Concrete Compression Test Report

Test Date 09.01.2023


Report No
Sampling Date 11.12.2022
Concrete Plant
Owner BUIKWE WATER SUPPLY SANITATION SYSTEMS
Contractor
Layout/Block /Plot BUIKWE
Concrete Class C30
Pace Rate (MPa/s) 0.6
The Place of Use FILTER TANK BASE SLAB
Audit Firm CHINA RAILWAY NO.10 ENGINEERING

Sample Breaking
Dimensions Weight Density Age Test No Load Strength
(mm) (gr) (gr/cm3) (Days) (kN) (MPa)
1 150:150:150 8200 2.43 7 809 983.6 43.705
2 150:150:150 8300 2.459 7 810 921.99 40.977
3 150:150:150 8200 2.43 7 811 755.79 33.591
4
5
6
Average 887.13 39.42

Tested By Approved By

-These results are only for the samples tested.


-This report cannot be reproduced without the permission of our permission.