m3 182.00
02.04.01.01.02 RELLENO Y COMPACTADO C/ MATERIAL PROPIO SELECCIONADO m3 178.80
02.04.01.01.03 ACARREO DE MATERIAL EXEDENTE PARA SER UTILIZADOS EN RELLENOS m3 178.80
02.04.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE DURANTE EL PROCESO CONSTRUm3 223.50
02.04.01.02 CONCRETO SIMPLE
02.04.01.02.01 CONCRETO SOLADO PARA ZAPATAS DE 2" FC=140 KG/CM2 m2 14.00
02.04.01.03 CONCRETO ARMADO
02.04.01.03.01 ZAPATAS
02.04.01.03.01.0 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 35.00
02.04.01.03.01.0 ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATA m2 28.00
02.04.01.03.01.0 ACERO FY=4200 KG/CM2 GRADO 60 EN ZAPATA kg 690.70
02.04.01.03.02 PANTALLA
02.04.01.03.02.0 CONCRETO PARA PANTALLA F'C=210 KG/CM2 m3 138.00
02.04.01.03.02.0 ENCOFRADO Y DESENCOFRADO PANTALLA m2 691.31
02.04.01.03.02.0 ACERO FY=4200 KG/CM2 EN PANTALLA kg 4,471.04
02.04.01.04 OTROS
02.04.01.04.01 JUNTA DE CONSTRUCCION E=1" JEBE MICROPOROSO m 14.23
02.04.01.04.02 CURADO DE ELEMENTOS ESTRUCTURALES m2 123.20
02.04.01.04.03 SOLAQUEADO DE ELEMENTOS ESTRUCTURALES m2 123.20
02.04.01.04.04 PEDESTAL DE CONCRETO INC/PLACA RECORDATORIA und 1.00
02.04.02 CONSTRUCCION DE MURO A GRAVEDAD
02.04.02.01 MOVIMIENTO DE TIERRAS
02.04.02.01.01 CORTE DE TERRENO EN FORMA MANUAL m3 312.00
02.04.02.01.02 RELLENO Y COMPACTADO C/ MATERIAL PROPIO SELECCIONADO m3 93.00
02.04.02.01.03 ACARREO DE MATERIAL EXEDENTE PARA SER UTILIZADOS EN RELLENOS m3 93.60
02.04.02.01.04 ELIMINACION DE MATERIAL EXCEDENTE DURANTE EL PROCESO CONSTRUm3 117.00
02.04.02.02 CONCRETO SIMPLE
02.04.02.02.01 CONCRETO SOLADO PARA ZAPATAS DE 2" FC=140 KG/CM2 m2 78.00
02.04.02.02.02 CONCRETO CICLÓPEO 1:10 +30% P.G. m3 218.40
02.04.02.02.03 TARRAJEO EN MUROS EXTERIORES CON CEMENTO-ARENA m2 78.00
03 CASETAS DE VIGILANCIA QUINTA NANCY
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 23.59
03.01.02 TRAZO Y REPLANTEO m2 23.59
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION m3 18.78
03.02.02 RELLENO CON MATERIAL PROPIO EN TERRENO m3 17.18
03.02.03 NIVELACION Y COMPACTACION PARA FALSO PISO, CON COMPACTADORA m2 3.93
03.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 2.00
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 CONCRETO F'C=100 KG/CM2. EN SOBRECIMIENTOS +30% P.G. PARA CIMIENT m3 1.60
03.04 OBRAS DE CONCRETO
03.04.01 ZAPATAS
03.04.01.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 4.00
03.04.01.02 ACERO GRADO 60 EN ZAPATAS kg 43.90
03.04.02 SOBRECIMIENTOS ARMADOS
03.04.02.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 1.37
03.04.02.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 27.65
03.04.02.03 ACERO GRADO 60 EN SOBRECIMENTO kg 22.29
03.04.03 COLUMNAS
03.04.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.33
03.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 9.30
03.04.03.03 ACERO GRADO 60 EN COLUMNAS kg 126.18
03.04.04 VIGAS
03.04.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 0.66
03.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 1.32
03.04.04.03 ACERO F'Y=4200KG/CM2 EN VIGAS kg 44.31
03.04.05 LOSA ALIGERADA
03.04.05.01 CONCRETO EN LOSA ALIGERADA F'C= 210 KG/CM2 m3 0.68
03.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADA m2 10.08
03.04.05.03 ACERO GRADO 60 EN LOSAS ALIGERADA kg 44.30
03.05 REVOQUES ENLUCIDOS Y MOLDURAS
03.05.01 TARRAJEO EN INTERIORES Y EXTERIORES INCLUIDO BRUNAS m2 9.30
03.05.02 TARRAJEO DE COLUMNAS m2 9.30
03.05.03 TARRAJEO DE VIGAS m2 1.32
03.05.04 TARRAJEO DE CIELO RASO INCLUYE BRUNAS m2 10.08
03.06 PINTURA
03.06.01 PINTURA LATEX EN INTERIORES Y EXTERIORES m2 9.30
03.06.02 PINTURA LATEX EN COLUMNAS m2 9.30
03.06.03 PINTURA LATEX EN VIGAS m2 1.32
03.06.04 PINTURA LATEX EN CIELO RASO m2 10.08
03.07 CARPINTERIA METALICA
03.07.01 PUERTA METALICA m2 20.00
03.08 CARPINTERIA DE MADERA
03.08.01 PUERTA DE MADERA CEDRO TIPO TABLERO CON MARCO DE 2"X4" m2 1.75
03.09 CERRAJERIA
03.09.01 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 1.00
03.09.02 MANIJA DE BRONCE DE L=4" und 1.00
03.09.03 BISAGRA ALUMINIZADA DE 4" PESADA EN PUERTA pza 3.00
03.09.04 BISAGRA DE FIERRO PARA PUERTA (PROMEDIO) und 6.00
03.09.05 PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M. und 1.00
03.09.06 CERROJO DE FIERRO REDONDO DE 1/2" X 0.25 M. und 2.00
03.10 VIDRIOS, CRISTALES Y SIMILARES
03.10.01 VENTANA DE SISTEMA DE CRSITAL POLARIZADO DE 6 MM. m2 1.68
03.11 INSTALACIONES ELECTRICAS
03.11.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 16MM(5/8) pto 2.00
03.11.02 SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR SIMPLE pto 3.00
03.11.03 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC pto 2.00
03.11.04 TABLEROS DISTRIBUCION CAJA METALICA pza 1.00
03.11.05 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza 2.00
04 PORTICOS Y CASETAS DE VIGILANCIA 28 DE JULIO
04.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 42.00
04.01.02 TRAZO Y REPLANTEO m2 42.00
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION m3 126.21
04.02.02 RELLENO CON MATERIAL PROPIO EN TERRENO m3 104.11
04.02.03 NIVELACION Y COMPACTACION PARA FALSO PISO, CON COMPACTADORA m2 27.63
04.02.04 ACARREO DE MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30 m3 27.63
04.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 27.63
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOBRECIMIENTOS
04.03.01.01 CONCRETO F'C=100 KG/CM2. EN SOBRECIMIENTOS +30% P.G. PARA CIMIE m3 12.01
04.03.01.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 10.20
04.03.01.03 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 25.50
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 ZAPATAS
04.04.01.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 18.63
04.04.01.02 ACERO GRADO 60 EN ZAPATAS kg 1,632.99
04.04.02 VIGAS DE CIMENTACION
04.04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C=210 KG/CM2 m3 11.15
04.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION m2 38.86
04.04.02.03 ACERO F'Y=4200KG/CM2 EN VIGAS DE CIMENTACION kg 1,356.87
04.04.03 COLUMNAS
04.04.03.01 CONCRETO EN COLUMNAS CIRCULARES F'C=210 KG/CM2 m3 9.55
04.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS CIRCULARES m2 108.26
04.04.03.03 ACERO GRADO 60 EN COLUMNAS CIRCULARES kg 1,193.03
04.04.04 VIGAS
04.04.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 14.04
04.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 97.20
04.04.04.03 ACERO F'Y=4200KG/CM2 EN VIGAS kg 1,356.87
04.04.05 LOSA ALIGERADA
04.04.05.01 CONCRETO EN LOSA ALIGERADA F'C= 210 KG/CM2 m3 4.98
04.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 56.70
04.04.05.03 BLOQUETAS DE TECHO 30x30x15 m2 472.31
04.04.05.04 ACERO GRADO 60 EN LOSA ALIGERADA kg 373.30
04.04.06 PLACAS
