You are on page 1of 68

TYNDP

2022
The Hydrogen and
Natural Gas TYNDP

Infrastructure Report
TABLE OF CONTENTS

1 INTRODUCTION....................................................................................................................................... 4

2 GAS INFRASTRUCTURE AND ­EUROPEAN ENERGY POLICY............................................................... 6

3 EXISTING CAPACITIES AND PROJECT DATA COLLECTION PROCESS.............................................. 8

3.1 Differences between TYNDP and ENTSOG Transparency Platform data........................................... 9

4 PROJECT STATUS AND ­INFRASTRUCTURE LEVELS.......................................................................... 10

4.1 Project status........................................................................................................................................10


4.2 Infrastructure levels..............................................................................................................................11
4.2.1 Natural gas infrastructure levels..............................................................................................11
4.2.2 Hydrogen infrastructure levels.................................................................................................12

5 ANALYSIS OF PROMOTERS’ ­SUBMISSIONS...................................................................................... 14

5.1 Type of infrastructures.........................................................................................................................15


5.2 Projects commissioned since TYNDP 2020......................................................................................16
5.3 Projects foreseen to be commissioned soon......................................................................................17

6 PROMOTERS SUBMISSIONS FOR ­NATURAL GAS FOR TYNDP 2022.............................................. 18

6.1 Gas transmission pipeline projects including compressor stations (TRA)......................................19


6.2 Map for transmission and compressor station projects in TYNDP 2022........................................20
6.3 
Reception and storage and regasification or decompression facilities
for liquified ­naturals gas or compressed ­natural gas (LNG)�������������������������������������������������������������22
6.4 Underground storage facility (UGS)....................................................................................................24
6.5 Further Details on the TYNDP 2022 promoters’ submissions for Natural GAs projects................26
6.5.1 Overview per type and status..................................................................................................28
6.5.2 Overview of promoters’ investments per geographical location...........................................31
6.5.3 Analysis of projects schedule..................................................................................................33
6.5.4 Investment costs......................................................................................................................39
6.5.5 TYNDP 2022 submissions and National Development Plans..............................................40
6.6 TYNDP 2022 Projects being Part of the 5th PCI List..........................................................................41

2 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
7 PROMOTERS’ SUBMISSIONS FOR HYD, RET, BIO AND OTH INVESTMENTS FOR TYNDP 2022. 42

7.1 HYD projects.........................................................................................................................................42


7.2 RET projects..........................................................................................................................................43
7.3 BIO projects..........................................................................................................................................43
7.4 OTH projects.........................................................................................................................................43
7.5 Further details on the TYNDP 2022 promoters’ submissions for HYD, RET, BIO and OTH............50
7.5.1 Overview per status..................................................................................................................51
7.5.2 Overview of promoters’ investments per geographical location...........................................52
7.5.3 Analysis of projects schedule..................................................................................................54
7.5.4 Investment costs......................................................................................................................56
7.6 Hydrogen Infrastructure and its 1st PCI/PMI call under the revised TEN-E Regulation...................58

8 INCREMENTAL CAPACITY PROCESS................................................................................................... 59

8.1 Incremental capacity process initiated in 2021.................................................................................60

LIST OF FIGURES ........................................................................................................................................ 62

LIST OF TABLES .......................................................................................................................................... 63

LIST OF ABBREVIATIONS .......................................................................................................................... 64

COUNTRY CODES (ISO)............................................................................................................................. 66

LEGAL DISCLAIMER.................................................................................................................................... 67

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 3
1 INTRODUCTION
This ENTSOG TYNDP, together with the Project of Common Interest (PCI)
selection process (which is the responsibility of the European Commission), is
a key step for the development of European gas infrastructures. Gas
­infrastructures, along with the implementation of harmonised business rules,
are fundamental for the strengthening of the European Internal Energy Market.

The TYNDP provides transparent and comprehensive information to


­stakeholders. From one edition to another, ENTSOG is constantly improving its
TYNDP process, taking into account all the valuable feedback received by
stakeholders.

FUTURE GAS INFRASTRUCTURE EVOLUTION


Gas infrastructure is an essential part of the future sudden announcements of new projects. It should
energy system, enabling the implementation of therefore be noted that this infrastructure report
both existing and innovative carbon neutral gas cannot reflect all latest developments even at its
technologies. The TYNDP 2022 provides a view publication date, while multiple major develop-
of the future gas infrastructure developments, ments of 2022 could be captured.
while also taking into consideration the ongoing
decarbonisation efforts and a need to reduce Already in the previous TYDNP edition, ENTSOG
Russian gas supply dependence. introduced a new project infrastructure category
for Energy Transition Projects. In response to the EU
The work on this TYNDP started in 2021, more Green Deal and the revision process of the TEN-E
than two years ago. Since then, rapid changes in Regulation (EU) 2022/869, ENTSOG decided to
the European gas market have occurred and the further update this category by substituting it by
increased hydrogen ambitions of many countries four new categories to provide additional insights,
and commercial players were observed, causing including development trends.

Picture courtesy of Teréga

4 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
RENEWABLE AND LOW-CARBON HYDROGEN
Renewable and low-carbon hydrogen will be key to years. The role of biomethane and hydrogen is
decarbonise the hard-to-abate sector in the next thereby expected to gain further relevance.

PROJECT SUBMISSION
For TYNDP 2022, an initial project submission reported in Annex A and the TYNDP 2022 maps are
took place between 18 October and 12 Novem- reflecting therefore the status of the projects during
ber 2021. Due to the Russian invasion of Ukraine the end of the project collection phase for TYNDP
and the commencement of new infrastructure 2022.
initiatives to reduce the European dependence
on Russian gas supply (including those outlined In addition to the above-mentioned TYNDP project
in the REPowerEU Plan), ENTSOG exceptionally collection phases, hydrogen infrastructure projects
re-opened the project collection process with the have been complemented in a final call between
purpose of including relevant projects that were 18 October and 15 December 2022. This collection
now being considered in light of security of supply was necessary to allow for updates or submissions
needs. Between 30 May and 24 June 2022, project of PCI candidates under the revised TEN-E Regula-
promoters had the opportunity to submit new pro- tion.
jects aiming to both strengthen Europe’s security of Projects submitted to the TYNDP 2022 have
supply and ­contributing to the energy transition, as different levels of maturity and their inclusion in
well as offering project promoters the opportunity the ­T YNDP does not make their development
to update already existing projects with the latest legally binding and should not be interpreted as an
available information. The project information as endorsement by ENTSOG or an EU body.

PROJECT COMPLIANCE
Submitted projects have to comply with specific applied by ENTSO-E and ENTSOG when d ­ eveloping
administrative and technical criteria for their their TYNDPs”, as set out in Annex III.2 (5) of
inclusion in the TYNDP, as defined in the ­“ENTSOG ­Regulation (EU) No 347/2013 (TEN-E)2. Since this
Practical implementation document (PID) for TYNDP 2022 was developed in a transition period
developing the 10-year network development of the TEN-E Regulation, anticipated changes were
plan 2022”1. This document follows the European taken into account as much as possible. The PID
­Commission’s recommendation on “Guidelines on was consulted in a dedicated workshop on 2 June
equal treatment and transparency criteria to be 2021.

1 https://www.entsog.eu/sites/default/files/2021-09/TYNDP0075-21_TYNDP_2022_PID_FINAL.pdf

2 https://eur-lex.europa.eu/legal-content/en/TXT/?uri=celex%3A32013R0347

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 5
2 GAS INFRASTRUCTURE AND
­EUROPEAN ENERGY POLICY
Existing European gas infrastructures already provide a high level of market
integration, security of supply, and competition in many parts of Europe. Recent
changes in the geopolitical context prove that further developments in some
specific areas are necessary in order to ensure that such benefits will be
strengthened and maintained including independence from Russia, improving
diversification, and taking into account the acceleration of hydrogen deploy-
ment communicated in REPowerEU3.

MARKET-BASED DEVELOPMENT OF GAS INFRASTRUCTURES


The Third Energy Package ensured a sound climate isolated from European energy markets, strength-
for a market-based development of gas infrastruc- ening of existing cross-border interconnections,
tures. In this context the TEN-E Regulation4 aims and cooperation with partner countries.
at facilitating the delivery of key ­infrastructures.
­Published in June 2022, the revised TEN-E Reg- New infrastructure projects may contribute to
ulation lays down new EU rules for cross-border sustainability, decarbonisation, market ­integration,
energy infrastructure. It promotes integration of competition and diversification of gas supply
renewables and new clean energy technologies sources or routes. It is therefore important that the
into the energy system in the light of the European European regulatory framework continues ensuring
Green Deal5, the connection of regions currently adequate support to infrastructure developments
that will allow to meet current and future needs.

THE REVISED TEN-E REGULATION


With regards to the gas PCI process, the revised version of the TEN-E Regulation, and ENTSOG
TEN-E Regulation clearly states that new natural proactively is taking initiative for already designing
gas projects will not be eligible for the PCI status infrastructure assessments for the cross-border
already for the 6th PCI list (1st PCI/PMI under the infrastructure by grasping both, e ­ xisting natural gas
revised TEN-E). At the same time, it defines the and future hydrogen networks. This is to properly
rules for the assessments starting in 2024. This and carefully represent ­interactions and synergies
TYNDP 2022 spans the revised and previous between different ­energy infrastructure categories.

3 https://commission.europa.eu/strategy-and-policy/priorities-2019-2024/european-green-deal/repowereu-affordable-secure-and-sustainable-
energy-europe_en

4 https://eur-lex.europa.eu/eli/reg/2022/869/oj

5 https://commission.europa.eu/strategy-and-policy/priorities-2019-2024/european-green-deal_en

6 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
Picture courtesy of the European Commission

THE REPowerEU PLAN


REPowerEU is addressing the European Commis- the green transition, while increasing the resilience
sion’s response to the hardships and global energy of the EU-wide energy system. In its defined meas-
market disruptions caused by Russia's invasion of ures, increased production of biomethane, targeted
Ukraine. It is a plan for saving energy, producing investments for natural gas infrastructure and LNG
clean energy and diversifying energy supplies aim- and hydrogen purchases from alternative supply
ing at the reduction of Europe’s dependency on the sources are listed. The TYNDP 2022 development
Russian supplies of natural gas. The REPowerEU was adjusted and modified along the process to
plan sets out a series of measures to rapidly reduce include these ambitions into the perspective of the
dependence on Russian fossil fuels and fast forward infrastructure development and its assessment.

GAS INFRASTRUCTURE – A FLEXIBLE SYSTEM


Regarding the sustainability pillar of the EU up to seasonal balancing of energy systems, as
Energy Policy, gas infrastructures already offer a well as transporting energy at relatively low costs.
flexible system able to support the development New investments into and accelerated deployment
of renewable energies. These infrastructures are ­of hydrogen will establish advanced integration of
able to transport a fuel that is less carbon-inten- renewable sources and achieve a higher level of
sive than coal and oil to support the development decarbonisation. All technologies that contribute to
of ­intermittent renewable power production and the decarbonisation of the energy system, including
­enable a large-scale injection of non-fossil gas (such those which enable renewable and decarbonised
as biomethane, hydrogen, or synthetic ­methane). gases, should benefit from an objective treatment,
Gas infrastructures provide the advantage of stor- assuring a level playing field between energy
ing renewable energy, providing opportunities for ­carriers.

COORDINATED AND COHERENT INTERACTION


To achieve climate goals under the European Green Such an integrated approach should address how
Deal in a cost-efficient way, a coordinated and to develop the infrastructure necessary for the
coherent interaction between electricity and gas- future in an efficient and technology-neutral man-
es (including natural gas, biomethane, synthetic ner, which also reflects the increasing demand for
­methane, and hydrogen) is essential. hydrogen and the essential role of power-to-gas
technologies.

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 7
3 EXISTING CAPACITIES AND
PROJECT DATA COLLECTION PROCESS
ENTSOG has improved the transparency of the process, strengthened the
communication with project promoters and upgraded its Project Data Portal
to ensure the best possible availability, consistency and quality of the collected
project data. This in exchange ensures the quality of the assessment.

For each TYNDP, ENTSOG collects information When submitting projects, the promoters commit
on existing firm capacities directly from TSOs (for to report accurate and up-to-date information. In
transmission infrastructures) as well as from GIE6 very few instances ENTSOG has directly u ­ ndertaken
(for LNG regasification terminals and storage corrective actions in line with pre-defined rules.
­facilities). For TYNDP 2022, existing firm capacities Furthermore, for a given project, the related TYNDP
were collected as of 1 January 2023. code is assigned automatically by the Project Data
Portal when the project is first submitted. Updates
In order to provide a holistic view of the European of the project in future TYNDPs are handled by
gas system over the next 20 years, it is important the promoter under the same project code. This
that all relevant infrastructure projects are incorpo- allows using the project code as another key for the
rated into the TYNDP. ENTSOG has endeavoured monitoring of projects along the different TYNDP
to run an open and transparent data collection editions and for the PCI selection process.
­p rocesses, and actively encouraged project
­promoters to submit their projects. To ensure as much consistency as possible,
­ENTSOG encouraged promoters intending to resub-
As the submission of comprehensive project data is mit projects that were already part of the ­TYNDP
a critical prerequisite for the infrastructure analysis, 2020 to update the already existing information
ENTSOG provides a Project Data Portal open to all while keeping the same TYNDP project code. In this
project promoters to support the process. way it has been possible to better link the different
Only projects actively (re)submitted by promoters TYNDP editions and monitor the project evolution.
through the Project Data Portal have been con- Promoters were also requested to provide com-
sidered in this edition of the TYNDP. This process prehensive information including detailed project
ensures transparency and non-discrimination implementation schedules ( sections 6.4.3 and
between projects. Ahead of the submission phase, 7.5.3) and estimated costs ( sections 6.4.3 and
to better support project promoters, ENTSOG 7.5.4).
provided a documentation kit with a handbook7 on For the TYNDP 2022, an initial project submission
how to use the Project Data Portal and organised took place between 18 October and 12 November
dedicated webinars for project promoters. 2021. The submission phase was followed by a
In order to increase transparency and accuracy check and correction phase (from 15 November
of the information and to facilitate coordination to 10 December 2021) where both ENTSOG and
among promoters, the ENTSOG Project Data Portal promoters could verify and amend the submitted
offers promoters capacity monitoring interfaces. information. Additionally, in order to ensure a more
This allows project promoters to actively monitor careful consistency check on submitted projects’
their submission through specific reports and data, during the TYNDP 2022 project data col-
check the final capacity value resulting from the lection, ENTSOG liaised with ACER and National
application of the “lesser-of-rule”8. Regulatory Authorities (NRAs) after the first initial
data collection. Promoters were informed about

6 Gas Infrastructure Europe

7 https://www.entsog.eu/sites/default/files/2022-05/TYNDP076-21_2022_Project_Submission_Handbook.zip

8 The “lesser-of-rule” means that, on a Point with Entry and Exit capacities, the minimum of the two values will be considered as the firm capacity available
for use. Example: Promoter A submits an Exit capacity on Point P in the value of 100. Promoter B submits an Entry capacity on the other side of the Point
P, in the value of 200. After the application of the rule, the firm capacity considered for modelling will be 100.

8 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
the comments provided by ACER and NRAs and of Europe’s energy sources and contributing to
allowed to amend the information provided during the energy transition, as well as to update existing
the project data collection if deemed necessary. ­projects with the latest available information. The
The same information was also shared with the project information as reported in Annex A and
European Commission. TYNDP 2022 maps are reflecting therefore the
status of the projects during the end of the project
Due to the Russian invasion of Ukraine and the collection phase for TYNDP 2022.
commencement of new infrastructure initiatives
to reduce Europe’s dependence on Russian gas In addition to the above-mentioned TYNDP project
supply (including the REPowerEU targets), ENTSOG collection phases, hydrogen infrastructure projects
decided to reopen the project collection process have been complemented in a final call between
with the purpose of including relevant projects in 18 October and 15 December 2022. This collection
light of security of supply. Between 30 May and was necessary to allow for updates or submissions
24 June 2022 project promoters had the opportuni- of PCI candidates under the revised TEN-E Regula-
ty to submit additional projects aiming to strength- tion.
en Europe’s security of supply, the diversification

3.1 DIFFERENCES BETWEEN TYNDP AND


ENTSOG TRANSPARENCY PLATFORM DATA
Regulation (EC) no. 715/2009 and its amendments Firm technical capacity data collected and used
require ENTSOG to provide a Union-wide platform for the TYNDP might differ from the capacity data
where all Transmission System Operators for gas published on the ENTSOG Transparency Platform
shall make their relevant data publicly available. for the three main following reasons:

The Transparency Platform provides technical and \ though the modelling mostly uses the ENTSOG
commercial data on gas transmission systems on Transparency Platform topology, in some ­cases
a daily and hourly basis, which include intercon- the topology used in the TYNDP differs from
nection points and connections with storages, LNG the latter. This is to better serve simulations
facilities, distribution networks, final consumers ­purposes;
and production facilities.
\ both existing capacity and project capacities
The platform is available on web address: are not constantly updated during the TYNDP
­process but have a specific time stamp (1 Jan-
https://transparency.entsog.eu   uary 2023 for existing infrastructure while for
where the interested parties are able to access ­projects the closure day of the data collection);
­valuable information uploaded by all TSOs. \ capacities are modelled in the TYNDP after the
application of the Lesser-of-Rule.

Picture courtesy of ONTRAS

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 9
4 PROJECT STATUS AND
­INFRASTRUCTURE LEVELS

4.1 PROJECT STATUS


Projects are categorised along two different project \ All projects that do not meet the FID or
status: FID and non-FID. As for TYNDP 2020 the ­Advanced criteria are considered as having the
non-FID status has been sub-categorised into non- Non-Advanced status. Projects with Non-Ad-
FID Advanced (hereafter Advanced) and non-FID vanced status are identified in in TYNDP pro-
Less-Advanced (hereafter Less Advanced). ject code with an N (e. g. TRA-N-000).

Each project status is directly derived from the Based on past TYNDP process experience and the
information provided by its promoter and according recommendations expressed by ACER in their Opin-
to the rules set in the ENTSOG Practical Implemen- ions, the Advanced status was already introduced
tation Document: in the 2017 edition 11 and allows to better reflect the
different project maturities. This status was defined
\ The FID status of a project corresponds to a in close cooperation with ACER and the European
project that has taken the final investment Commission, and in consultation with stakeholders.
­decision before the closure of TYNDP project
collection period. Projects with FID status are To enable meaningful simulation for system needs
identified in TYNDP project code with a F (e. g. assessments, ENTSOG decided to move forward
TRA-F-000); the project status of around 15 projects from less
advanced to advanced. Most of these projects have
\ The Advanced status is applied to all non-FID been initiated directly after the Russian invasion
projects that fulfils the following conditions: of Ukraine aiming to bring additional supply to
– commissioning year expected at the latest Europe or solving internal system bottlenecks. All
by 31 December of the year of the TYNDP respective projects have a common point: that the
project data collection + 6 (e. g. 2028 in case commission date and the realisation is very likely in
of TYNDP 2022 for which the latest data the near future but based on the ad hoc planning all
collection was done in 2022) information on FEED and/or permitting could not
be provided during the second project submission
– and phase. Examples for this are investments at the bor-
der between France and Germany enabling reverse
– whose permitting phase has started flow and the construction of FSRU’s in several Euro-
ahead of the TYNDP project data collec- pean Countries. This decision was well discussed
tion with all concerned project promoters.
OR Additionally, the PCI status is assigned to natural
– FEED9 has started (or the project has gas projects that are part of the latest approved
been selected for receiving CEF 10 grants 5th Union list of Projects of common interest (the
for FEED) ahead of the TYNDP project PCI list) referred in Article 3 of the Regulation (EU)
data collection. 347/2013, irrespective of the above-mentioned
project status.
Projects with Advanced status are identified in
TYNDP project code with an A (e. g. TRA-A-000)

9 Front End Engineering Design as the basic engineering activity conducted after completion of the conceptual design or the (pre-)feasibility study.

10 The Connecting Europe Facility (CEF) is an EU funding instrument defined in Art. 14 of Regulation (EU) 347/2013.

11 http://www.acer.europa.eu/official_documents/acts_of_the_agency/opinions/opinions/acer%20opinion%2011-2015.pdf

10 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
4.2 INFRASTRUCTURE LEVELS

4.2.1 NATURAL GAS INFRASTRUCTURE LEVELS


As in previous TYNDP editions, project status is the basis for the definition of natural gas infrastructure
levels:

\ Existing infrastructure level \ PCI infrastructure level

Existing infrastructure level is composed of the PCI infrastructure level is composed of existing
existing network + FID projects having their com- infrastructure level + FID projects + natural gas
missioning date no later than 31 December 2022. infrastructure projects included in the 5th PCI list.

Existing infrastructure level will be the basis for the The PCI infrastructure level is composed by
following infrastructure levels (PCI and Advanced), existing infrastructures, infrastructure projects
as it represents the minimum level of natural gas having FID status (whatever their PCI status is) and
infrastructure development that will be considered ­infrastructure projects labelled as PCIs in the 5th PCI
in the TYNDP 2022 System Assessment. selection process (not having their FID taken yet).
Although it includes projects of different maturity,
\ Advanced infrastructure level this infrastructure level allows to build a bridge
Advanced infrastructure level is composed of exist- between past PCI selection processes and it also
ing infrastructure level + FID projects + Advanced enables the assessment of the 5th list of PCI natural
projects. gas projects.

The advanced infrastructure level broadens the


range of the TYNDP 2022 System assessment, by
including the natural gas advanced projects on top
of the existing and FID infrastructure allowing for
a better and more complete infrastructure gaps
identification.

Advanced Non-FID
non-FID projects with
projects 5th PCI label

FID projects
FID FID
commissioning
projects projects
< 31/12/2022

Existing Existing Existing


infrastructure infrastructure infrastructure

Existing Advanced PCI


infrastructure infrastructure infrastructure
level level level

Figure 1: Natural gas infrastructure levels in TYNDP 2022

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 11
4.2.2 HYDROGEN INFRASTRUCTURE LEVELS
Unlike natural gas, hydrogen infrastructure levels to TYNDP 2022, but it is also complemented by
can only be defined with the consideration of additional Hydrogen infrastructure projects sub-
planned projects, as there is no existing infrastruc- mitted to the first PCI selection process under
ture in place. revised TEN-E (for which project collection closed
in December 2022).
After the inclusion of ETR project category (Ener-
gy Transition projects) in the TYNDP2020, and in The addition of hydrogen projects submitted to the
order to provide a more accurate and up to date PCI project submission in the TYNDP 2022 edition
representation of the latest infrastructure develop- is explained by the specific relationship between the
ments ENTSOG extended the projects categories TYNDP 2022 cycle and the ongoing first PCI selec-
of ETR projects into four new separate categories tion process. As for the first PCI selection process,
in TYNDP 2022. Among these new infrastructure previous project submission to the TYNDP 2022
categories further detailed in  section 5.1 “Types edition was not set a mandatory condition, unlike
of infrastructures”, Hydrogen infrastructure projects previous and future TYNDP/PCI processes.
were collected as part of the dedicated new hydro-
gen project category. It is also important to highlight that considering
PCI project submission information as part of
In addition, hydrogen projects included different TYNDP 2022 infrastructure levels, has also allowed
subcategories of hydrogen infrastructure projects, to update TYNDP 2022 project data of hydrogen
such as: infrastructure with the best available information
from project promoters. This is also reflected in
\ On-shore or off-shore Hydrogen transmission the TYNDP 2022 System and Project-specific CBA
pipelines (newly constructed or repurposed assessment and will enable a fair and non-discrim-
from natural gas pipelines) including pipelines inatory analysis of future hydrogen infrastructure.
enabling hydrogen imports from extra-EU
countries. In addition, and as further detailed in the definition
of the Hydrogen infrastructure levels some addi-
\ Newly constructed or repurposed liquefied hy- tional infrastructure assumptions are included for
drogen terminal including hydrogen embedded H2 infrastructure level 2.
in other chemical substances with the objec-
tive of injecting the hydrogen into the grid. Unlike natural gas infrastructure levels, hydrogen
infrastructure levels are not based on project-­
\ Hydrogen storages (newly constructed or status. As hydrogen infrastructure being at an early
repurposed from natural gas infrastructure). stages of development compared to natural gas
Extensive data collection carried out for TYNDP infrastructure that has been gradually developed
2022, allowed for the consideration of hydrogen reaching already in the existing infrastructure level
infrastructure levels as a first step on the assess- considerable level of development for most Europe-
ment and analysis of hydrogen infrastructure. an countries.

For the first time, in the TYNDP 2022 edition, As described later in section 7.5.1 “Overview
­ENTSOG has introduced Hydrogen infrastructure of ­project status”, most hydrogen projects have
levels, that includes not only Hydrogen infrastruc- ­non-FID less-advanced project status, whereas only
ture projects (as defined in the Practical Imple- few submissions have non-FID advanced project
mentation document of TYNDP 2022) submitted status and only one project has FID status.

12 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
In TYNDP 2022 two contrasted hydrogen infrastructure levels were included 12:

\ Hydrogen infrastructure level 1: \ Hydrogen infrastructure level 2:

Additional
infrastructure
assumptions

HYD projects ­submitted to HYD projects ­submitted to


1st PCI selection ­process 1st PCI selection ­process

HYD projects ­submitted HYD projects ­submitted


to TYNDP 2022 to TYNDP 2022

Hydrogen infrastructure level 1 is a project-based Hydrogen infrastructure level 2 is defined as


infrastructure level, is composed of all TYNDP a policy-based infrastructure, is composed of
2022 hydrogen projects (including also TYNDP Hydrogen infrastructure level 1 and additional
2022 hydrogen-ready infrastructure), as well infrastructure assumptions based on TSOs’ need-
as hydrogen projects submitted to the first PCI ed to enable policy objectives, such as the 2030
selection process that were not previously sub- hydrogen imports targets defined the RePowerEU
mitted to TYNDP 2022. Plan.

Figure 2: Hydrogen infrastructure levels in TYNDP 2022

Infrastructure levels are the basis for the identifi- that could be reached (in 2030, 2040, 2050)
cation of infrastructure gaps in the TYNDP 2022 under the hypothesis of a full commissioning of H2
System assessment. For the first time, TYNDP planned infrastructures that are not yet in place.
2022 will include a dual assessment of natural gas Therefore, even in configurations where no demand
and hydrogen infrastructure: by combining each curtailment are identified these results should not
natural gas infrastructure level with both hydrogen be read as the absence of H2 infrastructure needs.
infrastructure levels in the TYNDP System assess- On the other hand, it is assumed a full availability
ment. As for the hydrogen system an existing of the infrastructures composing the H2 infra levels
infrastructure level is not yet available. ENTSOG has in order to avoid demand curtailment. Indeed, if
identified a possible hydrogen network according planned infrastructure is not developed, demand
to the information provided by promoters in their curtailment would materialise at rates ­progressively
project submission for TYNDP/PCI process (i. e. H2 increasing together with the number of planned
infrastructure levels). For this reason, it should be project not actually realised.
clear that the System Assessment shows results

Existing Hydrogen Hydrogen Advanced Hydrogen Hydrogen PCI Hydrogen Hydrogen


infrastructure infra. infra. infrastructure infra. infra. infrastructure infra. infra.
level level 1 level 2 level level 1 level 2 level level 1 level 2

Natural gas Hydrogen Natural gas Hydrogen Natural gas Hydrogen

Figure 3: Natural gas and Hydrogen infrastructure levels in the System Assessment

12 Detailed capacities of Hydrogen Infrastructure levels 1 and 2 can be found on the Annex C2

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 13
5 ANALYSIS OF PROMOTERS’
­SUBMISSIONS
Overall, 358 investments have been included to TYNDP 2022 by more than
60 different project promoters including both TSOs and third-party promoters.
The below graph provides the overview for this submission, compared to the
previous TYNDP editions.

The full details of the project information included information of the received submissions. Submis-
in the TYNDP 2022 can be found in Annex A of this sions are further analysed in Chapter 6 and 7.
Report. This section of the report provides a general

Natural Gas = TRA + LNG + UGS

New
New investments
investments (213)
New Cancelled/not (94)
Investments (26) re-submitted Cancelled/not
(31) re-submitted
(81)

Investments
Investments
already in Investments
already in
­previous already in
­previous
TYNDPs TYNDPs 2020
TYNDPs
(168) (145)
(181)

Completed
(36)

Completed (10)
Existing
Existing infrastructure
Existing infrastructure
infrastructure

TYNDP 2018 TYNDP 2020 TYNDP 2022


207 investments 262 ­investments 358 ­investments

Figure 4: Comparison between TYNDP 2018, TYNDP 2020 and TYNDP 2022

14 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
5.1 TYPE OF INFRASTRUCTURES
For the previous TYDNP edition ENTSOG intro- decided to further evolve this category by replacing
duced for the first time a new project infrastructure it with four new categories allowing more insights
category for Energy Transition Projects. TYNDP and reflection of development trends. Projects are
2020 already included 75 Energy Transitions classified in TYNDP 2022 according to the following
­Projects. Following the EU Green Deal and the infrastructure categories.
revision process of the TEN-E regulation, ENTSOG

PROJECTS ARE CLASSIFIED IN TYNDP 2022 ACCORDING TO THE


­FOLLOWING INFRASTRUCTURE CATEGORIES:
\ Gas Transmission pipeline including ­Compressor Stations (TRA)

\ Reception and storage and regasification or decompression facilities


for liquified ­naturals gas or compressed natural gas (LNG)

\ Underground storage facility (UGS)

\ New or repurposed infrastructure to carry hydrogen (HYD)

\ Projects for retrofitting infrastructure to further integrate hydrogen (RET)

\ Biomethane development projects (BIO)

\ Other infrastructure related projects (OTH)

Renewable and low-carbon hydrogen will be key to Figure 5 provides an overview of the submitted
decarbonise the hard-to-abate sector in the next investment per Type of Infrastructure.
years but alternatively some European countries
can still reduce their carbon footprint by replacing
more carbon intensive fuels. Investments falling
11 %
under the TRA, UGS and LNG infrastructure cate-
3%
gory thus need to be technically suitable to trans- 39 30 %
4%
port, store or receive safely, securely, and efficiently 11 108
13
increasing percentages of H2 (possibly up to 100 %)
TYNDP 2022
or contribute to the fuel-gas-switch within a coun- Projects by type
try/area. of infrastructure
23
12 6%
152
43 % 3%

TRA LNG UGS

HYD RET BIO OTH

Figure 5: Investment inclusion in TYNDP 2022 by type


of infrastructure

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 15
5.2 PROJECTS COMMISSIONED SINCE TYNDP 2020
The following map shows all projects that, from the last TYNDP edition, have been completed.

Balticconnector (FI)

Balticconnector (EE)

Enhancement of EE-LV interconnection

Biometahne reverse flow DK


Baltic Pipe (onshore DK)
Norwegian tie-in to DK upstream system Baltic Pipe: PL–DK-interconnection (offshore)

GIPL (LT)
Biometahne reverse flow DK

Upgrade Sülstorf station


GIPL (PL)
NOWAL

EUGAL Baltic Pipe (onshore DK)

North - South Gas Corridor in Western Poland


H2-Import Coalition
PL–SK Interconnection (PL)
Capacity4Gas – DE/CZ
Reverse Flow TENP
CS Wertingen Capacity4Gas – CZ/SK

West Grid Synergy Capacity increase at IP Lanžhot entry

RO–HU reverse flow (HU) Phase 1


NTS developments in NE Romania
CS 1 Croatian GTS Interconnection NTS with DTS
and reverse flow at Isaccea
LNG evacuation pipeline
Upgrading GMS Isaccea 1
LNG Krk Phase 1
New NTS developments for taking
over gas from the Black Sea shore
BRUA (RO) Phase 1
Upgrading GMS Negru Voda I
San Marco – Recanati
Jupiter 1000

TAP

TAP interconnection
MRS Nea Messimvria

Figure 6: Map of projects commissioned since 2020

32 investments already part of TYNDP 2020 were Some of the above projects have been submitted
completed over the years between both TYNDP edi- to TYNDP 2022 but have been commissioned in
tions. The commissioning of all these investments the following months directly after the end of the
further contributes to the development of the project submission phase (commissioning date
European gas system, enhancing the level of mar- < 31.12.2022) and will be therefore considered in
ket integration, security of supply and competition. the TYNDP 2022 Existing infrastructure level and is
Four of these projects are contributing to the energy no longer part of the promoter submission analyses
transition. in the next chapters.

16 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
5.3 PROJECTS FORESEEN TO BE COMMISSIONED SOON
In addition to the 32 commissioned investments, 25 investments with either FID or Advanced status
and commissioning year 2023 haven been submitted to TYNDP 2022. These projects are further
contributing to the security of supply. A list of these projects is presented below:

Project code Project name Promoter Country Commssioning


year

Enhancement of Latvia – Lithuania interconnection


TRA-F-342 AB Amber Grid LT 2023
(Lithuanian part)

Enhancement of Latvia – Lithuania interconnection


TRA-F-382 Conexus Baltic Grid, JSC LV 2023
(Latvian part)

Gasunie Deutschland Transport


TRA-A-1199 LNG Terminal Brunsbüttel – Grid Integration DE 2023
Service GmbH

TRA-F-814 Upgrade for IP Deutschneudorf et al. for More Capacity ONTRAS Gastransport GmbH DE 2023

LNG terminal in northern Greece / Alexandroupolis –


LNG-A-62 Gastrade S.A. GR 2023
LNG Section

LNG terminal in northern Greece / Alexandroupolis –


TRA-A-63 Gastrade S.A. GR 2023
Pipeline Section

Gasunie Deutschland Transport


TRA-A-988 LNG Terminal Stade – Grid Integration DE 2023
Service GmbH

TRA-F-539 FSRU 1 Connection Snam Rete Gas S.p.A. IT 2023

LNG-F-1134 FSRU 1 – SNAM Snam Rete Gas S.p.A. IT 2023

LNG-F-272 Upgrade of LNG terminal in Świnoujście GAZ-SYSTEM S.A. PL 2023

Open Grid Europe GmbH and


TRA-F-329 ZEELINK DE 2023
Thyssengas GmbH

Development on the Romanian territory


TRA-F-362 SNTGN Transgaz SA RO 2023
of the Southern Transmission Corridor

GRTgaz Deutschland GmbH and


TRA-F-755 CS Rimpar DE 2023
Open Grid Europe GmbH

TRA-A-1090 Metering and Regulating Station at Alexandroupoli DESFA S.A. GR 2023

TRA-F-1115 WAL Open Grid Europe GmbH DE 2023

TRA-F-1276 Upgrade of Nea Mesimvria Compressor Station DESFA S.A. GR 2023

TRA-F-1278 Compressor station at Ambelia DESFA S.A. GR 2023

OTH-A-430 Porthos Porthos Development CV NL 2023

HYD-A-562 Energy Park Bad Lauchstädt ONTRAS Gastransport GmbH DE 2023

Reallocation H-Gas towards NL: Bunde/Oude to Zone Gasunie Deutschland Transport


TRA-A-809 DE 2023
Oude Statenzijl H Services GmbH

OTH-A-924 Power to Methanol Antwerp Power to Methanol Antwerp BV BE 2023

TRA-A-1268 Romania – Serbia Interconnection SNTGN Tranzgaz SA RO 2023

TRA-A-564 FSRU in Le Havre connection GRTgaz FR 2023

Expansion of Revithoussa LNG Terminal


LNG-A-1123 DESFA S.A GR 2023
via installation of FSU

LNG-F-178 Musel LNG terminal Enagas Transport S.A.U. ES 2023

TRA-A-1275 Zeebrugge Opwijk Fluxys Belgium BE 2023

Table 1: Investments included in TYNDP 2022 whose expected commissioning year is 2023

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 17
6 PROMOTERS SUBMISSIONS
FOR ­NATURAL GAS FOR TYNDP 2022
Following the information provided by promoters, ENTSOG has aggregated the
submitted investments according to a strictly functional-related criteria.

FOR EXAMPLE:
\ In case of an interconnector connecting two (or In all above cases, investments carried on by differ-
more) countries, two (or more) different ent promoters need to be implemented together for
­promoters are usually involved; the overall project to materialise. These should then
\ A new LNG terminal or storage may need a new be considered as a single “aggregated” project.
evacuation pipeline to connect them to the gas Based on this, for TYNDP 2022 promoters
network and in some cases the two invest- ­submitted 112 gas infrastructure projects i. e.
ments might be promoted by different entities; transmission, UGS and LNG projects. In TYNDP
\ In some cases, projects connecting the EU to 2020 promoters submitted 142 gas infrastructure
new supply sources are composed of different projects
projects (and in some cases promoted by
­different subjects) whose full realisation is a
prerequisite to connect the new source.

Picture courtesy of Moldovatransgaz

18 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
6.1 GAS TRANSMISSION PIPELINE PROJECTS
INCLUDING COMPRESSOR STATIONS (TRA)
Today in EU and UK around 205,090 km of transmission pipelines exist. The data included in the map rep-
resent the total length of 46 TSOs transmission pipeline. The definition of transmission pipeline might differ
country by country.

