B-4 Boq
B-4 Boq
(Architectural)
B-4
Project :
Location :
TOTAL
UNIT
ITEM DESCRIPTION QUANTITY UNIT COST
COST
(SR)
MASONRY WALL / PARTITION:
1 Concrete Block, 20cm. thick (insulated block) with vertical and 450 SQ. M.
Horizontal reinforcement.
2 Concrete Block, 20cm. thick with vertical and Horizontal 500 SQ. M.
reinforcement.
FLOORINGS:
1 Terrazzo floor tiles, 40cm. x 40cm. Flame finish with 10cm.
Terrazzo Tile Skirting. 240 SQ. M.
2 Glazed Ceramic tiles floor 25cm x 25cm 50 SQ. M.
Page of 3 1
ROOFINGS:
Roof waterproofing system, 2 layer 4mm. thk. waterproofing
membrane, 50mm. thk. Thermal insulation, foam screed 300 SQ. M.
1 concrete, gravel topping and 2mm. thk. Aluminum counters
flashing fastened by non-corroding screws sealed by Sikaflex Pro
2HP sealant. With concrete tile roof favers
FINISHING
Plastering, 16mm. thk. with metal lathe accessories and curing 2200 SQ. M.
1 (internal and external walls/partitions and including beams and
Fascia)
2 Exterior walls painting, fine texture (including back of parapet 550 SQ. M.
wall))
3 Interior walls painting, semi-gloss (including fascia, exposed 1800 SQ. M.
bottom surface of slab, exposed concreter and gypsum ceiling))
4 Glazed ceramic wall tiles , 25cm x 25cm. 160 SQ. M.