04.04.06.01 CONCRETO EN PLACAS F'C= 210 KG/CM2 m3 31.11
04.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS m2 414.80
04.04.06.03 ACERO GRADO 60 EN PLACAS kg 3,518.90
04.05 REVOQUES ENLUCIDOS Y MOLDURAS
04.05.01 TARRAJEO DE COLUMNAS m2 108.26
04.05.02 TARRAJEO DE PLACAS m2 414.80
04.05.03 TARRAJEO DE VIGAS m2 97.20
04.05.04 TARRAJEO DE CIELO RASO INCLUYE BRUNAS m2 56.70
04.06 PINTURA
04.06.01 PINTURA LATEX EN COLUMNAS m2 108.26
04.06.02 PINTURA LATEX EN PLACAS m2 414.80
04.06.03 PINTURA LATEX EN VIGAS m2 97.20
04.06.04 PINTURA LATEX EN CIELO RASO m2 56.70
04.07 CARPINTERIA METALICA
04.07.01 PUERTA METALICA m2 41.00
04.07.02 REJA METALICA T-1 m2 268.84
04.07.03 PUERTA DE REJA METALICA T-2 m2 20.40
04.08 CARPINTERIA DE MADERA
04.08.01 PUERTA DE MADERA CEDRO TIPO TABLERO CON MARCO DE 2"X4" m2 1.75
04.09 CERRAJERIA
04.09.01 PUERTA METALICA EN FRONTIS DE INGRESO PRINCIPAL INC. ACCESORIOS E m2 32.80
04.10 VIDRIOS, CRISTALES Y SIMILARES
04.10.01 VENTANA DE SISTEMA DE CRSITAL POLARIZADO DE 6 MM. m2 1.68
04.11 VARIOS
04.11.01 CURADO DE ELEMENTOS ESTRUCTURALES m2 196.62
04.11.02 JUNTA DE DILATACIÓCON ESPUMA PLASTICA + JEBE MICROPOROSO m 20.00
04.11.03 REJA METALICA INC. ACCESORIOS E INSTALACION m2 196.62
04.11.04 LETRAS DE ALTO RELIEVE INC. FABRICACION E INSTALACION und 54.00
04.11.05 RELOJ EN LA TORRE und 1.00
04.11.06 ELEMENTO TEMATICO und 2.00
04.11.07 INSTALACION TACHOS DE BASURA und 1.00
04.12 INSTALACIONES ELECTRICAS
04.12.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 16MM(5/8) pto 5.00
04.12.02 SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR SIMPLE pto 5.00
04.12.03 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC pto 2.00
04.12.04 TABLEROS DISTRIBUCION CAJA METALICA pza 1.00
04.12.05 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza 1.00
04.12.06 POZO-CONEXION A TIERRA und 1.00
05 CAFETIN UNIVERSITARIO
05.01 OBRAS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL m2 42.00
05.01.02 TRAZO Y REPLANTEO m2 119.00
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION m3 23.33
05.02.02 DEMOLICION ESTRUCTURA DE CONCRETO m3 28.50
05.02.03 RELLENO CON MATERIAL PROPIO EN TERRENO m3 14.53
05.02.04 NIVELACION Y COMPACTACION PARA FALSO PISO, CON COMPACTADORA m2 11.01
05.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 11.01
05.03 OBRAS DE CONCRETO SIMPLE
05.03.01 CONCRETO F'C=100 KG/CM2. EN SOBRECIMIENTOS +30% P.G. PARA CIMIENT m3 2.10
05.04 OBRAS DE CONCRETO
05.04.01 ZAPATAS
05.04.01.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 5.40
05.04.01.02 ACERO GRADO 60 EN ZAPATAS kg 153.63
05.04.02 COLUMNAS
05.04.02.01 CONCRETO EN COLUMNAS CIRCULARES F'C=210 KG/CM2 m3 2.80
05.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS CIRCULARES m2 60.84
05.04.02.03 ACERO GRADO 60 EN COLUMNAS CIRCULARES kg 3,042.39
05.04.03 VIGAS
05.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 9.13
05.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 36.52
05.04.03.03 ACERO F'Y=4200KG/CM2 EN VIGAS kg 2,443.84
05.04.04 VIGAS DE CIMENTACION
05.04.04.01 CONCRETO EN VIGAS DE CIMENTACION F'C=210 KG/CM2 m3 1.44
05.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION m2 35.13
05.04.04.03 ACERO F'Y=4200KG/CM2 EN VIGAS DE CIMENTACION kg 453.89
05.04.05 LOSA ALIGERADA(02 NIVELES)
05.04.05.01 CONCRETO EN LOSA ALIGERADA F'C= 210 KG/CM2 m3 20.38
05.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2 107.08
05.04.05.03 BLOQUETAS DE TECHO 30x30x15 m2 891.97
05.04.05.04 ACERO GRADO 60 EN LOSA ALIGERADA kg 522.23
05.04.06 ALBAÑILERIA
05.04.06.01 MURO DE LADRILLO KK - SOGA m2 33.00
05.05 REVOQUES ENLUCIDOS Y MOLDURAS
05.05.01 TARRAJEO EN INTERIORES Y EXTERIORES INCLUIDO BRUNAS m2 66.00
05.05.02 TARRAJEO DE COLUMNAS m2 108.26
05.05.03 TARRAJEO DE VIGAS m2 97.20
05.05.04 TARRAJEO DE CIELO RASO INCLUYE BRUNAS m2 472.31
05.06 PINTURA
05.06.01 PINTURA LATEX EN INTERIORES Y EXTERIORES m2 66.00
05.06.02 PINTURA LATEX EN COLUMNAS m2 60.84
05.06.03 PINTURA LATEX EN VIGAS m2 36.52
05.06.04 PINTURA LATEX EN CIELO RASO m2 90.00
05.07 CARPINTERIA DE MADERA
05.07.01 PUERTA DE MADERA CEDRO TIPO TABLERO CON MARCO DE 2"X4" SEGUN DI m2 1.98
05.08 VIDRIOS, CRISTALES Y SIMILARES
05.08.01 VENTANA DE SISTEMA DE CRSITAL POLARIZADO DE 6 MM. m2 55.52
05.09 INSTALACIONES ELECTRICAS
05.09.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 16MM(5/8) pto 8.00
05.09.02 SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR SIMPLE pto 2.00
05.09.03 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC pto 10.00
05.09.04 TABLEROS DISTRIBUCION CAJA METALICA pza 1.00
05.09.05 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza 6.00
06 VEREDAS Y CANAL DE REGADIO
06.01 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL m2 161.19
06.01.02 TRAZO Y REPLANTEO m2 161.19
06.02 VEREDAS
06.02.01 MOVIMIENTO DE TIERRAS
06.02.01.01 CORTE DE MATERIAL COMPACTO m3 198.79
06.02.01.02 BASE COMPACTACION MANUAL PARA ACERAS DE 0.10 M. m2 660.63
06.02.01.03 ELIMINACION DE MATERIAL EXEDENTE CON EQUIPO m3 248.38
06.02.02 CONCRETO SIMPLE
06.02.02.01 ENCOFRADO Y DESENCOFRADO m2 171.49
06.02.02.02 CONCRETO F'C=175 KG/CM2 m3 99.39
06.02.02.03 JUNTAS ASFALTICAS m 220.21
06.03 CANAL DE REGADIO
06.03.01 MOVIMIENTO DE TIERRAS
06.03.01.01 BASE COMPACTACION MANUAL PARA CANAL DE 0.10 M. m2 115.56
06.03.01.02 ELIMINACION DE MATERIAL EXEDENTE CON EQUIPO m3 11.56
06.03.02 CONCRETO ARMADO
06.03.02.01 ENCOFRADO Y DESENCOFRADO CANALES m2 192.60
06.03.02.02 CONCRETO F'C=175 KG/CM2 CANAL DERIVACIÓN m3 44.30
06.03.02.03 ACERO GRADO 60 EN CANAL kg 3,058.49
07 PAVIMENTOS EN EL INTERIOR DE SEDE 28 DE JULIO
07.01 MOVIMIENTO DE TIERRAS
07.01.01 CORTE DE MATERIAL COMPACTO m3 23.80
07.01.02 NIVELACION Y COMPACTACION DE SUB RAZANTE Y SUB BASE m2 119.00
07.01.03 BASE COMPACTACION MANUAL PARA ACERAS DE 0.10 M. m2 119.00
07.01.04 ELIMINACION DE MATERIAL EXEDENTE CON EQUIPO m3 28.56
07.02 CONCRETO SIMPLE
07.02.01 ENCOFRADO Y DESENCOFRADO m2 119.00
07.02.02 CONCRETO F'C=175 KG/CM2 m3 23.80
07.02.03 JUNTAS ASFALTICAS m 128.00
07.02.04 ACERO F'Y=4200KG/CM2 kg 78.88
08 PASE VEHICULAR
08.01 MOVIMIENTO DE TIERRAS
08.01.01 CORTE DE MATERIAL COMPACTO m3 100.00
08.01.02 NIVELACION Y COMPACTACION DE SUB RAZANTE Y SUB BASE m2 25.00
08.01.03 BASE COMPACTACION MANUAL PARA ACERAS DE 0.10 M. m2 25.00
08.01.04 ELIMINACION DE MATERIAL EXEDENTE CON EQUIPO m3 125.00
08.02 CONCRETO SIMPLE
08.02.01 ENCOFRADO Y DESENCOFRADO m2 12.00
08.02.02 CONCRETO F'C=175 KG/CM2 m3 3.00
08.02.03 JUNTAS ASFALTICAS m 10.00
08.02.04 ACERO F'Y=4200KG/CM2 kg 524.16
09 ADQUISICION DE TERRENO
09.01 ADQUISICION DE TERRENO PARA CENTRO EXPERIMENTAL GLB 1.00
10 MITIGACION AMBIENTAL
10.01 MITIGACION AMBIENTAL GLB 1.00
11 CAPACITACION
11.01 CAPACITACION GLB 1.00

77,186.86
Precio (S/.) Parcial (S/.)

129,077.81
17,922.90
895.70 895.70
6,775.85 6,775.85
13.20 9,251.35
1,000.00 1,000.00
891.58
450.00 450.00
441.58 441.58
31,999.11
1.82 4,501.62
2.14 5,293.12
7.36 18,204.37
4,000.00 4,000.00
28,847.70
39.20 8,232.00
98.17 20,615.70
12,000.00
12,000.00 12,000.00
19,866.52
10.86 1,290.17
31.55 4,685.18
63.43 13,891.17
17,550.00
17,550.00
14,740.00 14,740.00
1,310.00 1,310.00
1,500.00 1,500.00
975,380.90
25,238.14
27.17 6,155.64
0.88 520.74
10.55 1,986.99
66.07 4,988.29
7.61 3,173.98
20.17 8,412.50
111,421.78
30.93 3,621.28
215.44 38,667.17
69,133.33
378.73 47,220.06
27.55 21,913.27
599,743.99
31,171.03
438.52 25,811.29
5.14 5,359.74
131,475.94
29.76 34,466.54
426.79 35,210.18
5.05 61,799.22
39,007.60
29.76 8,639.33
404.99 10,578.34
5.03 19,789.93
240,376.83
105.50 17,143.75
141.41 220,207.89
93.37 3,025.19
141,377.10
59.89 102,994.63
23.46 27,604.91
30.93 10,777.56
16,335.49
6.12 10,524.75
3.81 4,483.15
3.81 1,327.59
238,976.99
166,212.45
44,294.81
27.17 4,944.94
66.07 11,813.32
49.82 8,907.82
83.35 18,628.73
446.74
31.91 446.74
118,263.58
19,669.60
438.52 15,348.20
38.89 1,088.92
4.68 3,232.48
98,593.98
413.74 57,096.12
29.76 20,573.39
4.68 20,924.47
3,207.32
24.98 355.47
5.23 644.34
5.08 625.86
1,581.65 1,581.65
72,764.54
29,036.65
27.17 8,477.04
66.07 6,144.51
49.82 4,663.15
83.35 9,751.95
43,727.89
31.91 2,488.98
182.53 39,864.55
17.62 1,374.36
17,083.37
57.56
0.30 7.08
2.14 50.48
660.57
15.53 291.65
19.03 326.94
3.08 12.10
14.94 29.88
411.76
257.35 411.76
6,704.39
2,212.61
496.74 1,986.96
5.14 225.65
1,241.20
267.63 366.65
27.55 761.76
5.06 112.79
1,897.48
354.49 825.96
46.70 434.31
5.05 637.21
532.47
381.43 251.74
40.14 52.98
5.14 227.75
820.63
372.92 253.59
34.06 343.32
5.05 223.72
756.05
20.63 191.86
31.08 289.04
36.25 47.85
22.55 227.30
200.60
6.12 56.92
3.81 35.43
3.81 5.03
10.24 103.22
5,436.20
271.81 5,436.20
622.25
355.57 622.25
438.71
77.78 77.78
28.39 28.39
18.71 56.13
27.92 167.52
51.53 51.53
28.68 57.36
126.34
75.20 126.34
1,668.94
205.46 410.92
224.36 673.08
188.30 376.60
93.88 93.88
57.23 114.46
384,566.61
102.48
0.30 12.60
2.14 89.88
4,649.40
15.53 1,960.04
19.03 1,981.21
3.08 85.10
7.61 210.26
14.94 412.79
6,523.13
6,523.13
257.35 3,090.77
267.63 2,729.83
27.55 702.53
111,481.69
17,647.84
496.74 9,254.27
5.14 8,393.57
12,787.09
381.43 4,252.94
40.14 1,559.84
5.14 6,974.31
14,465.92
354.49 3,385.38
46.70 5,055.74
5.05 6,024.80
16,231.20
381.43 5,355.28
40.14 3,901.61
5.14 6,974.31
6,849.56
372.92 1,857.14
34.06 1,931.20
2.49 1,176.05
5.05 1,885.17
43,500.08
372.92 11,601.54
34.06 14,128.09
5.05 17,770.45
16,923.24
31.08 3,364.72
21.11 8,756.43
36.25 3,523.50
22.55 1,278.59
5,001.21
3.81 412.47
8.77 3,637.80
3.81 370.33
10.24 580.61
95,889.39
271.81 11,144.21
294.60 79,200.26
271.81 5,544.92
622.25
355.57 622.25
9,075.10
276.68 9,075.10
126.34
75.20 126.34
131,124.53
5.23 1,028.32
4.59 91.80
273.01 53,679.23
154.17 8,325.18
30,000.00 30,000.00
15,000.00 30,000.00
8,000.00 8,000.00
3,047.85
205.46 1,027.30
224.36 1,121.80
188.30 376.60
93.88 93.88
57.23 57.23
371.04 371.04
102,855.25
267.26
0.30 12.60
2.14 254.66
6,914.85
15.53 362.31
213.25 6,077.63
19.03 276.51
3.08 33.91
14.94 164.49
540.44
257.35 540.44
65,244.06
3,472.06
496.74 2,682.40
5.14 789.66
19,197.87
354.49 992.57
46.70 2,841.23
5.05 15,364.07
17,509.71
381.43 3,482.46
40.14 1,465.91
5.14 12,561.34
4,292.37
381.43 549.26
40.14 1,410.12
5.14 2,332.99
16,105.52
372.92 7,600.11
34.06 3,647.14
2.49 2,221.01
5.05 2,637.26
4,666.53
141.41 4,666.53
18,900.39
20.63 1,361.58
31.08 3,364.72
36.25 3,523.50
22.55 10,650.59
1,696.46
6.12 403.92
3.81 231.80
3.81 139.14
10.24 921.60
704.03
355.57 704.03
4,175.10
75.20 4,175.10
4,412.66
205.46 1,643.68
224.36 448.72
188.30 1,883.00
93.88 93.88
57.23 343.38
102,541.84
393.31
0.30 48.36
2.14 344.95
59,028.84
10,865.53
4.20 834.92
7.60 5,020.79
20.17 5,009.82
48,163.31
76.14 13,057.25
343.40 34,130.53
4.43 975.53
43,119.69
879.15
5.59 645.98
20.17 233.17
42,240.54
43.38 8,354.99
353.43 15,656.95
5.96 18,228.60
20,667.93
2,470.54
4.20 99.96
7.48 890.12
7.60 904.40
20.17 576.06
18,197.39
76.14 9,060.66
343.40 8,172.92
4.43 567.04
5.03 396.77
7,942.95
3,318.25
4.20 420.00
7.48 187.00
7.60 190.00
20.17 2,521.25
4,624.70
76.14 913.68
343.40 1,030.20
4.43 44.30
5.03 2,636.52
200,000.00
200,000.00 200,000.00
220,586.72
220,586.72 220,586.72
3,000.00
3,000.00 3,000.00

542,494.00 ###
HOJA DE METRADOS DE AVANCE DEL MES DE ENERO 2016

Ítem Partidas del Expediente Aprobado Ejecutadas Del Mes Und Metrado

3.00 MOVIMIENTO DE TIERRAS

3.04 RELLENO COMPACTADO A MANO-MAT. DE PRESTAMO PARA BASE m3 20.00


3.05 NIVELACION DE TERRENO Y APISONADO C/20cm m2 80.00
4.00 CONCRETO SIMPLE

4.03 CONCRETO CICLOPEO 1:10(C:H)+30% P.G.-CIMIENTOS CORRIDOS m3 123.00


4.04 CONCRETO CICLOPEO 1:8(C:H)+25% P.M.-SOBRECIMIENTOS m3 30.00
4.05 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS m2 460.00
5.00 CONCRETO ARMADO

5.02 SOBRECIMIENTO REFORZADO

05.02.01 CONCRETO EN SOBRECIMIENTOS REFORZADOS f'c=175 kg/cm2 m3 4.74


05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS REFORZADOS m2 63.18
05.02.03 ACERO ESTRUCTURAL TRABAJADO PARA SOBRECIMIENTOS REFORZADOS kg 387.39
5.12 ESCALERA

05.12.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 15.00


05.12.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 54.00
05.12.03 ACERO ESTRUCTURAL TRABAJADO PARA ESCALERAS kg 0.00
6.00 ESTRUCTURA METALICA

6.01 TIJERALES METALICOS (TIPO 1) und 18.00


6.02 CORREAS METALICAS CON TUBO RECTANGULAR 25mmX50mm m 321.00
9.00 PRUEBAS DE LABORATORIO

9.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 80.00


15.00 VARIOS

15.02 JUNTA DE CONSTRUCCION CON TECNOPOR E=1" m2 22.00


4.00 SISTEMA DE AGUAS PLUVIALES

4.01 TRAZO Y REPLANTEO DE OBRAS LONGITUDINALES m 383.40


4.05 CUNETA DE MORTERO P/EVACUACION PLUVIAL EN TECHO A=0.10M m 504.40
4.06 SUMINISTRO Y COLOCACION DE BAJANTES C/TUB. 4" PVC SAL m 100.00
RESUMEN DE METRADOS

PARTIDA Descripción Und. Metrado

1 TRABAJOS PRELIMINARES
1.01 ALMACEN OFICINA Y CASETA DE GUARDIANIA m2 105.00
1.02 CARTEL DE OBRA DE 5.40 X 3.60 und 2.00
1.03 INSTALACION PROVISIONAL Y DEFINITIVA DE AGUA Y DESAGUE GLB 0.50
1.04 INSTALACION PROVISIONAL Y DEFINITIVA DE LUZ GLB 0.50
1.05 CERCO PERIMETRICO CON TRIPLAY DE 6MM H=2.40M m 197.00
2 OBRAS PRELIMINARES
2.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00
2.02 LIMPIEZA DE TERRENO MANUAL m2 4,627.00
2.03 TRAZO Y REPLANTEO PRELIMINAR m2 4,625.95
3 MOVIMIENTO DE TIERRAS
3.01 EXCAVACION MASIVA CON MAQUINARIAS EN TERRENO NORMAL m3 2,988.62
3.02 EXCAV. ZANJAS P/CIMIENTOS m3 176.30
3.06 ACARREO INTERNO MATERIAL PROCEDENTE DE EXCAVACIONES m3 1,200.00
3.07 ELIMINACION DE MATERIAL EXCEDENTE ACARREADO m3 1,200.00

DESAGREGADO DE METRADOS
Proyecto:
"MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS DE LA I. E. P. N° 54164 DEL CENTRO POBLADO DE ANCATIRA, DISTRITO DE SAN JERONIMO – ANDAHUAYLAS – APURIMAC"
Ubicación: DISTRITO DE SAN JERONIMO - ANDAHUAYLAS - APURIMAC
Localidad: CENTRO POBLADO DE ANCATIRA
Fecha: Aug-15

MEDIDAS
ITEM DESCRIPCION UND. NºVECES NºELEMEN. PARCIAL TOTAL
LARGO ANCHO ALTO Area/vol
1
TRABAJOS PRELIMINARES
1.01 ALMACEN OFICINA Y CASETA DE GUARDIANIA m2 1.00 1.00 26.25 4.00 105.00 105.00
1.02 CARTEL DE OBRA DE 5.40 X 3.60 UND. 1.00 2.00 2.00 2.00
1.03 INSTALACION PROVISIONAL Y DEFINITIVA DE AGUA Y DESAGUE glb 1.00 1.00 0.50 0.50
1.04 INSTALACION PROVISIONAL Y DEFINITIVA DE LUZ glb 1.00 1.00 0.50 0.50
1.05 CERCO PERIMETRICO CON TRIPLAY DE 6MM H=2.40M
2
OBRAS PRELIMINARES
2.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 1.00 1.00 1.00
2.02 LIMPIEZA DE TERRENO MANUAL m2 1.00 1.00 70.00 66.10 4,627.00 4,627.00
2.03 TRAZO Y REPLANTEO PRELIMINAR m2 1.00 1.00 77.09 60.00 4,625.95 4,625.95
3
MOVIMIENTO DE TIERRAS
3.01 EXCAVACION MASIVA CON MAQUINARIAS EN TERRENO NORMAL m3 2,988.62 2,988.62
1.00 1.00 38.50 38.50 2.02
3.02 EXCAV. ZANJAS P/CIMIENTOS m3 1.00 1.00 176.30
Z-1_1 1.00 1.00 1.50 1.50 2.30 5.18
Z-1_2 1.00 1.00 1.50 1.50 2.30 5.18
Z-2_1 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_2 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_3 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_4 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_5 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_6 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_7 1.00 1.00 1.70 1.70 2.30 6.65
Z-3_1 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_2 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_3 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_4 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_5 1.00 1.00 2.00 2.00 2.30 9.20
Z-1_1 1.00 1.00 1.50 1.50 2.30 5.18
Z-1_2 1.00 1.00 1.50 1.50 2.30 5.18
Z-2_1 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_2 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_3 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_4 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_5 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_6 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_7 1.00 1.00 1.70 1.70 2.30 6.65
Z-3_1 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_2 1.00 1.00 2.00 2.00 2.30 9.20
3.06 ACARREO INTERNO MATERIAL PROCEDENTE DE EXCAVACIONES m3 1.00 1.00 60.00 10.00 2.00 1,200.00 1,200.00
3.07 ELIMINACION DE MATERIAL EXCEDENTE ACARREADO m3 1.00 1.00 60.00 10.00 2.00 1,200.00 1,200.00
SETIEMBRE
RESUMEN DE METRADOS

PARTIDA Descripción Und. Metrado

1 TRABAJOS PRELIMINARES
1.03 INSTALACION PROVISIONAL Y DEFINITIVA DE AGUA Y DESAGUE GLB 0.50
1.04 INSTALACION PROVISIONAL Y DEFINITIVA DE LUZ GLB 0.50
3 MOVIMIENTO DE TIERRAS
3.02 EXCAV. ZANJAS P/CIMIENTOS m3 610.27
3.03 RELLENO COMPACTADO A MANO-MAT. PROPIO m3 183.36
3.06 ACARREO INTERNO MATERIAL PROCEDENTE DE EXCAVACIONES m3 2,548.36
3.07 ELIMINACION DE MATERIAL EXCEDENTE ACARREADO m3 2,548.36
3.08 REFINE Y NIVELACION EN TERRENO NORMAL DE ZANJAS m2 4.48
4 CONCRETO SIMPLE
4.01 CONCRETO CICLOPEO 1:12(C:H)+60% P.G. EN FALZA ZAPATA m3 86.45
4.02 SOLADO CONCRETO f´c=100 kg/cm2 h=2" m2 132.91
5 CONCRETO ARMADO
5.01 ZAPATAS
05.01.01 CONCRETO F'C=210 KG/CM2 ZAPATAS m3 155.04
05.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 4,226.15
5.03 VIGAS DE CIMENTACIÓN
05.03.02 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION kg 20,548.27
5.04 COLUMNAS
05.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 65,555.90
5.12 ESCALERA
05.12.03 ACERO ESTRUCTURAL TRABAJADO PARA ESCALERAS kg 1,983.25
DESAGREGADO DE METRADOS
Proyecto:
"MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS DE LA I. E. P. N° 54164 DEL CENTRO POBLADO DE ANCATIRA, DISTRITO DE SAN JERONIMO – ANDAHUAYLAS – APURIMAC"
Ubicación: DISTRITO DE SAN JERONIMO - ANDAHUAYLAS - APURIMAC
Localidad: CENTRO POBLADO DE ANCATIRA
Fecha: Sep-15