1,300 (FI)

977 (EE)

602 (SE) 1,190 (LV)

1,048 (DK) 2,285 (LT)

2,476 (IE)
11,741 (PL)
12,556 (NL)
8,416 (UK) 34,580 (DE)
4,000 (BE)
3,973 (CZ)
277 (LU) 2,273 (SK)

1,702 (AT)
5,889 (HU)
292 (CH) 13,430 (RO)
37,627 (FR) 1,201 (SI)

2,544 (HR)
3,469 (BG)

13,361 (ES) 34,500 (IT)

1,375 (PT) 1,465 (GR)

Figure 7: Transmission length in EU and UK in km (year 2022)

80 transmission and compressor stations projects have been submitted to TYNDP 2022.
These projects can be summarised according to the following categories:

\ 25 interconnection projects between two or \ 6 infrastructure projects supporting the switch


more countries. In some cases, only one side of from low-calorific gas to high-­calorific gas in
the interconnection has been submitted since Germany, France, Netherlands and ­Belgium;
the other part is ­already existing or the project
consists of the creation of additional capacity \ 1 project concerning ­methanisation of new
at the same IP where an interconnection ­areas ­(Sardinia).
­already exists; The following map shows the list of all projects
\ 20 projects related to the construction of ­concerning transmission and compressor (or
­compressor or metering stations; metering) stations development. Evacuation
­pipelines to connect regasification terminals or
\ 5 projects related to new ­import or production storages are considered as part of  sections 6.2
development; or 6.3.

\ 20 projects concerning ­upgrade, modernisa-


tion or enhancement of the system

\ 3 reverse flow projects;

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 19
TRA-A-47 Capacity from France to Germany at Obergailbach Advanced Non-PCI TRA-N-8 Import developments from North-East Less-Adv. Non-PCI
TRA-A-63 LNG terminal northern Greece / Alexandroupolis - Pipeline Section Advanced Non-PCI TRA-N-92 CS Ajdovščina, 1st phase of upgrade Less-Adv. Non-PCI
TRA-A-66 Int. Croatia - Bosnia and Herzegovina (Slobodnica- Bosanski Brod) Advanced Non-PCI TRA-N-108 M3 pipeline reconstruction CS Ajdovščina to Šempeter/Gorizia Less-Adv. Non-PCI

TRA-A-68 Ionian Adriatic Pipeline Advanced Non-PCI TRA-N-112 R15/1 Pince - Lendava - Kidričevo Less-Adv. Non-PCI
TRA-A-70 Interconnection Croatia/Serbia (Slobodnica-Sotin-Bačko Novo Selo) Advanced Non-PCI TRA-N-224 Gaspipeline Brod - Zenica Less-Adv. Non-PCI
Less-Adv. Non-PCI
MAP FOR TRANSMISSION AND COMPRESSOR STATION PROJECTS IN TYNDP
Advanced 2022
TRA-A-75 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac Advanced Non-PCI TRA-N-303 Interconnection Croatia-Bosnia and Herzegovina (west)

Non-PCI TRA-A-258 Developments for Montoir LNG terminal 2.5 bcm expansion TRA-N-325 Slovenian-Hungarian interconnector (HU hydrogen corridor III) Less-Adv. Non-PCI
TRA-A-302 Interconnection Croatia-Bosnia and Herzegovina (South) Advanced Non-PCI TRA-N-389 Upgrade of Murfeld/Ceršak interconn. (M1/3 Interconn. Ceršak) Less-Adv. Non-PCI
TRA-A-339 Trans-Caspian Advanced Non-PCI TRA-N-570 Expansion Compressor Station Rehden Less-Adv. Non-PCI
TRA-A-439 Stazione di Spinta "San Marco" Advanced Non-PCI TRA-N-600 Czech-Austrian Interconnection (AT) Less-Adv. Non-PCI
TRANSPORT BY PIPELINES (INCL. COMPRESSOR STATIONS)
TRA-A-457 Medelsheim deodorisation station Advanced Non-PCI TRA-N-602 Upgrading GMS Isaccea 2 and GMS Negru Voda 2 Less-Adv. Non-PCI
TRA-F-137 Interconnection Bulgaria - Serbia FID PCI
TRA-A-496 Increase of Gas Transport to the Netherlands Advanced Non-PCI TRA-N-612 ES-IT Offshore-Interconnector Less-Adv. Non-PCI
TRA-F-298 Modernization and rehabilitation of the Bulgarian GTS FID PCI
TRA-A-505 Lucera - San Paolo Advanced Non-PCI TRA-N-766 Entry Murfeld Less-Adv. Non-PCI
TRA-F-342 Enhancement of Latvia-Lithuania interconnection (Lithuania's part) FID PCI
TRA-A-564 FSRU in Le Havre connection Advanced Non-PCI TRA-N-782 TANAP X - Expansion Trans Anatolian Natural Gas Pipeline Project Less-Adv. Non-PCI
TRA-F-362 Devt. on the Romanian territory of Southern Transmission Corridor FID PCI
TRA-A-566 FSRU 2 Connection Advanced Non-PCI TRA-N-810 TAP Expansion Less-Adv. Non-PCI
TRA-F-382 Enhancement of Latvia-Lithuania interconnection (Latvian part) FID PCI
TRA-A-598 NTS developments in North-West Romania Advanced Non-PCI TRA-N-910 West Interconnection BiH/CRO Less-Adv. Non-PCI
TRA-F-245 North - South Gas Corridor in Eastern Poland FID Non-PCI
TRA-A-607 Transmission Hybrid Compressor Stations Advanced Non-PCI TRA-N-913 Modification NP23 MW turboset to H2-ready low-emissions at CS04 Less-Adv. Non-PCI
TRA-F-329 ZEELINK FID Non-PCI
TRA-A-628 Eastring - Slovakia Advanced Non-PCI TRA-N-954 TAG Reverse Flow Less-Adv. Non-PCI
TRA-F-394 Norwegian tie-in to Danish upstream system FID Non-PCI
TRA-A-655 Eastring - Romania Advanced Non-PCI TRA-N-955 GUD: Complete conversion to H-gas (North-West Germany) Less-Adv. Non-PCI
TRA-F-402 TENP Security of Supply FID Non-PCI
TRA-A-656 Eastring - Hungary Advanced Non-PCI TRA-N-1057 Compressor stations 2 and 3 at Croatian gas tranmission system Less-Adv. Non-PCI
TRA-F-409 Larino - Chieti FID Non-PCI
TRA-A-786 Capacity Expansion for the German LNG Terminals Advanced Non-PCI TRA-N-1059 Czech-Austrian Interconnection (CZ) Less-Adv. Non-PCI
TRA-F-500 L/H Conversion Belgium FID Non-PCI
TRA-A-809 Realloc. H-Gas towards NL: Bunde/Oude to Zone Oude Statenzijl H Advanced Non-PCI TRA-N-1063 Export to Malta Less-Adv. Non-PCI
TRA-F-539 FSRU 1 Connection FID Non-PCI
TRA-A-851 Southern Interconnection pipeline BiH/CRO Advanced Non-PCI TRA-N-1112 Upgrade of Compressor Station at Komotini Less-Adv. Non-PCI
TRA-F-755 CS Rimpar FID Non-PCI
TRA-A-951 Embedding CS Folmhusen in H-Gas Advanced Non-PCI TRA-N-1124 Capacity increase Bulgaria to Romania (Rupcha-Vetrino Looping) Less-Adv. Non-PCI
TRA-F-814 Upgrade for IP Deutschneudorf et al. for More Capacity FID Non-PCI
TRA-A-967 Nea-Messimvria to Evzoni/Gevgelija pipeline (IGNM) and BMS Advanced Non-PCI TRA-N-1131 Reinforcement of NNGTS-South section Less-Adv. Non-PCI
TRA-F-873 Additional import at Oude StatenZijl area FID Non-PCI
TRA-A-988 LNG Terminal Stade - Grid Integration Advanced Non-PCI TRA-N-1138 South Caucasus Pipeline Future Expansion (SCPFX) Less-Adv. Non-PCI
TRA-F-971 Booster Compressor Station for TAP in Nea Messimvria FID Non-PCI
TRA-A-1009 Czech-Polish Bidirectional Interconnection Advanced Non-PCI TRA-N-1140 Technical capacity increase gas transm. GR to BG and BG to NM Less-Adv. Non-PCI
TRA-F-1090 Metering and Regulating Station at Alexandroupoli FID Non-PCI
TRA-A-1058 LNG Evacuation Pipeline Kozarac-Slobodnica Advanced Non-PCI TRA-N-1143 Capacity intensification of the Poland – Slovak Interconnector Less-Adv. Non-PCI
TRA-F-1095 TENP Security of Supply plus FID Non-PCI
TRA-A-1060 NEL (Middle) compressor station Advanced Non-PCI TRA-N-1145 Export enhancements Less-Adv. Non-PCI
TRA-F-1115 WAL FID Non-PCI
TRA-A-1109 Greifswald GPCM station Advanced Non-PCI TRA-N-1170 Maritsa East hydrogen ready pipeline Less-Adv. Non-PCI
TRA-F-1118 Lubmin 2 GPCM station TENP
FID Non-PCI
TRA-A-1114 Grid extension for LNG Wilhelmshaven Advanced Non-PCI TRA-N-1175 NEL Compressor Station Wittenburg Less-Adv. Non-PCI
TRA-F-1254 CS Elten FID Non-PCI
TRA-A-1141 Czech-Polish Gas Interconnection - PL section Advanced Non-PCI TRA-N-1194 Sardinia Methanization  Less-Adv. Non-PCI
TRA-F-1271 Compressor Station Krummhoern FID Non-PCI
TRA-A-1181 Connecting pipe to LNG terminal in Latvia Advanced Non-PCI TRA-N-1235 Firm transmission capacity increase at the IP Veľké Zlievce Less-Adv. Non-PCI
TRA-F-1276 Upgrade of Nea Mesimvria Compressor Station FID Non-PCI
TRA-A-1199 LNG Terminal Brunsbuettel - Grid Integration Advanced Non-PCI
TRA-F-1278 Compressor station at Ambelia FID Non-PCI
TRA-A-7 Development for new import from the South (Adriatica Line) Advanced PCI TRA-A-1268 Romania-Serbia Interconnection Advanced Non-PCI

TRA-A-10 Poseidon Pipeline Advanced PCI TRA-A-1275 Zeebrugge-Opwijk Advanced Non-PCI

TRA-A-31 Melita TransGas Hydrogen Ready Pipeline Advanced PCI TRA-N-94 CS Kidričevo, 2nd phase of upgrade Less-Adv. PCI

TRA-A-86 Interconnection Croatia/Slovenia (Lučko - Zabok - Jezerišće - Sotla) Advanced PCI TRA-N-377 Romanian-Hungarian reverse flow Hungarian section 2nd stage Less-Adv. PCI

TRA-A-128 Compressor Station Komotini (former Kipi) Advanced PCI TRA-N-390 Upgrade of Rogatec interconnection (M1A/1 Interconn. Rogatec) Less-Adv. PCI

TRA-A-330 EastMed Pipeline Advanced PCI TRA-N-524 Enhancement of Transm. Capacity Slovak-Hungarian interconnector Less-Adv. PCI

TRA-A-1091 Metering and Regulating station at Megalopoli for East Med Advanced PCI TRA-N-1092 Metering and Regulating Station at UGS South Kavala Less-Adv. PCI

TRA-A-1322 Devt. on Romanian territory of NTS (BG–RO-HU-AT) - Phase II Advanced PCI TRA-N-1195 Matagiola - Massafra pipeline Less-Adv. PCI

TRA-A-47 Capacity from France to Germany at Obergailbach Advanced Non-PCI TRA-N-8 Import developments from North-East Less-Adv. Non-PCI

TRA-A-63 LNG terminal northern Greece / Alexandroupolis - Pipeline Section Advanced Non-PCI TRA-N-92 CS Ajdovščina, 1st phase of upgrade Less-Adv. Non-PCI

TRA-A-66 Int. Croatia - Bosnia and Herzegovina (Slobodnica- Bosanski Brod) Advanced Non-PCI TRA-N-108 M3 pipeline reconstruction CS Ajdovščina to Šempeter/Gorizia Less-Adv. Non-PCI

TRA-A-68 Ionian Adriatic Pipeline Advanced Non-PCI TRA-N-112 R15/1 Pince - Lendava - Kidričevo Less-Adv. Non-PCI

TRA-A-70 Interconnection Croatia/Serbia (Slobodnica-Sotin-Bačko Novo Selo) Advanced Non-PCI TRA-N-224 Gaspipeline Brod - Zenica Less-Adv. Non-PCI

TRA-A-75 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac Advanced Non-PCI TRA-N-303 Interconnection Croatia-Bosnia and Herzegovina (west) Less-Adv. Non-PCI
TRA-A-258 Developments for Montoir LNG terminal 2.5 bcm expansion Advanced Non-PCI TRA-N-325 Slovenian-Hungarian interconnector (HU hydrogen corridor III) Less-Adv. Non-PCI
TRA-A-302 Interconnection Croatia-Bosnia and Herzegovina (South) Advanced Non-PCI TRA-N-389 Upgrade of Murfeld/Ceršak interconn. (M1/3 Interconn. Ceršak) Less-Adv. Non-PCI
TRA-A-339 Trans-Caspian Advanced Non-PCI TRA-N-570 Expansion Compressor Station Rehden Less-Adv. Non-PCI
TRA-A-439 Stazione di Spinta "San Marco" Advanced Non-PCI TRA-N-600 Czech-Austrian Interconnection (AT) Less-Adv. Non-PCI
TRA-A-457 Medelsheim deodorisation station Advanced Non-PCI TRA-N-602 Upgrading GMS Isaccea 2 and GMS Negru Voda 2 Less-Adv. Non-PCI
Figure 8: Map for transmission and compressor station projects inAdvanced
TYNDP Non-PCI
2022
TRA-A-496 Increase of Gas Transport to the Netherlands TRA-N-612 ES-IT Offshore-Interconnector Less-Adv. Non-PCI
TRA-A-505 Lucera - San Paolo Advanced Non-PCI TRA-N-766 Entry Murfeld Less-Adv. Non-PCI
Download
TRA-A-564 the map
FSRU in Lefrom
Havre ENTSOG
connection website: Advanced Non-PCI TRA-N-782 TANAP X - Expansion Trans Anatolian Natural Gas Pipeline Project Less-Adv. Non-PCI
TRA-A-566
Just click on FSRU 2 Connection
the icon. Advanced Non-PCI TRA-N-810 TAP Expansion Less-Adv. Non-PCI
TRA-A-598 NTS developments in North-West Romania Advanced Non-PCI TRA-N-910 West Interconnection BiH/CRO Less-Adv. Non-PCI
TRA-A-607 Transmission Hybrid Compressor Stations Advanced Non-PCI TRA-N-913 Modification NP23 MW turboset to H2-ready low-emissions at CS04 Less-Adv. Non-PCI
TRA-A-628 Eastring - Slovakia Advanced Non-PCI TRA-N-954 TAG Reverse Flow Less-Adv. Non-PCI
TRA-A-655 Eastring - Romania Advanced Non-PCI TRA-N-955 GUD: Complete conversion to H-gas (North-West Germany) Less-Adv. Non-PCI
TRA-A-656 Eastring - Hungary Advanced Non-PCI TRA-N-1057 Compressor stations 2 and 3 at Croatian gas tranmission system Less-Adv. Non-PCI
TRA-A-786 Capacity Expansion for the German LNG Terminals Advanced Non-PCI TRA-N-1059 Czech-Austrian Interconnection (CZ) Less-Adv. Non-PCI
TRA-A-809 Realloc. H-Gas towards NL: Bunde/Oude to Zone Oude Statenzijl H Advanced Non-PCI TRA-N-1063 Export to Malta Less-Adv. Non-PCI
TRA-A-851 Southern Interconnection pipeline BiH/CRO Advanced Non-PCI TRA-N-1112 Upgrade of Compressor Station at Komotini Less-Adv. Non-PCI
TRA-A-951 Embedding CS Folmhusen in H-Gas Advanced Non-PCI TRA-N-1124 Capacity increase Bulgaria to Romania (Rupcha-Vetrino Looping) Less-Adv. Non-PCI
TRA-A-967 Nea-Messimvria to Evzoni/Gevgelija pipeline (IGNM) and BMS Advanced Non-PCI TRA-N-1131 Reinforcement of NNGTS-South section Less-Adv. Non-PCI
TRA-A-988 LNG Terminal Stade - Grid Integration Advanced Non-PCI TRA-N-1138 South Caucasus Pipeline Future Expansion (SCPFX) Less-Adv. Non-PCI
20 | Ten-Year
TRA-A-1009 Network
Czech-Polish Development
Bidirectional Interconnection Advanced
Plan 2022 – The hydrogen and natural Non-PCI | Infrastructure
gas TYNDP TRA-N-1140Report
Technical capacity increase gas transm. GR to BG and BG to NM Less-Adv. Non-PCI
TRA-A-1058 LNG Evacuation Pipeline Kozarac-Slobodnica Advanced Non-PCI TRA-N-1143 Capacity intensification of the Poland – Slovak Interconnector Less-Adv. Non-PCI
TRA-A-1060 NEL (Middle) compressor station Advanced Non-PCI TRA-N-1145 Export enhancements Less-Adv. Non-PCI
BERYL Haugesund Narva
Avaldsnes Karmøy STOCKHOLM TALLINN
Karlstad Paldiski
Kårstø Örebro
Bygnes Stokke Fredrikstad

ED
Järna

RL
Nevsk

IIA
TE
KA
Rafnes Slantsy

IPE
GRANE

IIB

E
VE

AT
FU

E
EP

IPE
UTS

NS
PIP
ESTONIA
Stavanger

ZE

DE
KEYS

EP

AT
Brunnsviksholmen

IRA

ST

ON
ZE
(Nynäshamn)

RC
BRAE Risavika
EDVARD GRIEG

NE
Mariestad

EIP
Cross-border points / intra-country or intra balancing zone points JOHAN SVERDRUP

SL
GUDRUN Linköping Norrköping Velikiya Novgorod

GE
Lidköping

SA
Borovichi
Cross-border interconnection point Cross-border interconnection point Puiatu

ON)
Pärnu

R
Mlölby

LE
Lysekil
within Europe within Europe

RATI
MIL
or export point to non-EU country or export point to non-EU country OUTER

s
Stenungsund

OPE
HEBRIDES SLEIPNER k

de
Vallby Kile Valdai
Under construction or Planned GOLDENEYE a

OT IN
DRAUPNER Karksi
rr

bri
Gulf of
ATLANTIC

M I (N
Pskov Vichni Volochok
Cross-border interconnection point Cross-border third country (import) BRITANNIA e Riga Värska
g

EURO
He
REV Göteborg
with third country (import) Under construction or Planned

REA
NNIA a JönKöping Luhamaa
k

TH

PIPE
BRITA Misso Izborsk

D ST
he
S Göteborg

SOU
FORTIES GO4LNG
Intra-country or
RUSSIA

II
Gnosjö GOTLAND

NOR
Third country cross-border St. Fergus Korneti

f t
EVEREST Gislaved

GELED
intra balancing zone points interconnection point FULMAR
Torzhok

a o

LAN
Skulte TRA-A-1181

Se
Virtual point Aalborg
Varberg Incukalns
ULA RIGA

Ka
INNER
ELGIN FRANKLIN Ljungby L AT V I A Tver
Gas Reserve areas Countries

tt
HEBRIDES GYDA

North
Kalmar TRA-F-382

eg
Halmstad
Drilling platform EU Countries EKOFISK
Liepaja Iecava Rezekne
Gas field
Sea DENMARK

at
Other Countries VALHALL
HARALD
Rzhev
HOD Kiemėnai
Helsingborg Kristianstadt
SYD
Transport by pipeline LNG Terminals and Plants ARNE
Kuršėnai
Edinburgh KKP Daugavpils

SEAL
TYRA BALTIC PIP Siauliai P TRA-F-342
E Kubin

S
No Glasgow
COPENHAGEN

CAT
Existing infrastructure : LNG Terminals’ entry point rt
Klaipéda LNG
(FSRU Independence) Klaipéda
Panevėžys
h Egdved Malmö
Diameter < 600 mm intro transmission system Ch Visaginas Navapolatsk

EUROPIP
Nybro
an
Diameter 600 - 900 mm
Operational ne
l
Odense Kongsmark

Nyborg
Dragør
Baltic Se
a LITHUANIA
Moffat

E II
LNG Plants’ export point B/13 Faxe Trelleborg
Vitebsk
Diameter > 900mm Jurbarkas Dorogobuzh

EU
Londonderry BORNHOLM Kaliningrad

RO
Not operational Project categories : / Derry BALTIC PIPE (FSRU) Jauniunai

PIP
Twynholm Šakiai NG
MURDOCH

EI
NO
IP Kaunas T
SN
FID projects TRA-A-1199

RP
ZEEPIPE
FRANPIPE
Brighouse Bay VIP DK-THE
VILNIUS Smolensk

IPE
NOGAT
Teesside Ellund
Carrickfergus Brunnsbüttel
Project categories : Non-FID, advanced projects Middlesbrough Gdansk (FSRU)
Kaliningrad RUSSIA Kotlovka
MARKHAM
K

GIPL
CORRIB Belfast Dornum

DEUD

BALT
FID projects BREAGH
Kiel
P
Orsha Wilhelmshaven
Non-FID, less-advanced projects AL TRA-A-988

IC PI
YAM

AN
Non-FID, advanced projects
Bellanaboy ISLE OF MAN Lubmin Gdansk Santaka Krupskaya
NGT TRA-F-1271
TRA-A-1109 Stade

L
PE
AUDREY

WA
Killeen CM
S
TRA-F-1118
Krummhörn Emden TRA-F-1115
Kirov
R2 Douglas Barrow MURDOCH NG Rostock Greifswald Eemshaven
Non-FID, less-advanced projects Project is part of 5th PCI list : C TO T
TRA-A-1199
Lubmin II Świnoujście
Che
NE Olsztyn

R1
Irish Delfzijl

NET
ON Brunnsbüttel MINSK

TO
RC
Quarnstedt Mogilev TRA-A-951
Jemgum
IRELAND

RA
EC
P TE Leeds W. SOLE Levitzow Kamminke Płoty Oude
FID projects Sea MARKHAM GroningenStatenzijl

NN
IN AMETHYST Dornum Folmhusen

T
Stade L
Project is part of 5 PCI list :

GA
th Gormanston NE Bremen

CO

L
Wilhelmshaven Schwerin Bünde

NE
TRA-A-988 TRA-F-873

ER

NO
L
NGT TRA-F-1271 LEMAN

GIP
Easington

INT

L
P Manchester AUDREY
Non-FID, advanced projects

WA
Krummhörn Emden Sülstorf TRA-A-496 Wardenburg
FID projects Loughshinny Point of Ayr CM
S Eemshaven TRA-F-1115 Hamburg Wittenburg Sionim Julianadorp TRA-A-786
TRA-A-1060 Nezvizhskaya
Delfzijl NEL TRA-N-1175 Kraak Szczecin Balgzand TRA-A-809
Galway DUBLIN GALLEON Osipovich TRA-A-1114

NET

G
P L
Non-FID, advanced projects Non-FID, advanced export projects Theddlethorpe LANCELOT TRA-A-951
Jemgum Uniszki Zawadzkie oPo BBL

RH
Oude

RA
EuR Bryansk

L
GroningenStatenzijl Tietierowka Wieringermeer
Folmhusen TRA-F-955

NE
T
GA

EUGAL
Bremen
Nordlohne

OPAL
Bünde

NE
TRA-F-873
Non-FID, less-advanced projects
BELARUS

INTE
NO
LEMAN Damaslawek EuRoPoL Babryusk Vlieghuis Orel
P Non-FID, less-advanced projects Julianadorp TRA-A-496 Wardenburg TRA-A-786 Kondratki TRA-N-570
HEWETT TRA-A-809 Lelystad

RCO
Balgzand Gustorzyn
TRA-A-1114 Steinitz VIP TTF-THE-H Rehden

G
BBL Zwolle

L
Ijmuiden

RH

WA
Point of Interconnection

L
Bacton Wieringermeer TRA-F-955 Płońsk Ahlten

NE

NO
AMSTERDAM Emsbüren

NNE
Nordlohne (PWP) PL
Project identification : Project identification : Limerick Oranienburg Hannover

INTE
Vlieghuis
TRA-N-570 Mallnow EuRoPoL Wloclawek Enschede VIP TTF-THE-L Drohne
UNITED THE NETHERLANDS
Rembelszczyzna

CTO
Lelystad Pogar

RCO
Birmingham Zwolle VIP TTF-THE-H Rehden Kienbaum Gomel

L
Ijmuiden BERLIN Lwówek

WA
Ahlten Wysokoje Apeldoorn
ENTSOG project code ENTSOG project code Epe

NO
TRA-N-123 Shannon LNG AMSTERDAM Emsbüren Poznan Den Haag

NNEC
LNG-N-123

R
Hannover Hołowczyce Kromy
KINGDOM
Waterford Enschede VIP TTF-THE-L Drohne Groß Köris
Warwick Wolfsburg Legden
THE NETHERLANDS Utrecht TRA-F-329

TOR
Apeldoorn Epe Zevenaar Winterswijk
Dragon LNG Den Haag
Magdeburg WARSAW Kobryn Münster
Legden TRA-F-329 AL Radeland Maasvlakte Rotterdam
Mozyr Nijmegen Elten
Utrecht Zevenaar Winterswijk JAG Guben
Milford Haven Gubin

L
Rotterdam Nijmegen Ravenstein

IN
Cork Münster

DA
Elten
Storage facilities Compressor stations
Maasvlakte

EL
EUGAL
TRA-F-1254

ZE
OPAL
K
Moerdijk

L
Ravenstein GCP GAZ-SYSTEM/ONTRAS

WE
IN
Lodz Kursk

DA
EL
TRA-F-1254 Werne

ZE
Moerdijk

WE
Werne Odolanów VIP BENE
Project categories : Essen
Acquifer Cardiff VIP BENE Essen
POLAND Vlissingen Tilburg

K
KINSALE HEAD South Hook LNG Tilburg Dortmund

IN
Vlissingen

K
Dortmund

IN
GERMANY

EL
Isle of Grain

MIDA
Zandvliet

EL
Duisburg

MIDAL
SEVEN HEADS Zandvliet Wronów
Hilvarenbeek Tegelen

ZE
Hilvarenbeek Tegelen Duisburg

ZE
Salt cavity - cavern l LONDON Terneuzen
ne Zeebrugge
Terneuzen
Leipzig
FID projects an Poppel Zeebrugge
Ch TRA-F-329

EUGAL
Lasów Poppel

OPAL

L
ol Zelzate
Depleted (Gas) field on shore / offshore ist
Brugge
Antwerpen
TRA-F-329
Düsseldorf Kassel
Wroclaw Lublin
Brugge Zelzate
Br Dunkerque TRA-A-1275 Dresden Dunkerque Antwerpen Düsseldorf
Sudzha
Kassel
Dilsen
Non-FID, advanced projects Gent Obbicht

K
Opwijk
Other type

IN
Unknown Köln

EL
Alveringem Sayda TRA-A-1275 Sumy

ZE
TRA-F-814 Gent Dilsen Obbicht

K
TRA-F-500 Opwijk

IN
VIRTUALYS Bocholtz Würselen Köln

EL
BRUSSELS Broichweiden STEGAL TRA-F-245 Alveringem

ZE
Lutsk
Non-FID, less-advanced projects ‘s Gravenvoeren
Stolberg
TRA-F-329 Olbernhau
VIRTUALYS TRA-F-500 U
UP ress
Project categories : Lille
Eynatten Reckrod
Deutschneudorf
Hora Svaté Kateřiny Rozwadów (Charzewice) Bocholtz Würselen g
Raeren/Lichtenbusch VIP THE-ZTP
Herbstein VIP Brandov BRUSSELS ‘s Gravenvoeren Broichweiden Pro
Project is part of 5th PCI list : Tworzen
Lille Stolberg
TRA-F-329
FID projects BELGIUM Koblenz Kędzierzyn-Koźle KYIV

EKKR
Quévy Blaregnies Eynatten Reckrod
Taisnières Hradec Králové
Racibórz Zhytomyr Raeren/Lichtenbusch VIP THE-ZTP Herbstein
Non-FID, advanced projects P Katowice
FID projects ISLES
OF Frankfurt Oświęcim Jaroslaw
of Ukrain
e

TE
Y
AL
CZECH v - West Koblenz

NP
l
Non-FID, less-advanced projects P
SCILL

Ch
an
ne Bras
MID
TRA-F-755 PRAGUE
Hať
TRA-A-1141
Skoczów Pogórska Wola
Rzeszow Quévy BlaregniesKyi
Taisnières
BELGIUM Kharkiv

Non-FID, advanced projects GDLux (BE) / Rimpar Drozdovychi Lviv

En
gli
sh Bras Petange (LU) LUX. Gernsheim Rothenstadt Plzeň REPUBLIC STORK
Cieszyn Drozdwicze
Hermanowice d) Frankfurt

TE
Cherbourg TRA-A-564 Le Havre Pétange LUX. MEGAL
Würzburg MEG
Forchheim TRA-A-1009 Ternopil UPU -Uzhgoro
AL y-Pomary L

NP
P Non-FID, less-advanced projects FSRU LE HAVRE Lampertheim Waidhaus (Urengo
Bras DA
Poltava
Project is part of 5th PCI list : Gournay Remich
Kaiserslautern
Nürnberg
MEGAL Strachocina PROGRE
SS
MI
Schwandorf Bezměrov Vinnytsia GDLux (BE) / Z

L
Žilina SOYU
LUX.

GA
Obergailbach TRA-F-402 Brno Výrava TRA-A-1143 Bras Petange (LU)

ME
Caen TE
P P P FID projects TRA-A-457 NP Poprad TRA-A-429 Gernsheim
Kremenchuk
ME
LUX. I

LSF
Karlsruhe GA KR
Cheppy TRA-A-47 Medelsheim L Pétange MEGAL SD
Regensburg Dolni Bojanovice
SLOVAKIA
N
SC ORD
Lannion TRA-F-1095 České Budějovice Dolyna Ivano-Frankivsk Lampertheim
UKRAINE
LE HW
Arresting
Non-FID, advanced projects
Au am Rhein
P P
ITU AR
P NG ZW
Břeclav Kaiserslautern
Stuttgart TRA-N-1059 Gournay
AL
PARIS D Jablonov Košice
Nancy Leonberg Wertingen Lanžhot Nad Turňou Remich uk
Oberkappel

LFF
Saint-Arnould Kuty Vel’ké Kapušany Uzhhorod ch
Zvolen en
Non-FID, less-advanced projects

NP
P P des Bois WAG Budince

CZATi
P TRA-F-1095 rem Kropyvnytskyi Dnipro

TE
Láb Lakšárska Nová Ves Oleksiivka
Brest MONA Burghausen ES
T
-K
TRA-A-258 Morelmaison CO /Uberackern W iv
NT
A
Baumgarten Nitra an
Dierrey-Saint-Julien TRA-A-47 München Finsing PE Linz Vel’ké Zlievce Beregdaróc An
Project identification : Project identification : Rennes Wolfersberg Haiming VIENNA TRA-N-600 BRATISLAVA Ivánka Pri Nitre
TRA-A-628 Beregovo
Selešťany
Kittsee TRA-N-913
VIP BEREG
Balassagyarmat Tekovo Siret

EASTRING
Atlantic Ocean Inzenham

HAG
Le Mans Voisines TRA-F-402 Haidach
UGS-N-123 ENTSOG project code TRA-N-123 ENTSOG project code Orleans Salzburg Mosonmagyaróvár TRA-N-524
Mediesu Aurit Kryvyi Rih Zaporizhzhia
TRA-A-258 Thayngen Kiefersfelden Satu Mare Ananiv
TRA-F-1095
Fallentor Dorog P P Szada TRA-N-1235 SDKRI Nikopol
VIP Pfronten Kufstein
Oltingue Germany-CH
Lindau
Leiblach Hajdúszoboszló MOLDOVA
AUSTRIA
Rodersdorf Basel Wallbach VIP Kiefersfelden / Pfronten Fălticeni Ungheni
BUDAPEST

TAG
Zürich TRA-A-598 Leţcani
Innsbruck TRA-A-656

AT I
Montoir de Bretagne Nantes
TRA-F-137 Interconnection Bulgaria - Serbia FID PCI Iaşi

EA
Lucerne

STR
L I E C H T. Graz Gherăești Mykolaiv
Palleau BERN

ING
Siófok
Weitendorf TRA-N-954 Sărmăşel CHISINAU
HUNGARY
II Városföld
TAG TRA-N-766 Grebenyky Melitopol
Project ENTSOG code Project Name Project Promoter Project status codes

SO
TAG I
SWITZERLAND Klagenfurt

L
TRA-N-954 Murfeld TRA-N-389
Cersak Tornyiszentmiklós Târgu Mureş
Tarvisio Bacău Yuzhne Kherson
Arnoldstein
Project not marked on map Etrez
Griespass TRA-A-607 TRA-N-94
Kidričevo
P
TRA-N-112
Pince
Nagykanizsa
TRA-N-377
Kaushany
Odesa
Malborghetto TRA-N-325 P
Exact project location is not available or is Project ENTSOG codes / color : Geneva
Passo Gries Bordano
SLOVENIA TRA-N-390 TRA-N-1057
Algyő
Kiskundorozsma Horia
Coroi Onesti Sea

AI
La Rochelle
marked as confidential TRA-A-607 Masera Arad

RI,
FRANCE Trento Flaibano Udine LJUBLJANA Rogatec Zabok Kozármisleny Csanádpalota

DK
Subotica Nagylak Mediaș

I, S
Ajdovščina TRA-A-86 EA
Exact project locations not marked on map TRA-N-000 Project is part of 5th PCI list Drávaszerdahely

AT
Bizzarone Gorizia ST STREIKOV
Sempeter TRA-N-92 ZAGREB Sombor Petrovaselo RIN GOLITSYNO
Lyon Treviso Lučko G Sibiu Șinca KERCH
Project has several locations/points. Istrana TRA-N-8 Trieste
TRA-N-108
Okoli
Donji Miholac
Osijek
Mokrin TRA-A-1268 BR
UA Brașov Chernomorsk
The indicated location is for representation TRA-N-000 Project is not part of 5th PCI list TRA-A-607 Koper Karlovac Kozarac
Hateg K
purposes only and does not indicate the Bačko ODESSA
ROMANIA
Milano Venezia Umag Zlobin TRA-N-1057 Jupa
Rijeka Bosiljevo Novo Selo Orlovka KRYM
TRA-A-75 TRA-A-1058 Slobodnica Sotin

BRUA
exact location of the project Grenoble Porto Krk LNG
Omišalj Tržac Vel. Kladusa Novi Sad
TRA-N-602
TRA-A-70 Isaccea
Bay of Biscay Saint-Avit TRA-N-1145 Viro Rovigo TRA-N-303
Cazin
TRA-A-1322 SHTORMOV Yevpatoria
Torino Cavarzere Vodnjan Brod TRA-A-66 TRA-A-655
Castillon TRA-A-607 Lička Rakovica Bos. Krupa Modrica EAST
Pula Banja Luka Urziceni

PIPELINEKAN
Jasenica RIN
Project status codes :
Bordeaux Parma PoggioRenatico Bihač TRA-N-910 Bibeşti G COBALCESCU
BOSNIA BELGRADE Alushta

TRANS-BAL
Gospič Bilciurești
Modena TRA-N-224 Sevastopol
The project advancement status is based on project collection conducted in Oct-Nov 2021 AND Loznica Horezu
BUCHAREST
Slobozia LEBADA
and/or June 2022. Genova
Bologna FSRU 2 - SNAM
Ravenna TRA-A-566
C R O AT I A HERZEGOVINA
Ghercești
BRUA
Podișor Bălăceanca
Năvodari
Yalta
Travnik Zvornik
SERBIA LUCEAFARUL DOINA
I TA LY
Panigaglia Zadar Zenica Constanţa
Knin G.Vakuf
PCI Non-PCI PCI status (Project of Common Interest) San Marino Benkovac
Zaychar
Giurgiu Ruse
Silistra
TRA-N-602 ANA DOMINO
Firenze TRA-A-851 Kiseljac Kardam
GASCOGNE Negru Voda
GAVIOTA UR MIDI SARAJEVO
FID Advanced Less-Adv. FID status (Final Investment Decision) E L’A
DO
Lussagnet
Toulouse
Saint-Martin-de-Crau Nice
Monaco
OLT Offshore LNG Ancona Kireevo
Razgrad

IBR
RE D
Black Sea
Ferrol Barran Toscana (FSRU) Imotski Dobrich
TRA-A-7 Split IAP
Mugardos Musel / Gijon Santander ARTE Cruzy (Hérault)
Fos Tonkin Fos Cavaou Livorno Posušje
Pleven Valchi Dol
S. Sebastián Biriatou Lacq TRA-A-607
A Montana
Advanced status is applied to all projects that, based on the information submitted, have: A Coruña Guitriz Oviedo
Bilbao Pau Tarbes
Marseille Terranuova Bracciolini San Marco Recanati
d
Zagvozd TRA-A-302 Mostar
Niš IBS TRA-F-298 Targovishte
Shumen Vetrino
Irun Toulon Ligurian ri Vratsa Lovech Provadia
Varna
KAVARNA
- commissioning year expected at the latest by 31st December of the year of the TYNDP project VIP PIRINEOS Barbaira TRA-N-137 P

AD
TRA-F-539 a
Lugo Gulf of Sea Perugia Monte Urano Ploče Veliko Tarnovo TRA-N-1124
data collection + 6 (e.g. 2028 in case of TYNDP 2022, for which projects are collected in 2022)

RIA
Pamplona Larrau Piombino ti Dimitrovgrad IBS Botevgrad
Gabrovo Rupcha GALATA
KALIAKRA
Santiago Lion MONTENEGRO

TIC
de Compostela Vitoria
Rio Marina c IA
P PRISTINA TRA-N-137 Novi Iskar

A
- and whose permitting phase has started ahead of the TYNDP project data collection - OR - Castropodame Bastia S
BULGARIA Lozenets P TRA-F-298

PIP
Cellino
e TRA-A-68
UNMI Pernik SOFIA

ELIN
FSRU 1 - SNAM PODGORICA
FEED has started (or the project has been selected for receiving CEF grants for FEED ahead of the Pontevedra Villafranca Leon
ANDORRA
a Burgas STREAM
del Bierzo Logroño tor KOSOVO P TRA-F-298 Stara Zagora Yambol TURK

E
nnec Gallese L’Aquila Chieti
TYNDP project data collection) Ourense Burgos Villar de Arnedo
- Inte
rco
CORSICA TRA-F-409
Kyustendil Ihtiman TRA-N-1170
P
Figueras ore TRA-A-607 Gueshevo

IA
Offsh Sopot Pazardzhikk

P
Tuy Palencia T Zidilovo
Huesca ES-I P Sulmona Blagoevgrad Plovdiv
TRA-N-612 Ajaccio ROME TRA-A-7
Dimitrovgrad Strandzha Malkoclar
Valença do Minho Tetovo Sinop
Soria Larino San Paolo SKOPJE Bansko

IGB
Hostalric Simitli Edirne Kırklareli
TRA-A-505 Gostivar Shtip Kardzhali Bartın
ENTSOG currently comprises 43 TSO members, Vale de Frades Valladolid Zaragoza
Lérida
Lucera
TRA-A-68 NORTH Petrich
Smolyan
TRA-N-1112 Kıyıköy
Zamora Campobasso TIRANA MACEDONIA Negotino P TRA-F-298 Kastamonu Bafra
2 Associated Partners from 27 European Countries and 10 Observers Barbolla
Adradas
Arbós Prilep Kulata
TRA-A-128
P
Zongulda
Karabük
Sams
Castelnou Sidirokastron Xanthi
Bari Gevgelija Karperi TRA-F-1090 TRA-A-810 Istanbul
Porto

IAP
POSEIDON
Barcelona TRA-A-607 Melizzano P
Kafasan Evzoni Lachanas Kipoi
Tarragona Serres Komotini Tekirdağ
Salamanca Segovia Tivisa Dumrea Bitola TRA-A-967 TA
P Kavala
Celorico da Beira Olbia

TA
TRA-A-810
When the same point is affected by several projects, the point is shown with the Porto Torres TRA-A-810 Nea Mesimvria TRA-N-1092 Alexandroupolis TRA-A-63 Marmara Düzce Bolu

N
Napoli POSEIDON
Ereglisi

AP
Mangualde Avila Sassari Potenza TRA-N-1195 TRA-A-810 Sakarya Amasya
Guadalajara Brindisi Fier Berat Plati Thessaloniki Yalova
highest project status (operational, FID, advanced, non-FID), the status from single Cantanhede MADRID Massafra
TAP
TAP
Trikala TRA-F-971 ro
s
Kocaeli Çankırı
Çorum
Guarda Balearic Alghero T Taranto Matagiola Vlorë Korce Bilisht TAP Sa
projects can vary from that. Teruel Sea Macomer
Nuoro y
rr San Foca
TRA-F-1276
Katerini Gu
lf
of

Figueira da Foz
TRA-A-607 Montesano Melendugno ALBANIA
The projects are shown with the planning status reported in their TYNDP 2022 VIP IBERICO Cuenca h TRA-A-10 Çanakkale Bursa
Bilecik ANKARA
Castellón
MENORCA TRA-N-1194
SARDINIA e
n
Otranto
I
Oristano IG ON
submission. Carriço de la Plana ia PO ID Yozgat
S PA I N Palmas Arborea SE SE Eskişehir
IDO PO Aegean Kırıkkale
Toledo
Sagunto
n N TRA-N-782 TANAP Pipeline
All data provided on this map is for information purposes and shall be treated as Trikala Sea Balıkesir Trans-Anatolian
PORTUGAL
MALLORCA Larissa
S TRA-A-607 Tarsia TRA-A-10 TANAP
Valencia e
indicative and non-contractual in nature, without pre-empting different outcomes Cáceres
Palma de Mallorca a Volos
Thesprotia Ampelia Kütahya
TURKEY
Portovesme Florovouni
of any possible discussion held at regional level. Under no circumstances shall it be Carbonia
Cagliari TRA-F-1278 Kırşehir

EAST
Carregado Badajoz Albacete Sarroch
regarded as information intended for commercial use. Bucelas
Ciudad Real IBIZA

MED
Campo Maior Porto Botte Catanzaro Lamia
Tu

GREECE
Afyon z
LISBON Aliaga Manisa
G
öl
ü Kayseri
Uşak
Version : March 2023
Setúbal
Mediterranean Sea Ag. Nikolaos
Halkida Aliveri
Nevşehir

Alicante
Gioia Tauro Ionian Thiva
Inofyta Izmir Aksaray
Thisvi TRA-N-1131
WGS 84 / Pseudo-Mercator projection Palermo TRA-A-607 Sea
Messina TRA-A-330
Agioi Theodoroi ATHENS Niğde
Sines Dioriga Gas Konya
Cordoba Murcia
Jaén Isparta
Revythoussa Lavrio Aydın K
Cartagena Mazara del Vallo Denizli
Agia Triada Burdur
Sevilla TRA-A-607 Enna Eregli
ED P
Huelva SM Agrigento TRA-A-1091
Megalopoli
AN
Granada TR Muğla
El Haouaria Gela Karaman Adana
Annaba TRA-N-1063 Tarsus
Almeria Antalya Osman
Motril ALGIERS Skikda Koudiet Eddraouch Içel
Málaga
TUNIS

MELIT
Bejala Dörtyol
Cádiz
A TRAN
Iskenderun
TRA-A-31
ME

Chlef Hatay
DG

SGAS
CANARY ISLANDS Tarifa
AZ

TRA-A-330
Arzew
LANZAROTE Strait of Gibraltar
Ceuta Sousse Malta LNG (FSRU)
Tangiers Samandağ
Relizane LA VALETTA
Oran Latakia

M A LTA
Santa Cruz de Tenerife
FUERTEVENTURA
TENERIFE Mascara
Sidi bel Abbes
M

Las Palmas
Beni-Saf C R E TA
REA

NICOSIA Banias
Arico-Granadilla LNG GRAN CANARIA MEDGAZ
EN ST

Melilla
CYPRUS
P
Arinaga LNG Tlemcen Tartus
Ouled Vassilikos H
GRE

Mimoun Saida Sfax


Djelfa
Sebdou MATTEI
C ENRICO HERN LINE Ab
El Gor GAZODU TRA-A-330
EAST MED / NORT Tripoli
K4

El Aricha HERN LINE


EAST MED / SOUT
LEBANO
EGPDF

1-G

La Skhirra
Mediterranean Sea

NL
MAGHREB-EU

EAST
GG2

GK

RABAT ROPE GAS (MEG


TUNISIA

/
ED
)
GZ

Fes
GG1-

Meknès BEIRUT

TM

MED /
Gabes
0-G
ME

EAS
Z5
DG

Casablanca Mohammedia
Bahr Es Salam

SL
AZ

Sidon
Naama
APHRODITE/ISHAI
TANIN

MADEIRA Jorf Lasfar / El Jadida


KARISH

AGP
LEVIATHAN

MAGHREB-EUROPE GAS (MEG)


Hassi R’Mel
Mellitah

TRIPOLI
Ten-Year Network Development Plan 2022 – The hydrogen and natural gas TYNDP | Infrastructure Report | 21
Al Khums
TAMAR Haifa

Funchal DALIT
DOLPHIN
Misurata
SCARAB
SAFFRON Hadera Offshore
AKEN Mafraq
MOROCCO ALGERIA Ouargla Benghazi
Tobruk
BALTIM N
BALTIM E KAROUS KERSH MARI-B
Tel Aviv
Ashdod AMM
ROSETTA
Hassi Messaoud ABU SIR
6.2 RECEPTION AND STORAGE AND REGASIFICATION
OR DECOMPRESSION FACILITIES FOR LIQUIFIED
­NATURALS GAS OR COMPRESSED ­NATURAL GAS (LNG)
For TYNDP 2022 promoters submitted 20 projects related to LNG terminals. For five of these projects the
respective evacuation pipeline projects connecting the terminal to the gas grid were submitted by different
promoters. In case of LNG-Terminal Rostock (LNG-N-413 and LNG-N-1196) the project is only focusing on
the connecting pipes.

MAP FOR LNG REGASIFICATION ­TERMINALS


­(including evacuation pipelines)

LNG IMPORT TERMINALS


LNG-F-50 Gate terminal phase 3 FID Non-PCI
LNG-F-178 Musel LNG terminal FID Non-PCI
LNG-F-272 Upgrade of LNG terminal in Świnoujście FID Non-PCI
LNG-F-1117 Zeebrugge LNG Terminal - Additional regasification capacity FID Non-PCI
LNG-F-1134 FSRU 1 - SNAM FID Non-PCI
LNG-A-947 FSRU Polish Baltic Sea Coast Advanced PCI
LNG-A-1146 Cyprus LNG Import Terminal (CyprusGas2EU) Advanced PCI
LNG-A-62 LNG terminal in northern Greece / Alexandroupolis - LNG Section Advanced Non-PCI
LNG-A-225 Montoir LNG Terminal Expansion Advanced Non-PCI
LNG-A-227 Fos Cavaou LNG Terminal Expansion Advanced Non-PCI
LNG-A-304 Italy-Sardinia Virtual Pipeline Advanced Non-PCI
LNG-A-559 Hanseatic Energy Hub (Stade) Advanced Non-PCI
LNG-A-610 Extension of the LNG Terminal Krk 1st phase Advanced Non-PCI
LNG-A-792 Gate terminal phase 4 Advanced Non-PCI
LNG-A-912 Skulte LNG Advanced Non-PCI
LNG-A-1005 Thrace LNG Terminal Advanced Non-PCI
LNG-A-1123 Expansion of Revithoussa LNG Terminal via installation of FSU Advanced Non-PCI
LNG-A-1142 FSRU 2 - SNAM Advanced Non-PCI
LNG-A-1198 LNG Terminal Brunsbuettel Advanced Non-PCI
LNG-N-413 Grid Connection LNG Terminal Rostock Less-Adv. Non-PCI
LNG-N-815 LNG terminal Krk 2nd phase Less-Adv. Non-PCI
LNG-N-1196 Tie-In LNG Rostock Less-Adv. Non-PCI

Figure 9: Map for LNG reagsification terminals (including evacuation pipelines)

Download the map from ENTSOG website:

Just click on the icon.

22 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
BERYL Haugesund Narva
Avaldsnes Karmøy STOCKHOLM TALLINN
Karlstad Paldiski
Kårstø Örebro
Bygnes Stokke Fredrikstad

ED
Järna

RL
Nevsk

IIA
TE
KA
Rafnes Slantsy

IPE
GRANE

IIB

E
VE

AT
FU

E
EP

IPE
UTS

NS
PIP
ESTONIA
Stavanger

ZE

DE
EP
KEYS

AT
Brunnsviksholmen

IRA

ST

ON
ZE
(Nynäshamn)

RC
BRAE Risavika
EDVARD GRIEG

NE
Mariestad

EIP
Cross-border points / intra-country or intra balancing zone points JOHAN SVERDRUP

SL
GUDRUN Linköping Norrköping Velikiya Novgorod

GE
Lidköping

SA
Borovichi
Cross-border interconnection point Cross-border interconnection point Puiatu

ON)
Pärnu

R
Mlölby

LE
Lysekil
within Europe within Europe

RATI
MIL
OUTER
or export point to non-EU country or export point to non-EU country

s
Stenungsund

OPE
HEBRIDES SLEIPNER k

de
Vallby Kile Valdai
GOLDENEYE a

OT IN
Under construction or Planned DRAUPNER Karksi
rr

bri
Gulf of
ATLANTIC

M I (N
Pskov Vichni Volochok
Cross-border interconnection point Cross-border third country (import) BRITANNIA e Riga Värska
g

EURO
He
REV Göteborg

REA
with third country (import) Under construction or Planned NNIA a JönKöping Luhamaa
k

TH

PIPE
BRITA Misso Izborsk

D ST
he
S Göteborg

SOU
FORTIES GO4LNG
RUSSIA

II
Gnosjö GOTLAND

NOR
Intra-country or St. Fergus Korneti

f t
Third country cross-border EVEREST Gislaved

GELED
FULMAR
intra balancing zone points interconnection point Torzhok

a o
LNG-A-912

LAN
Skulte

Se
Aalborg
Virtual point Varberg
RIGA
Incukalns
ULA

Ka
INNER
ELGIN FRANKLIN Ljungby L AT V I A Tver

tt
Gas Reserve areas Countries HEBRIDES GYDA

North
Kalmar

eg
EKOFISK Halmstad
Drilling platform EU Countries Liepaja Iecava Rezekne

Sea DENMARK

at
Gas field Other Countries VALHALL
HARALD
Rzhev
HOD Kiemėnai
Helsingborg Kristianstadt
SYD Kuršėnai
Transport by pipeline LNG Terminals and Plants ARNE
Edinburgh KKP Daugavpils

SEAL
TYRA BALTIC PIP Siauliai
E Kubin

S
No Glasgow
COPENHAGEN

CAT
Klaipéda LNG
Existing infrastructure : rt (FSRU Independence) Panevėžys
LNG Terminals’ entry point h
Ch
Egdved Malmö Klaipéda
Visaginas Navapolatsk

EUROPIP
Nybro
Diameter < 600 mm intro transmission system an

Diameter 600 - 900 mm


Operational ne
l
Odense Kongsmark

Nyborg
Dragør
Baltic Se
a LITHUANIA
Moffat

E II
B/13 Faxe Trelleborg
Vitebsk
LNG Plants’ export point Jurbarkas Dorogobuzh
Diameter > 900mm

EU
Londonderry BORNHOLM Kaliningrad

RO
/ Derry BALTIC PIPE (FSRU) Jauniunai
Project categories :

PIP
Not operational Twynholm Šakiai
MURDOCH NG

EI
NO
IP Kaunas T
SN LNG-A-1198

RP
ZEEPIPE
FRANPIPE
Brighouse Bay VIP DK-THE
FID projects VILNIUS Smolensk

IPE
NOGAT
Teesside Ellund
Carrickfergus Brunnsbüttel
Project categories : Non-FID, advanced projects Middlesbrough Gdansk (FSRU)
Kaliningrad RUSSIA Kotlovka
MARKHAM
K

GIPL
CORRIB Belfast Dornum LNG-A-559

DEUD

BALT
BREAGH P LNG-A-947
FID projects Kiel
AL
Orsha Wilhelmshaven

IC PI
Non-FID, less-advanced projects YAM

AN
Bellanaboy Gdansk Krupskaya
ISLE OF MAN Lubmin Santaka NGT Stade

L
AUDREY

PE
Non-FID, advanced projects

WA
Killeen CM
S Krummhörn Emden Kirov
R2 Douglas Barrow MURDOCH NG Rostock Greifswald Eemshaven Che
TO T Lubmin II
Non-FID, less-advanced projects Project is part of 5th PCI list : NE
C LNG-A-1198 LNG-N-1196 Świnoujście Olsztyn

R1
Delfzijl
Irish LNG-N-413

NET
ON Brunnsbüttel LNG-F-272 MINSK

TO
Quarnstedt Mogilev
RC Jemgum
IRELAND

RA
EC
TE Leeds W. SOLE Levitzow Kamminke Płoty Oude
Sea MARKHAM GroningenStatenzijl Folmhusen

NN
P IN AMETHYST Dornum

T
FID projects Stade L

GA
Gormanston NE Bremen

CO

L
Wilhelmshaven Schwerin
Project is part of 5th PCI list : LNG-A-559 Bünde

NE
LNG-A-947

ER

NO
L
NGT LEMAN

GIP
Easington

INT

L
Manchester AUDREY

WA
Krummhörn Emden Sülstorf
P S Hamburg Wittenburg Sionim Julianadorp Wardenburg
FID projects Non-FID, advanced projects Loughshinny Point of Ayr CM Eemshaven
Szczecin Nezvizhskaya
Galway GALLEON Delfzijl NEL Kraak Balgzand
Osipovich
DUBLIN

NET

G
L
Theddlethorpe LANCELOT Jemgum Uniszki Zawadzkie oPo BBL

RH
Oude

RA
EuR Bryansk

L
Non-FID, advanced projects P Non-FID, advanced export projects GroningenStatenzijl Folmhusen Tietierowka Wieringermeer

NE
T
GA

EUGAL
Bremen
Nordlohne

OPAL
Bünde

NE
BELARUS

INTE
NO
LEMAN Damaslawek EuRoPoL Babryusk Vlieghuis Orel
Non-FID, less-advanced projects Julianadorp Wardenburg Kondratki
P Non-FID, less-advanced projects HEWETT Lelystad

RCO
Balgzand Gustorzyn
Steinitz
Zwolle VIP TTF-THE-H Rehden

L
BBL Ijmuiden

RH

WA
Point of Interconnection

L
Bacton Wieringermeer Płońsk Ahlten

NE

NO
AMSTERDAM Emsbüren

NNE
Nordlohne (PWP) PL
Limerick Oranienburg Hannover

INTE
Vlieghuis EuRoPoL Wloclawek Enschede VIP TTF-THE-L Drohne
Project identification : Project identification : Mallnow
UNITED THE NETHERLANDS
Rembelszczyzna

CTO
Lelystad Pogar

RCO
Birmingham Zwolle VIP TTF-THE-H Rehden Kienbaum Gomel

L
Ijmuiden BERLIN Lwówek

WA
Ahlten Wysokoje Apeldoorn Epe

NO
Shannon LNG AMSTERDAM Emsbüren Poznan Den Haag

NNEC

R
Hannover Hołowczyce Kromy
LNG-A-792
KINGDOM
Drohne
TRA-N-123 ENTSOG project code LNG-N-123 ENTSOG project code Waterford Warwick Enschede VIP TTF-THE-L Wolfsburg Groß Köris Legden
THE NETHERLANDS Utrecht

TOR
Dragon LNG Den Haag Apeldoorn Epe
WARSAW Kobryn LNG-F-50 Zevenaar Winterswijk
Münster
LNG-A-792 Magdeburg Radeland Rotterdam
Legden AL Maasvlakte Mozyr Nijmegen Elten
LNG-F-50 Utrecht Zevenaar Winterswijk JAG Guben
Milford Haven Gubin

L
Rotterdam Nijmegen Ravenstein

IN
Cork Münster

DA
Maasvlakte Elten

EL
EUGAL

ZE
OPAL
Moerdijk

L
Ravenstein GCP GAZ-SYSTEM/ONTRAS

WE
Storage facilities Compressor stations

IN
Lodz Kursk

DA
EL
Werne

ZE
Moerdijk

WE
Werne Odolanów VIP BENE Essen
VIP BENE Essen
POLAND Vlissingen Tilburg

K
KINSALE HEAD South Hook LNG Cardiff Tilburg Dortmund

IN
Project categories : Vlissingen

K
Acquifer Dortmund

IN

EL
GERMANY
Isle of Grain
LNG-F-1117

MIDA
Zandvliet

EL
Hilvarenbeek Tegelen Duisburg

MIDAL
LNG-F-1117 Zandvliet Wronów

ZE
SEVEN HEADS Hilvarenbeek Tegelen Duisburg

ZE
l LONDON Terneuzen
ne Zeebrugge
Terneuzen
Leipzig
Salt cavity - cavern an Poppel Zeebrugge
Ch

EUGAL
Lasów Poppel

OPAL

L
ol Zelzate
FID projects ist
Brugge
Antwerpen Düsseldorf Kassel
Wroclaw Lublin
Brugge Zelzate
Depleted (Gas) field on shore / offshore Br Dunkerque Dresden Dunkerque Antwerpen Düsseldorf
Sudzha
Kassel
Gent Dilsen Obbicht

K
Opwijk

IN
Köln

EL
Sayda Sumy
Non-FID, advanced projects Alveringem

ZE
Gent Dilsen Obbicht

K
Other type Unknown Opwijk

IN
VIRTUALYS Bocholtz Würselen Köln

EL
BRUSSELS Broichweiden STEGAL Alveringem

ZE
‘s Gravenvoeren Olbernhau Lutsk U
Lille Stolberg Deutschneudorf VIRTUALYS Bocholtz Würselen UP ress
Non-FID, less-advanced projects Eynatten VIP THE-ZTP Reckrod Hora Svaté Kateřiny Rozwadów (Charzewice)
BRUSSELS Broichweiden
g
Project categories : Raeren/Lichtenbusch Herbstein VIP Brandov ‘s Gravenvoeren Pro
Tworzen
Lille Stolberg
Koblenz Kędzierzyn-Koźle
BELGIUM KYIV

EKKR
Project is part of 5th PCI list : Quévy Blaregnies Eynatten VIP THE-ZTP Reckrod
FID projects Taisnières Hradec Králové
Racibórz Katowice
Zhytomyr Raeren/Lichtenbusch Herbstein
OF Frankfurt Oświęcim Jaroslaw Ukraine
P ISLES

TE
- West of
Non-FID, advanced projects Y
AL
CZECH Koblenz

NP
FID projects SCILL

Ch
an
ne
l
GDLux (BE) /
Bras
MID
Rimpar
PRAGUE
Hať Skoczów Pogórska Wola
Rzeszow
Drozdovychi Lviv
Quévy BlaregniesKyi
Taisnières
Bv E L G I U M Kharkiv

Non-FID, less-advanced projects P Non-FID, advanced projects En


gli
sh Bras Petange (LU) LUX. Gernsheim Rothenstadt Plzeň REPUBLIC STORK
Cieszyn Drozdwicze
Hermanowice d) Frankfurt

TE
Cherbourg Le Havre Pétange LUX. MEGAL
Würzburg MEG
Forchheim Ternopil UPU -Uzhgoro
AL y-Pomary L

NP
Lampertheim Waidhaus (Urengo A
Poltava
FSRU LE HAVRE Bras SS ID
P Non-FID, less-advanced projects Gournay Remich
Kaiserslautern
Nürnberg
MEGAL Strachocina PROGRE M
Project is part of 5th PCI list : Schwandorf Bezměrov Vinnytsia GDLux (BE) / Z

L
Žilina SOYU
LUX.

GA
Obergailbach Brno Výrava Bras Petange (LU)

ME
Caen TE
NP Poprad Gernsheim
ME
LUX. Kremenchuk I

LSF
P Karlsruhe GA KR
P P FID projects Cheppy Medelsheim L Pétange MEGAL SD
Regensburg Dolni Bojanovice
SLOVAKIA
N
SC ORD
Lannion České Budějovice Dolyna Ivano-Frankivsk Lampertheim
UKRAINE
LE HW
Au am Rhein ITU AR
NG ZW Arresting
PARIS
AL
D Stuttgart Břeclav Jablonov Košice Gournay Kaiserslautern
P P P Non-FID, advanced projects Nancy Leonberg Wertingen Lanžhot Nad Turňou Remich uk
Oberkappel

LFF
Saint-Arnould Kuty Vel’ké Kapušany Uzhhorod ch
Zvolen en

NP
des Bois WAG Budince

CZATi
rem Kropyvnytskyi Dnipro

TE
Láb Lakšárska Nová Ves Oleksiivka
P P P Non-FID, less-advanced projects Brest MONA Burghausen ES
T
-K
Morelmaison CO /Uberackern W iv
NT
A
Baumgarten Nitra an
Dierrey-Saint-Julien München Finsing PE Linz Vel’ké Zlievce Beregdaróc An
Rennes Wolfersberg Haiming VIENNA BRATISLAVA Ivánka Pri Nitre
Beregovo
Selešťany
Project identification : Project identification : Kittsee
Balassagyarmat VIP BEREG Tekovo Siret

EASTRING
Atlantic Ocean Inzenham

HAG
Le Mans Voisines Haidach Mediesu Aurit Kryvyi Rih Zaporizhzhia
Orleans Salzburg Mosonmagyaróvár Ananiv
UGS-N-123 ENTSOG project code TRA-N-123 ENTSOG project code Thayngen
Fallentor
Kiefersfelden
Dorog Szada
Satu Mare
SDKRI Nikopol
VIP Pfronten Kufstein
Oltingue Germany-CH
Lindau
Leiblach Hajdúszoboszló MOLDOVA
AUSTRIA
Rodersdorf Basel Wallbach VIP Kiefersfelden / Pfronten Fălticeni Ungheni
BUDAPEST

TAG
Zürich Leţcani
Innsbruck

AT I
Montoir de Bretagne Nantes
Iaşi

EA
LNG-A-225 Lucerne

STR
Gherăești Mykolaiv
TRA-F-137 Interconnection Bulgaria - Serbia FID PCI Palleau BERN
L I E C H T. Graz

ING
Siófok
Weitendorf Sărmăşel CHISINAU
HUNGARY
II Városföld
TAG Grebenyky Melitopol

SO
TAG I
SWITZERLAND Klagenfurt

L
Murfeld Tornyiszentmiklós
Project ENTSOG code Project Name Project Promoter Project status codes Griespass
Tarvisio
Arnoldstein
Cersak
Pince
Târgu Mureş Bacău Yuzhne Kherson
Odesa
Etrez Kidričevo Nagykanizsa Kaushany
Malborghetto
Project not marked on map Geneva
Passo Gries Bordano
SLOVENIA
Algyő
Kiskundorozsma Horia
Coroi Onesti Sea

AI
La Rochelle
Exact project location is not available or is Masera Arad

RI,
Project ENTSOG codes / color : FRANCE Trento Flaibano Udine LJUBLJANA Rogatec Zabok Kozármisleny Csanádpalota

DK
Subotica Nagylak
marked as confidential Mediaș

I, S
Ajdovščina EA
Drávaszerdahely

AT
Bizzarone Gorizia ST STREIKOV
Sempeter ZAGREB Sombor Petrovaselo RIN GOLITSYNO
Lyon Treviso Lučko G Sibiu KERCH
Exact project locations not marked on map TRA-N-000 Project is part of 5th PCI list Istrana
Trieste Okoli
Donji Miholac
Osijek
Mokrin BR
UA
Șinca
Brașov Chernomorsk
Kozarac
Project has several locations/points. Koper Karlovac
Hateg K
TRA-N-000 Project is not part of 5th PCI list Bačko ODESSA
ROMANIA
Zlobin
The indicated location is for representation Milano Venezia Umag Rijeka Bosiljevo Slobodnica Sotin
Novo Selo Jupa Orlovka KRYM

BRUA
purposes only and does not indicate the Grenoble Porto Krk LNG
Omišalj Tržac Vel. Kladusa Novi Sad Isaccea
exact location of the project Bay of Biscay Saint-Avit Viro Rovigo LNG-A-610
Cazin
SHTORMOV Yevpatoria
Torino Cavarzere Vodnjan Brod
Castillon LNG-N-815 Modrica
Pula Lička Rakovica Bos. Krupa
Banja Luka EAST Urziceni

PIPELINEKAN
Bordeaux PoggioRenatico Jasenica RIN
Parma Bihač Bibeşti G COBALCESCU
BOSNIA BELGRADE Alushta

TRANS-BAL
Gospič Bilciurești
Modena Loznica Sevastopol
Project status codes : LNG-A-1142 AND Horezu
BUCHAREST
Slobozia LEBADA
The project advancement status is based on project collection conducted in Oct-Nov 2021 Genova
Bologna FSRU 2 - SNAM
Ravenna
C R O AT I A HERZEGOVINA
Ghercești
BRUA
Podișor Bălăceanca
Năvodari
Yalta
Travnik Zvornik
SERBIA LUCEAFARUL DOINA
I TA LY
Panigaglia Zadar
and/or June 2022. Knin
Zenica Constanţa
G.Vakuf Zaychar Silistra
Benkovac ANA DOMINO
San Marino Giurgiu Ruse
Firenze Kiseljac Kardam
PCI Non-PCI PCI status (Project of Common Interest) LNG-F-178 GAVIOTA UR
GASCOGNE
MIDI Monaco SARAJEVO
Negru Voda
DO Toulouse OLT Offshore LNG Ancona Kireevo
E L’A Lussagnet Saint-Martin-de-Crau Nice Razgrad

IBR
RE D
Black Sea
Ferrol Barran Toscana (FSRU) Imotski Dobrich
IAP
FID Advanced Less-Adv. FID status (Final Investment Decision) Mugardos Musel / Gijon Santander ARTE Cruzy (Hérault)
Fos Tonkin Fos Cavaou Livorno
Split Posušje
Pleven Valchi Dol
S. Sebastián Biriatou Lacq Montana
A Coruña Guitriz Oviedo Marseille Terranuova Bracciolini San Marco Recanati A Zagvozd Mostar
IBS
Shumen Vetrino
Bilbao Pau Tarbes LNG-A-227 Ligurian d Niš Targovishte Varna
Advanced status is applied to all projects that, based on the information submitted, have:
Irun
VIP PIRINEOS Barbaira
Toulon ri Vratsa Lovech Provadia KAVARNA

AD
Lugo Gulf of Sea Perugia Monte Urano a Ploče Veliko Tarnovo

RIA
- commissioning year expected at the latest by 31st December of the year of the TYNDP project Pamplona Larrau Piombino ti Dimitrovgrad IBS Botevgrad
Gabrovo Rupcha GALATA
KALIAKRA
Santiago Lion MONTENEGRO

TIC
Rio Marina c IA Novi Iskar

G)
de Compostela Vitoria P PRISTINA

A
data collection + 6 (e.g. 2028 in case of TYNDP 2022, for which projects are collected in 2022)
BULGARIA

(LN
IA
Castropodame Bastia LNG-F-1134 S Lozenets

PIP
Cellino

DIN
e Pernik SOFIA

INE
UNMI

ELIN
FSRU 1 - SNAM PODGORICA
a STREAM

AR
Villafranca
- and whose permitting phase has started ahead of the TYNDP project data collection - OR - Pontevedra ANDORRA
Burgas

EL
Leon tor TURK
del Bierzo Logroño KOSOVO Yambol

LY-S
Stara Zagora

E
PIP
nnec Gallese L’Aquila Chieti Kyustendil
rco
FEED has started (or the project has been selected for receiving CEF grants for FEED ahead of the Burgos Villar de Arnedo
CORSICA Ihtiman

ITA
Ourense

AL
- Inte
ore

TU
Figueras Gueshevo

IA
TYNDP project data collection) Offsh Sopot Pazardzhikk

VIR

P
Tuy Palencia T Zidilovo
Huesca ES-I Blagoevgrad Plovdiv
Ajaccio ROME Sulmona
Dimitrovgrad Strandzha Malkoclar
Valença do Minho Tetovo Sinop
Soria Larino San Paolo SKOPJE Bansko

IGB
Hostalric Simitli Edirne Kırklareli
Gostivar Shtip Kardzhali Bartın
Vale de Frades Valladolid Zaragoza Smolyan
Lérida NORTH Petrich Kıyıköy
Lucera
Campobasso TIRANA MACEDONIA Negotino Kastamonu Bafra
ENTSOG currently comprises 43 TSO members, Zamora
Barbolla
Adradas
Arbós
LNG-A-304
Kulata
Zongulda
Karabük
Sams
Castelnou Prilep Sidirokastron Xanthi
2 Associated Partners from 27 European Countries and 10 Observers Porto Bari Gevgelija Karperi Istanbul

IAP
POSEIDON
Barcelona Melizzano
Kafasan Evzoni Lachanas Kipoi
Tarragona Serres Komotini Tekirdağ
Salamanca Segovia Tivisa Dumrea Bitola TA
P Kavala
Celorico da Beira Olbia

TA
Porto Torres Nea Mesimvria Alexandroupolis Marmara Düzce Bolu

N
Napoli POSEIDON
Ereglisi

AP
Mangualde Avila Sassari Potenza LNG-A-62 Sakarya Amasya
Guadalajara Brindisi Fier Berat TAP Plati Thessaloniki Yalova Kocaeli
When the same point is affected by several projects, the point is shown with the Cantanhede MADRID Alghero T
Massafra
TAP Vlorë Korce Bilisht Trikala LNG-A-1005
ar
os
Çankırı
Çorum
Guarda Balearic Nuoro y Taranto Matagiola TAP
of
S
highest project status (operational, FID, advanced, non-FID), the status from single Teruel Sea Macomer rr Montesano
San Foca
Melendugno ALBANIA Katerini Gu
lf
Figueira da Foz
projects can vary from that. VIP IBERICO Cuenca h Çanakkale Bursa
Bilecik ANKARA
Castellón
MENORCA
SARDINIA e
n
Otranto
I
de la Plana Oristano IG ON
The projects are shown with the planning status reported in their TYNDP 2022
Carriço ia PO ID Yozgat
S PA I N Palmas Arborea SE SE Eskişehir
IDO PO Aegean Kırıkkale
Toledo n N TANAP Pipeline
submission. Sagunto Trikala Sea Balıkesir Trans-Anatolian
PORTUGAL
MALLORCA Larissa
S Tarsia TANAP
Valencia e
Palma de Mallorca a
All data provided on this map is for information purposes and shall be treated as Cáceres Thesprotia Ampelia
Volos
Kütahya
TURKEY
Portovesme Florovouni
Cagliari Kırşehir
indicative and non-contractual in nature, without pre-empting different outcomes Carbonia

EAST
Carregado Badajoz Ciudad Real Albacete IBIZA
Sarroch
of any possible discussion held at regional level. Under no circumstances shall it be Bucelas

MED
Campo Maior Porto Botte Catanzaro Lamia
Tu

GREECE
Afyon z

regarded as information intended for commercial use. LISBON Aliaga Manisa


G
öl
ü Kayseri
Uşak
Setúbal
Mediterranean Sea Ag. Nikolaos
Halkida Aliveri
Nevşehir

Alicante
Gioia Tauro Ionian Thiva
Inofyta Izmir Aksaray
Thisvi
Version : March 2023 Palermo Sea
Messina Agioi Theodoroi ATHENS Niğde
Sines Dioriga Gas
WGS 84 / Pseudo-Mercator projection Cordoba
Jaén
Murcia
LNG-A-1123
Lavrio
Isparta
Konya
Mazara del Vallo Revythoussa Aydın K
Cartagena Denizli
Agia Triada Burdur
Sevilla Enna Eregli
ED
Huelva SM Agrigento Megalopoli
AN
Granada TR Muğla
El Haouaria Gela Karaman Adana
Annaba Tarsus
Almeria Antalya Osman
Motril ALGIERS Skikda Koudiet Eddraouch Içel
Málaga
TUNIS

MELIT
Bejala Dörtyol
Cádiz
A TRAN
Iskenderun
ME

Chlef Hatay
DG

SGAS
CANARY ISLANDS Tarifa
AZ

Arzew
LANZAROTE Strait of Gibraltar
Ceuta Sousse Malta LNG (FSRU)
Tangiers Samandağ
Relizane LA VALETTA
Oran Latakia

M A LTA
Santa Cruz de Tenerife
FUERTEVENTURA
TENERIFE Mascara
Sidi bel Abbes
M

Las Palmas
Beni-Saf C R E TA
REA

NICOSIA Banias
Arico-Granadilla LNG GRAN CANARIA MEDGAZ
EN ST

Melilla
CYPRUS
P LNG-A-1146
Arinaga LNG Tlemcen Tartus
Ouled Vassilikos H
GRE

Mimoun Saida Sfax


Djelfa
Sebdou MATTEI
C ENRICO HERN LINE Ab
El Gor GAZODU EAST MED / NORT Tripoli
K4

El Aricha HERN LINE


EAST MED / SOUT
LEBANO
EGPDF

1-G

La Skhirra
Mediterranean Sea

NL
MAGHREB-EU

EAST
GG2

GK

RABAT ROPE GAS (MEG


TUNISIA

/
ED
)
GZ

Fes
GG1-

Meknès BEIRUT

TM

MED /
Gabes
0-G
ME

EAS
Z5
DG

Casablanca Mohammedia
Bahr Es Salam

SL
AZ

Sidon
Naama
APHRODITE/ISHAI
TANIN

MADEIRA Jorf Lasfar / El Jadida


KARISH

AGP
LEVIATHAN

MAGHREB-EUROPE GAS (MEG)


Hassi R’Mel
Mellitah

TRIPOLI
Ten-Year Network Development Plan 2022 – The hydrogen and natural gas TYNDP | Infrastructure Report | 23
Al Khums
TAMAR Haifa

Funchal DALIT
DOLPHIN
Misurata
SCARAB
SAFFRON Hadera Offshore
AKEN Mafraq
MOROCCO ALGERIA Ouargla Benghazi
Tobruk
BALTIM N
BALTIM E KAROUS KERSH MARI-B
Tel Aviv
Ashdod AMM
ROSETTA
Hassi Messaoud ABU SIR
6.3 UNDERGROUND STORAGE FACILITY (UGS)
For TYNDP 2022 promoters submitted 12 projects related to gas storage facilities (UGS).

