Professional Documents
Culture Documents
Brief
Brief
Of
MAK TEK ENGINEERING
Registered Office : Shawon Tower (14thFloor ,Suite-c-1) 2/c, Purana Paltan, Dhaka-1000
Corporate Office: House # 595, Level-6, Road # 9, Mirpur DOHS, Dhaka.
Workshop : T. N .T Gate, Joydebpur Chowrasta, Gazipur city corporation
Phone : Tell:+8802-9559606,Fax:88029569344
Mobile : +8801917264866, +8801817678745, +01730732212
Email : maktek_engg@yahoo.com , bishwajit.halder97@gmail.com
01. Mak Tek Profile
DESIGN & CONSULTANCY SYSTEMSUPPLY INSTALLATION SERVICES
COMPANY OVERVIEW
We, the MAK TEK Engineering a electro-mechanical engineering solution provider and
striving for excellence in professional services for design, manufacture, supply & installation
of mechanical system of any kind of industry specially in Textile, Oil & Gas, Power Plant,
Process Industry, Auto Rice Mill, Poultry & Fish Feed Mill, FMCG, Ceramic & Auto Brick
Field and RMG sector since 2005.
We are equipped with office, workshop, warehouse, skilled erection team, logistics, tools &
equipments etc. Our process includes:
• Team work- with different professionals of engineering disciplines
• Design- optimum design, work plan and budget
• Excellence-Construction with safety, quality, time and cost limit
• Post Construction- review, adjustment, modification and after sales service
We specialize in medium and large-scale projects that require a mix of supply, fabrication,
machining and welding. We also handle cutting, bending, welding, assembling, blasting,
painting, testing, and shipping. And we do it all under one roof at our workshop located at
Vhogra bypass, Joydebpur, Gazipur
The success of our projects is not only measurable through our clean indicators on safety,
quality and delivery timing, but also consists in reaching environmental sustainability and
carrying social responsibilities.
OUR VISION
To become the leading engineering service provider through loyal relationship and creative
solutions within our unique work environment while achieving personal and community growth.
OUR VALUES
INTEGRITY
Keeping honesty in communication and at work. Ensure customer compliance. We integrate
honesty, integrity and business ethics into all aspects of our business functioning. We believe in
treating our customers with respect and faith.
COMMITMENT
Committing to fulfill our promises and accompanying clients to the success. On time quality
delivery is our key motto.
EXCELLENCE
Constantly preparing and proactively seeking the best solutions to 4any challenge. Continuous
improvement empowers us to grow in order to exceed clients’ satisfaction. The success of our
projects is not only measurable through our clean indicators on safety, quality, on time delivery in
cost effective manner.
SUSTAINABILITY
Provide consistent solution in reaching safe working place, environmental sustainability and
carrying social responsibilities.
We Provide: Complete engineering, design & build, full support for any size
project from concept designs up to project completion and commissioning of
1 Mechanical
UG & AG Pipeline Construction/Installation
HVAC System supply & installation
Central Chiller installation, ducting/insulation works
VRF System installation
Generator, Boiler, EGB, Compressor installation works
Tank Fabrication, Erection and Testing 4
Machine Erection & Commissioning
Steel Structure Fabrication and Erection
Firefighting system supply and installation
Fire Detection system supply & Installation work
Electro-Mechanical Testing Work
3 Plumbing/Environmental
Plumbing, Sanitary, Sewage system installation
Water/Waste Water Treatment (STP, WTP)
Supply and Installation of ETP including operation and
maintenance support.
4
Drainage and Sewers system design and installation
Complete solution of Deep Tube Well
Process Water Supply System
OTHER SERVICES
Installation of machinery (factory setup)
Solution for textile and Utility Machines Installation, Piping works
Testing & Commissioning of Knit, Yarn, Woven Dyeing, Spinning,
Denim, Washing Plant etc.
Dyeing, Washing, Denim, Spinning project machinery & Piping works
(Full Solution)
Trolley , Dock Leveler Supply
CRS System Supply.
Booster Pump Supply.
MS and SS Tank Supply.
Substation & Electric panel supply 4
BBT System Supply & Installation
Trolley , Dock Leveler Supply.
Jacking, Ducting, Insulation & HVAC works for industries
We Provide:
1. Optimal Design
2. Engineering Solution
3. Civil Engineering Design
4. Fire Protection & Detection Design
5. Interior Design and Work
4
PROJECT MANAGEMENT:
We follow international mythology/standard for project management. We
provide Procurement Support, Project Planning & Scheduling,
Construction Management, Project Cost Estimating, Quality
Management, Business Case Development, Feasibility and Strategic
Studies for Industrial and commercial projects.
POLICY
HSE Policy is signed by our CEO and committed by Top Management
throughout the implementation of the process to ensure a safe
workplace for all our employees.
Mak Tek officially announces our HSE policy as the following
1. To comply with legal requirements and other requirements that
4 as environmental
relevant to occupational health and safety as well
aspects.
2. To ensure occupational health and safety for employees and prevent
occupational diseases that affect employees' health in the working
process.
3. To protect the environment and the safety of the local community.
4. Work for continual improvement to reduce the risk of work place.
Banking Documents
Youth Group
4
1 2 3
5 6 7
8 9 10
13
11 12
3
1 2
4 5 6
9
8
8
10 11 12
3
1 2
5 6 7
5 6
Reference:
Square Denims Ltd. Hameem Denims
Nassa Super Wash Ltd. Bay Foot Wear Ltd.
DBL Pharmacuticals Nassa Supreme Wash.
Reference:
Envoy Textile Ltd. Apex Foot Wear Ltd.
Nassa Hi-Tech Wash Ltd. Colombia Washing Plant Ltd.
Beacon Pharmacuticals Ltd. Glory Textile Ltd..
Reference:
Square Textile Ltd. Fariha Textile Ltd.
Nassa Tai-Pie Textile Ltd. Bay Tannaries Ltd.
Hamza Textile Ltd. Nice Cotton Ltd.
6 Calvert Construction
5 Piling Works
Brand: DP
Origin: Holland
Brand: LG
to waste
to waste
JOCKEY DIESEL
CONTROLLER CONTROLLER
ELECTRIC
CONTROLLER
JOCKEY PUMP
ARRANGEMENT
0 30
0 30
-1 10
-1 10
water source
ABOVE GROUND
VORTEX PLATE
AUTOMATION SYSTEM
1. We obey safety.
2. We are commited to quality.
3. On time Delivery.
4. Cost effective solutions
5. Supervision & follow up by qualified engineers.
6. We are equipped with certified welder/ fitter & tools tackles.
7. We have sufficient equipments.
Some images used in this profile are used as thematic for better depiction of the roles & areas of mechanical engineering. However, own
images of TEL (Projects, Products & Services) are all captioned as per our best concern.