You are on page 1of 2

N.D.

CHAURASIYA
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD
Client:RattanIndia Power LTD
Site:- Date of Testing:-
Chainage:- Material:-
Height of Bank:- Layer No.:-

Moisture Content Field Dry


Wt.of Wt.of Wt. of
Bulk W=(Rmm Density
Bulk Cylinder+ Wt. of Cylinder+ Wt. of Sand in
Density of Reading/Rmm of Soil Avg
Density of Sand Soil from Sand Sand in Hole MDD of Compaction
Location Soil Reading+100)×100 ƴd=(ƴb/ Compaction
Sand ƴs Before Hole Ww After Cone W3 Wb=W1- Material in %
ƴb=(ww/ 100+W) in %
(gm/cc) Pouring (gm) Pouring (gm) W2-W3
wb)×ys ×100
W1 (gm) W2 (gm) (gm)
(gm/cc)
RMM
W
Reading

Contractor Representative RIPL Quality RIPL Execution

You might also like