MAP FOR GAS STORAGE


­PROJECTS IN TYNDP 2022

UNDERGROUND GAS STORAGE FACILITIES


UGS-F-311 Bilciuresti daily withdrawal capacity increase FID PCI
UGS-F-374 Enhancement of Incukalns UGS FID PCI
UGS-F-260 System Enhancements - Stogit - on-shore gas fields FID Non-PCI
UGS-F-347 Underground gas storage Grubisno Polje FID Non-PCI
UGS-F-398 Ghercesti underground gas storage in Romania FID Non-PCI
UGS-A-138 UGS Chiren Expansion Advanced PCI
UGS-A-233 Depomures Advanced PCI
UGS-A-356 Underground Gas Storage Velke Kapusany Advanced Non-PCI
UGS-A-371 Sarmasel underground gas storage in Romania Advanced Non-PCI
UGS-N-385 South Kavala Underground Gas Storage facility Less-Adv. PCI
UGS-N-399 Falticeni UGS Less-Adv. Non-PCI
UGS-N-606 Modernization of natural gas storage infrastr. - Balaceanca UGS Less-Adv. Non-PCI
UGS-N-1182 Alfonsine UGS Enhancement Less-Adv. Non-PCI

Figure 10: Map for gas storage projects in TYNDP 2022

Download the map from ENTSOG website:

Just click on the icon.

24 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
BERYL Haugesund Narva
Avaldsnes Karmøy STOCKHOLM TALLINN
Karlstad Paldiski
Kårstø Örebro
Bygnes Stokke Fredrikstad

ED
Järna

RL
Nevsk

IIA
TE
KA
Rafnes Slantsy

IPE
GRANE

IIB

E
VE

AT
FU

E
EP

IPE
UTS

NS
PIP
ESTONIA
Stavanger

ZE

DE
EP
KEYS

AT
Brunnsviksholmen

IRA

ST

ON
ZE
(Nynäshamn)

RC
BRAE Risavika
EDVARD GRIEG

NE
Mariestad

EIP
Cross-border points / intra-country or intra balancing zone points JOHAN SVERDRUP

SL
GUDRUN Linköping Norrköping Velikiya Novgorod

GE
Lidköping

SA
Borovichi
Cross-border interconnection point Cross-border interconnection point Puiatu

ON)
Pärnu

R
Mlölby

LE
Lysekil
within Europe within Europe

RATI
MIL
OUTER
or export point to non-EU country or export point to non-EU country

s
Stenungsund

OPE
HEBRIDES SLEIPNER k

de
Vallby Kile Valdai
GOLDENEYE a

OT IN
Under construction or Planned DRAUPNER Karksi
rr

bri
Gulf of
ATLANTIC

M I (N
Pskov Vichni Volochok
Cross-border interconnection point Cross-border third country (import) BRITANNIA e Riga Värska
g

EURO
He
REV Göteborg

REA
with third country (import) Under construction or Planned NNIA a JönKöping Luhamaa
k

TH

PIPE
BRITA Misso Izborsk

D ST
he
S Göteborg

SOU
FORTIES GO4LNG
RUSSIA

II
Gnosjö GOTLAND

NOR
Intra-country or St. Fergus Korneti

f t
Third country cross-border EVEREST Gislaved

GELED
FULMAR
intra balancing zone points interconnection point Torzhok

a o

LAN
Skulte

Se
Aalborg P
Virtual point Varberg
RIGA
Incukalns
ULA

Ka
UGS-F-374

INNER
ELGIN FRANKLIN Ljungby L AT V I A Tver

tt
Gas Reserve areas Countries HEBRIDES GYDA

North
Kalmar

eg
EKOFISK Halmstad
Drilling platform EU Countries Liepaja Iecava Rezekne

Sea DENMARK

at
Gas field Other Countries VALHALL
HARALD
Rzhev
HOD Kiemėnai
Helsingborg Kristianstadt
SYD Kuršėnai
Transport by pipeline LNG Terminals and Plants ARNE
Edinburgh KKP Daugavpils

SEAL
TYRA BALTIC PIP Siauliai
E Kubin

S
No Glasgow
COPENHAGEN

CAT
Klaipéda LNG
Existing infrastructure : rt (FSRU Independence) Panevėžys
LNG Terminals’ entry point h
Ch
Egdved Malmö Klaipéda
Visaginas Navapolatsk

EUROPIP
Nybro
Diameter < 600 mm intro transmission system an

Diameter 600 - 900 mm


Operational ne
l
Odense Kongsmark

Nyborg
Dragør
Baltic Se
a LITHUANIA
Moffat

E II
B/13 Faxe Trelleborg
Vitebsk
LNG Plants’ export point Jurbarkas Dorogobuzh
Diameter > 900mm

EU
Londonderry BORNHOLM Kaliningrad

RO
/ Derry BALTIC PIPE (FSRU) Jauniunai
Project categories :

PIP
Not operational Twynholm Šakiai
MURDOCH NG

EI
NO
IP Kaunas T
SN

RP
ZEEPIPE
FRANPIPE
Brighouse Bay VIP DK-THE
FID projects VILNIUS Smolensk

IPE
NOGAT
Teesside Ellund
Carrickfergus Brunnsbüttel
Project categories : Non-FID, advanced projects Middlesbrough Gdansk (FSRU)
Kaliningrad RUSSIA Kotlovka
MARKHAM
K

GIPL
CORRIB Belfast Dornum

DEUD

BALT
BREAGH P
FID projects Kiel
AL
Orsha Wilhelmshaven

IC PI
Non-FID, less-advanced projects YAM

AN
Bellanaboy Gdansk Krupskaya
ISLE OF MAN Lubmin Santaka NGT Stade

L
AUDREY

PE
Non-FID, advanced projects

WA
CM
S Krummhörn Emden Kirov
Killeen
R2 Douglas Barrow MURDOCH NG Rostock Greifswald Eemshaven Che
TO T Lubmin II
Non-FID, less-advanced projects Project is part of 5th PCI list : NE
C Świnoujście Olsztyn

R1
Delfzijl
Irish

NET
ON Brunnsbüttel MINSK

TO
Quarnstedt Mogilev
RC Jemgum

RA
IRELAND

EC
TE Leeds W. SOLE Levitzow Kamminke Płoty Oude
GroningenStatenzijl
Sea MARKHAM Folmhusen

NN
IN AMETHYST

T
P FID projects Dornum Stade L

GA
Gormanston NE Bremen

L
CO
Wilhelmshaven Schwerin
Project is part of 5th PCI list : Bünde

NE
ER

NO
L
NGT LEMAN

GIP
Easington

INT
Manchester AUDREY Krummhörn Emden
P S Hamburg Wittenburg Sülstorf Sionim Julianadorp Wardenburg
FID projects Non-FID, advanced projects Loughshinny Point of Ayr CM Eemshaven
Nezvizhskaya
GALLEON Delfzijl NEL Kraak Szczecin Balgzand
Osipovich

G
Galway DUBLIN

NET
L
Theddlethorpe LANCELOT Jemgum Uniszki Zawadzkie oPo BBL

RH
Oude

RA
EuR

L
P Bryansk
Non-FID, advanced projects Non-FID, advanced export projects GroningenStatenzijl Folmhusen Tietierowka Wieringermeer

NE
T
GA

EUGAL
Bremen Nordlohne

OPAL
Bünde

NE
BELARUS

INTE
NO
LEMAN Damaslawek EuRoPoL Babryusk Vlieghuis Orel
Non-FID, less-advanced projects Julianadorp Wardenburg Kondratki
P Non-FID, less-advanced projects Lelystad

RCO
HEWETT Balgzand Gustorzyn
Steinitz Zwolle VIP TTF-THE-H Rehden

L
BBL Ijmuiden

WA
RH
Point of Interconnection

L
Bacton Wieringermeer Płońsk Ahlten

NO
Emsbüren

NE
AMSTERDAM

NNE
Nordlohne Oranienburg (PWP) PL Hannover
Limerick

INTE
Vlieghuis EuRoPoL Wloclawek Enschede VIP TTF-THE-L Drohne
Project identification : Project identification : Mallnow
THE NETHERLANDS
UNITED
Rembelszczyzna

CTO
Lelystad Pogar

RCO
Birmingham Zwolle VIP TTF-THE-H Rehden Kienbaum Gomel

L
Ijmuiden BERLIN Lwówek

WA
Ahlten Wysokoje
Den Haag Apeldoorn Epe

NO
Shannon LNG AMSTERDAM Emsbüren Poznan

NNEC

R
Hannover Hołowczyce Kromy
KINGDOM
Drohne
TRA-N-123 ENTSOG project code LNG-N-123 ENTSOG project code Waterford Warwick Enschede VIP TTF-THE-L Wolfsburg Groß Köris Legden
THE NETHERLANDS Utrecht

TOR
Apeldoorn Epe Zevenaar Winterswijk
Dragon LNG Den Haag
Magdeburg WARSAW Kobryn Münster
Legden AL Radeland Maasvlakte Rotterdam
Mozyr Nijmegen Elten
Utrecht Zevenaar Winterswijk JAG Guben

K
Gubin

L
Milford Haven Rotterdam Nijmegen Ravenstein

IN

DA
Cork Elten Münster

EL
Maasvlakte

EUGAL

ZE
Moerdijk

OPAL
K

L
Ravenstein GCP GAZ-SYSTEM/ONTRAS

WE
Storage facilities Compressor stations

IN
Lodz Kursk

DA
EL
Werne

ZE
Moerdijk

WE
Werne Odolanów VIP BENE Essen
VIP BENE
POLAND Vlissingen Tilburg

K
KINSALE HEAD South Hook LNG Cardiff Essen
Dortmund

IN
Tilburg
Project categories : Vlissingen

K
Acquifer Dortmund

EL
IN
GERMANY
Isle of Grain

MIDA
Zandvliet

EL
Hilvarenbeek Tegelen Duisburg

ZE
MIDAL
SEVEN HEADS Zandvliet Hilvarenbeek Tegelen Duisburg Wronów

ZE
l LONDON Terneuzen
ne Zeebrugge
Terneuzen
Leipzig Zeebrugge
Salt cavity - cavern an Poppel
Ch

EUGAL
Lasów Poppel

OPAL

L
ol Zelzate
FID projects ist
Brugge
Antwerpen Düsseldorf Kassel
Wroclaw Lublin
Brugge Zelzate
Depleted (Gas) field on shore / offshore Br Dunkerque Dresden Dunkerque Antwerpen Düsseldorf Sudzha
Kassel
Gent Dilsen Obbicht

K
Opwijk

IN
Köln

EL
Sayda Sumy
Non-FID, advanced projects Alveringem Dilsen

ZE
Gent Obbicht

K
Other type Unknown Opwijk

IN
VIRTUALYS Bocholtz Würselen Köln

EL
BRUSSELS Broichweiden STEGAL Alveringem

ZE
‘s Gravenvoeren Olbernhau Lutsk U
Lille Stolberg Deutschneudorf VIRTUALYS Bocholtz Würselen UP ress
Non-FID, less-advanced projects Eynatten VIP THE-ZTP Reckrod Hora Svaté Kateřiny Rozwadów (Charzewice)
BRUSSELS Broichweiden g
Project categories : Raeren/Lichtenbusch Herbstein VIP Brandov ‘s Gravenvoeren Pro
Tworzen
Lille Stolberg
Koblenz Kędzierzyn-Koźle
BELGIUM KYIV

EKKR
Project is part of 5th PCI list : Quévy Blaregnies Eynatten VIP THE-ZTP Reckrod
FID projects Taisnières Hradec Králové
Racibórz Katowice
Zhytomyr Raeren/Lichtenbusch Herbstein
OF Frankfurt Oświęcim Jaroslaw Ukraine
P ISLES

TE
- West of
Non-FID, advanced projects Y
AL
CZECH BELGIUM Koblenz

NP
FID projects SCILL l BlaregniesKyiv
ne Bras PRAGUE Rzeszow Quévy Kharkiv
an MID Skoczów
Ch GDLux (BE) / Rimpar
Pogórska Wola
Drozdovychi Lviv Taisnières
Non-FID, less-advanced projects P Non-FID, advanced projects En
gli
sh Bras Petange (LU) LUX. Gernsheim Rothenstadt Plzeň REPUBLIC STORK
Cieszyn Drozdwicze
d) Frankfurt

TE
LUX. Hermanowice UPU
Cherbourg Le Havre Pétange MEGAL
Würzburg MEG
Forchheim Ternopil -Uzhgoro L
y-Pomary

NP
AL
(Urengo A
FSRU LE HAVRE Lampertheim Waidhaus Bras SS ID
Poltava
P Non-FID, less-advanced projects Gournay Remich
Kaiserslautern
Nürnberg
MEGAL Strachocina PROGRE M
Project is part of 5th PCI list : Schwandorf Bezměrov Vinnytsia GDLux (BE) / Z

L
SOYU
Žilina
LUX.

GA
Obergailbach Brno Výrava Bras Petange (LU)

ME
Caen TE
NP Gernsheim
ME Poprad
LUX. Kremenchuk I

LSF
P Karlsruhe GA
MEGAL KR
P P FID projects Cheppy Medelsheim L Pétange SD
Regensburg Dolni Bojanovice
SLOVAKIA
N
SC ORD
Lannion České Budějovice Dolyna Ivano-Frankivsk Lampertheim
UKRAINE
LE HW
Au am Rhein ITU AR
Arresting
Kaiserslautern
NG ZW
AL
Stuttgart Břeclav Jablonov Košice Gournay
P P P Non-FID, advanced projects PARIS Leonberg
D

Nad Turňou Remich


Nancy Wertingen Oberkappel Lanžhot uk

LFF
Saint-Arnould Kuty Vel’ké Kapušany Uzhhorod ch
Zvolen en

NP
des Bois WAG Budince
UGS-A-356
rem Kropyvnytskyi Dnipro

TE
Láb Lakšárska Nová Ves Oleksiivka
P P P Non-FID, less-advanced projects Brest MONA Burghausen ES
T
-K
Morelmaison CO /Uberackern W iv
NT
A
Baumgarten Nitra an
Dierrey-Saint-Julien München Finsing PE Linz Vel’ké Zlievce Beregdaróc An
Rennes Wolfersberg Haiming VIENNA BRATISLAVA Ivánka Pri Nitre
Beregovo
Selešťany
Project identification : Project identification : Kittsee
Balassagyarmat VIP BEREG Tekovo Siret
Atlantic Ocean Inzenham

HAG
Le Mans Voisines Haidach Mediesu Aurit Kryvyi Rih Zaporizhzhia
Orleans Salzburg Mosonmagyaróvár Ananiv
UGS-N-123 ENTSOG project code TRA-N-123 ENTSOG project code Thayngen
Fallentor
Kiefersfelden
Dorog Szada
Satu Mare
SDKRI Nikopol
VIP Pfronten Kufstein
Oltingue Germany-CH
Lindau
Leiblach Hajdúszoboszló MOLDOVA
AUSTRIA
Rodersdorf Basel Wallbach VIP Kiefersfelden / Pfronten Fălticeni Ungheni
BUDAPEST

TAG
Zürich Leţcani
Innsbruck UGS-N-399

AT I
Montoir de Bretagne Nantes
Iaşi
Lucerne
Gherăești Mykolaiv
TRA-F-137 Interconnection Bulgaria - Serbia FID PCI Palleau BERN
L I E C H T. Graz
Siófok
Weitendorf Sărmăşel UGS-N-371 CHISINAU
HUNGARY
II Városföld
TAG Grebenyky Melitopol

SO
TAG I
SWITZERLAND Klagenfurt

L
Murfeld P
Project ENTSOG code Project Name Project Promoter Project status codes Griespass
Tarvisio
Arnoldstein
Cersak Târgu Mureş UGS-A-233 Bacău Yuzhne Kherson
Odesa
Etrez Kidričevo Nagykanizsa Kaushany
Malborghetto
Project not marked on map Geneva
Passo Gries Bordano
SLOVENIA
Algyő
Kiskundorozsma Horia
Coroi Onesti Sea

AI
La Rochelle
Exact project location is not available or is Masera Arad

RI,
Project ENTSOG codes / color : FRANCE Trento Flaibano Udine LJUBLJANA Rogatec Zabok Kozármisleny Csanádpalota

DK
Subotica Nagylak
marked as confidential Mediaș

I, S
Ajdovščina
Drávaszerdahely

AT
Bizzarone Gorizia Petrovaselo STREIKOV
Sempeter ZAGREB Sombor GOLITSYNO
Lyon Treviso Lučko Sibiu KERCH
Exact project locations not marked on map TRA-N-000 Project is part of 5th PCI list Istrana
Trieste Okoli
UGS-F-347
Donji Miholac
Osijek
Mokrin BR
UA
Șinca
Brașov Chernomorsk
UGS-F-260 Kozarac
Project has several locations/points. Karlovac
Hateg K
TRA-N-000 Project is not part of 5th PCI list UGS-F-260 Bačko ODESSA
ROMANIA
Zlobin
The indicated location is for representation Milano Venezia Umag Rijeka Bosiljevo Slobodnica Sotin
Novo Selo Jupa Orlovka KRYM

BRUA
purposes only and does not indicate the Grenoble Porto Krk LNG
Omišalj Tržac Vel. Kladusa Novi Sad Isaccea
exact location of the project Bay of Biscay Saint-Avit Viro Rovigo
Cazin
SHTORMOV Yevpatoria
Torino Cavarzere Vodnjan Brod
Castillon Modrica UGS-F-311
Pula Lička Rakovica Bos. Krupa
Banja Luka Urziceni

PIPELINEKAN
Bordeaux PoggioRenatico UGS-N-1182 Jasenica
Parma Bihač Bibeşti COBALCESCU
UGS-F-260 BOSNIA BELGRADE Alushta

TRANS-BAL
Gospič Bilciurești
Modena Loznica Sevastopol
Project status codes : AND Horezu
BUCHAREST
Slobozia LEBADA
The project advancement status is based on project collection conducted in Oct-Nov 2021 Genova
Bologna FSRU 2 - SNAM
Ravenna
C R O AT I A HERZEGOVINA
Ghercești
BRUA
Podișor Bălăceanca
Năvodari
Yalta
Travnik Zvornik
SERBIA UGS-N-606
LUCEAFARUL DOINA
I TA LY
Panigaglia Zadar
and/or June 2022. Knin
Zenica UGS-F-398 Constanţa
G.Vakuf Zaychar Silistra
Benkovac ANA DOMINO
San Marino Giurgiu Ruse
Firenze Kiseljac Kardam
PCI Non-PCI PCI status (Project of Common Interest) GAVIOTA UR
GASCOGNE
MIDI Monaco SARAJEVO
Negru Voda
DO Toulouse OLT Offshore LNG Ancona Kireevo
E L’A Lussagnet Saint-Martin-de-Crau Nice Razgrad

IBR
RE D
Black Sea
Ferrol Barran Toscana (FSRU) Dobrich
FID Advanced Less-Adv. FID status (Final Investment Decision) Mugardos Musel / Gijon Santander ARTE Cruzy (Hérault)
Fos Tonkin Fos Cavaou Livorno
Split
P
Pleven Valchi Dol
S. Sebastián Biriatou Lacq Montana
UGS-A-138
A Coruña Guitriz Oviedo Marseille Terranuova Bracciolini San Marco Recanati A Zagvozd Mostar Shumen Vetrino
Bilbao Pau Tarbes
Ligurian d Niš Targovishte Varna
Advanced status is applied to all projects that, based on the information submitted, have:
Irun
VIP PIRINEOS Barbaira
Toulon ri Vratsa Lovech Provadia KAVARNA
Lugo Gulf of Sea Perugia Monte Urano a Ploče Veliko Tarnovo
- commissioning year expected at the latest by 31st December of the year of the TYNDP project Pamplona Larrau Piombino ti Botevgrad
Gabrovo Rupcha GALATA
KALIAKRA
Santiago Lion Rio Marina c MONTENEGRO Novi Iskar
de Compostela Vitoria PRISTINA
data collection + 6 (e.g. 2028 in case of TYNDP 2022, for which projects are collected in 2022)
Villafranca
Castropodame Bastia
FSRU 1 - SNAM
Cellino S
e
a PODGORICA UNMI Pernik SOFIA BULGARIA Lozenets
STREAM
- and whose permitting phase has started ahead of the TYNDP project data collection - OR - Pontevedra ANDORRA
Leon Burgas TURK
del Bierzo Logroño
Gallese L’Aquila Chieti KOSOVO Stara Zagora Yambol
Kyustendil
FEED has started (or the project has been selected for receiving CEF grants for FEED ahead of the Ourense Burgos Villar de Arnedo
Figueras
CORSICA Gueshevo
Ihtiman

TYNDP project data collection) Tuy Palencia Huesca Zidilovo Blagoevgrad


Pazardzhikk
Plovdiv
Ajaccio ROME Sulmona
Dimitrovgrad Strandzha Malkoclar
Valença do Minho Tetovo Sinop
Soria Larino San Paolo SKOPJE Bansko

IGB
Hostalric Simitli Edirne Kırklareli
Gostivar Shtip Kardzhali Bartın
Valladolid Zaragoza UGS-F-260 Smolyan
Lérida NORTH Petrich Kıyıköy
Lucera
Campobasso TIRANA MACEDONIA Negotino Kastamonu Bafra
ENTSOG currently comprises 43 TSO members, Zamora
Barbolla
Adradas
Arbós Kulata
Zongulda
Karabük
Sams
Castelnou Prilep Sidirokastron Xanthi
2 Associated Partners from 27 European Countries and 10 Observers Porto Bari Karperi Istanbul

IAP
Barcelona Melizzano
Tarragona Kafasan Lachanas Kipoi
Salamanca Bitola Serres Komotini Tekirdağ
P Kavala
P
Celorico da Beira Segovia Tivisa Olbia Dumrea TA

TA
Porto Torres Nea Mesimvria Alexandroupolis Marmara Düzce Bolu

N
Napoli UGS-N-385 Ereglisi

AP
Mangualde Avila Sassari Potenza Sakarya Amasya
Guadalajara Brindisi Fier Berat TAP Plati Thessaloniki Yalova Kocaeli
When the same point is affected by several projects, the point is shown with the Cantanhede MADRID Alghero T
Massafra
TAP Vlorë Korce Bilisht Trikala
Sa
ro
s Çankırı
Çorum
Guarda Balearic Nuoro y Taranto Matagiola TAP
of
highest project status (operational, FID, advanced, non-FID), the status from single Teruel Sea Macomer rr Montesano
San Foca
Melendugno ALBANIA Katerini Gu
lf
Figueira da Foz
projects can vary from that. VIP IBERICO Cuenca h Çanakkale Bursa
Bilecik ANKARA
Castellón
MENORCA

Oristano
SARDINIA e
n
Carriço de la Plana ia Yozgat
The projects are shown with the planning status reported in their TYNDP 2022 S PA I N Toledo
Palmas Arborea
n
Aegean Eskişehir Kırıkkale
TANAP Pipeline
submission. Sagunto Trikala Sea Balıkesir Trans-Anatolian
PORTUGAL
MALLORCA Larissa
S Tarsia TANAP
Valencia e
Palma de Mallorca a
All data provided on this map is for information purposes and shall be treated as Cáceres Thesprotia Ampelia
Volos
Kütahya
TURKEY
Portovesme
Cagliari Kırşehir
indicative and non-contractual in nature, without pre-empting different outcomes Carregado Badajoz Ciudad Real Albacete
Carbonia
Sarroch
IBIZA
of any possible discussion held at regional level. Under no circumstances shall it be Bucelas Campo Maior Porto Botte Catanzaro Lamia
Tu

GREECE
Afyon z

regarded as information intended for commercial use. LISBON Aliaga Manisa


G
öl
ü Kayseri
Uşak
Setúbal
Mediterranean Sea Ag. Nikolaos
Halkida Aliveri
Nevşehir

Alicante
Gioia Tauro Ionian Thiva
Inofyta Izmir Aksaray
Thisvi
Version : March 2023 Palermo Sea
Messina Agioi Theodoroi ATHENS Niğde
Sines Dioriga Gas
WGS 84 / Pseudo-Mercator projection Cordoba
Jaén
Murcia
Lavrio
Isparta
Konya
Mazara del Vallo Revythoussa Aydın K
Cartagena Denizli
Agia Triada Burdur
Sevilla Enna Eregli
ED
Huelva SM Agrigento Megalopoli
AN
Granada TR Muğla
El Haouaria Gela Karaman Adana
Annaba Tarsus
Almeria Antalya Osman
Motril ALGIERS Skikda Koudiet Eddraouch Içel
Málaga
Bejala TUNIS Dörtyol
Cádiz Iskenderun
ME

Chlef Hatay
DG

CANARY ISLANDS Tarifa


AZ

Arzew
LANZAROTE Strait of Gibraltar
Ceuta Sousse Malta LNG (FSRU)
Tangiers Samandağ
Relizane LA VALETTA
Oran Latakia

M A LTA
Santa Cruz de Tenerife
FUERTEVENTURA
TENERIFE Mascara
Sidi bel Abbes
M

Las Palmas
Beni-Saf C R E TA
REA

NICOSIA Banias
Arico-Granadilla LNG GRAN CANARIA MEDGAZ
EN ST

Melilla
CYPRUS
P
Arinaga LNG Tlemcen Tartus
Ouled Vassilikos H
GRE

Mimoun Saida Sfax


Djelfa
Sebdou MATTEI
C ENRICO Ab
El Gor GAZODU Tripoli
K4

El Aricha
LEBANO
EGPDF

1-G

La Skhirra
MAGHREB-EU Mediterranean Sea
GG2

GK

RABAT ROPE GAS (MEG


) TUNISIA
GZ

Fes
GG1-

Meknès Gabes BEIRUT


0-G
ME

Z5
DG

Casablanca Mohammedia
Bahr Es Salam
AZ

Sidon
Naama
APHRODITE/ISHAI
TANIN

MADEIRA Jorf Lasfar / El Jadida


KARISH

AGP
LEVIATHAN

MAGHREB-EUROPE GAS (MEG)


Hassi R’Mel
Mellitah

TRIPOLI
Ten-Year Network Development Plan 2022 – The hydrogen and natural gas TYNDP | Infrastructure Report | 25
Al Khums
TAMAR Haifa

Funchal DALIT
DOLPHIN
Misurata
SCARAB
SAFFRON Hadera Offshore
AKEN Mafraq
MOROCCO ALGERIA Ouargla Benghazi
Tobruk
BALTIM N
BALTIM E KAROUS KERSH MARI-B
Tel Aviv
Ashdod AMM
ROSETTA
Hassi Messaoud ABU SIR
6.4 FURTHER DETAILS ON THE TYNDP 2022 PROMOTERS’
SUBMISSIONS FOR NATURAL GAS PROJECTS
This chapter provides more details on the investments submitted to TYNDP 2022 aiming to transport,
receive or storage natural gas.

In order to provide more detailed and transparent information, all the statistics described in the
following sections consider:

\ Individual investments submitted by different \ Some promoters have submitted individual


promoter not aggregated as described in ­facilities as separate investments (e. g. com-
 section 6 but considered as many projects pressor station and pipe as individual project
as promoters submitting the investment. To submissions) whereas others have joined
each of these investments an individual TYNDP ­together a number of investment in one project
code is assigned. For example, for an intercon- (e. g. compressor station and pipe under a
nector between two countries two separate ­single project submission).
investments are considered. The same ap-
­
proach is applied for LNG terminals (or UGS Therefore, the high level of investments should be
projects) and the evacuation pipeline(s) considered in the context of the above considera-
­needed to connect the terminal (or the s­ torage) tions.
to the gas grid; 143 Investments aim to transport, store or receive
\ For projects developed in different phases, natural gas, also in liquid form.
each phase as an individual investment and the Figure 11 provides the overview for this submission,
whole project as multiple projects; compared to the previous TYNDP editions, empha-
sising the comparison for natural gas submissions
(NG).

Picture courtesy of GRTgaz

26 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
Natural Gas (NG) = TRA + LNG + UGS
New
investments
(213)

New
investments Cancelled/not
New Cancelled/not (94) re-submitted of which are
Investments (26) re-submitted (52) new NG
(31) Total 81 investments
(43)

Investments
already in
TYNDPs 2020
Investments (145)
Investments
already in
already in
­previous
­previous of which are
TYNDPs
TYNDPs re-submitted
(168)
(181) NG investments
(100)
Completed NG
(32)
Total 36

Completed (10)
Existing
Existing infrastructure
Existing infrastructure
infrastructure

TYNDP 2018 TYNDP 2020 TYNDP 2022


207 investments 187 NG ­investments + 75 ETRs 358 ­investments

* It is very likely that this number of new investments also includes former ETRs which have been submitted under TYNDP
2020. By introducing new project categories and subcategories in TYNDP 2022, we gave promoters the possibility to split
projects to fully align with new categories. E. g. 1 ETR = 1 RET and 1 BIO investment

Figure 11: Comparison between TYNDP 2018, TYNDP 2020 and TYNDP 2022 – Natural Gas

From the graph the following conclusions can be drawn:

\ Due to the completion of 32 investments since (change in flow directions) and bring additional
TYNDP 2020 and to the investments with LNG to Europe to ensure security of supply
commissioning years 2023, the European
­ also in phases of high demand following the
­infrastructure is reinforced and has shown the ­decrease of Russian supply;
resilience in the energy crisis following Russian
invasion in Ukraine; \ As further elaborated in the assessment
­chapters, the aggregated number of existing
\ The total number of natural gas investments and planned infrastructures in TYNDP 2022
are declining, showing that the European gas confirms that more infrastructure develop-
infrastructure is well advanced. In particular ment is needed in some specific areas to
during the second project collection, new strengthen the security of supply and to
investments have been submitted with the
­ ­improve diversification.
objective to mitigate internal bottlenecks
­

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 27
6.4.1 OVERVIEW PER TYPE AND STATUS
From the total of 358 Investments included in Investments by infrastructure type

­TYNDP 2022, 143 natural gas Investments have


8%
been submitted for the categories TRA, LNG and
UGS (40 %). 12
16 %
Compared to 187 Investments in these three cate- 23

gories in TYNDP 2020 it can be observed for this TYNDP 2022


TYNDP 2022 edition that there is a reduction to 143 (Natural gas)

investments. This reduction is relevant for all three


categories TRA, LNG and UGS. The reduction stems 108

from: 76 %

\ The application of the ENTSOG PID that sets


clear administrative and technical criteria to be TRA LNG UGS
matched by promoters and projects in order to
be considered eligible for inclusion in the
Figure 12: Investment inclusion in TYNDP 2022 by type
­TYNDP;
of infrastructure – Natural Gas. The inner cir-
cle represents absolute numbers of invest-
\ Completed projects have in the meantime ments; the outer circle represents the share
further contributed to the reduction of the
­ of each project type.
­infrastructure gaps;
Figure 13 shows the breakdown of TYNDP 2022
\ Development and inclusion of hydrogen natural gas projects by project maturity status.
­becomes more and more important.

The following figures and tables provide a statistical Natural gas investments by status
overview of promoters’ submissions (see TYNDP 70
Annex A for further details) based on information
4
such as the type of infrastructure or the FID/PCI 60
status. The Annex A reports reflect all the details 15
entered as part of the data collection process by 50

project promoters. 3
40
3
Figure 12 presents an overview of all the invest- 5
30
ments accepted for inclusion in TYNDP 2022 per 5
type of infrastructure for natural gas. 46
20 37

25
10

0
FID Advanced Less-Advanced

TRA LNG UGS

Figure 13: Promoters submission for natural gas by


­maturity status

Due to the information collected, it has been


­possible to identify investments submitted for
TYNDP 2020 that were not active anymore but for
which promoters had missed to previously report
the information to ENTSOG or that were deleted or
not resubmitted.

28 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
for additional import possibilities has been mainly
Status TRA LNG UGS
driven by security of supply issues after the ­Russian
Completed 31 1 0 invasion of Ukraine and the aim of EU Member
States to reduce Russian supply dependency.
Still planned 78 12 10
Among the UGS submissions evolution from
Cancelled 12 0 1
TYNDP 2020 to TYNDP 2022, two TYNDP 2020
investments have been cancelled or not been
Not resubmitted 29 9 1
resubmitted while two new investments in TYNDP
New projects 30 11 2 2022 are planned. The new UGS projects are an
enhancement project in Italy (UGS-N-1182) and a
storage modernisation in Romania (UGS-N-606).
Table 2: Number of investments for natural gas from Ten Investments were resubmitted and thus the
TYNDP 2020 completed, still planned, amount of UGS submissions is very stable. The UGS
not-resubmitted and cancelled
project South Kavala has been resubmitted but
Regarding transmission investments an overall under the project category HYD with the objective
reduction of number of investments can be seen, to store pure hydrogen in the future (HYD-N-385).
31 have been completed since TYNDP 2020, while The next table provides an overview of all
41 investments have been cancelled or not resub- ­cancelled projects. It should be noted that project
mitted and 30 new TRA investments have been TRA-A-283 “3rd IP between Portugal and Spain
submitted. (pipeline Celorico – Spanish border)” submitted
Considering LNG projects, 1 LNG terminal related by ­Portuguese TSO Ren and Project UGS-N-914
investment (LNG terminal Krk 1st phase) has been ‘UGS Damasławek’ submitted by Polish TSO
commissioned since TYNDP 2020 while nine ­GAZ-­SYSTEM have been cancelled for natural gas
investments were not resubmitted. However, eleven but have been re-introduced to TYNDP 2022 as new
new LNG investments were newly submitted. Most projects aiming to transport or storage direct from
of this new LNG investments have been submitted the commissioning pure hydrogen (HYD-N-1156 &
in the second project collection phase. The need HYD-N-981):

Project code Project name Status

TRA-N-9 Additional Southern developments Cancelled

LNG-A-32 Project GO4LNG LNG terminal Gothenburg Cancelled

TRA-A-273 Poland - Czech Republic Gas Interconnection (PL section) Cancelled

TRA-A-283 3rd IP between Portugal and Spain (pipeline Celorico-Spanish border) Cancelled

TRA-A-320 Carregado Compressor Station Cancelled

TRA-N-354 Interconnection with Slovenia Cancelled

TRA-N-596 Interconnection between the RO and the UA gas transmission systems Cancelled

TRA-A-621 Poland - Ukraine Gas Interconnection (PL section)* Cancelled

UGS-N-914 UGS Damasławek Cancelled

TRA-F-937 Nord Stream 2 Cancelled

TRA-N-1202 GCP GAZ-SYSTEM/ONTRAS – incremental capacity project Cancelled

TRA-F-1241 Interconnection with production in Gela Cancelled

TRA-N-1246 Greece – Italy interconnection Cancelled

TRA-N-1227 Gorizia plant upgrade Cancelled

*The extension of capacities at Poland – Ukraine interconnection is now considered as part of TRA-F-245 - North – South Gas Corridor in Eastern Poland.

Table 3: Cancelled Investments for natural gas from TYNDP 2020

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 29
In order to be able to make a comparison at the More in details, of the 35 FID natural gas initiatives
maturity level between the TYNDP 2020 and the in TYNDP 2022
TYNDP 2022 submission, the graph below shows
for TYNDP 2020 the project status only for the \ 15 were already FID in TYNDP 2020
­natural gas projects i.e. transmission, LNG and UGS. \ 9 with Advanced status in TYNDP 2020 took
For this TYNDP a majority of TRA, LNG and UGS the FID
projects is in the advanced status. In the previous \ 6 with Less-Advanced status in TYNDP 2020
TYNDP 2020 the highest number of projects were took the FID
recorded in status “less advanced”. For status FID a
reduction can be seen, which can be interpreted by \ 5 were not submitted for TYNDP 2022
the high number of commissioned projects.
Submissions with the Less-Advanced status show
a decrease based on one hand of project maturity
progress as some projects reached the advanced
or even the FID status and on the other hand the
decrease is reported because many projects with
this maturity status have not been resubmitted for
TYNDP 2022.

