Professional Documents
Culture Documents
19.10 - Rede Drenagem Aguas Residuais Domesticas
19.10 - Rede Drenagem Aguas Residuais Domesticas
5
5 .78 5.2 8
4.7 9 34 .30 =3 2.0
CT
7
=3 2.3 96 CT=S=32 C T S= 3 5.6 6
ito =3 1.8
Ø200→
C T S= 3 C
C T S= 3 5
97
C
C 95
SECT
5.8 9
ós s 7
4.7 0 C =3 1.7
OR
p =3 2.9 98 C T S= 3
0
6.0 1
De gá 94 C T S= 3
O =3 1.7 4
R2
C
5.9 8
C C T S= 3 =3 1.7
de C ←Ø200
92
C T S= 3
1
5
93 C 5.7 1
=3 1.8
Es C T S= 3
C
2
ta C 4 0
4.9 9
1
4.9 4 4.9 7 5 1
5 =3 1.8 4.7 5 3.5 4
cio 5.3 9 4.8 6
=3 2.1 =3 1.9 =3 1.9 C T S= 3 =3 1.4
5
4.6 5 3
4.5 3 =3 0.9
91 =3 1.8 C T S= 3 9
C T S= 3 C T S= 3 =3 1.2 =3 1.1 4.3 2 C T S= 3
na C T S= 3 6 C T S= 3 C C
C T S= 3 =3 1.0
5
4.2 2
SECTOR 3 35
4 4.6 8
C C C T S= 3 9 C
m 90 C 4.6 8 =3 2.2 3 0 C
32
C C T S= 3 =3 0.8 4.0 2
=3 0.6
31
C
6 =3 2.3 C T S= 3
en 4.8 3 C T S= 3 A 33 34
C
C T S= 3
to =3 2.0 C T S= 3 C 31 C
C
C T S= 3 36
C
7
28 37
4.6 3 38
C Ø200→
29
8
=3 2.1 4.1 6
88 C T S= 3 =3 2.2
89
00
C C T S= 3 39
←Ø2
←Ø C
87
200 8
8
86 40
3.9 1
=3 0.4
4.2 2 C T S= 3
=3 2.2 C
C T S= 3
200
←Ø
C
200
0
10
←Ø
0
3
4.4 4 4.3 8
=3 2.6 =3 1.2
C T S= 3 6 C T S= 3
12
C C
9
4.7 9
=3 1.8 9
1 C T S= 3 6 7 3.1 4 2
5.1 1 Ø200→ C =3 9.7
=3 2.2 C T S= 2
C T S= 3
66 6
3.6 1
C
=3 2.9
6
5.6 3
C
Ø2
00 →
=3 1.2
C T S= 3
C
10
1 41 CONVENÇÕES
C T S= 3 Ø200 →
C
65 68
→
Ø200 5 -LIMITE DA ÁREA DE INTERVENÇÃO
2.1 0
64 =3 0.4
69 2
10
0
6
6.2 2 C T S= 3 2.4 1
=3 3.2 C 0
1.7 3
5
3.3 6 42 =3 9.2
C T S= 2
C T S= 3 =3 9.9 =3 0.9 -COLECTOR EM PVC
C C T S= 2 C T S= 3 Ø2
C
70
C C 00 →
5
1.2 0 3 07 1 -CÂMARA DE VISITA DA REDE RESIDUAL DOMÉSTICA
=3 8.8
C T S= 2 10 =33.0.77 9.5 7
=2 6.9
2 C C T S= 3 C T S= 2
8.0 1 C C
=3 5.1 63 3
4 15
C T S= 3 3
2
1.9 7 43 -CÂMARA DE RAMAL DE LIGAÇÃO DE LOTE
Ø2
C 6.9 6 =3 8.6
00
=3 3.6
2 13 1
C T S= 2
17 16
60
→
C T S= 3 C
C
11
9 18
-DIÂMETRO E SENTIDO DO ESCOAMENTO DO COLECTOR
9 10 1
1 20 1
←Ø200
6
3.4 2
=3 0.5
3 22 2
7 8
C T S= 3 -DESCARREGADOR