MEDIDAS
ITEM DESCRIPCION UND. NºVECES NºELEMEN. PARCIAL TOTAL
LARGO ANCHO ALTO Area/vol
1
TRABAJOS PRELIMINARES
1.03 INSTALACION PROVISIONAL Y DEFINITIVA DE AGUA Y DESAGUE glb 1.00 1.00 0.50 0.50
1.04 INSTALACION PROVISIONAL Y DEFINITIVA DE LUZ glb 1.00 1.00 0.50 0.50
3
MOVIMIENTO DE TIERRAS
3.02 EXCAV. ZANJAS P/CIMIENTOS m3 1.00 1.00 610.27
BLOQUE 01
PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 2.30 5.18
Z-1_2 1.00 1.00 1.50 1.50 2.30 5.18
Z-2_1 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_2 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_3 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_4 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_5 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_6 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_7 1.00 1.00 1.70 1.70 2.30 6.65
Z-3_1 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_2 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_3 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_4 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_5 1.00 1.00 2.00 2.00 2.30 9.20
PARA V.C.2= .70X.40
EJE 1 1.00 1.00 4.20 0.40 1.55 2.60
EJE 2 1.00 1.00 4.25 0.40 1.55 2.64
EJE 3 1.00 1.00 4.05 0.40 1.55 2.51
EJE 4 1.00 1.00 4.25 0.40 1.55 2.64
EJE 5 1.00 1.00 4.05 0.40 1.55 2.51
EJE 6 1.00 1.00 4.25 0.40 1.55 2.64
EJE 7 1.00 1.00 4.30 0.40 1.55 2.67
PARA V.C.1= .50X.40
EJE A 1.00 1.00 2.27 0.40 1.55 1.41
1.00 1.00 2.32 0.40 1.55 1.44
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.43 0.40 1.55 1.51
EJE B 1.00 1.00 2.02 0.40 1.55 1.25
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.18 0.40 1.55 1.35
BLOQUE 02

PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 2.30 5.18
Z-1_2 1.00 1.00 1.50 1.50 2.30 5.18
Z-2_1 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_2 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_3 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_4 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_5 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_6 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_7 1.00 1.00 1.70 1.70 2.30 6.65
Z-3_1 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_2 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_3 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_4 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_5 1.00 1.00 2.00 2.00 2.30 9.20
PARA V.C.2= .70X.40
EJE 1 1.00 1.00 4.20 0.40 1.55 2.60
EJE 2 1.00 1.00 4.25 0.40 1.55 2.64
EJE 3 1.00 1.00 4.05 0.40 1.55 2.51
EJE 4 1.00 1.00 4.25 0.40 1.55 2.64
EJE 5 1.00 1.00 4.05 0.40 1.55 2.51
EJE 6 1.00 1.00 4.25 0.40 1.55 2.64
EJE 7 1.00 1.00 4.30 0.40 1.55 2.67
PARA V.C.1= .50X.40
EJE A 1.00 1.00 2.27 0.40 1.55 1.41
1.00 1.00 2.32 0.40 1.55 1.44
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.43 0.40 1.55 1.51
EJE B 1.00 1.00 2.02 0.40 1.55 1.25
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.18 0.40 1.55 1.35
BLOQUE 03
PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 2.30 5.18
Z-1_2 1.00 1.00 1.50 1.50 2.30 5.18
Z-2_1 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_2 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_3 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_4 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_5 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_6 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_7 1.00 1.00 1.70 1.70 2.30 6.65
Z-3_1 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_2 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_3 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_4 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_5 1.00 1.00 2.00 2.00 2.30 9.20
PARA V.C.2= .70X.40
EJE 1 1.00 1.00 4.20 0.40 1.55 2.60
EJE 2 1.00 1.00 4.25 0.40 1.55 2.64
EJE 3 1.00 1.00 4.05 0.40 1.55 2.51
EJE 4 1.00 1.00 4.25 0.40 1.55 2.64
EJE 5 1.00 1.00 4.05 0.40 1.55 2.51
EJE 6 1.00 1.00 4.25 0.40 1.55 2.64
EJE 7 1.00 1.00 4.30 0.40 1.55 2.67
PARA V.C.1= .50X.40
EJE A 1.00 1.00 2.27 0.40 1.55 1.41
1.00 1.00 2.32 0.40 1.55 1.44
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.43 0.40 1.55 1.51
EJE B 1.00 1.00 2.02 0.40 1.55 1.25
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.18 0.40 1.55 1.35
PARA CIMIENTOS CORRIDOS
FUERA DE EJE 1.00 1.00 2.19 0.40 1.20 1.05
1.00 1.00 1.35 0.40 1.20 0.65
BLOQUE 04
PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 2.30 5.18
Z-1_2 1.00 1.00 1.50 1.50 2.30 5.18
Z-2_1 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_2 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_3 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_4 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_5 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_6 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_7 1.00 1.00 1.70 1.70 2.30 6.65
Z-3_1 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_2 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_3 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_4 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_5 1.00 1.00 2.00 2.00 2.30 9.20
PARA V.C.2= .70X.40
EJE 1 1.00 1.00 4.20 0.40 1.55 2.60
EJE 2 1.00 1.00 4.25 0.40 1.55 2.64
EJE 3 1.00 1.00 4.05 0.40 1.55 2.51
EJE 4 1.00 1.00 4.25 0.40 1.55 2.64
EJE 5 1.00 1.00 4.05 0.40 1.55 2.51
EJE 6 1.00 1.00 4.25 0.40 1.55 2.64
EJE 7 1.00 1.00 4.30 0.40 1.55 2.67
PARA V.C.1= .50X.40
EJE A 1.00 1.00 2.27 0.40 1.55 1.41
1.00 1.00 2.32 0.40 1.55 1.44
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.43 0.40 1.55 1.51
EJE B 1.00 1.00 2.02 0.40 1.55 1.25
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.18 0.40 1.55 1.35
PARA CIMIENTO CORRIDO
1.00 1.00 5.35 0.40 1.20 2.57
BLOQUE 05
PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 2.30 5.18
Z-1_2 1.00 1.00 1.50 1.50 2.30 5.18
Z-2_1 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_2 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_3 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_4 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_5 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_6 1.00 1.00 1.70 1.70 2.30 6.65
Z-2_7 1.00 1.00 1.70 1.70 2.30 6.65
Z-3_1 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_2 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_3 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_4 1.00 1.00 2.00 2.00 2.30 9.20
Z-3_5 1.00 1.00 2.00 2.00 2.30 9.20
PARA V.C.2= .70X.40
EJE 1 1.00 1.00 4.20 0.40 1.55 2.60
EJE 2 1.00 1.00 4.25 0.40 1.55 2.64
EJE 3 1.00 1.00 4.05 0.40 1.55 2.51
EJE 4 1.00 1.00 4.25 0.40 1.55 2.64
EJE 5 1.00 1.00 4.05 0.40 1.55 2.51
EJE 6 1.00 1.00 4.25 0.40 1.55 2.64
EJE 7 1.00 1.00 4.30 0.40 1.55 2.67
PARA V.C.1= .50X.40
EJE A 1.00 1.00 2.27 0.40 1.55 1.41
1.00 1.00 2.32 0.40 1.55 1.44
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.30 0.40 1.55 1.43
1.00 1.00 2.43 0.40 1.55 1.51
EJE B 1.00 1.00 2.02 0.40 1.55 1.25
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.00 0.40 1.55 1.24
1.00 1.00 2.18 0.40 1.55 1.35
PARA CIMIENTO CORRIDO
ENTRE EJES 6-6, 7-7 1.00 1.00 3.57 0.40 1.20 1.71
3.03 RELLENO COMPACTADO A MANO-MAT. PROPIO m3 183.36
BLOQUE 01

PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 1.50 3.38
Z-1_2 1.00 1.00 1.50 1.50 1.50 3.38
Z-2_1 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_2 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_3 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_4 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_5 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_6 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_7 1.00 1.00 1.70 1.70 1.50 4.33
Z-3_1 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_2 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_3 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_4 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_5 1.00 1.00 2.00 2.00 1.50 6.00
PARA V.C.2= .70X.40
EJE 1 1.00 1.00 4.20 0.40 0.40 0.67
EJE 2 1.00 1.00 4.25 0.40 0.40 0.68
EJE 3 1.00 1.00 4.05 0.40 0.40 0.65
EJE 4 1.00 1.00 4.25 0.40 0.40 0.68
EJE 5 1.00 1.00 4.05 0.40 0.40 0.65
EJE 6 1.00 1.00 4.25 0.40 0.40 0.68
EJE 7 1.00 1.00 4.30 0.40 0.40 0.69
PARA V.C.1= .50X.40
EJE A 1.00 1.00 2.27 0.40 0.40 0.36
1.00 1.00 2.32 0.40 0.40 0.37
1.00 1.00 2.30 0.40 0.40 0.37
1.00 1.00 2.30 0.40 0.40 0.37
1.00 1.00 2.30 0.40 0.40 0.37
1.00 1.00 2.43 0.40 0.40 0.39
EJE B 1.00 1.00 2.02 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.18 0.40 0.40 0.35
BLOQUE 02
PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 1.50 3.38
Z-1_2 1.00 1.00 1.50 1.50 1.50 3.38
Z-2_1 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_2 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_3 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_4 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_5 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_6 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_7 1.00 1.00 1.70 1.70 1.50 4.33
Z-3_1 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_2 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_3 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_4 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_5 1.00 1.00 2.00 2.00 1.50 6.00
PARA V.C.2= .70X.40
EJE 1 1.00 1.00 4.20 0.40 0.40 0.67
EJE 2 1.00 1.00 4.25 0.40 0.40 0.68
EJE 3 1.00 1.00 4.05 0.40 0.40 0.65
EJE 4 1.00 1.00 4.25 0.40 0.40 0.68
EJE 5 1.00 1.00 4.05 0.40 0.40 0.65
EJE 6 1.00 1.00 4.25 0.40 0.40 0.68
EJE 7 1.00 1.00 4.30 0.40 0.40 0.69
PARA V.C.1= .50X.40
EJE A 1.00 1.00 2.27 0.40 0.40 0.36
1.00 1.00 2.32 0.40 0.40 0.37
1.00 1.00 2.30 0.40 0.40 0.37
1.00 1.00 2.30 0.40 0.40 0.37
1.00 1.00 2.30 0.40 0.40 0.37
1.00 1.00 2.43 0.40 0.40 0.39
EJE B 1.00 1.00 2.02 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
BLOQUE 03
PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 1.50 3.38
Z-1_2 1.00 1.00 1.50 1.50 1.50 3.38
Z-2_1 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_2 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_3 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_4 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_5 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_6 1.00 1.00 1.70 1.70 1.50 4.33
Z-2_7 1.00 1.00 1.70 1.70 1.50 4.33
Z-3_1 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_2 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_3 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_4 1.00 1.00 2.00 2.00 1.50 6.00
Z-3_5 1.00 1.00 2.00 2.00 1.50 6.00
PARA V.C.2= .70X.40
EJE 1 1.00 1.00 4.20 0.40 0.40 0.67
EJE 2 1.00 1.00 4.25 0.40 0.40 0.68
EJE 3 1.00 1.00 4.05 0.40 0.40 0.65
EJE 4 1.00 1.00 4.25 0.40 0.40 0.68
EJE 5 1.00 1.00 4.05 0.40 0.40 0.65
EJE 6 1.00 1.00 4.25 0.40 0.40 0.68
EJE 7 1.00 1.00 4.30 0.40 0.40 0.69
PARA V.C.1= .50X.40
EJE A 1.00 1.00 2.27 0.40 0.40 0.36
1.00 1.00 2.32 0.40 0.40 0.37
1.00 1.00 2.30 0.40 0.40 0.37
1.00 1.00 2.30 0.40 0.40 0.37
1.00 1.00 2.30 0.40 0.40 0.37
1.00 1.00 2.43 0.40 0.40 0.39
EJE B 1.00 1.00 2.02 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.00 0.40 0.40 0.32
1.00 1.00 2.18 0.40 0.40 0.35
3.06 ACARREO INTERNO MATERIAL PROCEDENTE DE EXCAVACIONES m3 2,548.36
1.00 1.00 2,548.36

3.07 ELIMINACION DE MATERIAL EXCEDENTE ACARREADO m3 2,548.36


1.00 1.00 2,548.36

3.08 REFINE Y NIVELACION EN TERRENO NORMAL DE ZANJAS m2 4.48


1.00 1.00 2.00 2.24 4.48
4 CONCRETO SIMPLE
4.01 CONCRETO CICLOPEO 1:12(C:H)+60% P.G. EN FALZA ZAPATA m3 86.45
BLOQUE 01

PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 0.30 0.68
Z-1_2 1.00 1.00 1.50 1.50 0.30 0.68
Z-2_1 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_2 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_3 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_4 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_5 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_6 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_7 1.00 1.00 1.70 1.70 0.30 0.87
Z-3_1 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_2 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_3 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_4 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_5 1.00 1.00 2.00 2.00 0.30 1.20
BLOQUE 02

PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 0.30 0.68
Z-1_2 1.00 1.00 1.50 1.50 0.30 0.68
Z-2_1 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_2 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_3 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_4 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_5 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_6 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_7 1.00 1.00 1.70 1.70 0.30 0.87
Z-3_1 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_2 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_3 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_4 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_5 1.00 1.00 2.00 2.00 0.30 1.20
BLOQUE 03

PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 0.30 0.68
Z-1_2 1.00 1.00 1.50 1.50 0.30 0.68
Z-2_1 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_2 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_3 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_4 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_5 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_6 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_7 1.00 1.00 1.70 1.70 0.30 0.87
Z-3_1 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_2 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_3 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_4 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_5 1.00 1.00 2.00 2.00 0.30 1.20
BLOQUE 04

PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 0.30 0.68
Z-1_2 1.00 1.00 1.50 1.50 0.30 0.68
Z-2_1 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_2 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_3 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_4 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_5 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_6 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_7 1.00 1.00 1.70 1.70 0.30 0.87
Z-3_1 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_2 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_3 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_4 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_5 1.00 1.00 2.00 2.00 0.30 1.20
BLOQUE 05

PARA ZAPATAS
Z-1_1 1.00 1.00 1.50 1.50 0.30 0.68
Z-1_2 1.00 1.00 1.50 1.50 0.30 0.68
Z-2_1 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_2 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_3 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_4 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_5 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_6 1.00 1.00 1.70 1.70 0.30 0.87
Z-2_7 1.00 1.00 1.70 1.70 0.30 0.87
Z-3_1 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_2 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_3 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_4 1.00 1.00 2.00 2.00 0.30 1.20
Z-3_5 1.00 1.00 2.00 2.00 0.30 1.20

4.02 SOLADO CONCRETO f´c=100 kg/cm2 h=2" m2 132.91


1.00 1.00 2.00 66.46 132.91

5 CONCRETO ARMADO
5.01 ZAPATAS
05.01.01 CONCRETO F'C=210 KG/CM2 ZAPATAS m3 155.04
1.00 1.00 155.04

05.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 4,226.15


1.00 1.00 4,226.15
5.03 VIGAS DE CIMENTACIÓN
05.03.02 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION kg 20,548.27
1.00 1.00
5.04 COLUMNAS 20,548.27
05.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 65,555.90
1.00 1.00 65,555.90
5.12 ESCALERA
05.12.03 ACERO ESTRUCTURAL TRABAJADO PARA ESCALERAS kg 1,983.25
1.00 1.00 1,983.25
MUNICIPALIDAD DISTRITAL DE SAN JERONIMO

RESUMEN DE PAGO DE VALORIZACIONES DE RESIDENTE Nº 06


OBRA:
MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E.P N° 54164 DEL CENTRO POBLADO DE SAN JERONIMO - DISTRITO DE ANDAHUAYLAS - APURIMAC

CONTRATISTA ADMINISTRACION DIRECTA N° DE CONTRATO : Contrato Gerencial N°044-2015/ MDSJ


SUPERVISOR DE OBRA ING. RICHARD ENCISO QUILLA Fecha Inicio 11 de agosto de 2015
RESIDENTE DE OBRA ING. ZANYID ERICK HUAMAN MEZA Fecha de Término Contractual 10 de junio de 2015

MONTOS BRUTO BRUTO Ampliación de Plazo Nº 01


Contractual 110,000.00 110,000.00 Fecha de Termino Ampliación
Adicional Nº 01 Presupuesto Adicional N° 01
TOTAL 110,000.00 0.00 110,000.00
4,282,779.00
MONTO
PRESUPUESTO

N° DE CONTROL DE VALORIZACION TOTAL CONTROL DE VALORIZACION DE RESIDENTE IMPUESTOS Avance Físico %


Valorización Programado

VALORIZACION MONTO MENSUAL % MENSUAL MONTO MENSUAL % MENSUAL 8%


MONTO NETO a pagar Neta (Inc Impuestos) Actual Acumulado Acumul. %

01 130,053.53 3.04% 3,340.33 3.04% 3,073.10 267.23 3,340.33 3.04% 3.04% 4.54%
02 701,798.38 16.39% 18,025.17 16.39% 16,583.16 1,442.01 18,025.17 16.39% 19.42% 10.67%
03 415,208.14 9.69% 10,664.31 9.69% 9,811.17 853.15 10,664.31 9.69% 29.12% 15.88%
04 484,040.60 11.30% 12,432.22 11.30% 11,437.65 994.58 12,432.22 11.30% 40.42% 34.99%
05 346,337.24 8.09% 8,895.42 8.09% 8,183.78 711.63 8,895.42 8.09% 48.51% 51.92%
06 208,622.28 4.87% 5,358.31 4.87% 4,929.64 428.66 5,358.31 4.87% 53.38% 63.28%
Parcial 2,286,060.17 53.38% 58,715.76 53.38% 54,018.50 4,697.26 58,715.76

ADICIONALES
1
2
Parcial

Total Gral. 2,286,060.17 53.38% 58,715.76 53.38% 54,018.50 4,697.26 58,715.76

ITEM OBSERVACION 01 CONTROL DE VALORIZACION DE RESIDENTE IMPUESTOS Valorización

MONTO MENSUAL % MENSUAL 8%


MONTO NETO a pagar Neta (Inc Impuestos)
EXISTIA ERROR EN PORCENTAJE DE
VAL. AGOSTO VALORIZACION, LO CUAL FUE CORREGIDO EN
VALORIZACION DE SETIEMBRE 3,652.00 3.32% 3,359.84 292.16 3,652.00
LA VALORIZACION DE PRESENTE MES TIENE UN
DESCUENTO DE 0.28%, DEBIDO A QUE ESTE MONTO
VAL. SETIEMBRE ADICIONAL FUE PAGADO EN LA PRIMERA
VALORIZACION, POR LO QUE EL PORCENTAJE DE
VALORIZACION DEL MES DE SETIEMBRE ES 16.11% 17,721.00 16.11% 16,303.32 1,417.68 17,721.00
VAL. OCTUBRE NINGUNA
10,664.31 9.69% 9,811.17 853.15 10,664.31
VAL. NOVIEMBRE NINGUNA
12,432.22 11.30% 11,437.65 994.58 12,432.22
VAL. DICIEMBRE NINGUNA
VAL. DICIEMBRE NINGUNA
8,895.41 8.09% 8,183.78 711.63 8,895.41
VAL. ENERO NINGUNA
5,358.30 4.87% 4,929.64 428.66 5,358.30

You might also like