Projects by status – TRA/LNG/UGS projects only Projects by status – TRA/LNG/UGS projects only

54 35
43

77

TYNDP 2020 TYNDP 2022

56
65

FID Advanced Less-Advanced FID Advanced Less-Advanced

Figure 14: Comparison of submissions in TYNDP 2022 and TYNDP 2020 per status.

30 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
Picture courtesy of TAP

6.4.2 OVERVIEW OF PROMOTERS’ INVESTMENTS


PER GEOGRAPHICAL LOCATION
The following charts provide a summary of pro- Non-EU projects can in fact be submitted to TYNDP
moters’ submissions based on their geographical in the below cases:
location, infrastructure type and maturity status for
investments in the area of natural gas categories. \ Projects at least partially located in one of the
TYNDP geographical perimeter countries;
For this TYNDP edition, 143 initiatives falling under
the categories TRA, LNG and UGS were submitted \ Supply chain projects bringing additional gas
concerning 24 countries, of which 4 countries13 not sources to EU border;
being part of the EU. \ Projects whose promoter is an ENTSOG
Some of these countries are part of the Energy ­Observer;
Community14 (as contracting parties or observers).

TYNDP perimeter
TYNDP perimiter countries
countries
Energy Community Contracting Parties submitting projects for TYNDP 2018
Energy Community Observers submitting projects for TYNDP 2018
Submitted projects
TYNDP perimeter countries
in extra-EU
Energy Community Contracting Parties submitting projects for TYNDP 2022
Energy Community Observers submitting projects for TYNDP 2022

TYNDP perimeter countries Energy Community Contracting Parties submitting projects for TYNDP 2022
Energy Community Observers submitting projects for TYNDP 2022

Figure 15: TYNDP perimeter countries and countries outside European Union for which initiatives were submitted in
TYNDP 2022

13 Azerbaijan, Bosnia Herzegovina, Turkey, and Turkmenistan.

14 The Energy Community is an international organisation which brings together the European Union and its neighbours to create an integrated ­­
pan-European energy market (https://www.energy-community.org/)

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 31
However, only six submissions (4 %) of the 143 submissions actually refer to non-EU Member States.
Most of the submitted investments remain focused in the EU countries.

30
Number of investments per country and type of infrastructure

25

20

15

10

0
DE IT GR HR RO BG FR SI SK HU NL PL AT BE BA LV CZ ES AZ CY LT MT TM TR

TRA LNG UGS

Figure 16: Number of investments per country and type of infrastructure

30
Number of projects per country and maturity status

25

20

15

10

0
DE IT GR HR RO BG FR SI SK HU NL PL AT BE BA LV CZ ES AZ CY LT MT TM TR

FID Advanced Less-Advanced

Figure 17: Number of investments per country and maturity status

It should also be noted that the high number of submissions is in the context that in some countries, TSOs
are required to ensure some consistency between projects included in the National Development Plans and
projects included in the ENTSOG TYNDP.

32 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
6.4.3 ANALYSIS OF PROJECTS SCHEDULE

30
Projects by commissioning year and by project status TRA-LNG-UGS
2
25
6
12
20 12

3
15
5
15
10 11
14 7
15
11
5 5

5 4 5 2 5
1 3
0
2022 2023 2024 2025 2026 2027 2028 2029 From 2030

FID Advanced Less-Advanced

Figure 18: Investments by commissioning year and by project status

160
Projects by commissioning year and by project status (cumulative) TRA-LNG-UGS
140

120 35 38 43
30
100 23

80 11

8 63 65 65 65
60 58
47
2 32
40
17
20 5 34 34 35 35 35
25 30 30
11
0
2022 2023 2024 2025 2026 2027 2028 2029 From 2030

FID Advanced Less-Advanced

Figure 19: Investments by commissioning year (cumulative) and by infrastructure level

Figures 18 and 19 show the distribution of projects total of 88 investments out of the 143 submitted.
included in TYNDP according to the expected (first) Among these, 77 investments are well underway,
commissioning year, also in an aggregated way. presenting FID or Advanced status.

Around 62 % of the submitted initiatives are expect- Most of the ones having FID or Advanced status are
ed to be commissioned not later than 2025 for a expected to be commissioned in the next five years.

Feasibility, FEED, Permitting, FID, Construction and Commissioning

As part of the project collection, promoters have to to have an overview on the average duration for
provide information (except for some specific sit- each project phase and the average completion
uations) about the projects’ schedules of the main date for the main milestones.
project phases and milestones (Feasibility, FEED,
Permitting, FID, Construction and Commissioning). In case of the Feasibility Study phase, the start
ENTSOG has analysed these data with the purpose and end dates, either past or expected, have been
­provided for 107 investments.

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 33
Average duration of the feasibility study phase (months) Average duration of FEED phase (months)

18 25

16
20
14

12
15
10

8
10
6

4 5

0 0
TRA LNG UGS TRA LNG UGS

Average duration Average all Average duration Average all

Figure 20: Average duration of the feasibility study Figure 21: Average duration of the FEED phase per type
phase per type of infrastructure of infrastructure (TTRA–LNG–UGS)

The average duration of the Feasibility Study Average duration of permitting phase (months)

phase for these projects is 13.6 months, with the 45


highest average duration in case of UGS projects
40
(16.5 months) and lowest duration in case of LNG
projects (10 months), see figure 20. 35

30
85 investments have conducted their feasibility
study before the end of the project collection for 25

TYNDP 2022. The remaining 22 investments indi- 20


cated the end of the feasibility study after the end
15
of the project collection with the latest date in May
2026. 10

Regarding the FEED phase, the start and end dates, 5

either past or expected, have been provided for 102 0


TRA LNG UGS
investments. The average duration of the FEED
phase for these projects is 20 months, with the Average duration Average all

highest average duration in case of TRA projects (21


months) and the lowest average duration in case of Figure 22: Average duration of the Permitting phase per
LNG projects (13.3 months). UGS investments have type of infrastructure (TRA–LNG–UGS)
an average duration of 19 months, see figure 21.

52 investments have concluded their FEED phase In case of the Permitting phase, the start and end
before the end of the project collection for TYNDP dates, either past or expected, have been provided
2022. The 50 investments indicated the end of for 97 investments. The average duration of the
FEED after the end of the project collection with the Permitting phase for these projects is 38 months,
latest date in May 2027. with the highest average duration in case of UGS
projects (41 months) and the lowest average dura-
tion in case of LNG projects (26.5 months). TRA
projects have an average duration of 39 months,
see figure 22.

51 investments have completed the permitting


phase before the end of the project collection for
TYNDP 2022. The 46 investments indicated the end
of the Permitting phase after the end of the project
collection with the latest date in June 2027.

34 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
FID date for TRA–LNG–UGS projects included in TYNDP 2022

04.09.2028

23.04.2027

09.12.2025

27.07.2024
FID Date

15.03.2023

31.10.2021

18.06.2020

04.02.2019

22.09.2017

10.05.2016

27.12.2014
0 20 40 60 80 100
Cumulative number of submitted projects
FID Date Average FID Date

Figure 23: Distribution of projects per FID date TRA–LNG–UGS

The FID date, either past or expected, has been Average duration of construction (months)
provided for 97 investments. The graph below 50
shows the distribution of projects per FID date. The
45
average FID date is 04/03/2022 (see figure 23).
40
Regarding the Construction phase, the start and
35
end dates, either past or expected, have been
30
provided for 111 investments. The average duration
of the Construction phase for these projects is 30 25

months, with the highest average duration in case of 20


UGS projects (43.5 months) and the lowest average
15
duration in case of LNG projects (28 months). TRA
10
projects have an average duration of 29 months
(see figure 24). 5

0
35 Investments have started their construction TRA LNG UGS
prior the end of the project collection for TYNDP Average duration Average all
2022. From this two have already completed the
construction. The remaining 76 investment have
Figure 24: Average duration of the construction phase
foreseen the start of the construction after the end
per type of infrastructure
of the project collection with the latest end date in
December 2029.

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 35
Commissioning ends for TRA–LNG–UGS projects included in TYNDP 2022

2040

2035

2030

2025

2020
0 25 50 75 100 125 150
Cumulative number of submitted projects
Comissioning year ends Average FID Date

Figure 25: Distribution of projects per end commissioning year

The Commissioning year has been provided for is 2026 with 101 investments expected to be com-
141 investments out of 143 included in TYNDP 2022. missioned by the end of 2026 while the remaining
The average Commissioning year for these projects 40 will be commissioned after 2026.

Status Completed in FID in Advanced in Less- Cancelled/Not- Total


TYNDP 2022 TYNDP 2022 TYNDP 2022 Advanced in resubmitted
TYNDP 2022

FID (TYNDP 2020) 30 19 0 2 12 63

Advanced (TYNDP 2020) 5 6 24 2 23 60

Less-Advanced (TYNDP 2020) 1 9 31 52 46 139

Total 36 34 55 56 81 262

Table 4: Evolution of projects from TYNDP 2020 to TYNDP 2022 (All Categories)

Status Completed in FID in Advanced in Less- Cancelled/Not- Total


TYNDP 2022 TYNDP 2022 TYNDP 2022 Advanced in resubmitted
TYNDP 2022

FID (TYNDP 2020) 28 16 0 1 9 54

Advanced (TYNDP 2020) 4 5 22 2 23 56

Less-Advanced (TYNDP 2020) 0 9 22 25 21 77

Total 32 30 44 28 53 187

Table 5: Evolution of projects from TYNDP 2020 to TYNDP 2022 (TRA, LNG & UGS)

36 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
Of the 54 investments submitted for TRA, LNG For initiatives having already reached the
and UGS already having the FID status in TYNDP FID before their submission to TYNDP 2020
2020: (35 investments) the analysis of project submis-
sions shows:
\ 28 were completed;
\ 16 are still planned with FID status in \ 13 initiatives whose construction phase is
­TYNDP 2022; ­expected to end within 3 years from when the
FID was taken;
\ 1 is still planned but no more FID:
\ 15 initiatives whose construction phase is
\ TRA-N-95415 present in TYNDP 2022 has a ­expected to end within 4 to 7 years from when
Less-Advanced status while in TYNDP 2020 it the FID was taken;
was FID status. The promoter has changed the
status since TYNDP 2020 and indicated a d ­ elay \ 1 initiatives whose construction phase is
in the project based on internal replanning and ­expected to end after more than 7 years from
alignment with matching project on the Italian when the FID was taken;
site (TRA-N-1145)16; \ 6 initiatives did not indicate the expected end
\ 9 projects have not been resubmitted of the construction phase.
(TRA-F-307, TRA-F-949, LNG-F-163, Most of the FID projects are expected to be com-
LNG-F-183, TRA-F-592, LNG-F-824, TRA-F-937, pleted within four years from when the construction
TRA-F-1169 and TRA-F-1241). works will start.
Of the 56 investments having the Advanced The way FID is taken by each promoter may differ.
­status in TYNDP 2020: Some may take FID after the granting of permits
\ 4 were completed; and some before initiating the permitting proce-
dure. Those permitting procedures often make out
\ 6 got the FID after TYNDP 2020 project the longest phase of the whole project schedule
­collection; which often lasts more than five years. Therefore,
\ 22 still have the Advanced status; the above analysis is not necessarily indicative of
\ 2 moved from Advanced to Less-Advanced the project lead time for any future projects as there
mainly because the projects have been de- are, among the projects, some small and some very
layed or rescheduled (TRA-N-377 and complex ones.
TRA-N-782); For investments not having gotten the FID yet
\ 23 were not resubmitted (TRA-A-829, but presenting an Advanced status (65 projects)
TRA-A-21, TRA-A-133, TRA-A-808, TRA-A-136, the analysis shows:
TRA-A-273, TRA-A-561, TRA-A-621, TRA-A-283,
TRA-A-654, TRA-A-12, LNG-A-30, LNG-A-32, \ 46 investments for which promoters were able
LNG-A-79, TRA-A-123, UGS-A-294, LNG-A-295, to provide the relevant information are expect-
LNG-A-296, TRA-A-320, TRA-A-950, ed to be commissioned within five years from
LNG-A-962, TRA-A-980 and TRA-A-1303). when the FID is expected to be taken while
other three submissions between six and
­
Of the 77 TYNDP 2020 investments having twelve years;
Less-Advanced status: \ An average of almost two years between the
\ 9 got the FID after TYNDP 2020 project year when the construction works are expect-
­collection; ed to start and when the project is expected to
be commissioned.
\ 22 moved from Less-Advanced to Advanced
status;
\ 25 are still planned and present
Less-Advanced status;
\ 21 were cancelled/not-resubmitted.

15 TAG Reverse Flow


Picture courtesy of GAZ-SYSTEM
16 Export enhancements

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 37
Picture courtesy of Plinacro

Share of scheduled status for resubmitted projects Reported delays of projects from TYNDP 2020 to TYNDP 2022

9% 10 %

32%
34 %
56 %

59%

ahead of schedule on time delayed or rescheduled 1–2 years 3–5 years > 5 years

Figure 26: Share per scheduled status for resubmitted Figure 27: Reported delays from TYNDP 2020 to ­
projects TYNDP 2022

Finally, with regards to investments presenting More than half of the submissions in TYNDP
a Less-Advanced status, information may not be 2022 have reported experiencing delays since
always fully available or reliable making it effectively the last edition. Listed below are the main reasons
impossible to build any statistics. for delays indicated by project promoters:

Figures 26 and 27 illustrate the status of those \ Worsened and uncertain market conditions
common projects according to TYNDP 2020 and \ Delays in permitting/authorisations from
TYNDP 2022 submissions. The charts show the ­competent authorities
share of those projects for which a delay has been
reported regarding their expected commissioning \ Lack of coordination between hosting
date and the length of this delay. ­countries/political uncertainties
\ Delays in contract award procedure and/or
Among the projects without delay (64 % in total), procurement process
nine have been submitted with an earlier commis-
sioning date. \ Lack of funds/financing
\ Interdependencies with other (delayed)
­projects;
\ Delay following findings from concluded
pre-feasibility study

38 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
6.4.4 INVESTMENT COSTS
Investment costs are for project promoters in many However, the values shown in figures 28 and 29
cases commercially sensitive information and are based only on cost information provided as
might have the potential to negatively affect the non-confidential by Promoters.
competitive position of project promoters vis-à-vis
contractors. The highest share of costs is represented in the
advance status (66 %) while the share of advanced
As part of the transparency process adopted, project for TRA, LNG and UGS is only around 45 %.
­ENTSOG has collected information from p­ romoters
on indicative investment costs for all submitted Transmission projects, representing also the
projects. ­majority of the submitted projects (76 %), c ­ over
90 % of the total costs. According to project
In line with the ENTSOG Practical Implementation promoters’ submission, investments are highly
Document, the cost data submitted by the project concentrated in 2025 – 2028 (with a peak in 2025
promoters for the projects to be included in the of more than 10 billion €), with around 74 % of the
TYNDPs is made public by ENTSOG unless the data total expected cost to be experienced in those years
is deemed confidential by the respective project (see figure 30).
promoters.

Overview of total cost by project status (billion Euro) Overview of total cost by project status by infrastructure type
(billion Euro)
25 30

25
20

20
15

15

10
10

5
5

0 0
FID Advanced Less-Advanced TRA LNG UGS

Figure 28: Overview of total cost by project status for Figure 29: Overview of total cost by type of projects
TRA, LNG and UGS

12,000
Overview of costs by end commissioning year and project status (million Euro)

10,000

8,000

6,000

4,000

2,000

0
2022 2023 2024 2025 2026 2027 2028 2029 From 2030

FID Advanced Less-Advanced

Figure 30: Overview of total cost by last commissioning year and project status (TRA, LNG & UGS)

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 39
6.4.5 TYNDP 2022 SUBMISSIONS AND NATIONAL DEVELOPMENT PLANS
According to Article 8 of Regulation (EC) No. Following ACER recommendation, project promot-
715/2009, the Community-wide network devel- ers have been requested to always indicate if their
opment plan is required to build on national initiatives are part of the NDP. If not, the project
­investment plans. This does not prevent, from a promoters had to indicate the reason for its project
legal perspective, projects being submitted to the not being part of the NDP.
TYNDP although they are not part of a national
development plan (NDP), being the TYNDP a Furthermore, ENTSOG initiated a feedback loop
non-binding exercise. with ACER and National Regulatory Authorities
(NRAs) to collect relevant feedback and comments.

Country Part of NDP NOT Part of NDP Country Part of NDP NOT Part of NDP
AT 3 – HU 4 –

AZ – 1 IT 15 2

BA 3 – LT 1 –

BE 3 – LV – 4

BG 5 2 MT 1 –

CY – 1 NL 3 1

CZ 2 – PL 3 1

DE 24 2 RO 11 1

ES 1 1 SI 6 –

FR 5 1 SK 5 1

GR 8 8 TM – 1

HR 10 2 TR – 1

Table 6: Overview of projects being part or not of NDPs by country (TRA, LNG & UGS)

For the projects reported as not part of any NDP, promoters have generally indicated one of the following
reasons:

\ The NDP was prepared at an earlier date and \ The operators are not required to prepare and
the project will be proposed for inclusion in the publish an NDP.
next NDP edition17;
The provided reasons show that, in most of the
\ No NDP exists in the country where the project cases, a project is not part of any NDP for reasons
will be built; lying outside the control of the project promoters
himself. For further details, please refer to TYNDP
2022 Annex A.

17 It should be noted that the second project collection took place seven months after the first one, therefore it might be that the new projects submitted in
June 2022 were not included in their respective NDPs.

40 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
Picture courtesy of Gas Connect Austria

6.5 TYNDP 2022 PROJECTS BEING PART OF THE 5TH PCI


LIST
Every TYNDP edition ENTSOG collects ­information While the initial Project Collection for TYNDP 2022
also related to projects having already the PCI was ongoing, European Commission published
­status and projects that intend to apply to the the 5th PCI List in November 2021. S ­ ubsequently
­following PCI selection process (see  section 7.6). ­E NTSOG needed to review the relevant PCI
­information and when necessary updated the infor-
mation accordingly to be in line with the 5th PCI List.

In TYNDP 2022 there are 28 submissions with are part of the 5th PCI graphs below show the split of
these projects per maturity status and infrastructure type:

Projects with PCI status in the 5th PCI list by maturity status Projects with PCI status in the 5th PCI list by infrastructure status

18 %
25.0 % 28.6 %

11 %

71 %

46.4 %

FID Advanced Less-Advanced TRA LNG UGS

Figure 31: Projects having PCI status in the 5th PCI list Figure 32: Projects having PCI status in the 5th PCI list
by maturity status by infrastructure type

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 41
7 PROMOTERS’ SUBMISSIONS FOR HYD,
RET, BIO AND OTH INVESTMENTS FOR
TYNDP 2022
In TYNDP 2020 ENTSOG included a new but broad project category for Energy
Transition projects. For TYNDP 2022 ENTSOG decided to replace the former
ETR category with four new infrastructure categories.

The idea of this division was to allow more precise insights in different sector developments in particular in
the evolving low ­carbon and green gases and to reflect the revision of the TEN-E:

\ New or repurposed infrastructure to carry hydrogen (HYD)

\ Projects for retrofitting infrastructure to further integrate hydrogen (RET)

\ Biomethane development projects (BIO)

\ Other infrastructure related projects (OTH)

The new four categories have been introduced to European Commission and ACER together with the revised
Practical Implementation Document in a dedicated Webinar in June 2021.

161 projects consisting of 215 investments ­submissions have been included for TYNDP 2022 falling
under the four above mentioned infrastructure categories.

7.1 HYD PROJECTS


For TYNDP 2022 promoters submitted 99 projects (152 investment submissions) related to new or
­repurposed infrastructure to carry hydrogen:

\ 45 investments related to the repurposing \ 7 investments related to equipment or


of existing pipelines for hydrogen use; ­installation essential for the hydrogen system
to operate safely, securely and efficiently or to
\ 45 investments related to the construction enable bi-directional capacity, including
of on- or offshore pipelines to enable the ­compressor stations;
­transport of pure hydrogen;
\ 23 investments related to hydrogen
\ 3 investments related to the repurposing ­production with network related function;
of ­existing storages to enable the storage
of pure hydrogen; \ 2 investment enables the production,
­reception, injection, transportation, or end-use
\ 12 investments related to the construction supply of hydrogen;
of storages to enable the storage of pure
­hydrogen; \ 4 other hydrogen related investments.

\ 12 investments related to new liquefied


­hydrogen terminal including hydrogen  see maps in figure 33 on pages 44/45
­embedded in other chemical substances and figure 34 on pages 46/47
with the objective of injecting the hydrogen
into the grid;

42 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
Picture: istockphoto.com

7.2 RET PROJECTS


For TYNDP 2022 promoters submitted 13 projects related to investments for retrofitting
­infrastructure to further integrate hydrogen:

\ 8 investments regarding Retrofitting of e


­ xisting \ 1 investment regarding Retrofitting of existing
gas pipelines and other network related assets LNG terminal for blending (storage and/or
for (bio-)methane-hydrogen blending; ­injection to the natural gas grid).

\ 4 investments regarding Retrofitting of exist-


 see maps in figure 33 on pages 44/45
ing storages for H2 blending; and figure 34 on pages 46/47

7.3 BIO PROJECTS


For TYNDP 2022 promoters submitted ten biomethane development projects (eleven investment
submissions):

\ 3 projects enabling the reverse transportation \ 7 network development projects enabling


between DSO and TSO of biomethane; ­biomethane production/injection into the
gas grid.

 see map in figure 35 on pages 48/49

7.4 OTH PROJECTS


For TYNDP 2022 promoters submitted 39 Projects related to other infrastructure related projects:

\ 5 hydrogen production facilities other than the \ 4 projects related to the transport sector
ones included in category HYD; (incl. road, railway, aviation and maritime
­transport);
\ 3 projects enabling the production, reception,
injection, transportation, or end-use supply of \ 4 projects enabling gas–electricity integration;
hydrogen;
\ 9 projects related to the conversion of natural
\ 3 synthetic methane projects aiming at gas network for CO2 transport or storage;
­decarbonising the gas grids;
\ 2 any other infrastructure related projects.
\ 9 dedicated projects to reduce methane
­emission in existing infrastructure;
 see map in figure 35 on pages 48/49

Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report | 43
HYD-N-732 HU hydrogen corridor IV HU/SK Less-Adv. HYD-N-990 Central European Hydrogen Corridor (CZ part) Less-Adv.
HYD-N-754 ACE Terminal Less-Adv. HYD-N-991 AquaDuctus Less-Adv.
HYD-N-756 Negru Voda – Isaccea corridor modernization for hydrogen transm. Less-Adv. HYD-N-999 Giurgiu - Nădlac corridor modernization for hydrogen transmission Less-Adv.
HYD-N-757 H2 Backbone WAG + Penta West Less-Adv. HYD-N-1000 HyPerLink Less-Adv.
HYD-N-767 RWE H2 Storage expansion Gronau-Epe Less-Adv. HYD-N-1001 Danish-German Hydrogen Network Less-Adv.
HYD-N-771 H2ermes Less-Adv. HYD-N-1006 HELIOS Valley Less-Adv.
Less-Adv.

MAP FOR HYDROGEN (HYD) AND RETROFITTED (RET) PROJECTS IN TYNDP 2022
HYD-N-772 Infrastructure repurpose for H2 transmission in Slovakia HYD-N-1011 HyONE Network NL Less-Adv.
HYD-N-788 H2 transmission system in Bulgaria Less-Adv. HYD-N-1034 Czech German Hydrogen Interconnector (CZ part) Less-Adv.
HYD-N-789 HU hydrogen corridor V HU/RO Less-Adv. HYD-N-1035 Franco-Belgian H2 corridor Less-Adv.
HYD-N-790 Element Eins Less-Adv. HYD-N-1037 H2ercules Network North Less-Adv.
HYD-N-793 Delta Rhine Corridor H2 Less-Adv. HYD-N-1038 H2ercules Network West Less-Adv.
Less-Adv.
HYDROGEN INFRASTRUCTURE HYD-N-795 PoR import portfolio programme
RETROFITTING INFRASTRUCTURE
HYDROGEN
Less-Adv. FOR HYDROGEN
INFRASTRUCTURE
HYD-N-1052 H2ercules Network South
RETROFITTING INFRASTRUCTURE FOR HYDROGEN
HYD-N-796 FLOW East - Making Hydrogen Happen Less-Adv. HYD-N-1065 HU hydrogen corridor I HU/UA Less-Adv.
HYD-F-1304 HYPSTER FID Retrofitting : infrastructure upgrades to allowHYPSTER
HYD-F-1304 hydrogen blends FID Retrofitting : infrastructure upgrades to allow hydrogen blends
HYD-N-800 H2 Interconnector Bornholm-Lubmin (IBL) Less-Adv. HYD-N-1066 HU hydrogen corridor II HU/HR Less-Adv.
HYD-A-312 P2G Velke Kapusany Advanced RET-A-425 UGS Lab - H2 HYD-A-312 P2G Velke Kapusany Advanced Advanced RET-A-425 UGS Lab - H2 Advanced
HYD-N-802 RWE H2 Storage Staßfurt Less-Adv. HYD-N-1075 H2ercules Network North-West Less-Adv.
HYD-A-315 G2F - Gas to Future Advanced RET-A-1003 Power recovery with turboexpanderHYD-A-315
in Kardoskut UGS
G2F - Gas to Future Advanced Advanced RET-A-1003 Power recovery with turboexpander in Kardoskut UGS Advanced
HYD-N-818 RWE H2 Storage Xanten Less-Adv. HYD-N-1092 Metering and Regulating Station at UGS South Kavala Less-Adv.
HYD-A-396 Djewels 1 Advanced RET-N-483 L2DG (LNG to Decarbonised Gas) HYD-A-396 Djewels 1 Less-Adv. Advanced RET-N-483 L2DG (LNG to Decarbonised Gas) Less-Adv.
HYD-N-819 H2Med-BarMar (Teréga) Less-Adv. HYD-N-1096 RHYn Interco Less-Adv.
HYD-A-427 H2Pole Advanced RET-N-558 Retrofitting of the Bulgarian Gas Transmission
HYD-A-427SystemH2Pole Less-Adv. Advanced RET-N-558 Retrofitting of the Bulgarian Gas Transmission System Less-Adv.
HYD-N-820 Dunkerque New Molecules development Less-Adv. HYD-N-1098 Hydrogen seasonal storage in Latvia Less-Adv.
HYD-A-542 HyBRIDS Advanced RET-N-916 Blending readiness of the transmission system
HYD-A-542 HyBRIDS Less-Adv. Advanced RET-N-916 Blending readiness of the transmission system Less-Adv.
HYD-N-828 Green Hydrogen Hub Denmark - Electrolysis Less-Adv. HYD-N-1099 Ammonia Import Terminal Brunsbüttel Less-Adv.
HYD-A-549 Norway - Rotterdam Hydrogen Supply Chain Advanced RET-N-973 Retrofitting of existing Greek Transmission System Norway - Rotterdam Hydrogen SupplyLess-Adv.
HYD-A-549 Chain Advanced RET-N-973 Retrofitting of existing Greek Transmission System Less-Adv.
HYD-N-830 Green Hydrogen Hub Zuidwending Less-Adv. HYD-N-1100 Amplifhy Antwerp Less-Adv.
HYD-A-562 Energy Park Bad Lauchstädt Advanced RET-N-1044 Upgrade compressor control systemHYD-A-562
TH-W compressor unitsPark
Energy for H2
Bad Lauchstädt Less-Adv. Advanced RET-N-1044 Upgrade compressor control system TH-W compressor units for H2 Less-Adv.
HYD-N-833 Green Hydrogen Hub Drenthe Less-Adv. HYD-N-1120 Blue HyWest Less-Adv.
HYD-A-745 GO! - Green Octopus Storage Advanced RET-N-1049 H2RENGRID - Transport Network
HYD-A-745 GO! - Green Octopus Storage
Less-Adv. Advanced RET-N-1049 H2RENGRID - Transport Network Less-Adv.
HYD-N-834 HyONE-DE Less-Adv. HYD-N-1122 Nordic-Baltic Hydrogen Coridor - EE section Less-Adv.
HYD-A-770 H2-Fifty Advanced RET-N-1050 H2RENGRID - Carriço UGS
HYD-A-770 H2-Fifty
Less-Adv. Advanced RET-N-1050 H2RENGRID - Carriço UGS Less-Adv.
HYD-N-835 SK-HU H2 corridor Less-Adv. HYD-N-1127 Amplifhy Rotterdam Less-Adv.
RET-N-1081 Cross border gas transmission system retrofitting for hydrogen Less-Adv. RET-N-1081 Cross border gas transmission system retrofitting for hydrogen Less-Adv.
HYD-A-906 Vlieghuis-Ochtrup Advanced HYD-A-906 Vlieghuis-Ochtrup
HYD-N-1136 Nordic Hydrogen Route – Bothnian Bay – Finnish
Advanced
section Less-Adv.
HYD-N-846 Green Hydrogen Hub Harsefeld-Stade Less-Adv.
RET-N-1113 Replacement of chromatographs Less-Adv. RET-N-1113 Replacement of chromatographs Less-Adv.
HYD-A-968 GreenWilhelmshaven Terminal Advanced HYD-A-968 HYD-N-1137 Central European Hydrogen Corridor (UKR part) Advanced
GreenWilhelmshaven Terminal Less-Adv.
HYD-N-848 Baltic Sea Hydrogen Collector – Equipment [BHC] – Finland Less-Adv.
RET-N-1135 Retrofitting pipelines Less-Adv. RET-N-1135 Retrofitting pipelines Less-Adv.
HYD-A-992 GreenWilhelmshaven Electrolyser Advanced HYD-A-992 GreenWilhelmshaven Electrolyser Advanced Less-Adv.
HYD-N-849 FLOW West - Making Hydrogen Happen Less-Adv. HYD-N-1144 Nordic-Baltic Hydrogen Corridor - PL section
RET-N-1155 Gas system retrofitting for 100% H2 future capability Less-Adv. RET-N-1155 Gas system retrofitting for 100% H2 future capability Less-Adv.
HYD-A-996 Green Octopus Mitteldeutschland Advanced HYD-N-852 Green Hydrogen Hub Ahaus-Epe
HYD-A-996 Green Octopus Mitteldeutschland
Less-Adv. HYD-N-1149 Spanish hydrogen backbone Advanced Less-Adv.
HYD-A-1238 DK Hydrogen Storage Advanced HYD-N-854 H2 Interconnector Bornholm-Lubmin (Energinet)
HYD-A-1238 DK Hydrogen Storage HYD-N-1151 H2Med-BarMar (GRTgaz)
Less-Adv. Advanced Less-Adv.
HYD-A-1279 Hystock Opslag H2 Advanced HYD-N-855 Xanten-Voerde-Oberhausen
HYD-A-1279 Hystock Opslag H2
Less-Adv. HYD-N-1153 H2Med-BarMar (Enagás) Advanced Less-Adv.
HYD-N-385 South Kavala Underground Gas Storage facility Less-Adv. HYD-N-874 Green Hydrogen Hub Leer
HYD-N-385 South Kavala Underground
Less-Adv. Gas Storage
HYD-N-1152 H2facility
storage North-2 Less-Adv. Less-Adv.
HYD-N-440 H2 Transmission pipelines HyDeal España Less-Adv. HYD-N-876 Leverkusen-Cologne
HYD-N-440 H2 Transmission pipelines
Less-Adv. HyDeal España
HYD-N-1156 H2Med/CelZa Less-Adv. Less-Adv.
HYD-N-442 SLOP2G Less-Adv. HYD-N-883 Green Hydrogen Hub Moeckow SLOP2G
HYD-N-442 Less-Adv. HYD-N-1159 bp Wilhelmshaven Green Hydrogen Hub Less-Adv. Less-Adv.
HYD-N-443 Nordic-Baltic Hydrogen Corridor - FI section Less-Adv. HYD-N-884 CHE Pipeline
HYD-N-443 Nordic-Baltic HydrogenHYD-N-1171
Less-Adv. Corridor - FI section Less-Adv.
Nordic Hydrogen Route - Bothnian Bay- Swedish section Less-Adv.
HYD-N-468 National H2 Backbone Less-Adv. HYD-N-885 East-West Connection National H2 Backbone HYD-N-1176 Aukra Hydrogen Hub
HYD-N-468 Less-Adv. Less-Adv. Less-Adv.
HYD-N-508 H2 storage North-1 Less-Adv. HYD-N-894 Green Hydrogen Hub Etzel H2 storage North-1
HYD-N-508 Less-Adv. HYD-N-1205 Italian H2 Backbone Less-Adv. Less-Adv.
HYD-N-543 H2Sines.Rdam Less-Adv. HYD-N-899 mosaHYc - Mosel Saar Hydrogen Conversion H2Sines.Rdam
HYD-N-543 Less-Adv. HYD-N-1206 HU hydrogen corridor IV-1. HU/SK Less-Adv. Less-Adv.
HYD-N-544 Hydrogen Cifer Less-Adv. HYD-N-917 HyPerLink-Ruhr Area Connection Hydrogen Cifer
HYD-N-544 Less-Adv. HYD-N-1236 DK Hydrogen Pipeline, West DK Hydrogen System Less-Adv. Less-Adv.
HYD-N-565 GeoH2 Less-Adv. HYD-N-926 Baltic Sea Hydrogen Collector – Offshore Pipeline [BHC] – Sweden GeoH2
HYD-N-565 Less-Adv. HYD-N-1237 Croatia-Slovenia-Austria H2 corridor Less-Adv. Less-Adv.
HYD-N-569 HY-FEN – H2 Corridor Spain – France – Germany connection Less-Adv. HYD-N-931 Baltic Sea Hydrogen Collector – Equipment [BHC] – Sweden HY-FEN – H2 Corridor Spain
HYD-N-569 Less-Adv. – France – Nordic-Baltic
HYD-N-1239 Germany connection
Hydrogen Corridor - LT section Less-Adv. Less-Adv.
HYD-N-601 Hydrogen Imports to Rotterdam Less-Adv. HYD-N-933 Wilhelmshaven-HyPerLink-Connection Hydrogen Imports to Rotterdam
HYD-N-601 Less-Adv. HYD-N-1249 CHE Production Facility Less-Adv. Less-Adv.
HYD-N-608 Black Sea – Podișor Pipeline modernization for hydrogen transm. Less-Adv. HYD-N-934 SaltHy Harsefeld Black Sea – Podișor Pipeline
HYD-N-608 Less-Adv. modernization
HYD-N-1255 for hydrogen
H2 repurposing transm.
interconnection HR-HU Less-Adv. Less-Adv.
HYD-N-619 H2 interconnection Croatia/Slovenia (Lučko-Zabok-Rogatec) Less-Adv. HYD-N-939 H2morrow Steel
HYD-N-619 H2 interconnection Croatia/Slovenia
Less-Adv. HYD-N-1259 (Lučko-Zabok-Rogatec)
HU hydrogen corridor V-1. HU/RO Less-Adv. Less-Adv.
HYD-N-625 Onești – Ungheni corridor modernization for hydrogen transmission Less-Adv. HYD-N-942 Lacq Hydrogen
HYD-N-625 Onești – Ungheni corridor
Less-Adv. modernization
HYD-N-1264 for hydrogen
Central Europeantransmission
Hydrogen Corridor (SK part) Less-Adv. Less-Adv.
HYD-N-626 Hydrogen Imports to Hamburg Less-Adv. HYD-N-968 Green Wilhelmshaven Terminal/Storage/Cracker Hydrogen Imports to Hamburg
HYD-N-626 Less-Adv. HYD-N-1272 Network related electrolyser in South of Italy (SicilyLess-Adv.
and Apulia) Less-Adv.
HYD-N-633 GETH2-IPCEI Less-Adv. HYD-N-969 RHYn
HYD-N-633 GETH2-IPCEI
Less-Adv. HYD-N-1273 Guitiriz - Zamora H2 Pipeline Less-Adv. Less-Adv.
HYD-N-640 Isaccea - Jupa corridor modernization for hydrogen transmission Less-Adv. HYD-N-970 Dedicated H2 Pipeline
HYD-N-640 Isaccea - Jupa corridor modernization
Less-Adv. HYD-N-1274 H2 for supply
hydrogen transmission
system Croatia - North Less-Adv. Less-Adv.
HYD-N-642 HyPipe Bavaria – The Hydrogen Hub Less-Adv. HYD-N-978 Portuguese Hydrogen Backbone
HYD-N-642 HyPipe Bavaria – The Hydrogen
Less-Adv. Hub Nordic-Baltic Hydrogen Corridor - LV section
HYD-N-1280 Less-Adv. Less-Adv.
HYD-N-647 Vadu – T1 pipeline modernization for hydrogen transmission Less-Adv. HYD-N-647 Vadu – T1 pipeline modernization
HYD-N-1281for hydrogen transmission
HU hydrogen Less-Adv.
corridor III, Slovenian-Hungarian interconnector Less-Adv.
HYD-N-981 Damasławek Hydrogen Storage Less-Adv.
HYD-N-648 Romania - Serbia Interconn. modernization for hydrogen transm. Less-Adv. HYD-N-983 Polish Hydrogen Backbone Infrastructure
HYD-N-648 Romania - Serbia Interconn.
Less-Adv. modernization
HYD-N-1291 for hydrogen transm.
Hynframed Less-Adv. Less-Adv.
HYD-N-661 Adjustment of existing eus pipeline SK-HU Less-Adv. HYD-N-986 H2 Readiness of the TAG pipeline system
HYD-N-661 Adjustment of existing eus
Less-Adv. pipeline SK-HU
HYD-N-1307 H2 supply system Croatia - South Less-Adv. Less-Adv.
HYD-N-664 Antwerp NH3 Import Terminal Less-Adv. HYD-N-987 mosaHYc (Mosel Saar Hydrogen Conversion) - Germany
HYD-N-664 Antwerp NH3 Import Terminal
Less-Adv. HYD-N-1310 Nordic-Baltic Hydrogen Corridor - DE section Less-Adv. Less-Adv.
HYD-N-730 Coroi - Medieșu Aurit corridor modernization for hydrogen transm. Less-Adv. HYD-N-989 doing hydrogen Coroi - Medieșu Aurit corridor
HYD-N-730 Less-Adv. modernization
HYD-N-1311 Belgianfor hydrogen
Hydrogen transm.
Backbone Less-Adv. Less-Adv.
HYD-N-732 HU hydrogen corridor IV HU/SK Less-Adv. HYD-N-990 Central European Hydrogen Corridor (CZ part) HU hydrogen corridor IVHYD-N-1324
HYD-N-732 Less-Adv. HU/SK H2Med-CelZa (Enagás) Less-Adv. Less-Adv.
HYD-N-754 ACE Terminal Less-Adv. HYD-N-991 AquaDuctus ACE Terminal
HYD-N-754 Less-Adv. HYD-N-1325 Zeebrugge New Molecules development Less-Adv. Less-Adv.
HYD-N-756 Negru Voda – Isaccea corridor modernization for hydrogen transm. Less-Adv. HYD-N-999 Giurgiu - Nădlac corridor modernization for hydrogen transmission Negru Voda – Isaccea corridor
HYD-N-756 Less-Adv. modernization
HYD-N-1339 Aukra H2forPipeline
hydrogen transm. Less-Adv. Less-Adv.
HYD-N-757 H2 Backbone WAG + Penta West Less-Adv. HYD-N-1000 HyPerLink H2 Backbone WAG + Penta
HYD-N-757 Less-Adv. West
HYD-N-1352 HySoW (Hydrogen South West corridor of France) Less-Adv. Less-Adv.
HYD-N-767 RWE H2 Storage expansion Gronau-Epe Less-Adv. HYD-N-1001 Danish-German Hydrogen Network RWE H2 Storage expansion
HYD-N-767 Less-Adv. Gronau-EpeH2 Backbone Murfeld
HYD-N-1354 Less-Adv. Less-Adv.
HYD-N-771 H2ermes Less-Adv. HYD-N-1006 HELIOS Valley H2ermes
HYD-N-771 Less-Adv. HYD-N-1355 Less-Adv.
Baltic Sea Hydrogen Collector – Offshore Pipeline [BHC] – Finland Less-Adv.
HYD-N-772 Infrastructure repurpose for H2 transmission in Slovakia Less-Adv. HYD-N-1011 HyONE Network NL Infrastructure repurposeHYD-N-1356
HYD-N-772 Less-Adv. for H2 transmission in Slovakia
Italy-Slovenia-Hungary H2 corridor Less-Adv. Less-Adv.
HYD-N-788 H2 transmission system in Bulgaria Less-Adv. HYD-N-1034 Czech German Hydrogen Interconnector (CZ part) H2 transmission system in Bulgaria
HYD-N-788 Less-Adv. Less-Adv.
HYD-N-789 HU hydrogen corridor V HU/RO Less-Adv. HYD-N-1035 Franco-Belgian H2 corridor HU hydrogen corridor V HU/RO
HYD-N-789 Less-Adv. Less-Adv.
HYD-N-790 Element Eins Less-Adv. HYD-N-1037 H2ercules Network North Element Eins
HYD-N-790 Less-Adv. Less-Adv.
HYD-N-793 Delta Rhine Corridor H2 Less-Adv. HYD-N-1038 H2ercules Network West Delta Rhine Corridor H2
HYD-N-793 Less-Adv. Less-Adv.
HYD-N-795 PoR import portfolio programme Less-Adv. HYD-N-1052 H2ercules Network South HYD-N-795 Less-Adv.
PoR import portfolio programme Less-Adv.
HYD-N-796 FLOW East - Making Hydrogen Happen Less-Adv. HYD-N-1065 HU hydrogen corridor I HU/UA HYD-N-796 Less-Adv.
FLOW East - Making Hydrogen Happen Less-Adv.
Figure 33:H2Map
HYD-N-800
for Hydrogen (HYD) and Retrofitted (RET)
Interconnector Bornholm-Lubmin (IBL)
projects in HYD-N-1066
Less-Adv.
TYNDP HU 2022
hydrogen corridor II HU/HR HYD-N-800 Less-Adv.
H2 Interconnector Bornholm-Lubmin (IBL) Less-Adv.
HYD-N-802 RWE H2 Storage Staßfurt Less-Adv. HYD-N-1075 H2ercules Network North-West HYD-N-802 Less-Adv.
RWE H2 Storage Staßfurt Less-Adv.
HYD-N-818 RWE H2 Storage Xanten Less-Adv. HYD-N-1092 Metering and Regulating Station at UGS South Kavala HYD-N-818 Less-Adv.
RWE H2 Storage Xanten Less-Adv.
Download
HYD-N-819 the map from
H2Med-BarMar ENTSOG website:
(Teréga) Less-Adv. HYD-N-1096 RHYn Interco HYD-N-819 Less-Adv.
H2Med-BarMar (Teréga) Less-Adv.
HYD-N-820 Dunkerque New Molecules development Less-Adv. HYD-N-1098 Hydrogen seasonal storage in Latvia HYD-N-820 Less-Adv.
Dunkerque New Molecules development Less-Adv.
Just click on the icon.
HYD-N-828 Green Hydrogen Hub Denmark - Electrolysis Less-Adv. HYD-N-1099 Ammonia Import Terminal Brunsbüttel HYD-N-828 Less-Adv.
Green Hydrogen Hub Denmark - Electrolysis Less-Adv.
HYD-N-830 Green Hydrogen Hub Zuidwending Less-Adv. HYD-N-1100 Amplifhy Antwerp HYD-N-830 Less-Adv.
Green Hydrogen Hub Zuidwending Less-Adv.
HYD-N-833 Green Hydrogen Hub Drenthe Less-Adv. HYD-N-1120 Blue HyWest HYD-N-833 Less-Adv.
Green Hydrogen Hub Drenthe Less-Adv.
HYD-N-834 HyONE-DE Less-Adv. HYD-N-1122 Nordic-Baltic Hydrogen Coridor - EE section HYD-N-834 Less-Adv.
HyONE-DE Less-Adv.
HYD-N-835 SK-HU H2 corridor Less-Adv. HYD-N-1127 Amplifhy Rotterdam HYD-N-835 Less-Adv.
SK-HU H2 corridor Less-Adv.
HYD-N-846 Green Hydrogen Hub Harsefeld-Stade Less-Adv. HYD-N-1136 Nordic Hydrogen Route – Bothnian Bay – Finnish section HYD-N-846 Less-Adv.
Green Hydrogen Hub Harsefeld-Stade Less-Adv.
HYD-N-848 Baltic Sea Hydrogen Collector – Equipment [BHC] – Finland Less-Adv. HYD-N-1137 Central European Hydrogen Corridor (UKR part) HYD-N-848 Less-Adv.
Baltic Sea Hydrogen Collector – Equipment [BHC] – Finland Less-Adv.
HYD-N-849 FLOW West - Making Hydrogen Happen Less-Adv. HYD-N-1144 Nordic-Baltic Hydrogen Corridor - PL section HYD-N-849 Less-Adv.
FLOW West - Making Hydrogen Happen Less-Adv.
HYD-N-852 Green Hydrogen Hub Ahaus-Epe Less-Adv. HYD-N-1149 Spanish hydrogen backbone HYD-N-852 Less-Adv.
Green Hydrogen Hub Ahaus-Epe Less-Adv.
HYD-N-854 H2 Interconnector Bornholm-Lubmin (Energinet) Less-Adv. HYD-N-1151 H2Med-BarMar (GRTgaz) HYD-N-854 Less-Adv.
H2 Interconnector Bornholm-Lubmin (Energinet) Less-Adv.
HYD-N-855 Xanten-Voerde-Oberhausen Less-Adv. HYD-N-1153 H2Med-BarMar (Enagás) HYD-N-855 Less-Adv.
Xanten-Voerde-Oberhausen Less-Adv.
HYD-N-874 Green Hydrogen Hub Leer Less-Adv. HYD-N-1152 H2 storage North-2 HYD-N-874 Less-Adv.
Green Hydrogen Hub Leer Less-Adv.
HYD-N-876 Leverkusen-Cologne Less-Adv. HYD-N-1156 H2Med/CelZa HYD-N-876 Less-Adv.
Leverkusen-Cologne Less-Adv.
HYD-N-883 Green Hydrogen Hub Moeckow Less-Adv. HYD-N-1159 bp Wilhelmshaven Green Hydrogen Hub HYD-N-883 Less-Adv.
Green Hydrogen Hub Moeckow Less-Adv.
44 HYD-N-884
| Ten-YearCHENetwork
Pipeline Development Plan 2022 – The hydrogen and naturalHYD-N-1171
Less-Adv. gas TYNDP | Infrastructure
Nordic Hydrogen Report
Route - Bothnian Bay- Swedish section HYD-N-884 Less-Adv.
CHE Pipeline Less-Adv.
HYD-N-885 East-West Connection Less-Adv. HYD-N-1176 Aukra Hydrogen Hub HYD-N-885 Less-Adv.
East-West Connection Less-Adv.
HYD-N-894 Green Hydrogen Hub Etzel Less-Adv. HYD-N-1205 Italian H2 Backbone HYD-N-894 Less-Adv.
Green Hydrogen Hub Etzel Less-Adv.
BERYL Haugesund
Avaldsnes
Karmøy
Karlstad STOCKHOLM Paldiski
TALLINN Narva
Kårstø Örebro
HYD-N-884 Bygnes Fredrikstad

ED
Stokke
HYD-N-1249

RL
Järna Nevsk

IPE A
TE

II
IIB
KA
GRANE

S
HYD-N-1122 Slantsy

ZE IPE

E
VE

AT
FU
Rafnes

BHC
EP
UTS

NS
CH
EP
E
ESTONIA

ZE
CH

DE
E
KEYS Stavanger Brunnsviksholmen

PIP
IRA

ON
(Nynäshamn)

AT

RC
Risavika

ST
BRAE EDVARD GRIEG

NE
Mariestad

EIP
HYD-N-884
Cross-border points / intra-country or intra balancing zone points

SL
GUDRUN Norrköping
JOHAN SVERDRUP Velikiya Novgorod

GE
Lidköping

SA
Linköping Borovichi
Cross-border interconnection point Cross-border interconnection point

ON)
Pärnu Puiatu
HYD-N-848

R
Lysekil Mlölby

LE
within Europe within Europe

RATI
MIL
SLEIPNER HYD-N-926
or export point to non-EU country or export point to non-EU country OUTER

OPE
Stenungsund
HEBRIDES
k HYD-N-931

de
Vallby Kile Valdai
Under construction or Planned GOLDENEYE a

OT IN
DRAUPNER HYD-N-1355
rr
Karksi

bri
ATLANTIC
Gulf of

M I (N
Cross-border interconnection point Cross-border third country (import) BRITANNIA e Riga Värska
Pskov Vichni Volochok

EURO
He
REV Göteborg
with third country (import) Under construction or Planned

REA
NNIA a JönKöping
Luhamaa
k

TH

PIPE
BRITA

D ST
Misso Izborsk

he
S

SOU
FORTIES HYD-N-1280
Cross-border interconnection point
RUSSIA

II

NOR
EVEREST Gnosjö
Third country cross-border St. Fergus Korneti

f t
Gislaved

GELED
GOTLAND RET-N-1081
(Virtual Point) (Virtual Point / import) FULMAR
Torzhok

a o

LAN
Skulte
Intra-country or Third country cross-border

Se
Aalborg
intra balancing zone points interconnection point ULA
Varberg
RIGA
HYD-N-1098

Ka
Incukalns

LNG Import terminal LNG Import terminal INNER


ELGIN FRANKLIN Ljungby
L AT V I A Tver

tt
GYDA
(operational) (Under construction or planned) HEBRIDES HYD-N-1280

North
Kalmar
HYD-A-1238 RET-N-1081

eg
EKOFISK HYD-N-828 Halmstad
LNG Export terminal LNG Export terminal Lille Torup Liepaja Iecava Rezekne
(operational)
Sea

at
(Under construction or planned) HARALD C
VALHALL BH

DENMARK Rzhev

EUR
HOD SYD
Kiemėnai

OP
ARNE Helsingborg Kristianstadt
HYD-N-884

IPE
Kuršėnai
Gas Reserve areas Countries HYD-N-1239

I
Glasgow Edinburgh KKP Daugavpils

SEAL
TYRA BALTIC PIP Siauliai
Gas field Drilling platform E

S
Kubink
Other Countries EU Countries No COPENHAGEN

CAT
Klaipéda HYD-N-1239
Klaipéda LNG
rt (FSRU Independence) Panevėžys

EUROPIP
h Egdved

a
Malmö

Baltic Se
Ch Nybro Visaginas Navapolatsk
an
LITHUANIA
HYD-N-991 HYD-N-884 Odense Kongsmark Dragør
ne

E II
l HYD-N-834
Transport by pipeline LH2/NH3 Terminals and Plants Nyborg Trelleborg HYD-N-848 HYD-N-1239

AQ
B/13 Faxe Vitebsk

AQ
Moffat
B/13

CH CTU
UA yON PIP
HYD-N-1236 Dorogobuzh
Jurbarkas

E (O S

CH CTU
BORNHOLM

DU

UA yON PIP
Existing infrastructure for natural gas :
Kaliningrad
HYD-N-1236

H RO E
BALTIC PIPE (FSRU)

pt
LH2/NH3 Terminals’ entry point

E(
DU
Jauniunai

io
EU RPIP

Op
Šakiai

n
HYD-N-800
Diameter < 600 mm

NO
intro transmission system

H RO E
2)
E EI
Londonderry IP Twynholm Kaunas
SN

tio
/ Derry HYD-N-1159 HYD-N-854

ZEEPIPE
FRANPIPE

EU RPI
HYD-A-549
Operational Brighouse Bay VIP DK-THE

n
VILNIUS

S
NOGAT
HYD-N-1120 Ellund Smolensk
Diameter 600 - 900 mm

NO

2)
E EI
OR
Carrickfergus Teesside HYD-N-626 NE
CT IN
HYD-N-1099 ON - LUBM HYD-N-1239 Kotlovka
HYD-N-1159
RC Kaliningrad
LH2/NH3 Plants’ export point HYD-N-796 INTE HOLM L)
RUSSIA

ZEEPIPE
FRANPIPE
HYD-N-968
HYD-A-549
RN (IB K
Diameter > 900mm Belfast Middlesbrough BO
Gdansk (FSRU) VIP DK-THE

GIPL

NOGAT

P
Ellund

DEUD
HYD-N-1120

BALT
BREAGH HYD-A-968
HYD-N-983
Not operational CORRIB AQUADUCT HYD-A-992 AL
Orsha
HYD-N-626 HYD-N-1099

IC PI
E US
YAM

AN
Kiel
Bellanaboy
ON Gdansk Santaka Krupskaya
FID projects ISLE OF MAN
Hy
Helgoland HYD-N-796

PE
Killeen CM
S
HyONE
HYD-N-1001
Lubmin
HYD-N-968 Kirov
R2 NG HYD-N-626
Barrow

DEUD
AQ
Douglas MURDOCH Greifswald
HYD-N-1011 Rostock
HYD-A-968

UA
TO T Cher

Hy E
Hydrogen infrastructure Non-FID, advanced projects Lubmin II

DU
C HYD-N-1099

ON
CH
Świnoujście
NE

R1
Olsztyn

CT
Kamminke
Irish

E
ON AQUADUCTU HYD-A-992

US
MINSK

TO
Quarnstedt Mogilev
New RC E S

AN
HyONE Moeckow
IRELAND
HYD-N-883

EC
HYD-N-1037
ON
TE Leeds W. SOLE MARKHAM
Brunsbüttel Płoty
Non-FID, less-advanced projects Sea Levitzow

NN
IN HYD-N-1011
Hy
AMETHYST Helgoland
HyONE

CO
New and conversion Gormanston Dornum
HYD-N-790 Wilhelmshaven Stade Schwerin
NE
L HYD-N-1001

ER
SEAL

L
Easington NGT Hamburg

GIP
HYD-N-1011 WAL Police
NG HYD-N-626

AQ
INT
Manchester AUDREY Krummhörn Sülstorf
S HYD-N-796 HYD-N-1011

UA
Eemshaven HYD-N-894 Sionim
T

Hy E
Conversion of existing infrastructure Loughshinny CM HYD-N-1144

HyONE
Point of Ayr Harsefeld

DU
HYD-N-1099

ON
HYD-A-396 Etzel NEL Nezvizhskaya

CH
NET
HYD-N-846 Szczecin

CT
GALLEON Jemgum Kraak

E
DUBLIN Emden L Osipovich

RA
Theddlethorpe LANCELOT HYD-N-830 oPo

US
Retrofitted infrastructure Uniszki Zawadzkie
Quarnstedt

EUGAL
Galway HYD-N-933 HYD-N-934 EuR Bryansk
HyONE

T
Groningen Folmhusen

OPAL
Tietierowka

GA
Oude Bünde Wardenburg Schwedt HYD-N-1037 Brunsbüttel
BELARUS
Bremen HYD-N-1144 MARKHAM

L
NO
LEMAN Statenzijl Barßel EuRoPoL

NE
HYD-N-989 Damaslawek
Julianadorp
HYD-N-833 HYD-A-1279 HYD-N-874 HYD-N-1000 Kondratki Babryusk HYD-N-1011 Orel
HYD-N-981
Maritime transport for hydrogen HEWETT Balgzand Steinitz Dornum
HYD-N-790 Wilhelmshaven Stade

G
Gustorzyn L
BBL SEAAL

RH
HYD-N-917 HYD-N-983
NGT Hamburg

L
Bacton Vlieghuis Point of Interconnection
Oranienburg
HYD-N-1011

NE
Płońsk W
LH2/NH3 import route Wieringermeer Lingen Nordlohne (PWP) PL HYD-N-1144 Krummhörn

INTE
Limerick HYD-N-633
T H E N E T H ELelystad
RLANDS HYD-A-906 HYD-A-906 BERLIN EuRoPoL Wloclawek Eemshaven HYD-N-894
UNITED
Mallnow

HyONE
Rembelszczyzna
HYD-N-1000 Pogar Harsefeld

RCO
Shannon LNG Birmingham Rehden HYD-A-396 Gomel Etzel

NET
Zwolle

L
HYD-N-771
Ijmuiden Kienbaum Lwówek

WA
Ahlten
Hydrogen production Wolfsburg HYD-N-1310 Wysokoje HYD-N-846

NO
VIP TTF-THE-H Emsbüren Drohne Jemgum

NNEC
Poznan
AMSTERDAM HYD-N-1037 Hannover Emden Kromy

RA
Hołowczyce

KINGDOM
VIP TTF-THE-L HYD-N-633 HYD-N-1310 HYD-N-830
Warwick
Waterford HYD-A-549 HYD-N-468 Apeldoorn HYD-N-767 HYD-N-1099 HYD-N-933 HYD-N-934

TOR
HYD-N-795 HYD-A-996 Groß Köris HYD-N-1144

T
H2 infrastructure / production Enschede Ochtrup Magdeburg
HYD-N-989 WARSAW Groningen Folmhusen

GA
Den Haag Kobryn
HYD-A-770 Utrecht HYD-N-852 Epe Legden
Salzgitter
AL Radeland Eisenhüttenstadt Oude Bünde Wardenburg
JAG Mozyr Bremen

L
Winterswijk

NO
HYD-N-754 Statenzijl Barßel

NE
Rotterdam Zevenaar HYD-N-885 Guben Gubin
Münster
Cork Milford Haven HYD-N-543 Nijmegen Elten Staßfurt HYD-N-849 Julianadorp
HYD-N-833 HYD-A-1279 HYD-N-874 HYD-N-1000

EUGAL
K

OPAL
Dragon LNG HYD-N-601 Ravenstein HYD-N-885 HYD-N-983

L
IN
HYD-N-917 HYD-N-802
Project identification : Project identification : GCP GAZ-SYSTEM/ONTRAS Lodz Kursk

DA
EL
South Hook LNG HYD-N-793

ZE
HYD-N-1127 Balgzand

G
Moerdijk Voerde Werne

WE
HYD-N-818 Odolanów
GERMANY BBL

RH
KINSALE HEAD Tilburg Xanten
HYD-N-989 HYD-N-917

L
HYD-N-1037 Bernburg
Cardiff Vlieghuis
POLAND

NE
VIP BENE HYD-N-855
ENTSOG project code SEVEN HEADS Vlissingen Hilvarenbeek Dortmund
HYD-N-796 Wieringermeer Lingen Nordlohne
HYD-N-123 ENTSOG project code HYD-N-123 Isle of Grain Essen

MIDAL
HYD-N-1325 Poppel Wronów
l LONDON Zandvliet HYD-N-793 Duisburg HYD-N-633 HYD-N-939 Bad Lauchstädt
HYD-N-633
Ch
an
ne Zeebrugge Terneuzen Venlo
Leipzig T H E N E T H ELelystad
RLANDS HYD-A-906 HYD-A-906

EUGAL
HYD-N-1075 HYD-A-562

OPAL
Tegelen
ol Dunkerque Brugge Zelzate Antwerpen
HYD-N-793
Lasów
HYD-N-1000
ist HYD-A-745
K Lublin Rehden
IN Düsseldorf Kassel Zwolle

L
Br EL
HYD-N-771
Ijmuiden

WA
HYD-N-664 HYD-N-1100 HYD-N-1038 Sudzha
HYD-N-820 ZE Ahlten

NO
Dresden Wroclaw VIP TTF-THE-H Emsbüren Drohne
Storage facilities
Alveringem
Gent Opwijk Obbicht
Dilsen Chemelot Köln HYD-N-1099
Sayda AMSTERDAM HYD-N-1037
VIP TTF-THE-L HYD-N-633 SumyHannover
Storage facilities for hydrogen VIRTUALYS
Broichweiden
HYD-N-876 HYD-N-849 HYD-N-983 Lutsk
HYD-N-1035 BRUSSELS ‘s Gravenvoeren Weisweiler STEGAL HYD-N-983
HYD-A-549 HYD-N-468 Apeldoorn HYD-N-767 HYD-N-1099U
Lille Eynatten
Bocholtz
Raeren/LichtenbuschHYD-N-1038 Deutschneudorf Olbernhau HYD-N-795 Enschede Ochtrup UP ress
HYD-N-1311
Acquifer New VIP THE-ZTP
HYD-N-1099
Reckrod Hora Svaté Kateřiny Rozwadów (Charzewice)
HYD-A-770 Den Haag
Epe Legden Pro
g
HYD-N-543 Herbstein
VIP Brandov Utrecht HYD-N-852
Tworzen
HYD-N-754 Winterswijk
Salt cavity - cavern BELGIUM KYIV HYD-N-885

EKKR
New and conversion Quévy
Kędzierzyn-Koźle
Rotterdam Zevenaar

TE
Koblenz Münster
l Blaregnies HYD-N-1038 HYD-N-849 Hradec Králové HYD-N-543 Zhytomyr Nijmegen Elten

NP
Depleted (Gas) field on shore / offshore nne HYD-N-1035 Taisnières HYD-N-793 Racibórz Katowice
Cha Oświęcim

K
OF HYD-N-1034 Jaroslaw HYD-N-601 Ravenstein e
of Ukrain HYD-N-885

L
IN
ISLES Frankfurt
Conversion of existing infrastructure lish HYD-N-917
CZECH v - West

DA
EL
AL
Y
SCILL
Eng PRAGUE HYD-N-793 Kyi

ZE
Kharkiv
Bras
MID
Rzeszow HYD-N-1127 Moerdijk Voerde Werne

WE
Other type Hať Skoczów
HYD-N-818
GERMA
Pogórska Wola
Drozdwicze Drozdovychi Lviv Tilburg
REPUBLIC
GDLux (BE) / Rimpar Xanten
Bras Petange (LU) LUX. Plzeň
STORK
Cieszyn HYD-N-983 VIP BENE Hilvarenbeek HYD-N-1037
Cherbourg
LUX.
Gernsheim
Würzburg HYD-N-1052 Rothenstadt Hermanowice Vlissingen HYD-N-855 UPU orod) Dortmund
Ternopil -UzhgEssen
y-Pomary
Le Havre Pétange Forchheim

MIDA
FID projects Remich MEG Waidhaus Zandvliet Poppel
FSRU LE HAVRE Gournay HYD-N-1052
AL
Lampertheim AL HYD-N-793 (UrengoDuisburg HYD-N-633 HYD-N-939 Poltava
Perl
MEG MEGAL Strachocina
Zeebrugge Terneuzen VenloPROGRESS
Project identification : Kaiserslautern Nürnberg

L
Non-FID, advanced projects HYD-N-899 Völklingen Schwandorf
Tegelen HYD-N-1075 Z

L
Antwerpen Vinnytsia
SOYU

GA
Bezměrov Žilina
HYD-N-1038 ME HYD-N-990 Výrava Brugge Zelzate HYD-N-793

ME
Caen HYD-N-987 TE
NP HYD-N-1052 GA Brno K
Obergailbach
L Poprad LIN Düsseldorf Kremenchuk Kassel I
Non-FID, less-advanced projects HYD-N-123 ENTSOG project code Medelsheim Karlsruhe HYD-N-664 HYD-N-1100 ZE
E HYD-N-1038 KR

LSF
Cheppy
SLOVAKIA SD
Regensburg Ivano-Frankivsk
N
SC ORD HYD-N-544 České Budějovice
Dolni Bojanovice
Dolyna Gent Opwijk Obbicht
HYD-N-1137 HYD-N-1099
U K R A IChemelot
NE
Lannion HYD-N-569 Au am Rhein
LE HW
ITU AR Arresting
Köln
Strasbourg
NG ZW
AL HYD-N-849 Břeclav Jablonov Košice Alveringem Dilsen
PARIS D
RET-N-916 Nad Turňou Bohorodchany

P
Leonberg Lanžhot Broichweiden
Stuttgart HYD-N-642

TEN
VIRTUALYS k

LFF
Saint-Arnould
Nancy Oberkappel Kuty
Lakšárska Nová Ves HYD-N-772 Vel’ké Kapušany Uzhhorod HYD-N-876
nc
hu
Wertingen HYD-N-642
WAG Láb RET-N-916 Zvolen Budince
BRUSSELS ‘s Gravenvoeren Weisweiler e

CZATi
des Bois
HYD-F-1304 HYPSTER FID Brest ES
T
HYD-N-757
HYD-A-315
RET-A-425
HYD-N-772 HYD-N-1264
HYD-A-312
Oleksiivka Bocholtz
-
Raeren/LichtenbuschHYD-N-1038
Kr
em Kropyvnytskyi Dnipro
Morelmaison
MONA
CO Burghausen W
HYD-N-544 Nitra
HYD-N-1264 Zlievce
Vel’ké Lille HYD-N-1311 Eynatten iv
an
A
/Uberackern NT HYD-N-757 Reckrod
Dierrey-Saint-Julien
HYD-N-569 HYD-N-1096 München Finsing PE Linz Baumgarten Beregdaróc VIP THE-ZTP
HYD-N-1099 An
Haiming BRATISLAVA Ivánka Pri Nitre HYD-N-835

Atlantic Ocean
Rennes Wolfersberg Beregovo
VIENNA Selešťany Herbstein
Project ENTSOG code Project Name & Promoter Project status code HYD-N-642 Balassagyarmat HYD-N-661
HYD-N-1065
VIP BEREG

HAG
HYD-N-849 Inzenham Kittsee Tekovo Siret
Le Mans Orleans Voisines HYD-N-969 Freiburg im Breisgau
Haidach Mediesu Aurit Quévy BELGIUM

TE
Krozingen HYD-N-1065 Koblenz Kryvyi Rih Zaporizhzhia
Project not marked on map Salzburg Mosonmagyaróvár HYD-N-732
Blaregnies HYD-N-1038 HYD-N-849

NP
HYD-N-1206 Satu Mare Ananiv
Mulhouse Thayngen Kiefersfelden
Dorog
Szada HYD-N-1035 Taisnières HYD-N-793
SDKRI Nikopol
Exact project location is not available or is marked as confidential Oltingue
VIP
Germany-CH
Fallentor
Lindau Pfronten Kufstein
MOLDOVA Frankfurt
Rodersdorf Basel Wallbach
Leiblach BUDAPEST Hajdúszoboszló
L
AUSTRIA
VIP Kiefersfelden / Pfronten Fălticeni
DA
Ungheni

TAG
Exact project locations not marked on map HYD-N-569
Zürich Százhalombatta
Vecsés RET-N-1135
Leţcani
MI

AT I
Innsbruck Ercsi
Montoir de Bretagne Nantes HYD-N-986
Project has several locations/points. HYD-N-543 Lucerne Adony
HYD-N-1065 HYD-N-1065
HYD-N-730 Iaşi

The indicated location is for representation purposes only Palleau BERN


L I E C H T. Graz
Siófok
Gherăești
Mykolaiv
HYD-N-1066
and does not indicate the exact location of the project Weitendorf HYD-N-1354 Városföld Sărmăşel HYD-N-625 CHISINAU
HYD-N-1281 Kardoskút Melitopol

SO
Grebenyky
Kherson
SWITZERLAND

L
HUNGARY
Murfeld HYD-N-1356 RET-A-1003
Arnoldstein Cersak RET-N-1135
Klagenfurt Tornyiszentmiklós Târgu Mureş Yuzhne
Tarvisio HYD-N-1237 RET-N-1044 Bacău
Griespass Pince
Project status codes : Etrez
Passo Gries HYD-N-442
Kidričevo
Nagykanizsa
Kaposvár
RET-N-1113 RET-N-1135 HYD-N-1259 Szoreg
Kaushany
Odesa
HYD-N-789
La Rochelle HYD-F-1304 Geneva
Bordano HYD-N-325 HYD-N-1066 Horia
Coroi Onesti Sea
FID FID status (Final Investment Decision)

AI
Advanced Less-Adv. Masera Zabok HYD-N-1274 Kiskundorozsma Arad

RI,
FRANCE Udine Rogatec Csanádpalota HYD-N-640
LJUBLJANA Kozármisleny HYD-N-640

DK
Trento Báta Nagylak HYD-N-999
Flaibano HYD-N-1356 HYD-N-619 Subotica

I, S
Petrovaselo Mediaș

AT
Gorizia Ajdovščina ZAGREB EA STREIKOV
Drávaszerdahely HYD-N-640
Advanced status is applied to all projects that, based on the information submitted, have: Lyon Bizzarone
Treviso
Sempeter SLOVENIA Lučko HYD-N-1274
Sombor
Mokrin
ST
RIN Sibiu Șinca
GOLITSYNO
KERCH
Donji Miholac G
HYD-N-1205 Trieste HYD-N-1274 HYD-N-1274 HYD-N-648 BR Brașov
- commissioning year expected at the latest by 31st December of the year of the TYNDP project HYD-N-1205
Koper
Karlovac
Okoli UA Chernomorsk
Kozarac HYD-N-1255 Osijek
data collection + 6 (e.g. 2028 in case of TYNDP 2022, for which projects are collected in 2022) Bačko Hateg ODESSA K
Milano Venezia Umag Zlobin Bosiljevo
HYD-N-1274 Sotin Novo Selo Jupa
ROMANIA Orlovka KRYM

BRUA
Rijeka
- and whose permitting phase has started ahead of the TYNDP project data collection - OR - Grenoble Porto HYD-N-1307 Omišalj Tržac Vel. Kladusa Slobodnica
Novi Sad Isaccea
Bay of Biscay Saint-Avit Viro Rovigo Krk LNG SHTORMOV Yevpatoria
FEED has started (or the project has been selected for receiving CEF grants for FEED ahead of the Torino
Cavarzere Vodnjan
Cazin Brod
Bassens Castillon Lička Rakovica Bos. Krupa Modrica
HYD-N-1205
TYNDP project data collection) Bordeaux Parma
Poggio
Renatico Pula Jasenica
Bihač
Banja Luka EAST
RIN
G
Urziceni
HYD-N-756
Bibeşti COBALCESCU
BOSNIA BELGRADE HYD-N-999

PIPELINEKAN
HYD-N-1307 Bilciurești Alushta
HYD-N-569 Gospič Sevastopol
Modena
AND Loznica Horezu Slobozia HYD-N-647

TRANS-BAL
BUCHAREST LEBADA
Genova
Bologna FSRU 2 - SNAM
Ravenna
C R O AT I A HERZEGOVINA BRUA
Podișor Bălăceanca
Vadu
Năvodari
Yalta
HYD-N-1352 Zvornik Ghercești

ENTSOG currently comprises 43 TSO members,


RET-N-1155 Travnik
SERBIA HYD-N-608 LUCEAFARUL DOINA
I TA LY
Zenica HYD-N-999 Constanţa
Zadar
Panigaglia Benkovac G.Vakuf Zaychar Silistra ANA
2 Associated Partners from 27 European Countries and 10 Observers Lussagnet HYD-N-569
Manosque HYD-N-565 OLT Offshore LNG Firenze
San Marino Knin
Kiseljac
Giurgiu Ruse
Kardam
DOMINO
GASCOGNE Toscana (FSRU) Negru Voda
GAVIOTA HYD-N-1352 UR MIDI Monaco HYD-N-1205 SARAJEVO
DO Saint-Martin-de-Crau Ancona HYD-N-1307 Kireevo
E L’A
Musel / Gijon Nice
Toulouse

IBR
HYD-N-1352 Razgrad
RE D Carresse-
Black Sea
Barran HYD-N-1291 Imotski Dobrich
RET-N-483 Ferrol IAP
HYD-A-427 Santander Bayonne ARTE Cassaber Livorno HYD-N-1205 Split
Posušje
Pleven Valchi Dol
When the same point is affected by several projects, the point is shown with the Mugardos
A Coruña Oviedo
S. Sebastián
HYD-N-1352
Lacq
Pau
Cruzy (Hérault)
San Marco Recanati A Zagvozd Mostar Montana Shumen Vetrino
Guitriz
HYD-N-1149 Bilbao Irun Tarbes
HYD-N-1352 Fos Tonkin
Fos Cavaou
Marseille
Ligurian Terranuova Bracciolini
d Niš
IBS Targovishte Varna
highest project status (operational, FID, advanced, non-FID), the status from single HYD-N-508 Biriatou
HYD-N-942 Barbaira
Toulon
Sea ri HYD-N-1307 Vratsa Lovech Provadia KAVARNA

AD
Perugia a Veliko Tarnovo
projects can vary from that. Lugo HYD-N-1152 VIP PIRINEOS Larrau Monte Urano Ploče

RIA
Gulf of
Piombino ti Dimitrovgrad IBS Botevgrad
RET-N-558
Rupcha GALATA
KALIAKRA
Santiago MONTENEGRO Gabrovo

TIC
Pamplona Port-la-Nouvelle
de Compostela HYD-N-1273 Vitoria Rio Marina c IA
P PRISTINA
Novi Iskar

A
The projects are shown with the planning status reported in their TYNDP 2022 Castropodame HYD-N-1149 Lion FSRU 1 - SNAM
S
BULGARIA

PIP
Bastia Cellino Lozenets
e UNMI Pernik
SOFIA

ELIN
Leon HYD-N-1205 a PODGORICA
STREAM
Ponferrada
submission.
ANDORRA
Pontevedra Burgas
Logroño KOSOVO Yambol TURK

E
Stara Zagora
Gallese L’Aquila Chieti Kyustendil
Ourense Burgos Villar de Arnedo Ihtiman
All data provided on this map is for information purposes and shall be treated as Figueras
CORSICA Gueshevo

IA
HYD-A-542 Sopot

P
Tuy Palencia Huesca Pazardzhikk
Zidilovo Blagoevgrad Plovdiv Malkoclar
indicative and non-contractual in nature, without pre-empting different outcomes HYD-N-543
Valença do Minho HYD-N-1151 Ajaccio ROME Sulmona
Tetovo HYD-N-788 Dimitrovgrad Strandzha Sinop
Soria HYD-N-1149 Larino San Paolo SKOPJE
of any possible discussion held at regional level. Under no circumstances shall it be HYD-N-819 Bansko

IGB
Vale de Frades Hostalric Simitli Kırklareli
Gostivar Shtip Edirne
Valladolid Zaragoza HYD-N-1153 HYD-N-1006 Smolyan Kardzhali Bartın
regarded as information intended for commercial use. -C
elZ
a
HYD-N-1324
Lérida
ar
Campobasso NORTH
MACEDONIA Negotino Petrich
Kıyıköy

M
ed Zamora
Adradas arM Lucera TIRANA Zongulda Bafra
H2 d-B Kastamonu Samsu
Me
Barbolla Arbós Prilep Kulata
Castelnou HYD-N-1205 Karabük
HYD-N-1149 Tarragona Barcelona H2 Bari Gevgelija Sidirokastron Xanthi Istanbul
HYD-N-1156

IAP
Porto Karperi POSEIDON
Version : March 2023 Tivisa
HYD-N-1149
Melizzano
Kafasan Evzoni Lachanas
P Serres
Komotini Kipoi
Tekirdağ
Salamanca Segovia Dumrea Bitola TA Kavala
Celorico da Beira Porto Torres Olbia HYD-N-970 P Marmara

TA
WGS 84 / Pseudo-Mercator projection Nea Mesimvria Alexandroupolis Ereglisi Bolu

N
Düzce
POSEIDON
HYD-N-385

AP
HYD-N-978 Sassari Napoli Potenza
Avila HYD-N-1272 Brindisi Plati Yalova Sakarya Amasya
Guadalajara Fier Berat TAP HYD-N-1092 Kocaeli Çankırı
Massafra Trikala Thessaloniki s
Cantanhede
Mangualde Guarda MADRID Alghero T Matagiola TAP Vlorë
Korce
Bilisht TAP Sa
ro Çorum
Nuoro y Taranto San Foca of
HYD-N-978 lf
HYD-N-1149 Balearic Macomer rr Melendugno Gu
S PA I N
Teruel Montesano
VIP IBERICO ALBANIA Katerini
Figueira da Foz Cuenca
Sea h Çanakkale Bilecik
ANKARA
RET-N-1050
MENORCA
SARDINIA e
n
HYD-N-1205 Otranto
I
Bursa
HYD-N-978 Castellón IG ON
Carriço de la Plana
Palmas Arborea ia PO
SE SE
ID
Aegean Eskişehir Kırıkkale
Yozgat
Toledo Oristano IDO PO
n N TANAP Pipeline
HYD-N-1149
Sagunto MALLORCA
S Tarsia Trikala Larissa Sea Balıkesir
TANAP Trans-Anatolian
Valencia e
Cáceres
Palma de Mallorca a Volos

PORTUGAL Portovesme
Carbonia
Cagliari
Florovouni Thesprotia Ampelia
HYD-N-970
Kütahya

TURKEY Kırşehir

EAST
Monforte
Carregado Sarroch
RET-N-1049 Ciudad Real Albacete IBIZA RET-N-973 Lamia
Bucelas

MED
Campo Maior Badajoz Puertollano Porto Botte Catanzaro
Aliaga Tu

GREECE
Afyon
LISBON HYD-N-1205
z
G
öl
ü Kayseri
Manisa Uşak
Setúbal HYD-N-1149 Nevşehir
Halkida Aliveri

Alicante Mediterranean Sea Palermo Messina


Gioia Tauro Ionian
Sea
Ag. Nikolaos
Thisvi
Thiva
Inofyta Izmir Aksaray

HYD-N-543 Agioi Theodoroi


Sines HYD-N-1149 Murcia
Dioriga Gas ATHENS Niğde
Cordoba Revythoussa Konya
Jaén HYD-N-1272 Agia Triada Aydın Isparta
Mazara del Vallo Lavrio
Denizli
HYD-N-1205 Burdur
Cartagena Eregli
Sevilla ED Enna
SM Agrigento
Huelva AN Megalopoli
Granada TR Muğla
Gela Karaman Adana
Annaba El Haouaria Tarsus
Motril
Almeria ALGIERS Skikda Koudiet Eddraouch
Antalya
Içel
Osmaniy
Málaga TUNIS

MELIT
Bejala Dörtyol

A TRAN
Cádiz Iskenderun
ME

Hatay
Chlef
DG

SGAS
CANARY ISLANDS
AZ

Tarifa Samandağ
LANZAROTE Strait of Gibraltar Arzew
Ceuta Sousse Malta LNG (FSRU)
Tangiers Relizane
Oran LA VALETTA
Latakia

M A LTA
Santa Cruz de Tenerife
FUERTEVENTURA
TENERIFE Mascara
Sidi bel Abbes
M

Las Palmas
Beni-Saf C R E TA
REA

Arico-Granadilla LNG GRAN CANARIA MEDGAZ NICOSIA Banias


EN ST

CYPRUS
Melilla Vassilikos
Arinaga LNG Tlemcen Tartus
Ouled
GRE

Mimoun Saida Sfax


Djelfa
Sebdou MATTEI
C ENRICO HERN LINE Ab
El Gor GAZODU EAST MED / NORT Tripoli
K4

El Aricha HERN LINE


Mediterranean Sea EAST MED / SOUT
LEBANO
EGPDF

1-G

La Skhirra

NL
MAGHREB-EU

EAST
GG2

GK

RABAT ROPE GAS (MEG


TUNISIA

/
ED
)
GZ

Fes
GG1-

Meknès BEIRUT

TM

MED /
Gabes
0-G
ME

Mohammedia

EAS
Z5
DG

Bahr Es Salam

SL
AZ

Sidon
Casablanca Naama
APHRODITE/ISHAI
TANIN
Jorf Lasfar / El Jadida
MADEIRA KARISH

AGP
LEVIATHAN

MAGHREB-EUROPE GAS (MEG)


Hassi R’Mel
Mellitah

TRIPOLI
Ten-Year Network Development Plan 2022 – The hydrogen and natural gas TYNDP | Infrastructure Report | 45
Al Khums
TAMAR Haifa

Funchal DALIT
DOLPHIN
Misurata
SCARAB
Hadera Offshore
SAFFRON AKEN Mafraq

MOROCCO ALGERIA Ouargla Benghazi


Tobruk
BALTIM N
BALTIM E KAROUS KERSH MARI-B
Tel Aviv

Ashdod AMM
ROSETTA
Hassi Messaoud ABU SIR
MAP FOR HYDROGEN (HYD) AND RETROFITTED (RET) PROJECTS IN TYNDP 2022, CLEAN VERSION

TRANSPORT BY PIPELINES (INCL. COMPRESSOR STATIONS) TRANSPORT BY PIPELINES (INCL. COMPRESSOR STATIONS)
TRA-F-51 Trans Adriatic Pipeline FID PCI TRA-A-10 Poseidon Pipeline Advanced PCI TRA-A-10 Poseidon Pipeline Advanced PCI TRA-N-7 Development for new import from the South (Adriatica Line) Less-Adv. PCI
TRA-F-90 LNG evacuation pipeline Omišalj – Zlobin (Croatia) FID PCI TRA-A-31 Melita TransGas Pipeline Advanced PCI TRA-A-31 Melita TransGas Pipeline Advanced PCI TRA-N-63 LNG terminal in northern Greece / Alexandroupolis Less-Adv. PCI
– Pipeline Section

TRA-F-190 Poland – Slovakia interconnection FID PCI TRA-A-123 Városföld CS Advanced PCI TRA-A-123 Városföld CS Advanced PCI TRA-N-86 Interconnection Croatia/Slovenia (Lučko – Zabok – Jezerišće – Sotla) Less-Adv. PCI
TRA-F-212 Gas Interconnection Poland-Lithuania (GIPL) – PL section FID PCI TRA-A-271 Poland – Denmark interconnection (Baltic Pipe) – offshore section Advanced PCI TRA-A-271 Poland – Denmark interconnection (Baltic Pipe) – offshore section Advanced PCI TRA-N-92 CS Ajdovščina, 1st phase of upgrade Less-Adv. PCI
TRA-F-275 Poland – Slovakia Gas Interconnection (PL section) FID PCI TRA-A-330 EastMed Pipeline Advanced PCI TRA-A-330 EastMed Pipeline Advanced PCI TRA-N-94 CS Kidričevo, 2nd phase of upgrade Less-Adv. PCI
TRA-N-108 M3 pipeline reconstruction Less-Adv. PCI
TRA-F-298 Modernization and rehabilitation of the Bulgarian GTS FID PCI TRA-A-339 Trans-Caspian Advanced PCI TRA-A-339 Trans-Caspian Advanced PCI from CS Ajdovščina to Šempeter/Gorizia

TRA-F-334 Compressor station 1 at the Croatian gas transmission system FID PCI TRA-A-342 Enhancement of Latvia-Lithuania interconnection (Lithuania's part) Advanced PCI TRA-A-342 Enhancement of Latvia-Lithuania interconnection (Lithuania's part) Advanced PCI TRA-N-112 R15/1 Pince – Lendava – Kidričevo Less-Adv. PCI

TRA-F-341 Gas Interconnection Poland-Lithuania (GIPL) (Lithuania's section) FID PCI TRA-A-362
Development on the Romanian territory Advanced PCI TRA-A-362
Development on the Romanian territory Advanced PCI TRA-N-128 Compressor Station Kipi Less-Adv. PCI
of the Southern Transmission Corridor of the Southern Transmission Corridor
TRA-F-358 Development on the Romanian territory of the NTS FID PCI TRA-A-377 Romanian-Hungarian reverse flow Hungarian section 2nd stage Advanced PCI TRA-A-377 Romanian-Hungarian reverse flow Hungarian section 2nd stage Advanced PCI TRA-N-137 Interconnection Bulgaria – Serbia Less-Adv. PCI
(BG–RO-HU-AT)-Phase I

FID PCI TRA-N-245 North – South Gas Corridor in Eastern Poland Less-Adv. PCI
TRA-F-378 Interconnector Greece-Bulgaria (IGB Project) TRA-A-382 Enhancement of Latvia-Lithuania interconnection (Latvian part) Advanced PCI TRA-A-382 Enhancement of Latvia-Lithuania interconnection (Latvian part) Advanced PCI
TRA-N-325 Slovenian-Hungarian interconnector Less-Adv. PCI
TRA-F-500 L/H Conversion Belgium FID PCI TRA-A-429 Adaptation L-gas – H-gas Advanced PCI TRA-A-429 Adaptation L- gas – H-gas Advanced PCI
TRA-N-361 GCA 2015/08: Entry/Exit Murfeld Less-Adv. PCI
TRA-F-941 Metering and Regulating station at Nea Messimvria FID PCI TRA-A-780 Baltic Pipe project – onshore section in Denmark Advanced PCI TRA-A-780 Baltic Pipe project – onshore section in Denmark Advanced PCI
Upgrade of Murfeld/Ceršak interconnection
TRA-N-389 (M1/3 Interconnection Ceršak) Less-Adv. PCI
TRA-F-1193 TAP interconnection FID PCI TRA-A-782 TANAP X – Expansion of Trans Anatolian Natural Gas Pipeline Project Advanced PCI TRA-A-782 TANAP X – Expansion of Trans Anatolian Natural Gas Pipeline Project Advanced PCI
Interconnection of the NTS with the DTS Poland – Denmark interconnection (Baltic Pipe) Poland – Denmark interconnection (Baltic Pipe) TRA-N-390 Upgrade of Rogatec interconnection (M1A/1 Interconnection Rogatec) Less-Adv. PCI
TRA-F-139 and reverse flow at Isaccea FID Non-PCI TRA-A-1173 – onshore section in Poland Advanced PCI TRA-A-1173 – onshore section in Poland Advanced PCI
Development on the Romanian territory of the NTS Development on the Romanian territory of the NTS TRA-N-524 Enhancement of Transmission Capacity of SK-HUinterconnector Less-Adv. PCI
TRA-F-208 Reverse Flow TENP Germany FID Non-PCI TRA-A-1322 (BG–RO-HU-AT)-Phase II Advanced PCI TRA-A-1322 (BG–RO-HU-AT)-Phase II Advanced PCI
TRA-N-971 Compressor station at Nea Messimvria Less-Adv. PCI
TRA-F-247 North – South Gas Corridor in Western Poland FID Non-PCI TRA-A-12 GALSI Pipeline Project Advanced Non-PCI TRA-A-12 GALSI Pipeline Project Advanced Non-PCI
TRA-N-1057 Compressor stations 2 & 3 / Croatian gas transmission system Less-Adv. PCI
TRA-F-286 Romanian-Hungarian reverse flow Hungarian section 1st stage FID Non-PCI TRA-A-21 Bidirectional Austrian-Czech Interconnector (BACI) – AT section Advanced Non-PCI TRA-A-21 Bidirectional Austrian-Czech Interconnector (BACI) – AT section Advanced Non-PCI
TRA-N-1090 Metering and Regulating Station at Alexandroupoli Less-Adv. PCI
TRA-F-291 NOWAL – Nord West Anbindungsleitung FID Non-PCI TRA-A-68 Ionian Adriatic Pipeline Advanced Non-PCI TRA-A-68 Ionian Adriatic Pipeline Advanced Non-PCI
TRA-N-1091 Metering and Regulating station at Megalopoli Less-Adv. PCI
TRA-F-307 H-gas exit OSZ GTG Nord FID Non-PCI TRA-A-70 Interconnection Croatia/Serbia (Slobdnica-Sotin-Bačko Novo Selo) Advanced Non-PCI TRA-A-70 Interconnection Croatia/Serbia (Slobdnica-Sotin-Bačko Novo Selo) Advanced Non-PCI
TRA-N-1092 Metering and Regulating Station at UGS South Kavala Less-Adv. PCI
TRA-F-329 ZEELINK FID Non-PCI TRA-A-133 Bidirectional Austrian Czech Interconnection (BACI) – CZ section Advanced Non-PCI TRA-A-133 Bidirectional Austrian Czech Interconnection (BACI) – CZ section Advanced Non-PCI
TRA-N-1138 South Caucasus Pipeline Future Expansion (SCPFX) Less-Adv. PCI
TRA-F-340 CS Wertingen FID Non-PCI TRA-A-136 Czech-Polish Gas Interconnector (CPI) Advanced Non-PCI TRA-A-136 Czech-Polish Gas Interconnector (CPI) Advanced Non-PCI
TRA-N-1195 Matagiola – Massafra pipeline Less-Adv. PCI
TRA-F-357 NTS developments in North-East Romania FID Non-PCI TRA-A-273 Poland – Czech Republic Gas Interconnection (PL section) Advanced Non-PCI TRA-A-273 Poland – Czech Republic Gas Interconnection (PL section) Advanced Non-PCI
TRA-N-1227 Gorizia plant upgrade Less-Adv. PCI
TRA-F-409 Larino – Chieti FID Non-PCI TRA-A-283 3rd IP between Portugal and Spain (pipeline Celorico-Spanish border) Advanced Non-PCI TRA-A-283 3rd IP between Portugal and Spain (pipeline Celorico-Spanish border) Advanced Non-PCI
TRA-N-8 Import developments from North-East Less-Adv. Non-PCI
TRA-F-424 San Marco - Recanati FID Non-PCI TRA-A-302 Interconnection Croatia-Bosnia and Herzegovina (South) Advanced Non-PCI TRA-A-302 Interconnection Croatia-Bosnia and Herzegovina (South) Advanced Non-PCI
TRA-N-9 Additional Southern developments Less-Adv. Non-PCI
TRA-F-592 Necessary expansion of the Bulgarian gas transmission system FID Non-PCI TRA-A-320 Carregado Compressor Station Advanced Non-PCI TRA-A-320 Carregado Compressor Station Advanced Non-PCI
TRA-N-14 Komotini-Thesprotia pipeline Less-Adv. Non-PCI
TRA-F-752 Capacity4Gas – DE/CZ FID Non-PCI TRA-A-394 Norwegian tie-in to Danish upstream system Advanced Non-PCI TRA-A-394 Norwegian tie-in to Danish upstream system Advanced Non-PCI
TRA-N-27 Physical reverse flow from NI to GB and IE via SNIP pipeline Less-Adv. Non-PCI
TRA-F-755 CS Rimpar FID Non-PCI TRA-A-408 Wilhelmshaven LNG-Terminal Anbindungsleitung Advanced Non-PCI TRA-A-408 Wilhelmshaven LNG-Terminal Anbindungsleitung Advanced Non-PCI Less-Adv. Non-PCI
TRA-N-53 White Stream
TRA-F-763 EUGAL FID Non-PCI TRA-A-496 Increase of Gas Transport to the Netherlands Advanced Non-PCI TRA-A-496 Increase of Gas Transport to the Netherlands Advanced Non-PCI Interconnection Croatia-Bosnia and Herzegovina
Europaeische Gasanbindungsleitung (European Gaslink) TRA-N-66 (Slobodnica- Bosanski Brod) Less-Adv. Non-PCI
TRA-F-814 Upgrade for IP Deutschneudorf et al. for More Capacity FID Non-PCI TRA-A-561 Poland-Ukraine Interconnector (Ukrainian section) Advanced Non-PCI TRA-A-561 Poland-Ukraine Interconnector (Ukrainian section) Advanced Non-PCI TRA-N-75 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac Less-Adv. Non-PCI
TRA-F-895 Balticconnector FID Non-PCI TRA-A-621 Poland – Ukraine Gas Interconnection (PL section) Advanced Non-PCI TRA-A-621 Poland – Ukraine Gas Interconnection (PL section) Advanced Non-PCI TRA-N-192 Entry capacity expansion GATE terminal Less-Adv. Non-PCI
TRA-F-902 Capacity increase at IP Lanžhot entry FID Non-PCI TRA-A-628 Eastring – Slovakia Advanced Non-PCI TRA-A-628 Eastring – Slovakia Advanced Non-PCI TRA-N-224 Gaspipeline Brod – Zenica Less-Adv. Non-PCI
TRA-F-915 Enhancement of Estonia-Latvia interconnection FID Non-PCI TRA-A-654 Eastring – Bulgaria Advanced Non-PCI TRA-A-654 Eastring – Bulgaria Advanced Non-PCI TRA-N-258 Developments for Montoir LNG terminal 2.5 bcm expansion Less-Adv. Non-PCI
TRA-F-918 Capacity4Gas – CZ/SK FID Non-PCI TRA-A-655 Eastring – Romania Advanced Non-PCI TRA-A-655 Eastring – Romania Advanced Non-PCI TRA-N-269 Developments for Fosmax (Cavaou) LNG 8.25 bcm expansion Less-Adv. Non-PCI
TRA-F-928 Balticconnector Finnish part FID Non-PCI TRA-A-656 Eastring – Hungary Advanced Non-PCI TRA-A-656 Eastring – Hungary Advanced Non-PCI TRA-N-299 M3/1 Šempeter – Vodice Less-Adv. Non-PCI
TRA-F-937 Nord Stream 2 FID Non-PCI TRA-A-808 Additional transport of gas volumes to the Netherlands Advanced Non-PCI TRA-A-808 Additional transport of gas volumes to the Netherlands Advanced Non-PCI TRA-N-303 Interconnection Croatia-Bosnia and Herzegovina (west) Less-Adv. Non-PCI
TRA-F-949 Oude(NL)-Bunde(DE) GTG H-Gas FID Non-PCI TRA-A-829 Physical Reverse Flow at Moffat interconnection point (IE/UK) Advanced Non-PCI TRA-A-829 Physical Reverse Flow at Moffat interconnection point (IE/UK) Advanced Non-PCI TRA-N-336 Interconnection Croatia/Slovenia (Umag-Koper) Less-Adv. Non-PCI
TRA-F-954 TAG Reverse Flow FID Non-PCI TRA-A-950 Guitiriz – Lugo – Zamora pipeline Advanced Non-PCI TRA-A-950 Guitiriz – Lugo – Zamora pipeline Advanced Non-PCI TRA-N-354 Interconnection with Slovenia Less-Adv. Non-PCI
TRA-F-964 New NTS developments FID Non-PCI TRA-A-951 Embedding CS Folmhusen in H-Gas Advanced Non-PCI TRA-A-951 Embedding CS Folmhusen in H-Gas Advanced Non-PCI TRA-N-402 TENP Security of Supply Less-Adv. Non-PCI
for taking over gas from the Black Sea shore

TRA-F-1169 Trans-Balkan Bi-directional Flow FID Non-PCI TRA-A-967 Nea-Messimvria to Evzoni/Gevgelija pipeline (IGNM) Advanced Non-PCI TRA-A-967 Nea-Messimvria to Evzoni/Gevgelija pipeline (IGNM) Advanced Non-PCI TRA-N-423 GCA Mosonmagyaróvár Less-Adv. Non-PCI

TRA-F-1241 Interconnection with production in Gela FID Non-PCI TRA-A-980 Interconnection North Macedonia-Greece (North Macedonian part) Advanced Non-PCI TRA-A-980 Interconnection North Macedonia-Greece (North Macedonian part) Advanced Non-PCI TRA-N-439 Stazione di Spinta "San Marco" Less-Adv. Non-PCI

TRA-F-1254 CS Elten FID Non-PCI TRA-A-1199 LNG Terminal Brunsbuettel – Grid Integration Advanced Non-PCI TRA-A-1199 LNG Terminal Brunsbuettel – Grid Integration Advanced Non-PCI TRA-N-502 Interconnector Romania – Ukraine Less-Adv. Non-PCI

TRA-F-1267 Upgrade Sülstorf station FID Non-PCI TRA-A-1268 Romania-Serbia Interconnection Advanced Non-PCI TRA-A-1268 Romania-Serbia Interconnection Advanced Non-PCI TRA-N-596 Interconnection between RO & UA gas transmission systems Less-Adv. Non-PCI

TRA-F-1271 Compressor Station Krummhoern FID Non-PCI TRA-A-1303 IAEF – Vlora ccgt Advanced Non-PCI TRA-A-1303 IAEF – Vlora ccgt Advanced Non-PCI TRA-N-598 NTS developments in North-West Romania Less-Adv. Non-PCI

TRA-F-1276 Compressor station at Nea Messimvria (3rd unit) FID Non-PCI TRA-N-809 Reallocation H-Gas towards NL: Bunde/Oude to Zone Oude Statenzijl H Less-Adv. Non-PCI

TRA-F-1277 Upgrading GMS Isaccea 1 and GMS Negru Voda 1 FID Non-PCI TRA-N-810 TAP Expansion Less-Adv. Non-PCI
TRA-N-851 Southern Interconnection pipeline BiH/CRO Less-Adv. Non-PCI
TRA-N-873 Additional import at Oude StatenZijl area Less-Adv. Non-PCI
TRA-N-882 Transferring L-gas infrastructure to H-gas Less-Adv. Non-PCI
TRA-N-910 West Interconnection BiH/CRO Less-Adv. Non-PCI
TRA-N-955 GUD: Complete conversion to H-gas Less-Adv. Non-PCI
TRA-N-959 Further enlargement of BG—RO—HU—AT transmission corridor Less-Adv. Non-PCI
(BRUA) phase 3

TRA-N-1058 LNG Evacuation Pipeline Kozarac-Slobodnica Less-Adv. Non-PCI


TRA-N-1063 Export to Malta Less-Adv. Non-PCI
TRA-N-1064 Moffat Physical Reverse Flow Less-Adv. Non-PCI
TRA-N-1129 Compressor Station Kipi Increment Less-Adv. Non-PCI
TRA-N-1181 Connecting pipe to LNG terminal in Latvia Less-Adv. Non-PCI
TRA-N-1194 Sardinia Methanization  Less-Adv. Non-PCI
TRA-N-1202 GCP GAZ-SYSTEM/ONTRAS – incremental capacity project Less-Adv. Non-PCI
TRA-N-1235 Firm transmission capacity increase at the IP Veľké Zlievce Less-Adv. Non-PCI
TRA-N-1246 Greece – Italy interconnection Less-Adv. Non-PCI
TRA-N-1265 Biomethane productions interconnection Less-Adv. Non-PCI
TRA-N-1278 Compressor station at Ambelia Less-Adv. Non-PCI

Figure 34: Map for Hydrogen (HYD) and Retrofitted (RET) projects in TYNDP 2022, clean version

Download the map from ENTSOG website:

Just click on the icon.

46 | Ten-Year Network Development Plan 2022 – The hydrogen and natural gas TYNDP | Infrastructure Report
Karmøy STOCKHOLM Paldiski
TALLINN
HYD-N-884 Bygnes Kårstø
HYD-N-1249

E
HYD-N-1122

CH

BHC
KEYS ESTONIA
HYD-N-884
Cross-border points / intra-country or intra balancing zone points
E
CH
Cross-border interconnection point LNG Import terminal HYD-N-848
Puiatu

within Europe (operational) HYD-N-926


or export point to non-EU country OUTER

s
HEBRIDES
k HYD-N-931

de
LNG Import terminal ra HYD-N-1355 Karksi

bri
(Under construction or planned) r Gulf of
Cross-border interconnection point e
g

He
Riga
within Europe a
or export point to non-EU country k

he
S HYD-N-1280
Under construction or Planned

f t
GOTLAND RET-N-1081

a o
Intra-country or Skulte
intra balancing zone points

Se
HYD-N-1098
RIGA

Ka
Incukalns

L AT V I A
North
INNER

tt
Countries HEBRIDES HYD-N-1280
HYD-A-1238 RET-N-1081

eg
HYD-N-828
Other Countries EU Countries
Sea
Lille Torup Iecava

at
C
BH

DENMARK

EUR
Kiemėnai
Hydrogen infrastructure LH2/NH3 Terminals and Plants

OP
HYD-N-884

IPE
Kuršėnai
New HYD-N-1239

I
KKP
LH2/NH3 Terminals’ entry point Siauliai
New and conversion intro transmission system COPENHAGEN Klaipéda LNG
Klaipéda HYD-N-1239
Panevėžys
(FSRU Independence)
Egdved
Operational
Conversion of existing infrastructure
a
Baltic Se
Nybro

Retrofitted infrastructure LH2/NH3 Plants’ export point


HYD-N-991
HYD-N-834
HYD-N-884
LITHUANIA
HYD-N-848 HYD-N-1239

AQ

AQ
CH CTU
UA yON PIP
HYD-N-1236

CH CTU
UA yON PIP
HYD-N-1236

E (O S
BORNHOLM

DU
Kaliningrad
Maritime transport for hydrogen FID projects

E(
H RO
(FSRU)

pt

DU
Jauniunai

io

Op
EU

n
HYD-N-800

H RO
2)
E EI
LH2/NH3 import route

tio
Non-FID, advanced projects HYD-N-1159 HYD-N-854

EU
HYD-A-549

n
S
HYD-N-1120 Ellund VILNIUS

2)
E EI
OR

RUSSIA
CT IN
HYD-N-626 HYD-N-1099
NE
ON - LUBM HYD-N-1239
Hydrogen production Non-FID, less-advanced projects HYD-N-796
RC
INTE HOLM L) HYD-N-1159
HYD-N-968 BO
RN (IB
Gdansk (FSRU) HYD-A-549

GIPL
HYD-N-1120 Ellund

DEUD
HYD-A-968
HYD-N-983 HYD-N-626
H2 infrastructure / production E
AQUADUCT
US
HYD-A-992
HYD-N-1099

AN
ON Gdansk Santaka
HYD-N-796
RUSSIA
ISLE OF MAN
Hy HYD-N-968
HyONE Helgoland
HYD-N-1001
Lubmin

DEUD
HYD-N-626

AQ
HYD-N-1011 Rostock Greifswald
HYD-A-968

UA
Hy E
Lubmin II

DU
HYD-N-1099

ON
CH
Świnoujście
Project identification : HYD-A-992

CT
E
Moeckow AQUADUCTU
Project identification :

US
Quarnstedt MINSK E S

AN
HyONE
Irish HYD-N-1037 Brunsbüttel HYD-N-883 Płoty
ON
Hy
HYD-N-1011 Helgoland
HYD-N-123 ENTSOG project code HYD-N-123 ENTSOG project code Sea Dornum
HYD-N-790 Wilhelmshaven Stade
HyONE
HYD-N-1001
SEAL

L
NGT Hamburg
HYD-N-626

GIP

AQ
HYD-N-1011 WAL Police
Krummhörn HYD-N-796 HYD-N-1011

UA
Hy E
Eemshaven HYD-N-894 HYD-N-1144

HyONE
BELARUS

DU
Harsefeld
HYD-N-1099

ON
CH
HYD-A-396 Etzel

NET

CT
DUBLIN HYD-N-846

E
Emden Jemgum

RA

US
HYD-N-830 Quarnstedt
Storage facilities for hydrogen

EUGAL
HYD-N-933 HYD-N-934
Groningen Folmhusen HyONE HYD-N-1037

OPAL
Brunsbüttel
IRELAND Oude Bünde Wardenburg Schwedt
Bremen HYD-N-1144

L
Statenzijl Barßel

NE
Damaslawek
New HYD-N-833 HYD-A-1279 HYD-N-874 HYD-N-1000
HYD-N-989 HYD-N-1011
HYD-N-981 Dornum
Balgzand HYD-N-790 L Wilhelmshaven Stade
SEAAL
Gustorzyn
Project identification : Vlieghuis HYD-N-917 HYD-N-983
HYD-N-1011 NGT W Hamburg
New and conversion Wieringermeer Lingen Nordlohne
HYD-N-633
Płońsk
HYD-N-1144 Krummhörn
THE NETHERLANDS BERLIN Eemshaven HYD-N-894
UNITED
HYD-A-906 HYD-A-906 Wloclawek

HyONE
Rembelszczyzna Harsefeld
HYD-N-1000 Etzel
ENTSOG project code Kienbaum HYD-A-396

NET
Shannon LNG Rehden
Conversion of existing infrastructure HYD-N-123 HYD-N-771
Ijmuiden
Emsbüren Drohne
Ahlten HYD-N-1310
Lwówek
Emden Jemgum HYD-N-846
AMSTERDAM HYD-N-1037

RA
Hannover

KINGDOM HYD-N-795 HYD-A-549 HYD-N-468 HYD-N-767


Enschede Ochtrup
HYD-N-633
HYD-N-1099
HYD-A-996 Magdeburg
Groß Köris
HYD-N-1310
HYD-N-1144
HYD-N-830
Groningen Folmhusen
HYD-N-933 HYD-N-934
HYD-A-770 Den Haag HYD-N-989 WARSAW Wardenburg
HYD-N-852 Epe Legden
Salzgitter
AL Radeland Eisenhüttenstadt Oude Bünde Bremen

L
JAG Statenzijl Barßel
HYPSTER FID HYD-N-754

NE
HYD-F-1304 Rotterdam Zevenaar HYD-N-885
Milford Haven HYD-N-543 Nijmegen Elten Münster Staßfurt HYD-N-849
HYD-N-833 HYD-A-1279 HYD-N-874 HYD-N-1000

EUGAL
K

OPAL
Dragon LNG HYD-N-601 Ravenstein HYD-N-885 HYD-N-983

L
IN
HYD-N-917 HYD-N-802

DA
EL
South Hook LNG HYD-N-793 Balgzand

ZE
HYD-N-1127 Moerdijk Voerde Werne

WE
HYD-N-818 Odolanów
Project ENTSOG code Project Name & Promoter Project status code Xanten
HYD-N-1037 HYD-N-989 Vlieghuis HYD-N-917

ne
l LONDON
Isle of Grain
HYD-N-1325 Zandvliet
Hilvarenbeek
Poppel
HYD-N-793
HYD-N-855
Duisburg
Essen Dortmund
HYD-N-633 HYD-N-939 GERMANY Bad Lauchstädt
HYD-N-796
POLAND Wronów
Wieringermeer Lingen Nordlohne
HYD-N-633
Project not marked on map Ch
an Zeebrugge Venlo
Leipzig
THE NETHERLANDS HYD-A-906 HYD-A-906

EUGAL
HYD-N-1075 HYD-A-562
HYD-N-1000

OPAL
Antwerpen Tegelen
Exact project location is not available or is marked as confidential ol Dunkerque Brugge Zelzate HYD-N-793 Rehden
ist Düsseldorf HYD-A-745
HYD-N-771
Ijmuiden
Br HYD-N-820 HYD-N-664 HYD-N-1100 HYD-N-1038
Emsbüren Drohne
Ahlten
Exact project locations not marked on map Alveringem
Gent Obbicht
Dilsen Chemelot
Broichweiden
Köln HYD-N-1099
Sayda
AMSTERDAM HYD-N-1037
HYD-N-633
Hannover
HYD-N-876 HYD-N-849
Project has several locations/points. HYD-N-1035 BRUSSELS ‘s Gravenvoeren Weisweiler STEGAL HYD-N-983 HYD-N-983
HYD-A-549 HYD-N-468 HYD-N-767 HYD-N-1099
Bocholtz
Olbernhau
HYD-N-795 Enschede Ochtrup
The indicated location is for representation purposes only HYD-N-1311 Raeren/LichtenbuschHYD-N-1038
Eynatten VIP THE-ZTP Reckrod
Deutschneudorf
Hora Svaté Kateřiny Rozwadów (Charzewice)
HYD-A-770 Den Haag
Epe
and does not indicate the exact location of the project
HYD-N-1099 VIP Brandov HYD-N-852 Legden
HYD-N-543
HYD-N-754
BELGIUM Rotterdam Zevenaar
KYIV HYD-N-885
Quévy
Blaregnies
Koblenz
HYD-N-849 HYD-N-543 Nijmegen Elten Münster
l HYD-N-1038 PRAGUE
nne HYD-N-1035 Taisnières HYD-N-793
Cha

K
Oświęcim HYD-N-601 Ravenstein HYD-N-885

L
OF

IN
Project status codes : ISLES
lish
Frankfurt HYD-N-1034 HYD-N-917

DA
AL

EL
Y
SCILL
Eng HYD-N-793

ZE
MID HYD-N-1127
Bras
CZECH Moerdijk Voerde Werne

WE
Hať Pogórska Wola HYD-N-818 Xanten
FID Advanced Less-Adv. FID status (Final Investment Decision) LUX.
Rimpar
HYD-N-983 HYD-N-1037
LUX. Remich HYD-N-1052
Gernsheim

Lampertheim
Würzburg HYD-N-1052
MEG
AL
Forchheim
Rothenstadt
Waidhaus
REPUBLIC HYD-N-1325
Zeebrugge
Zandvliet
Hilvarenbeek
Poppel
HYD-N-793
HYD-N-855
Duisburg
Essen Dortmund
HYD-N-633 HYD-N-939 GERMAN
Advanced status is applied to all projects that, based on the information submitted, have: FSRU LE HAVRE
Perl MEG
AL MEGAL Venlo
Kaiserslautern Nürnberg
- commissioning year expected at the latest by 31st December of the year of the TYNDP project HYD-N-899 Völklingen Schwandorf
Antwerpen Tegelen HYD-N-1075

L
U K Düsseldorf
R A I N EHYD-N-1038

GA
HYD-N-1038 HYD-N-990 Bezměrov Brugge Zelzate HYD-N-793

ME
HYD-N-987
data collection + 6 (e.g. 2028 in case of TYNDP 2022, for which projects are collected in 2022) Obergailbach HYD-N-1052
Medelsheim Karlsruhe HYD-N-664 HYD-N-1100
SLOVAKIA
Ivano-Frankivsk
- and whose permitting phase has started ahead of the TYNDP project data collection - OR - HYD-N-569 Au am Rhein Arresting
HYD-N-544
HYD-N-1137 Dolyna Gent Obbicht
Chemelot Köln HYD-N-1099
HYD-N-849 Alveringem Dilsen
FEED has started (or the project has been selected for receiving CEF grants for FEED ahead of the PARIS Stuttgart HYD-N-642
Břeclav
Lanžhot
Jablonov
RET-N-916 Nad Turňou Košice
Broichweiden
Nancy Kuty Vel’ké Kapušany HYD-N-876
TYNDP project data collection) Wertingen HYD-N-642
Oberkappel
WAG Láb
Lakšárska Nová Ves RET-N-916 HYD-N-772 Uzhhorod
Budince BRUSSELS ‘s Gravenvoeren Weisweiler
T
HYD-A-315
HYD-N-772 HYD-N-1264 Oleksiivka
Bocholtz
ES HYD-N-757 RET-A-425 Raeren/LichtenbuschHYD-N-1038
Morelmaison Burghausen A
W
HYD-N-757 HYD-N-544 HYD-N-1264 Zlievce
Vel’ké HYD-A-312 HYD-N-1311 Reckrod
/Uberackern NT Eynatten VIP THE-ZTP
HYD-N-569 HYD-N-1096
PE
Baumgarten Beregdaróc Beregovo HYD-N-1099
Finsing Haiming VIENNA BRATISLAVA Ivánka Pri Nitre HYD-N-835