C 4
71 10
1
7.9 2
200
5 24 2
5 6
=2 5.5
←Ø
0→ 0
20 0.6 8 C T S= 2
Ø =3 8.1
2
C
4 -CAUDALÍMETRO
3 4
C T S= 2
27 26
61
← Ø200
C
7
1 2
7.7 1 5
0,7
=3 4.4 10
29 28
41
C T S= 3
l/s
C 62 0
3.8 4
1
9.1 9
=2 5.0
4
8.2 4 =3 0.4 C T S= 2
=3 4.3 C T S= 3 C 44
200
C T S= 3 C
←Ø
C
4
9 8.7 4
3.8 4 =2 3.0
=3 0.3 C T S= 2
C T S= 3 12Ø 8
←Ø200
6 200 C
→
C 6 9.6 9 5
8.1 6 5 6
10 =2 7.5 13 6.0 3
←Ø2
Ø200→
00
C T S= 2 7 7 =2 3.1 =2 3.7
C 9.5 7 C T S= 2 C T S= 2
=2 7.2 9 C C
7 C T S= 2 8.8 7
1
7.8 5 103.82 8 C .40
29 13
=2 2.9
C T S= 2
9
=3 5.1
C T S= 3 =3 0.2
C T S= 3
14CT==27. C
SECT
C CS
15
C
00
72 2
←Ø200
Ø2
Ø2
9.2 4
=2 6.9
OR 4
00
←
→
6
4
8.9 2 3.3 3 C T S= 2 Ø20
=2 7.2 =3 0.0 C 0→
6
C T S= 2 C T S= 3 4 6
8.8 9
L
5
C 8 9.9 2
C
10 =2 6.4 16 =2 2.9 45 6.7 2
=2 3.5
IPA
C T S= 2
4 C 178.73 5 C T S= 2 C T S= 2
18 8.54 4
5.8 6 8 =2 6.2 C C
=2 4.1
C T S= 2
12 C T S= 2
=2 6.1 Ø200→ 19 .32
5
8.0 5
C
C 8 7 =2 5.8
C C T S= 2 =2 5.9 C T S= 2
6 9 20
IN
Ø
C T S= 2
10
3.0 7 20 C C
=3 9.8 0→ C
C T S= 2
11
PR
C
9
6 12 6
8.0 7
2.6 8
46
4
=2 5.7
35
5.7 5
SE 11
=3 9.6
A
=2 3.8 C T S= 2 0
34
C T S= 2 7.0 7
C T S= 2 C
RU
0 =2 2.8
33
CT
C C T S= 2
1
32
2
C
31
3
OR
30
4
200
29
5
←Ø
28
H
SE
5
6
27
1
87
9
11
25
Ø
2.2 1
73
20
=3 9.5
CT
24
0→
3 4
5.3 3 5.8 4
9
C T S= 2 8
23
1
8.6 3 1.9 4 =2 3.5 =2 2.7
47
10
C
=3 9.3 C T S= 2 C T S= 2
22
=2 6.7
OR
C T S= 2
11
C T S= 2
21
C C
C 12
12
C
1
20
13
8
14
19
5
61 1
.98
17
8
4.3 7 24 .56
22
18
=2 2.5 C = T= 2 2
C T S= 2 21 C S
3 C 5
11
2
1.5 2 2 9 4.0 6
=3 9.1 3 4.8 7 4.2 2 =2 2.4
C T S= 2
C
1.2 3
=3 8.9
=2 2.7
C T S= 2
=2 2.4
s T 2
2 l/ C S=
50 C T S= 2
C
C T S= 2 C Ø2 0,4
0 C
6 49
4 00 → 3
3.9 2
48
← Ø200
11
C
51 =2 2.0
C T S= 2
3.7 9
=2 2.3
74 C C T S= 2
C
3
8.6 5
=2 6.2 23
C T S= 2 8
C 4.9 5
5 =2 2.3 Ø20
0→
3
0.7 2 11 C T S= 2
=3 8.5
C
24
C T S= 2 0
C 6 30.5 29 1
Ø20
0→ 1
3.7 6
11CT==28. 4.3 2
=2 1.6 =2 1.4
C T S= 2
52
C S C T S= 2
RUA 7
C C
Ø2
00 →
7 0
0.0 1