ENTSOG currently comprises 43 TSO members, Atlantic Ocean HYD-N-849


HYD-N-642
Selešťany
Balassagyarmat HYD-N-661
HYD-N-1065 Tekovo
Voisines HYD-N-969
Krozingen
Freiburg im Breisgau
HYD-N-732 HYD-N-1065
Quévy BELGIUM
Blaregnies
Koblenz
HYD-N-1038 HYD-N-849
2 Associated Partners from 27 European Countries and 10 Observers Mulhouse
Szada
HYD-N-1206 Satu Mare
HYD-N-1035 Taisnières HYD-N-793
Oltingue Lindau Frankfurt
Rodersdorf Leiblach BUDAPEST Hajdúszoboszló
AL
AUSTRIA MID

TAG
Ungheni
Százhalombatta
When the same point is affected by several projects, the point is shown with the Montoir de Bretagne
HYD-N-569
HYD-N-986
Ercsi Vecsés RET-N-1135
HYD-N-730
Leţcani
MOLDOVA
Adony
HYD-N-543 HYD-N-1065 HYD-N-1065 Gherăești
highest project status (operational, FID, advanced, non-FID), the status from single Palleau
L I E C H T.
Siófok HYD-N-1066
BERN
projects can vary from that. Weitendorf HYD-N-1354
HYD-N-1281
Városföld
Kardoskút
HYD-N-625 CHISINAU
FRANCE SWITZERLAND

SO
L
HUNGARY
Murfeld HYD-N-1356 RET-A-1003
The projects are shown with the planning status reported in their TYNDP 2022 Griespass
Arnoldstein
Tarvisio
Klagenfurt
HYD-N-1237
Cersak
Tornyiszentmiklós
RET-N-1135
RET-N-1044 Târgu Mureş
Pince
submission. Etrez
Passo Gries HYD-N-442 Kidričevo
Nagykanizsa
Kaposvár
RET-N-1113 RET-N-1135 HYD-N-1259 Szoreg
HYD-N-789 Onesti
HYD-F-1304 Bordano HYD-N-325 HYD-N-1066 Horia Coroi
All data provided on this map is for information purposes and shall be treated as Masera
LJUBLJANA
Rogatec Zabok HYD-N-1274
Kozármisleny Báta
Kiskundorozsma Csanádpalota
Nagylak
Arad
HYD-N-999 HYD-N-640 HYD-N-640
Sea o
Flaibano
indicative and non-contractual in nature, without pre-empting different outcomes Gorizia
Ajdovščina HYD-N-1356 HYD-N-619
ZAGREB Drávaszerdahely
Petrovaselo
HYD-N-640
SLOVENIA
ROMANIA
Sempeter
of any possible discussion held at regional level. Under no circumstances shall it be HYD-N-1205
Treviso
HYD-N-1274
Lučko HYD-N-1274 Donji Miholac
HYD-N-1274 HYD-N-648 BR
HYD-N-1205 UA
regarded as information intended for commercial use. Karlovac
Kozarac
HYD-N-1255 Osijek Hateg
Milano Jupa Galaţi
Venezia Zlobin Bosiljevo
HYD-N-1274 Orlovka

BRUA
Rijeka
Omišalj Slobodnica
HYD-N-1307 Isaccea
Version : March 2023 Bay of Biscay Saint-Avit Rovigo Krk LNG
Vodnjan
Bassens Castillon HYD-N-1205 Lička
WGS 84 / Pseudo-Mercator projection Bordeaux
Poggio
Renatico Pula Jasenica
Bibeşti
HYD-N-756
HYD-N-1307 BELGRADE HYD-N-999

PIPELINEKAN
HYD-N-569 Gospič
Horezu HYD-N-647

TRANS-BAL
Podișor
BUCHAREST
FSRU 2 - SNAM C R O AT I A BOSNIA BRUA Vadu

SERBIA
HYD-N-1352 Genova Ravenna
RET-N-1155 AND
HYD-N-608
HERZEGOVINA
Panigaglia I TA LY Zadar
Benkovac
HYD-N-999

Giurgiu Ruse
Silistra

Lussagnet Manosque HYD-N-565 OLT Offshore LNG Kardam


GASCOGNE HYD-N-569 Toscana (FSRU) Negru Voda
HYD-N-1352 UR MIDI HYD-N-1205 SARAJEVO
DO Saint-Martin-de-Crau HYD-N-1307 Kireevo
E L’A
Musel / Gijon
Toulouse

IBR
HYD-N-1352 Razgrad
RE D Carresse-
Barran HYD-N-1291 Dobrich
RET-N-483 Ferrol
Mugardos
HYD-A-427 Santander Bayonne ARTE Cassaber
Cruzy (Hérault)
Livorno HYD-N-1205 Split Pleven Valchi Dol
Lacq
A
Black Sea
A Coruña Oviedo HYD-N-1352 Fos Tonkin Zagvozd Montana Shumen Vetrino
Guitriz
HYD-N-1149 HYD-N-508 Bilbao HYD-N-1352 Fos Cavaou Ligurian d Targovishte Varna
HYD-N-942 Barbaira
Sea ri HYD-N-1307 Vratsa Lovech Provadia
Lugo HYD-N-1152 Larrau a Ploče Veliko Tarnovo
Port-la-Nouvelle Gulf of ti Botevgrad
RET-N-558 Gabrovo Rupcha
HYD-N-1273 Vitoria c IA
P MONTENEGRO PRISTINA
Novi Iskar

Ponferrada
Castropodame
Leon
HYD-N-1149
ANDORRA
Lion FSRU 1 - SNAM

HYD-N-1205
S
e
a PODGORICA UNMI
Pernik
SOFIA BULGARIA Lozenets

Burgas
Logroño Stara Zagora Yambol
Villar de Arnedo
Gallese KOSOVO Kyustendil Ihtiman

Tuy
CORSICA HYD-A-542
Zidilovo
Gueshevo
Pazardzhikk
Plovdiv Malkoclar
Blagoevgrad
HYD-N-543
Valença do Minho HYD-N-1151 ROME Sulmona HYD-N-788 Dimitrovgrad Strandzha
HYD-N-1149
HYD-N-819
SKOPJE

IGB
Vale de Frades Simitli
HYD-N-1153 HYD-N-1006
a Zaragoza NORTH Kardzhali
elZ ar
ed
-C HYD-N-1324
Zamora Lucera TIRANA MACEDONIA Petrich
M arM
H2 d-B
Me
Arbós Kulata
Castelnou HYD-N-1205
HYD-N-1149 Tarragona Barcelona H2 Gevgelija Sidirokastron Xanthi
Porto HYD-N-1156 Melizzano Karperi
Tivisa Evzoni Lachanas Komotini Kipoi
Salamanca HYD-N-1149 Serres
Celorico da Beira Porto Torres HYD-N-970 Kavala Marmara
Ereglisi
HYD-N-978 Napoli ALBANIA Nea Mesimvria
HYD-N-385
Alexandroupolis
HYD-N-1272
Trikala HYD-N-1092
Massafra Thessaloniki s
Mangualde Guarda ro
Cantanhede
MADRID
T Taranto of
Sa
HYD-N-978 y lf
HYD-N-1149 Balearic rr Montesano Katerini Gu
Figueira da Foz
Sea h ANKARA
MENORCA
SARDINIA e HYD-N-1205
S PA I N
RET-N-1050
HYD-N-978 n
Carriço
Oristano
ia Aegean
n
HYD-N-1149
Sagunto MALLORCA
S Tarsia Trikala Larissa Sea
e
a Volos

PORTUGAL Portovesme
Ampelia

Carregado
Bucelas RET-N-1049
Monforte

Campo Maior Badajoz Puertollano


IBIZA
HYD-N-970
RET-N-973 Lamia
TURKEY
Catanzaro
Aliaga
LISBON
Setúbal HYD-N-1149
HYD-N-1205 GREECE Aliveri

Mediterranean Sea Messina


Gioia Tauro Ionian
Sea
Ag. Nikolaos
Thisvi
Thiva
HYD-N-543 Agioi Theodoroi
Sines HYD-N-1149
Dioriga Gas ATHENS
Revythoussa
HYD-N-1272 Agia Triada
Mazara del Vallo Lavrio
HYD-N-1205
Cartagena Enna

Huelva Megalopoli

ALGIERS Antalya

TUNIS

CANARY ISLANDS
LANZAROTE Strait of Gibraltar
Malta LNG (FSRU)

LA VALETTA

M A LTA
Santa Cruz de Tenerife
FUERTEVENTURA
TENERIFE
Las Palmas

Arico-Granadilla LNG GRAN CANARIA


C R E TA NICOSIA
Arinaga LNG
CYPRUS

RABAT
Mediterranean Sea LEBANO
BEIRUT
Mohammedia
TUNISIA
Jorf Lasfar / El Jadida
MADEIRA
MOROCCO ALGERIA Ten-Year Network Development Plan 2022 – The hydrogen and natural gas TYNDP | Infrastructure Report | 47
TRIPOLI

Hadera Offshore

AMM
MAP FOR BIOMETHANE (BIO) AND OTHER
­INFRASTRUCTURE (OTH) PROJECTS IN TYNDP 2022
BIOMETHANE DEVELOPMENT PROJECTS
BIO-F-437 Supercritical water gasification demonstration facility Alkmaar FID PROD-INJ

BIO-A-921 Circular economy: waste to biomethane Advanced PROD-INJ

BIO-A-1107 Energy conversion waste organic materials to biomethane in Zsana Advanced PROD-INJ

BIO-N-20 GNI Sustainable Renewable Gas Central Grid Injection Project Less-Adv. PROD-INJ

BIO-N-125 Implementation of smart solutions for injection of renewable gases Less-Adv. PROD-INJ

BIO-N-287 Production of biomethane as a fuel for compressors Less-Adv. PROD-INJ

BIO-N-497 Reverse flow biomethane Denmark vol. 2 Less-Adv. REVERSE

BIO-N-547 Biomethane : Reverse flow Projects Less-Adv. REVERSE

BIO-N-624 Biomethane: Reverse flow projects Less-Adv. REVERSE

BIO-N-728 Biomethane: connection of production units Less-Adv. PROD-INJ

BIO-N-1265 Biomethane productions interconnection Less-Adv. PROD-INJ

OTHER INFRASTRUCTURE RELATED PROJECTS


OTH-F-541 CORE LNGas hive and LNGHIVE2 Infrastructure & logistic solutions FID TRANSPORT

OTH-F-632 Railway Proj. roadmap. Transformation to LNG, Biogas, e-fuels & H2 FID TRANSPORT

OTH-F-743 Impulse 2025 FID ELECTRICITY

OTH-A-300 HyOffWind Zeebrugge Advanced HYD PROD

OTH-A-401 Antwerp@C Advanced CCS

OTH-A-430 Porthos Advanced CCS

OTH-A-898 CNG filling station system development (CroBlueCorr project) Advanced TRANSPORT

OTH-A-924 Power to Methanol Antwerp Advanced OTHER

OTH-A-1043 Power conversion with fuel cell in Kardoskút UGS Advanced HYDROGEN

OTH-A-1046 Replacement of boilers in Zsana and Hajduszoboszlo UGS Advanced METHANE

OTH-A-1073 Sector-coupling with installing and relocating compressor units Advanced HYDROGEN

OTH-A-1104 Synthetic methane production in Zsana UGS w/ electricity balancing Advanced SYNT METH

OTH-A-1110 Reduction of methane emission with portable compressor Advanced METHANE

OTH-A-1269 CO2 Export & Transmission Facilities Advanced CCS

OTH-A-1337 Reduction of methane emissions in UGS Lab Advanced METHANE

OTH-N-305 PEGASUS Less-Adv. SYNT METH

OTH-N-306 Greening of Gas (GoG) Less-Adv. OTHER

OTH-N-322 North Sea Wind Power Hub Less-Adv. HYDROGEN

OTH-N-453 Hydrogen production for fuel gas at Városföld CS Less-Adv. HYD PROD

OTH-N-456 SAVA aquifer CO2 transmission claster Less-Adv. CCS

OTH-N-551 DRAVA aquifer CO2 transmission claster Less-Adv. CCS

OTH-N-554 Osijek aquifer CO2 transmission claster Less-Adv. CCS

OTH-N-560 Establishing power plant cap. to use max. 25% H2 at Szőreg-1 UGS Less-Adv. ELECTRICITY

OTH-N-604 P2G4A. Less-Adv. ELECTRICITY

OTH-N-920 Measures for the reduction of methane emissions Less-Adv. METHANE

OTH-N-929 Ghent Carbon Hub Less-Adv. CCS

OTH-N-972 Methane emission red. booster compressor Mosonmagyaróvár CS Less-Adv. METHANE

OTH-N-982 Portable compressor to reduce methane emission Less-Adv. METHANE

OTH-N-984 Pycasso Less-Adv. CCS

OTH-N-993 LNG Hub: 2nd jetty for maritime fuel Less-Adv. TRANSPORT

OTH-N-1069 Methane emission reduction booster compressor at Városföld CS Less-Adv. METHANE

OTH-N-1070 Methane emission reduction at 7 compressor station Less-Adv. METHANE

OTH-N-1071 Hydrogen production for fuelgas at Mosonmagyaróvár CS Less-Adv. HYD PROD


Download the map from ENTSOG website:
OTH-N-1133 CO2 network in Dunkirk Less-Adv. CCS

OTH-N-1157 CO2 Grid Italy Less-Adv. CCS


Just click on the icon.

OTH-N-1201 Reduction of transmission system methane emissions Less-Adv. METHANE

OTH-N-1230 Green H2 at CS01 Less-Adv. HYD PROD

OTH-N-1242 Modernisation of compressor units Joint Stock Company Less-Adv. ELECTRICITY

OTH-N-1338 Hydrogen production for fuelgas at Szőreg-1 UGS Less-Adv. HYD PROD

Figure 35: Map for Biomethane (BIO) and Other Infrastructure (OTH) projects in TYNDP 2022

48 | Ten-Year Network Development Plan 2022 – The Hydrogen and Natural Gas TYNDP | Infrastructure Report
BERYL Haugesund
Avaldsnes
Karmøy
Karlstad STOCKHOLM Paldiski
TALLINN Narva

Kårstø Örebro
Bygnes Fredrikstad

ED
Stokke

RL
Järna Nevsk

IPE A
TE

II
IIB
KA
GRANE Slantsy

ZE IPE

E
VE

AT
FU
Rafnes

EP
UTS

NS
EP
ESTONIA

ZE

DE
E
KEYS Stavanger Brunnsviksholmen

PIP
IRA

ON
(Nynäshamn)

AT

RC
Risavika

ST
BRAE EDVARD GRIEG

NE
Mariestad

EIP
Cross-border points / intra-country or intra balancing zone points

SL
GUDRUN Norrköping
JOHAN SVERDRUP Velikiya Novgorod

GE
Lidköping

SA
Linköping Borovichi
Cross-border interconnection point Cross-border interconnection point

ON)
Lorem ipsum Pärnu Puiatu

R
Lysekil Mlölby

LE
within Europe within Europe

RATI
MIL
SLEIPNER
or export point to non-EU country or export point to non-EU country OUTER

OPE
Stenungsund
HEBRIDES
k

de
Vallby Kile Valdai
Under construction or Planned GOLDENEYE a

OT IN
DRAUPNER
rr
Karksi

bri
ATLANTIC
Gulf of

M I (N
Cross-border interconnection point Cross-border third country (import) BRITANNIA e Riga Värska
Pskov Vichni Volochok

EURO
He
REV Göteborg
with third country (import) Under construction or Planned

REA
NNIA a JönKöping Luhamaa
k

TH

PIPE
BRITA Misso

D ST
Izborsk

he
Göteborg
S BIO-N-125

SOU
FORTIES GO4LNG
Cross-border interconnection point
RUSSIA

II

NOR
EVEREST Gnosjö
Third country cross-border St. Fergus Korneti

f t
Gislaved

GELED
GOTLAND
(Virtual Point) (Virtual Point / import) FULMAR
Torzhok

a o

LAN
Skulte
Intra-country or Third country cross-border

Se
L AT V I A
Aalborg
intra balancing zone points interconnection point ULA
Varberg
RIGA
Incukalns

Ka
BIO-N-125 BIO-N-125
ELGIN FRANKLIN BIO-N-125
LNG Import terminal LNG Import terminal INNER
Ljungby BIO-N-125
Tver

tt
GYDA
(operational) (Under construction or planned) HEBRIDES

North
Kalmar

eg
EKOFISK OTH-N-322 Halmstad
BIO-N-125
LNG Export terminal LNG Export terminal Lille Torup Liepaja Iecava Rezekne
(operational)
Sea

at
(Under construction or planned) VALHALL
HARALD
BIO-N-497
Rzhev

EUR
HOD SYD
Kiemėnai

DENMARK

OP
ARNE Helsingborg Kristianstadt

IPE
Kuršėnai
Gas Reserve areas Countries

I
Glasgow Edinburgh KKP Daugavpils

SEAL
TYRA BALTIC PIP Siauliai
Gas field Drilling platform E

S
Kubink
Other Countries EU Countries No COPENHAGEN

CAT
BIO-N-497 Klaipéda
Klaipéda LNG
rt (FSRU Independence) Panevėžys

EUROPIP
h
a
Malmö

Baltic Se
Ch Egdved
Nybro Visaginas Navapolatsk
an
LITHUANIA
Odense Kongsmark Dragør
ne BIO-N-497

E II
l
Transport by pipeline Storage facilities Nyborg Trelleborg
Moffat
B/13 Faxe Vitebsk
Jurbarkas Dorogobuzh
BORNHOLM Kaliningrad
Existing infrastructure for natural gas : Acquifer BALTIC PIPE (FSRU)
Jauniunai

EU RPIP
Šakiai
Diameter < 600 mm

NO
RO E
IP Twynholm
Salt cavity - cavern Londonderry
SN
Kaunas

PIP
/ Derry

ZEEPIPE
FRANPIPE
Brighouse Bay VIP DK-THE
VILNIUS

EI
NOGAT
Ellund Smolensk
Diameter 600 - 900 mm Depleted (Gas) field on shore / offshore
Carrickfergus Teesside
Kotlovka
Kaliningrad

Diameter > 900mm Belfast Middlesbrough Gdansk (FSRU) RUSSIA K

GIPL
DEUD

BALT
Other type BREAGH Orsha
Not operational CORRIB AL

IC PI
YAM

AN
Bellanaboy Kiel Gdansk Krupskaya
ISLE OF MAN Santaka
Helgoland

PE
S
CM
FID projects Killeen
R2 Douglas Barrow
MURDOCH NG Rostock Greifswald
Lubmin Kirov

Biomethane / Other pipeline infrastructure TO T Lubmin II Cher


EC Świnoujście

R1
Olsztyn
NN
Kamminke
Non-FID, advanced projects Irish MINSK

TO
Quarnstedt
BIO-N-20RCO Mogilev
FID project Moeckow
IRELAND
BIO-N-20

EC
TE Leeds W. SOLE MARKHAM
Brunsbüttel Płoty
Sea Levitzow

NN
IN AMETHYST

CO
Non-FID, advanced project Non-FID, less-advanced projects Gormanston Dornum
Wilhelmshaven Stade Schwerin
NE
L

ER
SEAL

L
Easington NGT Hamburg

GIP
WAL

INT
Manchester AUDREY Krummhörn Sülstorf
S Eemshaven Szczecin Sionim
Loughshinny CM

HyONE
Point of Ayr
Non-FID, less-advanced project Etzel Harsefeld
NEL Nezvizhskaya

NET
GALLEON Jemgum Kraak
DUBLIN Emden L Osipovich

RA
Theddlethorpe LANCELOT Uniszki Zawadzkie oPo

EUGAL
Galway EuR Bryansk

T
Groningen Folmhusen

OPAL
Tietierowka

GA
Oude Bünde Wardenburg Schwedt

BELARUS
Bremen

L
NO
LEMAN Statenzijl Barßel EuRoPoL

NE
Damaslawek Orel
Julianadorp Kondratki Babryusk
Biomethane projects HEWETT Balgzand Steinitz

G
Gustorzyn
BBL

RH

L
Bacton Vlieghuis Oranienburg Point of Interconnection

NE
Wieringermeer Płońsk
Lingen Nordlohne (PWP) PL

INTE
Limerick
BIO-F-437 BERLIN EuRoPoL Wloclawek
FID projects
UNITED
Mallnow Rembelszczyzna
Lelystad Pogar

RCO
Shannon LNG Birmingham Zwolle Rehden Gomel

L
Ijmuiden Kienbaum Lwówek

WA
Ahlten Wolfsburg Wysokoje

NO
VIP TTF-THE-H Emsbüren Drohne

NNEC
Poznan
Project identification : OTH-A-430 AMSTERDAM Hannover Hołowczyce Kromy

KINGDOM
VIP TTF-THE-L
Non-FID, advanced projects Warwick
Waterford
THE NETHERLANDS

TOR
Groß Köris
Apeldoorn Enschede Ochtrup Magdeburg
Den Haag Salzgitter WARSAW Kobryn
Utrecht Epe AL
Non-FID, less-advanced projects BIO-N-123 ENTSOG project code Winterswijk Legden
JAG
Radeland Eisenhüttenstadt
Mozyr
Milford Haven Rotterdam Zevenaar Münster Guben Gubin
Cork OTH-A-430 Nijmegen Elten Staßfurt

EUGAL
K

OPAL
Dragon LNG Ravenstein

L
IN
GCP GAZ-SYSTEM/ONTRAS Lodz Kursk

DA
EL
South Hook LNG

ZE
Moerdijk Voerde Werne

WE
Odolanów
PROD-INJ Network development projects enabling biomethane production/injection into the gas grid KINSALE HEAD Cardiff VIP BENE Tilburg
Xanten
GERMANY Bernburg
SEVEN HEADS Isle of Grain OTH-A-300 Vlissingen Essen Dortmund
POLAND

MIDAL
l Hilvarenbeek Venlo Wronów
LONDON Terneuzen Zandvliet Duisburg Bad Lauchstädt
REVERSE Projects enabling the reverse transportation between DSO and TSO of biomethane ne Poppel
an Zeebrugge Zelzate Leipzig
Ch

EUGAL
OPAL
Tegelen Lasów
ol Brugge Antwerpen
ist
Dunkerque K Lublin
OTH-N-929 IN Düsseldorf Kassel
Br OTH-A-401 ZE
EL
Dresden Wroclaw
Sudzha
Gent Opwijk Obbicht
Alveringem OTH-A-924 Dilsen Chemelot Köln Sumy
Sayda
Broichweiden
OTH-N-1133 VIRTUALYS Lutsk
Other infrastructure projects BRUSSELS ‘s Gravenvoeren
Bocholtz
Weisweiler STEGAL
U
Lille Eynatten Raeren/Lichtenbusch Deutschneudorf Olbernhau
Rozwadów (Charzewice) UP ress
OTH-A-1269 VIP THE-ZTP Reckrod Hora Svaté Kateřiny g
VIP Brandov Pro
Herbstein
Tworzen
FID projects BELGIUM KYIV

EKKR
Kędzierzyn-Koźle
Quévy

TE
Koblenz
Blaregnies Hradec Králové Zhytomyr
l

NP
nne Taisnières Racibórz Katowice
Project identification : ISLES
OF Cha Frankfurt
Oświęcim Jaroslaw
of Ukrain
e
Non-FID, advanced projects lish
CZECH
st
AL Kyiv - We
Y
SCILL
Eng PRAGUE Rzeszow Kharkiv
MID
Bras
Hať Skoczów Pogórska Wola
Drozdwicze Drozdovychi Lviv
REPUBLIC
GDLux (BE) / Rimpar
Non-FID, less-advanced projects OTH-N-123 ENTSOG project code Cherbourg
Bras Petange (LU) LUX. Gernsheim Plzeň
STORK
Cieszyn
LUX. Rothenstadt
UPU d)
-Uzhgoro
Würzburg Hermanowice
Ternopil
y-Pomary
Le Havre Pétange Forchheim
Remich MEG Waidhaus
FSRU LE HAVRE Gournay
Perl AL
Lampertheim AL Strachocina
(Urengo SS
Poltava
MEG MEGAL OTH-N-306 PROGRE
CCS Converted Infrastructure for Carbon Capture & Storage Völklingen Kaiserslautern Nürnberg Schwandorf Z

L
Vinnytsia
SOYU

GA
Bezměrov Žilina
ME Výrava

ME
Caen TE GA Brno
Obergailbach NP
L Poprad Kremenchuk
HYD PROD Hydrogen production facilities other than the onces included in category HYD Medelsheim Karlsruhe KR
I

LSF
Cheppy
SLOVAKIA SD
Regensburg Ivano-Frankivsk
N
SC ORD Dolni Bojanovice
České Budějovice Dolyna

UKRAINE
LE HW
Lannion Arresting
A project related to the transport sector Strasbourg
Au am Rhein ITU AR
NG ZW
AL Břeclav Jablonov Košice
OTH-N-1230
TRANSPORT PARIS D
Lanžhot OTH-N-920 Bohorodchany

P
(incl. road, railway, aviation and maritime transport) Leonberg Stuttgart Nad Turňou

TEN
Kuty uk

LFF
Nancy
Saint-Arnould Oberkappel Lakšárska Nová Ves
Vel’ké Uzhhorod ch
Wertingen WAG Láb OTH-N-920
Zvolen en

CZATi
des Bois Kapušany Budince
ELECTRICITY Projects enabling gas- electricity integration BIO-N-287 Vel’ké Oleksiivka rem Kropyvnytskyi Dnipro
OTH-N-1242 -K
T
Brest MONA ES Nitra Zlievce
Morelmaison CO Burghausen W iv
an
A
/Uberackern NT Baumgarten OTH-A-1137
Dierrey-Saint-Julien Finsing PE Linz Beregdaróc An
Projects enabling the production, reception, injection, transportation or München Haiming
VIENNA Ivánka Pri Nitre
OTH-N-920

Atlantic Ocean
Rennes Wolfersberg OTH-N-1070 Beregovo
HYDROGEN BRATISLAVA Selešťany
end-use supply of hydrogen OTH-N-604 Balassagyarmat VIP BEREG

HAG
Inzenham Kittsee Tekovo Siret
Voisines Freiburg im Breisgau Mosonmagyaróvár
Le Mans Orleans Haidach Mediesu Aurit Zaporizhzhia
SYNT METH Synthetic methane projects aiming at decarbonizing the gas grids Mulhouse
Krozingen
Thayngen Kiefersfelden
Salzburg OTH-N-972 OTH-N-1070
Satu Mare Ananiv
Kryvyi Rih
OTH-N-1070 Szada
VIP Fallentor
Pfronten
Dorog OTH-A-1110 SDKRI Nikopol

METHANE Dedicated projects to reduce methane emission in existing infrastructure Oltingue


Rodersdorf
Germany-CH
Basel Wallbach
Lindau
Leiblach
Kufstein
VIP Kiefersfelden / Pfronten
OTH-N-1071
BUDAPEST Hajdúszoboszló
OTH-A-1046
OTH-A-1073 Fălticeni
MOLDOVA
Ungheni

TAG
Zürich

AUSTRIA
Százhalombatta OTH-N-1070 Leţcani
BIO-N-547

AT I
Innsbruck Ercsi Vecsés
OTHER Any other infrastructure related projects Montoir de Bretagne Nantes
BIO-N-624
Lucerne Adony
OTH-N-1070
OTH-N-1069
Iaşi
L I E C H T. Gherăești
Graz OTH-N-453
Palleau BERN OTH-N-982 Siófok Mykolaiv
Weitendorf Sărmăşel CHISINAU
HUNGARY
II Városföld
TAG Kardoskút Grebenyky Melitopol

SO
Kherson
SWITZERLAND

L
IMurfeld
TAG Cersak
BIO-F-437 HYPSTER FID Griespass
Arnoldstein
Tarvisio
Klagenfurt Tornyiszentmiklós OTH-A-1073 OTH-A-1110
OTH-A-1046 OTH-A-1104
OTH-A-1043 Târgu Mureş Bacău Yuzhne
Pince Nagykanizsa Odesa
Etrez KidričevoOTH-A-898 Szoreg
Kaposvár Kaushany
Passo Gries BIO-A-1107
Zsana OTH-N-560
La Rochelle Geneva
Bordano SLOVENIA OTH-N-1338 Horia
Coroi Onesti Sea

AI
Project ENTSOG code Project Name & Promoter Project status code Masera Zabok Kiskundorozsma Arad

RI,
FRANCE
Rogatec Báta Csanádpalota
Flaibano Udine LJUBLJANA OTH-N-551 Kozármisleny

DK
Trento
OTH-N-1070
Subotica Nagylak

I, S
OTH-A-898 Petrovaselo Mediaș
ZAGREB OTH-N-1070

AT
Gorizia Ajdovščina EA
Project not marked on map Lyon Bizzarone
Treviso
Sempeter
Lučko
Drávaszerdahely Sombor
Mokrin
ST
RIN Sibiu Șinca
GOLITSYNO
STREIKOV
KERCH
Exact project location is not available or is marked as confidential Trieste OTH-N-1201 Okoli
OTH-N-456
OTH-A-898
Donji Miholac BR
UA
G Brașov
Chernomorsk
Koper
Milano Karlovac Kozarac Osijek Hateg ODESSA K
Exact project locations not marked on map Bačko
ROMANIA
Umag OTH-N-554 Jupa
Venezia Zlobin Bosiljevo Novo Selo Orlovka KRYM
Sotin

BRUA
Project has several locations/points. Grenoble Porto OTH-A-898
Rijeka
Omišalj Tržac Vel. Kladusa
Slobodnica Novi Sad Isaccea
The indicated location is for representation purposes only Bay of Biscay Saint-Avit
OTH-N-1157
Viro Rovigo Krk LNG
Cazin
OTH-A-898 SHTORMOV Yevpatoria
Torino Vodnjan Brod
and does not indicate the exact location of the project Bassens Castillon Poggio
Renatico
Cavarzere
Lička
Jasenica
Rakovica Bos. Krupa
Banja Luka
Modrica EAST Urziceni
Bordeaux Pula RIN
Parma Bihač G
BIO-N-728 Bibeşti COBALCESCU
BOSNIA BELGRADE

PIPELINEKAN
Bilciurești Alushta
Modena Gospič Sevastopol
AND Loznica Horezu Slobozia

TRANS-BAL
BUCHAREST LEBADA
Project status codes : Bologna FSRU 2 - SNAM C R O AT I A HERZEGOVINA BRUA
Podișor Bălăceanca
Vadu Yalta
BIO-N-728 Genova Ravenna Zvornik Ghercești Năvodari
BIO-N-728 OTH-A-898
Travnik
SERBIA LUCEAFARUL DOINA
FID Advanced Less-Adv. FID status (Final Investment Decision) BIO-N-728
I TA LY
Zenica Constanţa
Zadar
Panigaglia Benkovac G.Vakuf Zaychar Silistra
Knin ANA DOMINO
San Marino Giurgiu Ruse
Lussagnet OTH-F-743 Manosque OLT Offshore LNG Kiseljac Kardam
Advanced status is applied to all projects that, based on the information submitted, have: GAVIOTA UR
GASCOGNE
MIDI Monaco
Toscana (FSRU)
Firenze
SARAJEVO
Negru Voda
DO Saint-Martin-de-Crau Ancona Kireevo
E L’A
Musel / Gijon
- commissioning year expected at the latest by 31st December of the year of the TYNDP project Toulouse Nice

IBR
Razgrad
RE D Carresse-
Black Sea
Ferrol Barran Imotski Dobrich
IAP
ARTE BIO-N-728
OTH-F-541 Bayonne Split Posušje
Santander Cassaber Livorno OTH-A-898
data collection + 6 (e.g. 2028 in case of TYNDP 2022, for which projects are collected in 2022) Mugardos OTH-N-993
OTH-F-632
OTH-F-541
S. Sebastián Lacq Cruzy (Hérault) Pleven Valchi Dol
Guitriz Oviedo Pau OTH-N-984 Fos Tonkin Marseille
Ligurian Terranuova Bracciolini
San Marco Recanati A Zagvozd Mostar
IBS
Montana Shumen Vetrino
- and whose permitting phase has started ahead of the TYNDP project data collection - OR -
A Coruña Bilbao Irun Biriatou BIO-N-728 Tarbes Barbaira Fos Cavaou Toulon d Niš Targovishte Varna
ri OTH-A-898

AD
Vratsa Lovech Provadia KAVARNA
Sea

RIA
FEED has started (or the project has been selected for receiving CEF grants for FEED ahead of the Lugo VIP PIRINEOS Larrau BIO-N-728 Gulf of Perugia Monte Urano a Ploče Veliko Tarnovo
ti

TIC
Huelva Piombino Dimitrovgrad IBS Botevgrad Rupcha GALATA
BIO-A-921 BIO-N-728 MONTENEGRO Gabrovo KALIAKRA
Pamplona Port-la-Nouvelle Lion BIO-N-1265
c IA

A
TYNDP project data collection) Santiago Vitoria Rio Marina P Novi Iskar

PIPEL
PRISTINA
de Compostela Castropodame Bastia FSRU 1 - SNAM Cellino S
e UNMI Pernik
SOFIA BULGARIA Lozenets

INE
Leon
a PODGORICA
STREAM
Ponferrada ANDORRA
Pontevedra Burgas
Logroño KOSOVO Stara Zagora Yambol TURK
Gallese L’Aquila Chieti Kyustendil
Ourense Burgos Villar de Arnedo Ihtiman
Figueras
CORSICA Gueshevo

IA
ENTSOG currently comprises 43 TSO members, Larino Sopot

P
Tuy Palencia Huesca Pazardzhikk
Zidilovo Blagoevgrad Plovdiv Malkoclar
Valença do Minho Ajaccio ROME Sulmona Dimitrovgrad Strandzha Sinop

2 Associated Partners from 27 European Countries and 10 Observers Soria San Paolo
Tetovo
SKOPJE Bansko

IGB
Hostalric OTH-N-305 Simitli
Edirne Kırklareli
Gostivar Shtip
Vale de Frades Valladolid Zaragoza Smolyan Kardzhali Bartın
Campobasso NORTH Kıyıköy
OTH-F-632
Zamora
Adradas
Lérida
Lucera TIRANA MACEDONIA Negotino Petrich
Zongulda Bafra
OTH-F-541 Kastamonu Samsu
When the same point is affected by several projects, the point is shown with the Barbolla Castelnou
Tarragona
Arbós
Barcelona Bari
Prilep
Gevgelija
Kulata
Sidirokastron Xanthi Istanbul
Karabük

IAP
Porto Karperi POSEIDON
highest project status (operational, FID, advanced, non-FID), the status from single Salamanca
Tivisa
Melizzano
Kafasan
Bitola
Evzoni Lachanas
P Serres
Komotini Kipoi
Tekirdağ
Segovia TA
projects can vary from that. Celorico da Beira Porto Torres Olbia Dumrea Kavala Marmara

TA
Nea Mesimvria Alexandroupolis Ereglisi Bolu

N
POSEIDON Düzce

AP
Sassari Napoli Potenza
Avila Brindisi Plati Yalova Sakarya Amasya
Berat TAP
The projects are shown with the planning status reported in their TYNDP 2022 Mangualde Guarda MADRID
Guadalajara
Massafra
TAP
Fier
Korce Trikala Thessaloniki ro
s
Kocaeli Çankırı
Çorum
Cantanhede Alghero T Matagiola Vlorë Bilisht TAP
of
Sa
submission. Balearic Macomer
Nuoro y
rr
Taranto San Foca
Melendugno Gu
lf

S PA I N
Teruel Montesano
VIP IBERICO ALBANIA Katerini
Figueira da Foz Cuenca
Sea h Çanakkale Bilecik
ANKARA
All data provided on this map is for information purposes and shall be treated as MENORCA
SARDINIA e
n
Otranto
I
Bursa
Castellón IG ON
indicative and non-contractual in nature, without pre-empting different outcomes Carriço
Toledo
de la Plana
Oristano
Palmas Arborea ia PO
SE
IDO PO
SE
ID
Aegean Eskişehir Kırıkkale
Yozgat

OTH-F-541 n N TANAP Pipeline


of any possible discussion held at regional level. Under no circumstances shall it be Sagunto MALLORCA
S Tarsia Trikala Larissa Sea Balıkesir
TANAP Trans-Anatolian
regarded as information intended for commercial use. Valencia e
Cáceres
Palma de Mallorca a Volos

PORTUGAL Portovesme
Carbonia
Cagliari
Florovouni Thesprotia Ampelia Kütahya

TURKEY Kırşehir

EAST
Monforte
Carregado Albacete Sarroch
Version : March 2023 Bucelas Puertollano
Ciudad Real IBIZA Lamia

MED
Campo Maior Badajoz Porto Botte Catanzaro
Aliaga Tu

GREECE
Afyon
LISBON z

WGS 84 / Pseudo-Mercator projection


G
öl
Manisa ü Kayseri
Uşak
Setúbal Nevşehir
Halkida Aliveri

Alicante Mediterranean Sea Palermo Messina


Gioia Tauro Ionian
Sea
Ag. Nikolaos
Thisvi
Thiva
Inofyta Izmir Aksaray

Murcia Agioi Theodoroi


Sines
Dioriga Gas ATHENS Niğde