111 =3 7.5
9.9 1 C T S= 2
=2 7.7
75
C
C T S= 2 8
8 C 0,495 l/s 11
8.1 6
=2 5.9 7
C T S= 2
C
12
0
← Ø20
0
5.7 7
76 =2 1.0 53
3
8.6 1 C T S= 2
2 C
8.0 2 =2 6.9
=2 5.6 9 C T S= 2
C T S= 2
11
C Ø20
0→
C
54
5
4.3 2
P1
=2 0.9
C T S= 2
SECT
3
C 3.4 57
=2 20. 3
OR27 7
Ø20
0→ CT Q= 20.2
C S=
C 7
9 3.2 4
8.0 5 ←Ø
26 =2 0.4
0 =2 6.3 200
C T S= 2
77 12 C T S= 2
C C
7
8.5 7
=2 5.1 1
3.0 7
C T S= 2 =2 0.5
C A C T S= 2
25 C
9
8.0 8 ←Ø
200
1 =2 6.1 3
C T S= 2 2.6 0
12 C =2 0.7
25 C T S= 2
C
250
←Ø
5
7.6 2
=2 5.9
C T S= 2
C
2
78 12
3
8.1 2
=2 4.7
C T S= 2
C Ø2
00 →
0
Bypass
5.2 7
=2 9.8
Ø2 C T S= 1
00 → C
55
3
12
1
9
6.2 9
=2 3.3
.4 C T S= 2
59
C
22 .54 79
= 18
7
7.7 0
=2 4.3
250
C T S= 2
←Ø
C
C S=
C 4 C
=2 3.0
C T S= 2
3
4.9 7
12
80
9
7.2 8
=2 3.8
C T S= 2
C
Descarregador a montante da
315
10,5
Estação Elevatória (ficha técnica
70
←Ø
l/s
81
3
6.1 9
1
57
2 4.3 2
4.0 5 =2 9.2
=2 2.3
C T S= 2 C T S= 1
C C
Residuais Domésticas) 58 9
3.6 2
=2 8.9
C T S= 1
Ø315→ 83 C
2
3.6 1
=2 1.9 Ø20
25
0
C T S= 2 0→
←Ø
C 1
3.7 5
=2 1.4
C T S= 2
C 1
2.4 4
E
=2 8.5
.
C T S= 1
C Bypass
E o
ç ã ia
ta atór
59
P1
s
315
E le v ficha técnica encontra-se em anexo a Memória Descritiva
←Ø
E
D
da Rede de Drenagem de Águas Residuais Domésticas
Ø315→
E
E.
D
Conduta de descarga da conduta elevatória Ø200
1
Caudalímetro Ø200
D
FF
00
Ø2
Válvula anti-retorno
C
1
FF
D Conduta de descarga da conduta elevatória Ø200
l/s
D
FF
Válvula anti-retorno
,30
31
Projecto OBRAS DE URBANIZAÇÃO - REDE DE DRENAGEM DE ÁGUAS RESIDUAIS DOMÉSTICAS
Fase Alteração ao Projeto Aprovado
Requerente Oceânico II
PLANEAMENTO 2-REDE DE ÁGUAS 5-ELECTRICIDADE 8-REDE DE PLUVIAIS 11-PROJECTO DE ACÚSTICA 14-PROJ. DE ALTERAÇÕES
RECURSOS HIDRÍCOS 3-REDE DE ESGOTOS 6-TELEFONES 9-PROJECTO DE AVAC 12-PROJ. COMP. TERMICO 15-PROJ. DE EXECUÇÃO
1-ESTABILIDADE 4-INFRAESTRUTURAS VIÁRIAS 7-RESIDUOS SÓLIDOS 10-PROJECTO DE GÁS 13-MECÂNICOS 16-PROJ. Seg Contra Incêncios
Designação: